Package CHange History (pkgh)
BuilderTrend Vendor Pricing Update History
Welcome [swpm_show_member_info column="first_name"] | My Account - T&H Home - Logout
History of Package Changes in BuilderTrend.
| Status | Requested | By | Builder | BT Job | Model | Elevation | Affects | Short Description | Details | Rev Req | Reviewed | By | Completed | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Complete | 10/31/23 | Ross Johnson | Minto | NDICP 1294 Isles of Collier | ALL | ALL | Hardware *** | Adding H3's & HTS20's | 10/31/23 | 10/31/23 | ||||
| Complete | 10/31/23 | Ross Johnson | Minto | NDICP 1298 Isles of Collier | Cottage 2 | B | Hardware *** | Remove All A34/A35 | Ross Johnson: Please remove all a34 framing anchors from future hardware p.o.'s ----------------------------------------------------------------- Notes: * None of the CGs have A34s (must have already been removed). * Some of the CGs have A35s. Ross says to remove them (Adam). ----------------------------------------------------------------- Package Change Affected (4) Cost-Groups (Adam). HDW.NDICP-2A (12"PARTY WALL).WHITECAP HDW.NDICP-4A (12"PARTY WALL).WHITECAP A35: Old: 54, New: 0 HDW.NDICP-2B (12"PARTY WALL).WHITECAP HDW.NDICP-4B(12"PARTY WALL).WHITECAP A35: Old: 38, New: 0 | 10/31/23 | 10/31/23 | |||
| Complete | 10/31/23 | Jarrod Rathbun | Minto | NDLTS 2952 Latitudes | 40-136 | A | Hardware *** | Adding (1) HUC212-2 to each model/elevation | Jarrod Rathbun: Package change for hardware/ fill in order - MINTO homes does not have a masonry to wood bucket where it needs to be per plan. We need one at the front entry here. Please order (15) LGUM210-2 buckets. And please make sure (1) is added to this model package for each lot moving forward. Plans do not call for a bucket that NEEDS to be there. ----------------------------------------------------------------------- * Notes - Kevin approved this package change onn 11/3 (AS) * Notes - The bucket that's needed is not on the plans and it's needed because inspections are coming up and it enables Jarrod to attach on the wall without having to remove any other already built/attached items/materials. The item that's actually needed is the HUC210-2, but this will require additional work to remove materials already in place (Adam). ----------------------------------------------------------------------- HDW.NDLTS40-136-A.WHITECAP HDW.NDLTS40-136-B.WHITECAP HUC212-2: Old: 0, New: 1 | 10/31/23 | 11/03/23 | Kevin Bub | 11/06/23 | |
| Complete | 10/26/23 | Cyndi Mullee | Minto | NDLWS 370 Watersound | ALL | ALL | Hardware *** | Temporarily Removing All ABU66, SP4, HGA10 | Cyndi Mullee: Please remove the following hardware from takeoffs until further notice. All SP4, ABU66, HGA10. ------------------------------------------------------------------------ 10/26/23 - Permission granted to run it (Adam) * Permission/Under Review - Waiting on direction from Pete for how he'd like to handle this one (Adam) ------------------------------------------------------------------------ Affects (7 of 9) Cost-Groups. HDW.NDLWS50-179-B.WHITECAP ABU66: Old: 4, New: 0 HGA10KT: Old: 10, New: 0 SP4: Old: 46, New: 0 HDW.NDLWS50-179-II-A.WHITECAP ABU66: Old: 4, New: 0 HGA10: Old: 1, New: 0 SP4: Old: 0, New: NA HDW.NDLWS50-179-II-B.WHITECAP ABU66: Old: 5, New: 0 HGA10: Old: 10, New: 0 SP4: Old: 4, New: 0 HDW.NDLWS50-181-A.WHITECAP ABU66: Old: 7, New: 0 HGA10: Old: 1, New: 0 SP4: Old: 40, New:0 HDW.NDLWS50-181-B.WHITECAP ABU66: Old: 6, New: 0 HGA10: Old: 4, New: 0 SP4: Old: 0, New: NA HDW.NDLWS50-184-A.WHITECAP ABU66: Old: 2, New: 0 HGA10: Old: 1, New: 0 SP4: Old: 0, New: NA HDW.NDLWS50-184-B.WHITECAP ABU66: Old: 2, New: 0 HGA10: Old: 7, New: 0 SP4: Old: 0, New: NA | 10/26/23 | 10/26/23 | |||
| Complete | 10/20/23 | Dane Jones | Toll Brothers | TBLPT 069 Laurel Pointe | Marsanne | MO | Frame *** | Swapping LVL's in 1st Frame Drop | Dane Jones: Wrong parallams on takeoff. Last fill in for parallams I did the size got changed. Framers already used the smaller ones in place of places that require (4)2x6 posts. First lumber drop: PO has (2) 5-1/4”x 5-1/4”x10’ parallams Print calls for (2) 5-1/2”x7” parallams NEED: 1) 5-1/2”x7”x12’ 1) 5-1/2”x7”x10’ ---------------------------------------------------------------------- FRMMAT-DROP1.TBLPT069.BFS 5.25 x 5.25 x 10' Parallams: Old: 2, New: 0 5.25 x 7 x 10' Parallams: Old: 0, New: 1 5.25 x 7 x 12' Parallams: Old: 0, New: 1 | 10/20/23 | 10/20/23 | |||
| Complete | 10/19/23 | Ross Johnson | Minto | NDICP 1308 Isles of Collier | Cottage 2 | C | Frame *** | Removing 2x8's, Adding 2x4's, & 2x6's | Ross Johnson: Carpenter has requested this change due to them cutting down 2x8’s for fascia backing instead of having the correct 2x6 size. Also not enough pt 2x4s on the current package. Moving forward we need to change the lumber package. We can erase the following 2x8’s: (7) 2x8x8’ PT (4) 2x8x10’ PT (15) 2x8x16’ spruce #2 (2) 2x8x10’ YP (3) 2x8x12’ YP Please add to the framing PO: 2x6x14 - for fascia backing, they have been ripping down 2x8’s. 2x4x12 pt - for shear wall/ doors. (45) 2x6x14 ? (25) 2x4x12 PT ----------------------------------------------------------------------- * Updated To-Do / Comment **** after looking back through it, your numbers are correct. Not sure what I was looking at to get those mixed up but yes the quantities that you sent of those 2x8’s can all be removed. The only 2x8’s needed are (13) 2x8x12’ Pt and (2) 2x8x16 pt. All other 2x8’s can be removed -Ross 45) 2x6x14 PT* (25) 2x4x12 PT ----------------------------------------------------------------------- PO Quantities (NDICP 1308): (7) 2x8x8’ PT ? ------------ 4 in PO (AS) (4) 2x8x10’ PT ------------ 4 in PO (AS) (15) 2x8x16’ spruce #2 ------------ 5 in PO (AS) (2) 2x8x10’ YP ------------ 0 in PO (AS) (3) 2x8x12’ YP ------------ 12 in PO (AS) ----------------------------------------------------------------------- FRMMAT.NDICP-2C (12"PARTY WALL).84LUMBER 2x8x8’ PT: Old: 4, New: 0 2x8x10’ PT: Old: 4, New: 0 2x8x12’ PT: Old: 19, New: 13 2x8x16’ PT: Old: 4, New: 2 2x8x16’ spruce #2: Old: 5, New: 0 2x8x10’ SYP: N/A - Not in PO 2x8x12’ SYP: Old: 12, New: 0 2x4x12' PT: Old: 14, New: 39 (updated 10/24, AS) 2x6x14' PT: Old: 0, New: 45 (added 10/24, AS) | 10/19/23 | 10/24/23 | |||
| Complete | 10/18/23 | Brian Dinker | Minto | NDLTM 3268 Latitudes | Villa 12, Villa 12 II | A, B | Shaftwall *** | Adding Fire Caulk | Brian Dinker: No fire caulking on the denseglass package. For this model. Need (10) 29 oz tubes. ------------------------------------------------------------------- SHAFTWALL.NDLTM12-II-B/NDLTM12-II-B.INTERIOR/EXTERIOR SHAFTWALL.NDLTM12-A/NDLTM12-II-A.INTERIOR/EXTERIOR Fire Caulk (29oz Tube): Old: 0, New: 10 | 10/18/23 | 10/18/23 | |||
| Complete | 10/18/23 | Ross Johnson | Minto | NDICP 1296 Isles of Collier | All | All | Hardware *** | Removing all A34 | Ross Johnson: Please delete the 105 Simpson A34 framing angle bracket from all future hardware packages. None are needed. ------------------------------------------------------------------- This package change affects 11 cost-groups (Adam) ------------------------------------------------------------------- HDW.NDICP-1A (12"PARTY WALL).WHITECAP HDW.NDICP-1C (12"PARTY WALL).WHITECAP A34: Old: 105, New: 0 HDW.NDICP-1B (12"PARTY WALL).WHITECAP A34: Old: 66, New: 0 HDW.NDICP-2A (12"PARTY WALL).WHITECAP A34: Old: 30, New: 0 HDW.NDICP-2B (12"PARTY WALL).WHITECAP A34: Old: 43, New: 0 HDW.NDICP-2C (12"PARTY WALL).WHITECAP A34: Old: 141, New: 0 HDW.NDICP-3A (12"PARTY WALL).WHITECAP A34: Old: 90, New: 0 HDW.NDICP-3B (12"PARTY WALL).WHITECAP A34: Old: 69, New: 0 HDW.NDICP-3C (12"PARTY WALL).WHITECAP A34: Old: 137, New: 0 HDW.NDICP-4A (12"PARTY WALL).WHITECAP A34: Old: 45, New: 0 HDW.NDICP-4B(12"PARTY WALL).WHITECAP A34: Old: 40, New: 0 | 10/18/23 | 10/18/23 | |||
| Complete | 10/17/23 | Ross Johnson | Minto | NDICP 1310 Isles of Collier | All | All | Frame *** | Replacing 4x4 Posts with 2x4 and 1/2" CDX | Ross Johnson: Per Minto USA, we are to change the 4x4 columns that we use for the porch column posts and install two 2x4's with a piece of 1/2" plywood sandwiched between the two. See photo for detail on materials. ------------------------------------------------------------------------- Removing all 4x4 Posts and replacing each one with (2) 2x4x12 PT, and adding (1) sheet of 1/2" CDX (Should be enough for all columns per Sharon/Pete). Package Change affected (14) Cost-Groups (AS). ------------------------------------------------------------------------- FRMMAT.NDICP-1A (12"PARTY WALL).84LUMBER FRMMAT.NDICP-1A (12"PARTY WALL).MARJAM FRMMAT.NDICP-1B (12"PARTY WALL).84LUMBER 4x4x12 PT Posts: Old: 6, New: 0 2x4x12 PT: Old: 8, New: 20 1/2" CDX: Old: 0, New: 1 FRMMAT.NDICP-1C(12"PARTY WALL).84LUMBER 4x4x12 PT Posts: Old: 6, New: 0 2x4x12 PT: Old: 4, New: 16 1/2" CDX: Old: 0, New: 1 FRMMAT.NDICP-2A (12"PARTY WALL).84LUMBER FRMMAT.NDICP-2A (12"PARTY WALL).MARJAM FRMMAT.NDICP-2B (12"PARTY WALL).84LUMBER 4x4x12 PT Posts: Old: 5, New: 0 2x4x12 PT: Old: 6, New: 16 1/2" CDX: Old: 0, New: 1 FRMMAT.NDICP-2C (12"PARTY WALL).84LUMBER 4x4x12 PT Posts: Old: 5, New: 0 2x4x12 PT: Old: 4, New: 14 1/2" CDX: Old: 0, New: 1 FRMMAT.NDICP-3A/NDICP-3C (12"PARTY WALL).84LUMBER 4x4x12 PT Posts: Old: 3, New: 0 2x4x12 PT: Old: 2, New: 8 1/2" CDX: Old: 0, New: 1 FRMMAT.NDICP-3B (12"PARTY WALL).84LUMBER FRMMAT.NDICP-3B (12"PARTY WALL).MARJAM 4x4x12 PT Posts: Old: 3, New: 0 2x4x12 PT: Old: 6, New: 12 1/2" CDX: Old: 0, New: 1 FRMMAT.NDICP-4A (12"PARTY WALL).84LUMBER FRMMAT.NDICP-4A (12"PARTY WALL).MARJAM FRMMAT.NDICP-4B(12"PARTY WALL).84LUMBER 4x4x12 PT Posts: Old: 8, New: 0 2x4x12 PT: Old: 8, New: 24 1/2" CDX: Old: 0, New: 1 | 10/17/23 | 10/17/23 | |||
| Complete | 10/03/23 | Cyndi Mullee | Minto | NDLWS 367 Watersound | 50-184 | A, B | Hardware *** | Adding DTT2z and HTT5 | Cyndi Mullee: please add (2) DTT2z to future packages for this model. additionally this is the model that requires (8) HTT5 for the portal wall detail. ---------------------------------------------------------- HDW.NDLWS50-184-A.WHITECAP HDW.NDLWS50-184-B.WHITECAP DTT2Z: Old: 0, New: 2 HTT5: Old: 13, New: 21 | 10/03/23 | 10/03/23 | |||
| Complete | 09/29/23 | Bobby Neller | Minto | NDLTM 3270 Latitudes | Villa 11 | A, B | Shaftwall Materials *** | Adjusting Burn Clips | Bobby Neller: Too many on the takeoff. Sending out too many burn clips on the villas like to remove 90. Old burn clips-190, New burn clips-100. -------------------------------------------------------------------- SHAFTWALL.NDLTM11-A.INTERIOREXTERIOR SHAFTWALL.NDLTM11-B.INTERIOREXTERIOR Burn Clips: Old: 190, New: 100 | 09/29/23 | 09/29/23 | |||
| Complete | 09/29/23 | Pete/Kevin | Minto | - | All Single-Families | All | Frame *** | Swapping 2x6x16 R/S Spruce to 2x8 | Pete: Adam - Please update the single family cost groups to swap out the 2x6 for 2x8 as well as making the changes at the job level. ----------------------------------------------------------------------- Note: This Affects 78 Cost-Groups! (Adam) Waiting on pricing from Marjam for the 2x8x16 R/S Spruce ----------------------------------------------------------------------- FRMMAT.NDLTS40-136-A.84LUMBER FRMMAT.NDLTS40-136-A.BFS FRMMAT.NDLTS40-136-B.84LUMBER FRMMAT.NDLTS40-136-B.BFS FRMMAT.NDLTS40-136-A.MARJAM FRMMAT.NDLTS40-136-B.MARJAM 2x6x16 R/S Spruce: Old: 24, New: 0 2x8x16 R/S Spruce: Old: 0, New: 24 -------------------------------------------------------- FRMMAT.NDLTS40-175-A.84LUMBER FRMMAT.NDLTS40-175-A.BFS FRMMAT.NDLTS40-175-B.84LUMBER FRMMAT.NDLTS40-175-B.BFS FRMMAT.NDLTS40-175-II-A.84LUMBER FRMMAT.NDLTS40-175-II-A.BFS FRMMAT.NDLTS40-175-II-B.84LUMBER FRMMAT.NDLTS40-175-II-B.BFS FRMMAT.NDLTS40-175-A.MARJAM FRMMAT.NDLTS40-175-B.MARJAM FRMMAT.NDLTS40-175-II-A.MARJAM FRMMAT.NDLTS40-175-II-B.MARJAM 2x6x16 R/S Spruce: Old: 25, New: 0 2x8x16 R/S Spruce: Old: 0, New: 25 -------------------------------------------------------- FRMMAT.NDLTS40-176-A.84LUMBER FRMMAT.NDLTS40-176-A.BFS FRMMAT.NDLTS40-176-B.84LUMBER FRMMAT.NDLTS40-176-B.BFS FRMMAT.NDLTS40-176-II-A.84LUMBER FRMMAT.NDLTS40-176-II-A.BFS FRMMAT.NDLTS40-176-II-B.84LUMBER FRMMAT.NDLTS40-176-II-B.BFS FRMMAT.NDLTS40-176-A.MARJAM FRMMAT.NDLTS40-176-B.MARJAM FRMMAT.NDLTS40-176-II-A.MARJAM FRMMAT.NDLTS40-176-II-B.MARJAM 2x6x16 R/S Spruce: Old: 22, New: 0 2x8x16 R/S Spruce: Old: 0, New: 22 -------------------------------------------------------- FRMMAT.NDLTS40-177-A.84LUMBER FRMMAT.NDLTS40-177-A.BFS FRMMAT.NDLTS40-177-B.84LUMBER FRMMAT.NDLTS40-177-B.BFS FRMMAT.NDLTS40-177-A.MARJAM FRMMAT.NDLTS40-177-B.MARJAM FRMMAT.NDLTS50-180-A.MARJAM FRMMAT.NDLTS50-180-B.MARJAM FRMMAT.NDLTS50-181-A.MARJAM FRMMAT.NDLTS50-181-B.MARJAM 2x6x16 R/S Spruce: Old: 28, New: 0 2x8x16 R/S Spruce: Old: 0, New: 28 -------------------------------------------------------- FRMMAT.NDLTS40-178-A.84LUMBER FRMMAT.NDLTS40-178-A.BFS FRMMAT.NDLTS40-178-B.84LUMBER FRMMAT.NDLTS40-178-B.BFS FRMMAT.NDLTS40-178-II-A.84LUMBER FRMMAT.NDLTS40-178-II-A.BFS FRMMAT.NDLTS40-178-II-B.84LUMBER FRMMAT.NDLTS40-178-II-B.BFS FRMMAT.NDLTS50-179-A.84LUMBER FRMMAT.NDLTS50-179-A.BFS FRMMAT.NDLTS40-178-A.MARJAM FRMMAT.NDLTS40-178-B.MARJAM FRMMAT.NDLTS40-178-II-A.MARJAM FRMMAT.NDLTS40-178-II-B.MARJAM FRMMAT.NDLTS50-179-A.MARJAM FRMMAT.NDLTS50-179-B.MARJAM FRMMAT.NDLTS50-179-II-B.MARJAM 2x6x16 R/S Spruce: Old: 29, New: 0 2x8x16 R/S Spruce: Old: 0, New: 29 -------------------------------------------------------- FRMMAT.NDLTS50-179-II-A.MARJAM 2x6x16 R/S Spruce: Old: 35, New: 0 2x8x16 R/S Spruce: Old: 0, New: 35 -------------------------------------------------------- FRMMAT.NDLTS50-184-A.MARJAM FRMMAT.NDLTS50-184-B.MARJAM 2x6x16 R/S Spruce: Old: 27, New: 0 2x8x16 R/S Spruce: Old: 0, New: 27 ----------------------------------------------------------------------- 10/3/23 --------------------- >All Marjam Cost-Groups completed 9/29/23 --------------------- >Incomplete (Need Pricing from Vendor) *** >All Marjam *** | 09/29/23 | 10/03/23 | 10/03/23 | ||
| Complete | 09/29/23 | Bobby Neller | Minto | NDLTM 3278 Latitudes | Villa 11 | A, B | Hardware *** | Remove All MSTA36 | Bobby Neller: MSTA36. Removed at one time prior. Inspectors are allowing wet set straps to accommodate. Old/20 MSTA36, New/ 0 ------------------------------------------------------------------ HDW.NDLTM11-A.WHITECAP MSTA36: Old: 20, New: 0 HDW.NDLTM11-B.WHITECAP MSTA36: Old: 41, New: 0 | 09/29/23 | 09/29/23 | |||
| Complete | 09/29/23 | Bobby Neller | Minto | NDLTC 3390 Latitudes | ALL | ALL | Hardware *** | Adjusting 7/16 Panel Sheathing Clips | Bobby Neller: Package change across the board. This takeoff has a total of three boxes with 250 in each box. I’m going to remove one box of 250 leaving two boxes of 500 please. 7/16 sheeting clips: Old-3-boxes-750, New-2 boxes-500 ------------------------------------------------------------------- HDW.NDLTC2A.WHITECAP HDW.NDLTC1C.WHITECAP HDW.NDLTC1B.WHITECAP HDW.NDLTC1A.WHITECAP HDW.NDLTC2C.WHITECAP HDW.NDLTC3A.WHITECAP HDW.NDLTC3B.WHITECAP HDW.NDLTC3C.WHITECAP HDW.NDLTC4A.WHITECAP HDW.NDLTC4B.WHITECAP HDW.NDLTC4C.WHITECAP PSCL716: Old: 3 (Boxes), New: 2 (Boxes) HDW.NDLTC2B.WHITECAP PSCL716: Old: 4 (Boxes), New: 3 (Boxes) | 09/29/23 | 09/29/23 | |||
| Complete | 09/27/23 | Bobby Neller | Minto | NDLTC 3392 Latitudes | ALL | ALL | Shaftwall Materials *** | Adjusting Quantities | Bobby Neller: Good morning Adam, doing a package change on our C-track and H- track. I’d like to do this package change across-the-board to all cottages and elevations. On this H- track we’re basically removing all the 12 footers and adding six to the original 10 footers for a total of 16-10’. C-track: Old-(31)-10’, New-(20)-10’ H-track: Old-(10)-10’, Old-(17)-12’, New-(16)-10’ ---------------------------------------------------------------------------- SHAFTWALL.NDLTC3A/NDLTC3B/NDLTC3C.INTERIOR/EXTERIOR BUILDING SUPPLY "C" Shaft Wall Track 10': Old: 31, New: 20 "H" Shaft Wall Stud 12': Old: 17, New: 0 "H" Shaft Wall Stud 10': Old: 10, New: 16 SHAFTWALL.NDLTC1A/NDLTC1B/NDLTC1C.INTERIOR/EXTERIOR BUILDING SUPPLY "C" Shaft Wall Track 10': Old: 30, New: 20 "H" Shaft Wall Stud 12': Old: 17, New: 0 "H" Shaft Wall Stud 10': Old: 15, New: 22 SHAFTWALL.NDLTC2A/NDLTC2B/NDLTC2C.INTERIOR/EXTERIOR BUILDING SUPPLY "C" Shaft Wall Track 10': Old: 26, New: 20 "H" Shaft Wall Stud 12': Old: 17, New: 0 "H" Shaft Wall Stud 10': Old: 6, New: 12 SHAFTWALL.NDLTC4A/NDLTC4B/NDLTC4C.INTERIOR/EXTERIOR BUILDING SUPPLY "C" Shaft Wall Track 10': Old: 25, New: 20 "H" Shaft Wall Stud 12': Old: 17, New: 0 "H" Shaft Wall Stud 10': Old: 11, New: 17 | 09/27/23 | 09/27/23 | |||
| sent to Pete | 09/22/23 | Dane Jones | Toll Brothers | TBLPT 069 Laurel Pointe | Marsanne | MO | Multi-Slide Door Option *** | Adding Boxcar Block | Dane Jones: Fill in/package change. Short on boxcar for the SGD wall. Wall dimensions are 22’x12’. Masonry materials Short on boxcar. PO has 48 we need 138 -Dane Jones 90) 8”x12”x 16 Boxcar block ---------------------------------------------------------------- Sent to Pete for review before making any changes (Adam). MASMAT.TBLPT069-MULTISLIDE.TITANORLANDO(ZONE1 | 09/22/23 | ||||
| Complete | 09/20/23 | Bryan Healy | Mattamy Homes | MOSOL 005-03 Solara | 6-Unit | DRCCRD/CO | Slab Prep *** | Adding Red Tape | Bryan Healy: Package Change. Need to add 8 rolls of Red Tape to the next buildings. X8 rolls of Red Tape. ----------------------------------------------------- SLABPREP.MOSOL-DRCCRD(CO).LOTTSORLANDO Visqueen Tape - Red Vinyl 2" x 60 yds: Old: 0, New: 8 | 09/20/23 | 09/20/23 | |||
| Complete | 09/19/23 | Kyle Jolly | Dart Interests | DIEVM 043 Evermore Resort | Portal Entry | - | Masonry *** | Adding Pre-Blend | Kyle Jolly: Package change and fill in. Have been running short on mortar for these. Will need fill in for the following lots 43, 45, 47, 29, 30, 34. (4 bags each lot). Total 24 bags --------------------------------------------- MASMAT.DIEVM-PORTALENTRY.FLBESTBLOCKORLANDO Pre-Blend: Old: 9, New: 13 | 09/19/23 | 09/19/23 | |||
| Complete | 09/14/23 | Adrian Hart | Minto | NDLWS 355 Watersound | 30-197 | B | Frame *** | Removing LVLs | Adrian Hart: Remove lvls from future purchase orders- see attachments. Not sure where these were intended to go? ------------------------------------------------------------------ FRMMAT.NDLWS30-197-B.MIDSOUTH 1.75 x 24 LVL 14': Old: 2, New: 0 1.75 x 7.25 LVL 10': Old: 2, New: 0 1.75 x 7.25 LVL 14': Old: 2, New: 0 1.75 x 7.25 LVL 16': Old: 2, New: 0 | 09/14/23 | 09/14/23 | |||
| Complete | 09/13/23 | Kyle Jolly | Dart Interests | DIEVM 049 Evermore Resort | Portal Entry | - | Frame *** | Adding 2x12x8 PT for Door Bucks | Kyle Jolly: Package change. We need to install doorbucks on every entry portal. Please change all po’s going forward. (2) 2x12x8 PT -------------------------------------------------------------------------- 9/13/23 - Kyle says he needs 30 of them for now and to split between lots: 52 - 62, 43, 45, 30, 34 (Adam). FRMMAT.DIEVM-PORTALENTRY.HAVEN 2x12x8 PT: Old: 0, New: 2 | 09/13/23 | 09/13/23 | |||
| Complete | 09/13/23 | Jason Bridges | Dream Finders | DOTAL 096-02 Talichet | Avalon II | B | Precast *** | Adding (1) 8'-8" Lintel | Jason Bridges: (1) 8-8 u shaped lintel -------------------------------------------------------------- PCMS.DF-AVALON-II-B.LOTTSORLANDO 8'-8" Lintel: Old: 0, New: 1 | 09/13/23 | 09/13/23 | |||
| Complete | 09/12/23 | Kyle Jolly | Dart Interests | DIEVM 043 Evermore Resort | Portal Entry | - | Hardware *** | Remove Grace Ice & Water Shield, Sikadur 52 | Kyle Jolly: Can we adjust future entry portal po's The next 20 do not need ice and water shield or sikadur52. ----------------------------------------------------------------- HDW.DIEVM-PORTALENTRY.WHITECAP Grace Ice & Water Shield: Old: 1, New: 0 Sikadur 52 3gal: Old: 1, New: 0 | 09/12/23 | 09/12/23 | |||
| sent to bids | 09/07/23 | Anthony | Sobel Co | OFPPR 01P Parkway Preserve | 3-Unit | BDA | Precast/Masonry Steel *** | #6, #7 Rebar 20', #3 Stirrups | Anthony Lopez: Package change for rebar. D models have 3 tie beams Fill in - need 2 #7 & #6 rebar at 20’ and 38 5x 11 stirrups. --------------------------------------------------------------- 9/7/23 - Sent to bids (Adam) | 09/07/23 | ||||
| Complete | 08/22/23 | Sharon/Pete | Minto | - | - | - | Housewrap *** | Adding Button Caps | Sharon: Pete needs you to add 1 bucket of button caps to all of the 1 story cost groups for Watersound. HOUSEWRAP.NDLWS50-179-B//NDLWS50-179-II-A/NDLWS50-179-II-B/NDLWS50-181-A/NDLWS50-181-B/NDLWS50-184-A/NDLWS50-184-B.MIDSOUTH We will also need to revise the housewrap po’s adding the caps. Below is what is scheduled to be delivered and when. All other lots have not been scheduled but will still need to be revised. 4126, 4127, 4108, 4107- DO NOT REVISE PO’S, FILL INS WERE DONE TO COVER THEM. ----------------------------------------------------------------------------- HOUSEWRAP.NDLWS50-179-B//NDLWS50-179-II-A/NDLWS50-179-II-B/NDLWS50-181-A/NDLWS50-181-B/NDLWS50-184-A/NDLWS50-184-B.MIDSOUTH Button Caps: Old: 0, New: 1 | 08/22/23 | 08/22/23 | |||
| Complete | 08/22/23 | Sharon/Pete | Minto | - | All | All | QuickTie Materials *** | Adding Epoxy | Sharon: Please order (2) Quick Tie Epoxy w/1 Nozzle 28oz for the following lots: 4110, 4111, 4112, 4113, 4114, 4115, 4116, 4121, 4122, 4123, 4124, 4125 and 4515. Cindy said there is not enough on the take off. Pete said to do a package change for this. The take off only had 1 originally, we did a package change adding 3 more and Pete said to bump it again by 2 (so total of 6) ------------------------------------------------------------------- Revising Package Change now to (5) total instead of 6. QUICKTIE.NDLWS50-179-B.MIDSOUTH >Quick Tie Epoxy w/1 Nozzle 28oz: Old: 6, New: 5 QUICKTIE.NDLWS50-179-II-A.MIDSOUTH QUICKTIE.NDLWS50-179-II-B.MIDSOUTH QUICKTIE.NDLWS50-181-A.MIDSOUTH QUICKTIE.NDLWS50-181-B.MIDSOUTH QUICKTIE.NDLWS50-181-B.WHITECAP QUICKTIE.NDLWS50-184-A.MIDSOUTH QUICKTIE.NDLWS50-184-A.WHITECAP QUICKTIE.NDLWS50-184-B.MIDSOUTH QUICKTIE.NDLWS50-184-B.WHITECAP >Quick Tie Epoxy w/1 Nozzle 28oz: Old: 6, New: 5 ------------------------------------------------------------------- QUICKTIE.NDLWS50-179-B.MIDSOUTH >Quick Tie Epoxy w/1 Nozzle 28oz: Old: 1, New: 6 QUICKTIE.NDLWS50-179-II-A.MIDSOUTH QUICKTIE.NDLWS50-179-II-B.MIDSOUTH QUICKTIE.NDLWS50-181-A.MIDSOUTH QUICKTIE.NDLWS50-181-B.MIDSOUTH QUICKTIE.NDLWS50-181-B.WHITECAP QUICKTIE.NDLWS50-184-A.MIDSOUTH QUICKTIE.NDLWS50-184-A.WHITECAP QUICKTIE.NDLWS50-184-B.MIDSOUTH QUICKTIE.NDLWS50-184-B.WHITECAP >Quick Tie Epoxy w/1 Nozzle 28oz: Old: 4, New: 6 | 08/22/23 | 08/22/23 | 08/22/23 | ||
| Complete | 08/21/23 | Jason Bridges | Dream Finders | DOTAL 104-02 Talichet | Biscayne | C | Precast *** | Adding Precast for Porch | Jason Bridges: (1) 8-4 u shaped lintel (2) 7-6 u shaped lintel (2) 6-6 u shaped lintel ---------------------------------------------------------------- 8/28/23 - All the precast the field is asking for are on the front porch. Those precast were not in the takeoff because the master plans for the model show wood posts and beams on the front porch -Chris Plantz ---------------------------------------------------------------- PCMS.DF-BISCAYNE-B/BISCAYNE-C.LOTTSORLANDO 6'-6" Lintel: Old: 0, New: 2 7'-6" Lintel: Old: 1, New: 3 8'-8" Lintel: Old: 0, New: 1 | 08/21/23 | 08/28/23 | Chris Plantz | 08/28/23 | |
| Complete | 08/21/23 | Dane Jones | Mattamy Homes | MOMER 049 Meridian | 5-Unit | MCAACC/PR | Precast *** | Adding & Removing Materials | Dane Jones: Precast: Add 7) 4’6” for a total of 12 Remove 4) 7’-6” for a total of 1 -------------------------------------------------------------------- PCMS.MOMER-MCACC(PR)/CCACM(PR).LOTTSORLANDO 4'-6" Lintels: Old: 5, New: 12 7'-6" Lintels: Old: 5, New: 1 | 08/21/23 | 08/21/23 | |||
| Complete | 08/21/23 | Sharon | Mattamy Homes | MOWAT 001-06 Waterbrooke | 6-Unit | CCAACC/CR | Precast *** | Changing Quantities | Sharon: Please revise po’s and update cost groups on Waterbrooke 6, 4 and 3 to match the attached. (6 is scheduled to drop this week so need to be sure Lotts is notified via email so correct po gets delivered, the others have not been scheduled yet). Only update cost groups on Waterbrooke 5, 7 and 1 (these packages have already been delivered). --------------------------------------------------------------------- PCMS.MOMER/MOWAT - CCAACC(CR).LOTTSORLANDO 1x9 Dowels: Old: 152, New: 148 HETA20: Old: 332, New: 330 | 08/21/23 | 08/21/23 | |||
| Complete | 08/21/23 | Sharon | Mattamy Homes | MOWAT 007-06 Waterbrooke | 4-Unit | SCAC/CR | Precast *** | Changing Quantities and Precast | Sharon: Please revise po’s and update cost groups on Waterbrooke 6, 4 and 3 to match the attached. (6 is scheduled to drop this week so need to be sure Lotts is notified via email so correct po gets delivered, the others have not been scheduled yet). Only update cost groups on Waterbrooke 5, 7 and 1 (these packages have already been delivered). --------------------------------------------------------------------- PCMS.MOMER/MOWAT - SCAC(CR)/CACS(CR).LOTTSORLANDO 1x9 Dowels: Old: 121, New: 111 #5 Rebar, 20': Old: 38, New: 41 HETA20: Old: 254, New: 252 3'-6" Lintel: Old: 1, New: 0 4'-6" Lintel: Old: 3, New: 1 5'-10" Lintel: Old: 1, New: 2 7'-6" Lintel: Old: 5, New: 6 2'-2.5' Sill: Old: 1, New: 0 3'-1" Sill: Old: 3, New: 1 4'-5" Sill: Old: 1, New: 2 6'-2" Sill: Old: 4, New: 5 | 08/21/23 | 08/21/23 | |||
| Complete | 08/21/23 | Sharon | Mattamy Homes | MOWAT 005-06 Waterbrooke | 6-Unit | SCAACS/CR | Precast *** | Changing Quantities and Precast | Sharon: Please revise po’s and update cost groups on Waterbrooke 6, 4 and 3 to match the attached. (6 is scheduled to drop this week so need to be sure Lotts is notified via email so correct po gets delivered, the others have not been scheduled yet). Only update cost groups on Waterbrooke 5, 7 and 1 (these packages have already been delivered). --------------------------------------------------------------------- PCMS.MO-SCAACS(CR).LOTTSORLANDO 1x9 Dowels: Old: 184, New: 168 #5 Rebar, 20': Old: 56, New: 62 3'-6" Lintel: Old: 2, New: 0 4'-6" Lintel: Old: 6, New: 2 5'-10" Lintel: Old: 0, New: 2 7'-6" Lintel: Old: 8, New: 10 2'-2.5' Sill: Old: 2, New: 0 3'-1" Sill: Old: 6, New: 2 4'-5" Sill: Old: 0, New: 2 6'-2" Sill: Old: 6, New: 8 | 08/21/23 | 08/21/23 | |||
| Complete | 08/21/23 | Sharon | Mattamy Homes | MOWAT 003-06 Waterbrooke | 4-Unit | SCAS/CO | Precast *** | Changing Quantities and Precast | Sharon: Please revise po’s and update cost groups on Waterbrooke 6, 4 and 3 to match the attached. (6 is scheduled to drop this week so need to be sure Lotts is notified via email so correct po gets delivered, the others have not been scheduled yet). Only update cost groups on Waterbrooke 5, 7 and 1 (these packages have already been delivered). --------------------------------------------------------------------- PCMS.MOMER/MOWAT - SCAS(CO)/SACS(CO).LOTTSORLANDO 1x9 Dowels: Old: 137, New: 133 #5 Rebar, 20': Old: 39, New: 46 HETA20: Old: 276, New: 273 3'-6" Lintel: Old: 2, New: 0 4'-6" Lintel: Old: 6, New: 2 5'-10" Lintel: Old: 0, New: 6 2'-2.5' Sill: Old: 2, New: 0 3'-1" Sill: Old: 6, New: 2 4'-5" Sill: Old: 0, New: 6 | 08/21/23 | 08/21/23 | |||
| Complete | 08/21/23 | Sharon | Mattamy Homes | MOWAT 004-06 Waterbrooke | 6-Unit | CCAACS/FT | Precast *** | Changing Quantities and Precast | Sharon: Please revise po’s and update cost groups on Waterbrooke 6, 4 and 3 to match the attached. (6 is scheduled to drop this week so need to be sure Lotts is notified via email so correct po gets delivered, the others have not been scheduled yet). Only update cost groups on Waterbrooke 5, 7 and 1 (these packages have already been delivered). --------------------------------------------------------------------- PCMS.MOMER/MOWAT - CCAACS(FT)/SCAACC(FT).LOTTSORLANDO 1x9 Dowels: Old: 168, New: 174 #5 Rebar, 20': Old: 55, New: 57 HETA20: Old: 354, New: 348 3'-6" Lintel: Old: 1, New: 0 5'-10" Lintel: Old: 1, New: 8 7'-6" Lintel: Old: 7, New: 4 2'-2.5' Sill: Old: 1, New: 0 4'-5" Sill: Old: 1, New: 8 6'-2" Sill: Old: 6, New: 3 | 08/21/23 | 08/21/23 | |||
| Complete | 08/21/23 | Sharon | Mattamy Homes | MOWAT 006-06 Waterbrooke | 6-Unit | SCAACC/CO | Precast *** | Changing Quantities and Precast | Sharon: Please revise po’s and update cost groups on Waterbrooke 6, 4 and 3 to match the attached. (6 is scheduled to drop this week so need to be sure Lotts is notified via email so correct po gets delivered, the others have not been scheduled yet). Only update cost groups on Waterbrooke 5, 7 and 1 (these packages have already been delivered). --------------------------------------------------------------------- PCMS.MOMER/MOWAT - SCAACC(CO)/CCAACS(CO).LOTTSORLANDO 1x9 Dowels: Old: 168, New: 172 #5 Rebar, 20': Old: 55, New: 57 HETA20: Old: 354, New: 348 3'-6" Lintel: Old: 1, New: 0 4'-6" Lintel: Old: 3, New: 1 5'-10" Lintel: Old: 1, New: 4 2'-2.5' Sill: Old: 1, New: 0 3'-1" Sill: Old: 3, New: 1 4'-5" Sill: Old: 1, New: 4 | 08/21/23 | 08/21/23 | |||
| sent to bids | 08/15/23 | Bryan Healy | Mattamy Homes | MOWAT 005-06 Waterbrooke | 6-Unit | SCAACS/CR | Precast *** | Adding (2) 7'-6" Lintels, Removing (4) 4'-6" Lintels | Bryan Healy: The pre-cast PO only has x8 7’-6” headers. It needs to have an additional 2 for the rear sliding glass doors. There are also x6 4’-6” headers and the building only requires 2. -------------------------------------------------------------- Sent to bids for review 8/15/23 (Adam) | 08/15/23 | ||||
| Complete | 08/14/23 | Dane Jones | Mattamy Homes | MOMER 048 Meridian | 5-Unit | CCACM/CR | Precast *** | Adding (1) 7'-6" Lintel & (1) 6'-2" Sill | Dane Jones: This elevation requires 6 total 6’-2” Sills. We only have 5 in the package. Precast PO. Needed 6) 7-6 headers and 6) 6’-2” sills. Package has 5 of each. I was able to find a 7’-6” header, just missing the sill now. ---------------------------------------------------------------- PCMS.MOMER-MCACC(CR)/CCACM(CR).LOTTSORLANDO 7'-6" Lintel: Old: 5, New: 6 6'-2" Sill: Old: New: 6 | 08/14/23 | 08/14/23 | |||
| Complete | 08/09/23 | White Cap | Minto | All | All | Hardware *** | Swap H4 for H2.5A | Chris Booth: Hey man, I’ve seen a couple PO’s come across with H4’s on them. They’ve been discontinued for a few years now. Should I put H2.5A as a replacement? I attached a discontinued list, and it has a closest replacement part option on it. Let me know please. ---------------------------------------------------------------- HDW.NDLWS50-179-B.WHITECAP HDW.NDLWS50-179-II-B.WHITECAP H4: Old: 20, New: 0 H2.5A: Old: 141, new: 161 HDW.NDLWS50-181-A.WHITECAP HDW.NDLWS50-181-B.WHITECAP H4: Old: 20, New: 0 H2.5A: Old: 144, new: 164 | 08/09/23 | 08/09/23 | ||||
| Complete | 08/09/23 | White Cap | Sobel Co | 3-Unit | ACB | Hardware *** | Swap H4 for H2.5A | Chris Booth: Hey man, I’ve seen a couple PO’s come across with H4’s on them. They’ve been discontinued for a few years now. Should I put H2.5A as a replacement? I attached a discontinued list, and it has a closest replacement part option on it. Let me know please. ---------------------------------------------------------------- HDW.OFPPR-ACB.WHITECAP H4: Old: 20, New: 0 H2.5A: Old: 0, New: 20 | 08/09/23 | 08/09/23 | ||||
| Complete | 08/08/23 | Cindy/John C. | Minto | - | All | All | Hardware *** | Swap Wedge Anchors for Titen Bolts | Angie: at the request of Cindy and John C. we must change the 1/2 x 8 Wedge Anchor for this Titen HD. ------------------------------------------------- HDW.NDLWS50-179-B.WHITECAP HDW.NDLWS50-179-II-A.WHITECAP HDW.NDLWS50-179-II-B.WHITECAP >WA1285: Old: 43, New: 0 >THD50800WH: Old: 0, New: 43 HDW.NDLWS50-181-A.WHITECAP HDW.NDLWS50-181-B.WHITECAP HDW.NDLWS50-184-A.WHITECAP >WA1285: Old: 41, New: 0 >THD50800WH: Old: 0, New: 41 HDW.NDLWS50-184-B.WHITECAP >WA1285: Old: 45, New: 0 >THD50800WH: Old: 0, New: 45 Waiting on pricing from White Cap (Adam) | 08/08/23 | 08/09/23 | |||
| Complete | 08/07/23 | Cyndi Mullee | Minto | - | 50-181, 50-184 | A, B | Frame *** | 2x4 and 2x6 Changes | Adam Sowers: Pete made the following package changes: ----------------------------------------------------------- I made the following changes to the packages for watersound if you could please capture that on the Package Change History Sheet. Thanks much -Pete NDLWS 50-181-A Frame Package Removed All 2 x 6 x 104 5/8 Spruce Precuts (220) Removed All 2 x 6 x 92 5/8 Spruce Precuts (18) Added (270) 2 x 6 x 10’ Spruce #2 BTR Increased 2 x 4 x 16 SYP from 125 to 175 (50) Hardware Package Added (10) HTS16 NDLWS 50-181-B Frame Package Increased 2 x 6 x 10 Spruce #2 & BTR from 170 to 270 (100) Removed All 2 x 6 x 104 5/8 Spruce Precuts (50) Removed All 2 x 6 x 92 5/8 Spruce Precuts (20) Increased 2 x 4 x 16 SYP from 125 to 175 (50) Hardware Package Added (10) HTS16 NDLWS 50-184-A Frame Package Removed All 2 x 6 x 104 5/8 Spruce Precuts (174) Removed All 2 x 6 x 92 5/8 Spruce Precuts (26) Increased 2 x 6 x 10 Spruce #2 & BTR from 167 to 300 (133) Increased 2 x 4 x 16 SYP from 156 to 175 (19) Hardware Package Added (10) HTS16 NDLWS 50-184-B Frame Package Increased 2 x 6 x 10 Spruce #2 & BTR from 165 to 300 (135) Removed All 2 x 6 x 104 5/8 Spruce Precuts (81) Removed All 2 x 6 x 92 5/8 Spruce Precuts (20) Increased 2 x 4 x 16 SYP from 125 to 175 (50) Hardware Package Added (10) HTS16 | 08/07/23 | 08/07/23 | |||
| Complete | 08/04/23 | Cyndi Mullee | Minto | - | 50-184 | A | Frame *** | 2x4 and 2x6 Changes | Adam Sowers: Cyndi had a fill-in on 4125 for materials that were used on four different lots due to incorrect takeoffs. Angie reviewed everything and sent new totals. FRMMAT.NDLWS50-184-A.MIDSOUTH 2x4x10 Spruce: Old: 11, New: 13 2x4x14 SYP: Old: 30, New: 13 2x4x14 Spruce: Old: 4, New: 5 2x4x16 SYP: Old: 125, New: 156 2x4x8 SYP: Old: 1, New: 2 2x4x92-5/8: Old: 36, New: 43 2x6x104-5/8: Old: 81, New: 174 2x6x12 SYP: Old: 4, New: 6 2x6x14 PT: Old: 28, New: 35 2x6x14 SYP: Old: 57, New: 72 2x6x14 Spruce: Old: 30, New: 38 2x6x16 Spruce: Old: 25, New: 39 2x6x8 SYP: Old: 3, New: 4 2x6x92-5/8: Old: 20, New: 26 | 08/04/23 | Angie | 08/04/23 | ||
| Complete | 08/04/23 | Cyndi Mullee | Minto | - | 50-181 | B | Frame *** | 2x4 and 2x6 Changes | Adam Sowers: Cyndi had a fill-in on 4125 for materials that were used on four different lots due to incorrect takeoffs. Angie reviewed everything and sent new totals. FRMMAT.NDLWS50-181-B.MIDSOUTH 2x4x10 Spruce: Old: 24, New: 28 2x4x14 PT: Old: 2, New: 3 2x4x14 SYP: Old: 30, New: 50 2x4x16 SYP: Old: 125, New: 157 2x4x92-5/8: Old: 28, New: 38 2x6x12 SYP: Old: 1, New: 8 2x6x14 PT: Old: 25, New: 34 2x6x14 SYP: Old: 51, New: 68 2x6x16 Spruce: Old: 25, New: 34 2x6x8 SYP: Old: 4, New: 5 2x6x92-5/8: Old: 18, New: 20 2x4x8 Spruce: Old: 8, New: 12 2x6x10 SYP: Old: 9, New: 13 FRMMAT.NDLWS50-181-B.BFS 2x4x8 Spruce: Old: 8, New: 14 2x4x10 Spruce: Old: 24, New: 28 2x4x14 PT: Old: 2, New: 3 2x4x14 SYP: Old: 30, New: 50 2x4x16 SYP: Old: 125, New: 157 2x4x92-5/8: Old: 28, New: 38 2x6x12 SYP: Old: 1, New: 8 2x6x14 PT: Old: 25, New: 34 2x6x14 SYP: Old: 51, New: 68 2x6x16 Spruce: Old: 25, New: 34 2x6x8 SYP: Old: 4, New: 5 2x6x92-5/8: Old: 18, New: 20 2x6x10 SYP: Old: 9, New: 13 2x8x14 SYP: Old: 4, New: 6 | 08/04/23 | Angie | 08/04/23 | ||
| Complete | 08/04/23 | Cyndi Mullee | Minto | - | All | All | Hardware | Remove Tapcons, Add Anchor Bolts & SDS Screws | Cyndi Mullee: 5/8 x 12” anchor Bolt for all HTT5’s needed: 8 each lot and add to take off 4127, 4126, 4108, 4107 All models add to take off Remove tapcons Add 50- 1/4”x6” long SDS screws for SGD header ---------------------------------------------------------- HDW.NDLWS50-179-B.WHITECAP HDW.NDLWS50-179-II-A.WHITECAP HDW.NDLWS50-179-II-B.WHITECAP HDW.NDLWS50-184-A.WHITECAP HDW.NDLWS50-184-B.WHITECAP >AB5812 Anchor Bolt: Old: 0, New: 8 >SDS25600 1/4 x 6" SDS Screws: Old: 0, New: 50 >TH14334 1/4" x 3 3/4" (Box 100): Old: 9, New: 0 HDW.NDLWS50-181-A.WHITECAP HDW.NDLWS50-181-B.WHITECAP >AB5812 Anchor Bolt: Old: 0, New: 8 >SDS25600 1/4 x 6" SDS Screws: Old: 0, New: 50 >TH14334 1/4" x 3 3/4" (Box 100): Old: 7, New: 0 | 08/04/23 | 08/04/23 | |||
| Complete | 08/02/23 | Jason Bridges | Dream Finders | DOTAL 111-02 Talichet | Avalon II | A | Precast *** | Addiong (1) 8'-8" Lintel | Jason Bridges: There is now a lintel over the front columns on Avalon model -Jason Bridges (1) 8-8 u shaped lintel ------------------------------------------------------------ PCMS.DF-AVALON-A.LOTTSORLANDO PCMS.DF-AVALON-B.LOTTSORLANDO PCMS.DF-AVALON-C.LOTTSORLANDO 8'-8" Lintel: Old: 0, New: 1 | 08/02/23 | 08/02/23 | |||
| Complete | 08/01/23 | Sam Rathbun | Bella Vista Building Group | BVRDG 008 Rivers Edge | 6-Unit | ABAABA | Hardware *** | Adding Titen Bolts | Sam Rathbun: We need these for the LGT4 on the end units. This should only be added to the end unit takeoff. 4 for each unit. 8 total for the building. They have these in Sanford, and I am going to be picking them up. 3/8 x 5” Titen Bolts x 8 total count. --------------------------------------------------- HDW.BVRDG-ABAABA.WHITECAP THD.7500HMG Titen: Old: 0, New: 8 | 08/01/23 | 08/01/23 | |||
| Complete | 07/31/23 | Sam Rathbun | Bella Vista Building Group | BVRDG 008 Rivers Edge | 6-Unit | ABAABA | Hardware *** | Swapping (6) 12" Threaded Ros for 24" | Sam Rathbun: Longer All Thread Needed. Need 2’ All Thread. Going to need longer all thread to go through the floor system. 6 - 2’ x 5/8” Threaded Rod. ------------------------------------------------------------- Swapping four to longer sizes per Sam (Adam) HDW.BVRDG-ABAABA.WHITECAP TR5812: Old: 20, New: 16 TR5824: Old: 0, New: 4 | 07/31/23 | 08/01/23 | |||
| Complete | 07/27/23 | Ross Johnson | Sobel Co | OFPPR 01A Parkway Preserve | 3-Unit | ACB | Hardware *** | Adding Wedge Anchors & Tapcons | Ross Johnson: Please add 12 3/4 x 6" wedge anchors and 100 1/4 x 3" tap cons to the hardware package. Also, please create a fill in for these items so I can pick them up today as they are needed to fly the roof this afternoon. These items are needed to bolt the red iron buckets to the wall and the garage ledger to the wall. ------------------------------------------------------------ HDW.OFPPR-ACB.WHITECAP 3/4 x 6 1/4 Wedge Anchors: Old: 24, New: No Change 1/4 x 3 Tapcons: Old: 0, New: 1 Note: It looks like the wedge anchors are in the cost-group but not in the PO on the job. Must have been updated alread (Adam). | 07/27/23 | 07/27/23 | |||
| Complete | 07/26/23 | Ross Johnson | Sobel Co | OFPPR 01K Parkway Preserve | 3-Unit | ACB | Hardware *** | Adding (50) U210 Hangers | Ross Johnson: Please add 50 hu210 facemount brackets to this package making a total of 80. Also please create a fill in for the 50 I am requesting for the 1st and 2nd floor as 30 was only enough to partially complete the 1st floor. Need an additional 50 to complete truss hangers for entire house. -------------------------------------------------------------------------- HDW.OFPPR-ACB.WHITECAP U210: Old: 30, New: 80 | 07/26/23 | 07/26/23 | |||
| Complete | 07/24/23 | Bobby Neller | Richmond | ROHSQ 009 Heritage Square | F924/Ammolite | C | Precast *** | Adding 5'-10" and 4'-0" Sill | Bobby Neller: Wasn’t on takeoff. Package change: 5’10”-precast header-old-0, New-1 4’0”-flush mount sill- old- 0, New-1 Fill in- (PO request) 1-5’10” precast 1-4’0” flush sill ------------------------------------------------------------ PCMS.RA-Ammolite-F924-C.LOTTSORLANDO 5'-10" Lintel: Old: 0, New: 1 4'-0" Sill: Old: 0, New: 1 | 07/24/23 | 07/25/23 | |||
| Complete | 07/24/23 | Bobby Neller | Richmond | ROHSQ 009 Heritage Square | F924/Ammolite | C | Slab Prep, Precast *** | Removing Corner Bars & Duro Wall | Bobby Neller: Dura wall-Old-500 feet, New-0 30“ x 30“ rebar corners- old-9, New-0 ---------------------------------------------- SLABPREP.RA-Ammolite-F924-C.WHITECAP SLABPREP.RA-Ammolite-F924-C.LOTTSORLANDO Corner Bars: Old: 46, New: 0 PCMS.RA-Ammolite-F924-C.LOTTSORLANDO Corner Bars: Old: 9, New: 0 Duro Wall: Old: 3, New: 0 | 07/24/23 | 07/24/23 | |||
| Complete | 07/24/23 | Kyle Jolly | Dart Interests | DIEVM 067 Evermore Resort | Portal Entry | - | Hardware *** | Adding Simpson Hardware | Kyle Jolly: Please add these to every portal entry hardware po going forward. Will need fill in for lot 67 as well as all hardware packages going forward adjusted. (6) flat brackets (APVST610) (200) black bolt heads (STN22-R24 - 1" Outdoor Accents Hex-Head Washer) (4) t brackets (APVT6) Black finish ----------------------------------------------------------------- HDW.DIEVM-PORTALENTRY.WHITECAP Simpson APVST610: Old: 0, New: 6 Simpson APVT6: Old: 0, New: 4 Outdoor Accents Hex-Head Washer: Old: 0, New: 9 | 07/24/23 | 07/26/23 | |||
| Complete | 07/21/23 | Cyndi Mullee | Minto | NDLWS 4108 Watersound | All | All | Frame *** | Adding Materials | Cyndi Mullee The lumber appears to have been used up in bracing and temporary scaffolding (framers have been asked to not use it for scaffolding). The 6x6post appears to have been stolen. We may want to change the take off to adjust for now. All models should have (1) or (2) 6x6 posts. I do not see any on 4107, 4127, 4126. Package change: Change all models facia (2x6x14’ spruce) to 30 Please add (20) 2x4x14’ SYP to all ---------------------------------------------------------------------- 6x6 Posts for lots: 4107, 4126, 4127: the model of these lots does not require it -Angie --------------------------------------------------------------------- FRMMAT.NDLWS50-179-B.MIDSOUTH FRMMAT.NDLWS50-179-II-B.MIDSOUTH 2x6x14 Spruce: Old: 31, New: 30 2x4x14 SYP: Old: 9, New: 29 FRMMAT.NDLWS50-179-II-A.MIDSOUTH 2x6x14 Spruce: Old: 30, New: No Change 2x4x14 SYP: Old: 10, New: 30 FRMMAT.NDLWS50-181-A.MIDSOUTH FRMMAT.NDLWS50-181-B.BFS FRMMAT.NDLWS50-181-B.MIDSOUTH 2x6x14 Spruce: Old: 25, New: 30 2x4x14 SYP: Old: 10, New: 30 FRMMAT.NDLWS50-184-A.MIDSOUTH FRMMAT.NDLWS50-184-B.BFS FRMMAT.NDLWS50-184-B.MIDSOUTH 2x6x14 Spruce: Old: 28, New: 30 2x4x14 SYP: Old: 10, New: 30 | 07/21/23 | 07/21/23 | Angie | 07/21/23 | |
| Complete | 07/17/23 | Omar | Minto | NDICP 1318 Isles of Collier | All | All | Frame *** | Adding 2x6x16 Spruce for Fascia | Omar Hernandez: Please order 15 pcs of 2x6x16 spruce #2 Needed to install facia. Needed for facia please add to all framing packages. Thank you. ------------------------------------------------------------------ FRMMAT.NDICP-2A (12"PARTY WALL).84LUMBER FRMMAT.NDICP-2A (12"PARTY WALL).MARJAM FRMMAT.NDICP-2B (12"PARTY WALL).84LUMBER FRMMAT.NDICP-2C (12"PARTY WALL).84LUMBER FRMMAT.NDICP-3A/NDICP-3C (12"PARTY WALL).84LUMBER FRMMAT.NDICP-3B (12"PARTY WALL).84LUMBER FRMMAT.NDICP-3B (12"PARTY WALL).MARJAM 2x6x16 Spruce: Old: 0, New: 15 FRMMAT.NDICP-1A (12"PARTY WALL).84LUMBER FRMMAT.NDICP-1A (12"PARTY WALL).MARJAM FRMMAT.NDICP-1B (12"PARTY WALL).84LUMBER FRMMAT.NDICP-1C(12"PARTY WALL).84LUMBER FRMMAT.NDICP-4A (12"PARTY WALL).84LUMBER FRMMAT.NDICP-4A (12"PARTY WALL).MARJAM 2x6x16 Spruce: Old: 1, New: 15 | 07/17/23 | 07/17/23 | |||
| Complete | 07/05/23 | Chad Brewster | Marmer Contruction | - | All | All | Frame & Hardware *** | Adjusting Quantities | Isa: I am sending you the adjustment of materials as indicated by Chad. You can get this at: S:\Estimating\Marmer Construction\Cypress Gardens Apartment\2023 - Takeoff & Proposal ------------------------------------------------------------------------------ TYPE 1 ------------------------- PCMS-DROP1.MACGA-TYPE1.LOTTSORLANDO HETA20: Old: 0, New: 84 FRMMAT-DROP1.MACGA-TYPE1.HAVEN 2x8x16 PT: Old: 87, New: 76 HDW.MACGA-TYPE1.WHITECAP 1/2 Washers: Old: 420, New: 245 H3: Old: 436, New: 318 HCP2 Hip Corner Plate: Old: 46, New: 42 1/2" x 10" Wedge Anchor: Old: 215, New: 175 PCMS-DROP2.MACGA-TYPE1.LOTTSORLANDO HETA20: Old: 0, New: 366 FRMMAT-DROP2.MACGA-TYPE1.HAVEN 2x8x16 PT: Old: 48, New: 0 HDW.MACGA-TYPE1.WHITECAP 1/2 Washers: Old: 245, New: 70 H3: Old: 318, New: 0 HCP2 Hip Corner Plate: Old: 42, New: 0 1/2" x 10" Wedge Anchor: Old: 175, New: 0 TYPE 1 ------------------------- TYPE 2 ------------------------- PCMS-DROP1.MACGA-TYPE2.LOTTSORLANDO HETA20: Old: 0, New: 9 FRMMAT-DROP1.MACGA-TYPE2.HAVEN 2x8x16 PT: Old: 98, New: 96 HDW.MACGA-TYPE2.WHITECAP 1/2 Washers: Old: 393, New: 385 H3: Old: 410, New: 400 HCP2 Hip Corner Plate: NA 1/2" x 10" Wedge Anchor: Old: 208, New: 200 PCMS-DROP2.MACGA-TYPE2.LOTTSORLANDO HETA20: Old: 0, New: 416 FRMMAT-DROP2.MACGA-TYPE2.HAVEN 2x8x16 PT: Old: 54, New: 0 HDW.MACGA-TYPE2.WHITECAP 1/2 Washers: Old: 385, New: 185 H3: Old: 400, New: 0 HCP2 Hip Corner Plate: Old: 43, New: 0 1/2" x 10" Wedge Anchor: Old: 200, New: 0 TYPE 2 ------------------------- TYPE 3 ------------------------- PCMS-DROP1.MACGA-TYPE3.LOTTSORLANDO HETA20: Old: 0, New: 9 FRMMAT-DROP1.MACGA-TYPE3.HAVEN 2x8x16 PT: Old: 102, New: 100 HDW.MACGA-TYPE3.WHITECAP 1/2 Washers: Old: 475, New: 470 H3: Old: 454, New: 444 HCP2 Hip Corner Plate: NA 1/2" x 10" Wedge Anchor: Old: 225, New: 220 PCMS-DROP2.MACGA-TYPE3.LOTTSORLANDO HETA20: Old: 0, New: 451 FRMMAT-DROP2.MACGA-TYPE3.HAVEN 2x8x16 PT: Old: 59, New: 0 HDW.MACGA-TYPE3.WHITECAP 1/2 Washers: Old: 470, New: 250 H3: Old: 444, New: 0 HCP2 Hip Corner Plate: Old: 52, New: 0 1/2" x 10" Wedge Anchor: Old: 220, New: 0 TYPE 3 ------------------------- | 07/05/23 | Isa | 07/05/23 | ||
| Complete | 06/29/23 | Ross Johnson | Sobel Co | - | All | All | Masonry Lift 1 *** | Adding Four-Highs to All Models/Elevations | Ross Johnson: Adam please add an additional cube of 8x4x16 half blocks on all 1st lift p.o.’s moving forward. --------------------------------------------------------- Ross says 72 four-highs in a cube (Adam). MASMAT-DROP1.OFPPR-ACB.PREFERREDLEE/COLLIER(OFPPR) Four Highs: Old: 9, New: 81 Education Fee: Old: 4614, New: 4686 MASMAT-DROP1.OFPPR-ADB.PREFERREDLEE/COLLIER(OFPPR) Four Highs: Old: 9, New: 81 Education Fee: Old: 4689, New: 4761 -- Revised: 7/11/23 MASMAT-DROP1.OFPPR-ACB.PREFERREDLEE/COLLIER(OFPPR) Four Highs: Old: 81, New: 153 Education Fee: Old: 4686, New: 4758 MASMAT-DROP1.OFPPR-ADB.PREFERREDLEE/COLLIER(OFPPR) Four Highs: Old: 81, New: 153 Education Fee: Old: 4761, New: 4833 | 06/29/23 | 07/11/23 | 06/29/23 | ||
| Complete | 06/28/23 | Sam Rathbun | Surrey Homes | SOFXH 051 Fox Hammock | Clover | B | Adjusting Multiple Cost-Groups | Trimming Excess Materials | Sam Rathbun: Just trimming some materials from this takeoff. For this model: Clover Elv B 20 Regular Block 15 Lintel Block 20 Bags of Preblend Mortar 10 sheets of 7/16 OSB ---------------------------------------------------------------- Note: Sam meant 15/32 OSB, not 7/16 (Adam) MASMAT.SO-Clover-B.BESTBLOCKORLANDO MASMAT.SO-Clover-B.TITANORLANDO(ZONE3) Regulars: Old: 1911, New: 1891 (-20) Lintel Block: Old: 191, New: 176 (-15) Pre-Blend: Old: 150, New: 130 (-20) -- FRMMAT.SO-Clover-B.BFS 15/32 OSB: Old: 122, New: 112 | 06/28/23 | 06/28/23 | |||
| Complete | 06/27/23 | Kyle Jolly | Dart Interests | DIEVM 067 Evermore Resort | Portal Entry | - | Pad Prep *** | Removing (2) #4 Rebar, 20' | Kyle Jolly: On future entry portals, please combine footing materials and Precast. I’ve requested Lotts to drop “precast” and asked them to remove the 20’ steel as we have left over from the footings. From footings PO Remove (2) #4 20’ bars -------------------------------------------------------------- PADPREP.DIEVM-PORTALENTRY.LOTTSORLANDO PCMS.DIEVM-PORTALENTRY.LOTTSORLANDO Combining these two Cost-Groups per Kyle (Adam) Removed the Precast/Masonry Steel PO from the template. PADPREP.DIEVM-PORTALENTRY.LOTTSORLANDO #4 Rebar, 20': Old: 12, New: 10 #5 Rebar, 20': Old: 4, New: 5 #5 Rebar, 1x8' 4" Dowels: Old: 0, New: 6 Lintel Screen: Old: 0, New: 1 | 06/27/23 | 06/27/23 | |||
| Complete | 06/23/23 | Ross | Sobel Co | OFPPR 01J Parkway Preserve | 3-Unit | BDA | Precast, 2nd Lift *** | Swapping (2) 3'-1" Sills w/ (1) 4'-6" | Ross Johnson: Window sill replacement. I need three window sills from lotts to replace three broken ones -Ross 3’1" 4’6" 6’2" ------------------------------------------------------------------ Ross says that the (2) 3'-1"'s on the 2nd Lift PO are not needed and only (1) 4'-6" is needed there. He says the others were damaged and/or used somewhere else. We don't have 4'-6" in the catalog so I sent a 5'-0" Lintel instead (Adam) PCMS-DROP2.OFPPR-ADB.LOTTSFTMYERS 3'-1" Sill: Old: 2, New: 0 5'-0" Sill: Old: 0, New: 1 | 06/23/23 | 06/23/23 | |||
| Complete | 06/22/23 | Omar | Minto | NDICP 1326 Isles of Collier | Cottage 2 | B | Frame *** | Adding Missing 2x6x14 Spruce | Omar: Please order 15 pcs of 2x6x16 spruce #2 Needed to install facia. Needed as backing to the facia -Omar 15 pcs of 2x6x16 spruce #2 ----------------------------------------------------------------- For some reason the PO/Cost-Group only has (1) 2x6x14 Spruce but there are (36) in the takeoff. Will address Package Change after Fill-Ins (Adam). FRMMAT.NDICP-2B (12"PARTY WALL).84LUMBER 2x6x14 Spruce: Old: 1, New: 36 | 06/22/23 | 06/22/23 | |||
| Complete | 06/22/23 | Omar | Minto | NDICP 1318 Isles of Collier | Cottage 2 | B | Frame *** | Removing 2x8 PT & swapping 2x4 Spruce for SYP | Omar: Not all 2x8 are needed. Please delete from the frame package: -4 pcs of 2x8x8 pt borate, -6 pcs of 2x6x12 pt borate. Please switch the 32 pcs of 2x4x12 spruce to 2x4x12 yellow pine. Not all 2x8 are needed. The switch of the 2x4s is necessary because the borate 2xs are bowing and we’re having to go back and work on them. -------------------------------------------------------------------- 6/22/23 @ 4:47pm: ON HOLD FOR NOW (Adam) >Omar says he didn't mean to assign the To-Do yet. >Omar says he meant 2x8x12 PT not 2x6x12 PT FRMMAT.NDICP-2B (12"PARTY WALL).84LUMBER 2x8x8 PT: Old: 4, New: 0 2x4x12 Spruce: Old: 32, New: 0 2x4x12 SYP: Old: 48, New: 80 2x8x12 PT: Old: 12, New: 6 | 06/22/23 | 06/28/23 | |||
| Complete | 06/22/23 | Omar | Minto | NDICP 1326 Isles of Collier | Cottage 1 | A | Frame *** | Adding Missing 2x6x14 Spruce | Omar: Please order 15 pcs of 2x6x16 spruce #2 Needed to install facia. Needed as backing to the facia -Omar 15 pcs of 2x6x16 spruce #2 ----------------------------------------------------------------- For some reason the PO/Cost-Group only has (1) 2x6x14 Spruce but there are (36) in the takeoff. Will address Package Change after Fill-Ins (Adam). FRMMAT.NDICP-1A (12"PARTY WALL).84LUMBER 2x6x14 Spruce: Old: 1, New: 40 | 06/22/23 | 06/22/23 | |||
| Complete | 06/21/23 | Sam Rathbun | Surrey Homes | SOFXH 030 Fox Hammock | Iris | A | Masonry *** | Removing some Regulars & Pre-Blend | Sam Rathbun: Need to adjust this package down on a few items. Had some block and mortar left over. Not sure if this should apply to all elevations, could ask an estimator to look at how similar they all are, and make a judgement call from there. -30 x regular block -15 x mortar mix ----------------------------------------------------------- MASMAT.SO-Iris-A/Iris-B.FLBESTBLOCKORLANDO MASMAT.SO-Iris-A/Iris-B.TITANORLANDO Regulars: Old: 1845, New: 1815 Pre-Blend: Old: 151, New: 136 | 06/21/23 | 06/21/23 | |||
| Complete | 06/20/23 | Kyle Jolly | Dart Interests | DIEVM 067 Portal Entry | Portal Entry | - | Concrete *** | Switching to 3000 PSI and adding 2 Yards | Kyle Jolly: These footings are poured in 2 lifts. The first being 16” and the second being 14”. Concrete being used per Brian with Dart is 3000PSI with fiber. I will need an additional concrete PO submitted. The first lift should take 3 yards The second lift will take 3 yards -------------------------------------------------------------- Kyle says they will not need a pump for the footings (Adam) 2500 PSI: Old: 4 Yards, New: 0 3000 PSI: Old: 0, New: 6 Yards + Fiber + Fuel & Evironmental Fees | 06/20/23 | 06/20/23 | |||
| Complete | 06/16/23 | Brian Dinker | Minto | NDLTM 2968 Latitudes | All | All | Masonry *** | Removing Block | Brian Dinker: Old 8x8x12” block (60) New amount is (30) for both elevations Any villla with amount (75) 14” block Make new amount of (45) Both elevations ------------------------------------------------------------------ MASMAT.NDLTM12-A/NDLTM12-II-A.FLBESTBLOCKORLANDO MASMAT.NDLTM12-A/NDLTM12-II-A.PREFERREDDAYTONA 12" Block: Old: 60, New: 30 14" Block: Old: 75, New: 45 MASMAT.NDLTM9-B.PREFERREDDAYTONA MASMAT.NDLTM9-B.FLBESTBLOCKORLANDO MASMAT.NDLTM9-A.PREFERREDDAYTONA MASMAT.NDLTM9-A.FLBESTBLOCKORLANDO 12" Block: Old: 75, New: 30 14" Block: Old: 75, New: 45 MASMAT.NDLTM8-B.PREFERREDDAYTONA MASMAT.NDLTM8-B.FLBESTBLOCKORLANDO MASMAT.NDLTM8-A.PREFERREDDAYTONA MASMAT.NDLTM8-A.FLBESTBLOCKORLANDO 12" Block: Old: 75, New: 30 14" Block: Old: 75, New: 45 MASMAT.NDLTM7-B/NDLTM7-II-B.PREFERREDDAYTONA MASMAT.NDLTM7-B/NDLTM7-II-B.FLBESTBLOCKORLANDO MASMAT.NDLTM7-A/NDLTM7-II-A.PREFERREDDAYTONA MASMAT.NDLTM7-A/NDLTM7-II-A.FLBESTBLOCKORLANDO 12" Block: Old: 60, New: 30 14" Block: Old: 75, New: 45 MASMAT.NDLTM6-B.PREFERREDDAYTONA MASMAT.NDLTM6-B.FLBESTBLOCKORLANDO MASMAT.NDLTM6-A.PREFERREDDAYTONA MASMAT.NDLTM6-A.FLBESTBLOCKORLANDO 12" Block: Old: 75, New: 30 14" Block: Old: 75, New: 45 MASMAT.NDLTM5-B.PREFERREDDAYTONA MASMAT.NDLTM5-B.FLBESTBLOCKORLANDO MASMAT.NDLTM5-A.PREFERREDDAYTONA MASMAT.NDLTM5-A.FLBESTBLOCKORLANDO 12" Block: Old: 75, New: 30 14" Block: Old: 75, New: 45 MASMAT.NDLTM4-B/NDLTM4-II-B.PREFERREDDAYTONA MASMAT.NDLTM4-B/NDLTM4-II-B.FLBESTBLOCKORLANDO MASMAT.NDLTM4-A/NDLTM4-II-A.PREFERREDDAYTONA MASMAT.NDLTM4-A/NDLTM4-II-A.FLBESTBLOCKORLANDO 12" Block: Old: 75, New: 30 14" Block: Old: 75, New: 45 MASMAT.NDLTM3-B.PREFERREDDAYTONA MASMAT.NDLTM3-B.FLBESTBLOCKORLANDO MASMAT.NDLTM3-A.PREFERREDDAYTONA MASMAT.NDLTM3-A.FLBESTBLOCKORLANDO 12" Block: Old: 75, New: 30 14" Block: Old: 75, New: 45 MASMAT.NDLTM2-B.PREFERREDDAYTONA MASMAT.NDLTM2-B.FLBESTBLOCKORLANDO MASMAT.NDLTM2-A.PREFERREDDAYTONA MASMAT.NDLTM2-A.FLBESTBLOCKORLANDO 12" Block: Old: 75, New: 30 14" Block: Old: 75, New: 45 MASMAT.NDLTM13-A/NDLTM13-B.PREFERREDDAYTONA MASMAT.NDLTM13-A/NDLTM13-B.FLBESTBLOCKORLANDO 12" Block: Old: 75, New: 30 14" Block: Old: 75, New: 45 MASMAT.NDLTM10-B.PREFERREDDAYTONA MASMAT.NDLTM10-B.FLBESTBLOCKORLANDO MASMAT.NDLTM10-A.PREFERREDDAYTONA MASMAT.NDLTM10-A.FLBESTBLOCKORLANDO 12" Block: Old: 75, New: 30 14" Block: Old: 75, New: 45 | 06/16/23 | 06/16/23 | |||
| Complete | 06/16/23 | Bobby Neller | Richmond | ROEDH 032-02 Eden Hills | F924/Ammolite | J | Masonry *** | Adding Regulars & Lintel Block | Bobby Neller: Regulars 8 x 8 x 16: Old: 1468, New: 1684 Need three cubes of regulars. Lintel block 8 x 8 x 16: Old: 150, New: 200 ------------------------------------------------------------------ MASMAT.RA-F924-J.FLBESTBLOCKORLANDO Regulars: Old: 1464, New: 1684 Lintel Block: Old: 150, New: 200 MASMAT.RA-F924-J.FLBESTBLOCKTAMPA Regulars: Old: 1464, New: 1684 Lintel Block: Old: 150, New: 200 MASMAT.RA-F924-J.TITANORLANDO(ZONE3) Regulars: Old: 1464, New: 1684 Lintel Block: Old: 150, New: 200 MASMAT.RA-F924-J.TITANORLANDO(ZONE4) Regulars: Old: 1464, New: 1684 Lintel Block: Old: 150, New: 200 | 06/16/23 | 06/16/23 | |||
| Complete | 06/09/23 | Sam Rathbun | Bella Vista Building Group | BVRDG 008 Rivers Edge | 6-Unit | ABAABA | Frame *** | Adding 2x4x108 5/8 Spruce | Sam Rathbun: Need more studs for the first floor walls. Need 45 - 2x4x108 5/8”. I would add 30 total to takeoff 6 units x 5 each. ------------------------------------------------------------------ FRMMAT-DROP1.BVRDG-ABAABA.BFS 2 x 4 x 108 5/8" Spruce: Old: 320, New: 350 | 06/09/23 | 06/09/23 | |||
| Complete | 06/06/23 | Omar | Minto | NDICP 1330 Isles of Collier | Cottage 4 | B | Hardware *** | Adding Left Corner Column Cap | Omar: Order 1 pc of ECCLLQ4F4=SDS2.5 LEFT CORNER COLUMN CAP. This unit requires three corner caps. Please order one corner to be picked up and add one corner to po. Thank you. ---------------------------------------------------------- HDW.NDICP-4B(12"PARTY WALL).WHITECAP ECCLLQ444-SDS2.5 Left Corner Column Cap: Old: 2, New: 3 | 06/06/23 | 06/06/23 | |||
| Complete | 06/06/23 | Dane Jones | Toll Brothers | TBLPT 077 Laurel Pointe | Dolcetto | MO | Covered Balcony Option | Swapping to 3/4" T&G SYP CDX Treated | Adam Sowers: Need PT tongue and groove subfloor materials for the master bedroom balcony -Dane -------------------------------------------------------------------------- 6/6/23 - We had a similar fill-in to this on lot 48 (same model/elevation). 3/4" Treated needed for the Covered Balcony Option/Selection instead of the 3/4" Advantech per Dane. 263353 - COVBAL@PRIMARY FRMMAT-DROP1.TBLPT077.84LUMBER -------------------------------------------------------------------------- FRMMAT-DROP1.TBLPT077-COVBAL.84LUMBER 3/4" x 4' x 8' CDX T&G Floor Sheathing: Old: 14, New: 0 3/4" x 4' x 8' T&G SYP CDX TREATED: Old: 0, New: 14 Update: Swapped to 3/4" CDX Pressure Treated instead (Adam) | 06/06/23 | 06/06/23 | |||
| Complete | 06/05/23 | Omar | Minto | NDICP 1324 Isles of Collier | Cottage 1 | A | Slab Prep *** | Adding Rod Chairs | Omar: Needed to complete slab prep. Used some of this slab mat to complete two other slab. Please add one box to package. --------------------------------------------------------------------------- SLABPREP.NDICP-1A (12"PARTY WALL).WHITECAP SLABPREP.NDICP-1A (12"PARTY WALL).CASTCRETE 12" Rod Chairs: Old: 91 (each), New: 2 Boxes | 06/05/23 | 06/05/23 | |||
| Complete | 06/01/23 | Sam Rathbun | Bella Vista Building Group | BVRDG 008 Rivers Edge | 6-Unit | ABAABA | Frame *** | Adding 2x6x92 5/8 Spruce | Adam Sowers: This to-do is primarily to adjust down the number of 2x6x92 5/8 SP studs that were on the fill in yesterday. There is no way they could need that many. Only need 100 more and need to add 50 to each building (2 & 8) takeoff. ---------------------------------------------------------- FRMMAT-DROP2.BVRDG-ABAABA.BFS 2x6x92-5/8 Spruce: Old: 430, New: 480 | 06/01/23 | 06/01/23 | |||
| Complete | 06/01/23 | Sam Rathbun | Bella Vista Building Group | BVRDG 008 Rivers Edge | 6-Unit | ABAABA | Shaftwall Materials *** | Adding DensGlass | Sam Rathbun: DensGlass Package Change. DensGlass is short. Looks like we need roughly 40sheets per side of each wall. 40 x 10walls (2sides each) = 400 - 272 = 128 short per building. 256 total fill in for building 8. This is heavy but I’m not accounting for the strips they have to cut and use. Need H channel to go with this not sure how much yet. C channnel is fine I think. -------------------------------------------------------------------------- 6/1/23 - This was missed in the takeoff per Angie. Went over this with Kevin as well and will be changing the drops to 210 each (Adam). SHAFTWALL-DROP1.BVRDG-ABAABA.INTERIOREXTERIOR SHAFTWALL-DROP2.BVRDG-ABAABA.INTERIOREXTERIOR DenGlass - 2x10x1: Old: 136, New: 210 | 06/01/23 | Angie | 06/01/23 | ||
| Complete | 05/31/23 | Ross Johnson | Soebel Co | OFPPR 01L Parkway Preserve | 3-Unit | ADB | Hardare *** | Hardware Changes | Ross Johnsons: REMOVE ALL H4 hurricane tie (20) PA28 Purlin Anchor (13) Wedge Anchor 1/2" x 8 1/2" (36) CHANGE QUANTITY H10A Hurricane Tie (old:16 new:40) HU410 Heavy Face Mount Hanger (old:2 new:4) MSTA18 Medium Strap Tie (old:36 new:20) MSTA24 Medium Strap Tie (old:27 new:20) N58 Hex Nut 5/8" (old:10 new:30) 5/8" Panel Sheathing Clips (old:7 box new:5 box) SPH6 Heavy Stud Plate Tie (old:60 new:160) Sub Floor Adhesive (old:15 new:10) Thermafiber 4"x24"x48" (old:3 new:1) Wedge Anchor 1/2" x 7" (old:42 new:30) Wedge Anchor 5/8" x 10" (old:120 new:130) 3"x3"x1/2" Square Washer 1/4" thick (old:42 new:30) U210 Face Mount Hanger (old:30 new:70) ADD H2.5A hurricane clips (25) ------------------------------------------------------------------------------- HDW.OFPPR-ADB.WHITECAP H4: Old: 20, New: 0 PA28: Old: 13, New: 0 1/2 x 8-1/2 Wedge Anchor: Old: 36, New: 0 H10A: Old: 16, New: 40 HU410: Old: 2, New: 4 MSTA18: Old: 36, New: 20 MSTA24: Old: 27, New: 20 N58: Old: 10, New: 30 5/8" Panel Sheathing Clips: Old: 7, New: 5 SPH6: Old: 60, New: 160 Sub Floor Adhesive: Old: 15, New: 10 Thermafiber 4"x24"x48": Old: 3, New: 1 Wedge Anchor 1/2" x 7": Old: 42, New: 30 Wedge Anchor 5/8" x 10": Old: 120, New: 130 3"x3"x1/2" Square Washer: Old: 42, New: 30 U210: Old: 30, New: 70 H2.5A: Old: 0, New: 25 | 05/31/23 | 05/31/23 | |||
| Complete | 05/30/23 | Ross Johnson | Sobel Co | OFPPR 01I Parkway Preserve | 3-Unit | ACB | Frame Materials *** | Frame Changes | Ross Johnson: Lumber Package changes. OFPPR01I-0008 Needs to be revised and this revision should go for all ACB/BCA unit mixes going forward. Remove all: 2x12x16 #2 PT Borate (8) 2x12x20 #2 Southern Yellow Pine (3) 2x6x8 #2 PT Borate (10) 2x6x8 #2 Southern Yellow Pine (3) 2x8x8 #2 Southern Yellow Pine (6) 1x6x12 #2 PT Borate (66) 1x4x12 #2 PT Borate (87) Change quantity: 2x4x14 #2 PT Borate (old:11 new:18) 2x6x10 #2 PT Borate (old:3 new:10) 2x6x10 #2 Southern Yellow Pine (old:30 new:50) 2x6x16 #2 PT Borate (old:2 new:5) 2x8x16 Rough Sawn Spruce (old:30 new:50) 5/8x4x8 cdx sheathing (old:220 new:230) 1x2x10 #2 PT Borate (old:557 new:80) ----------------------------------------------------------- FRMMAT-DROP1.OFPPR-ACB.84LUMBER 2x12x16 PT: Old: 8, New: 0 2x12x20 SYP: Old: 3, New: 0 2x6x8 PT: Old: 10, New: 0 2x6x8 SYP: Old: 3, New: 0 2x8x8 SYP: Old: 6, New: 0 1x6x12 PT: Old: 0, New: 0 1x4x12 PT: Old: 0, New: 0 2x4x14 PT: Old: 11, New: 18 2x6x10 PT: Old: 3, New: 10 2x6x10 SYP: Old: 30, New: 50 2x6x16 PT: Old: 2, New: 5 2x8x16 RS Spruce: Old: 30, New: 50 5/8 CDX: Old: 224, New: 230 1x2x10 PT: Old: 0, New: 80 | 05/30/23 | 05/30/23 | |||
| Complete | 05/26/23 | Omar | Minto | NDICP 1328 Isles of Collier | Cottage 3 | A | Frame Materials *** | Swapping out 1x2 for 1x4 | Omar: Order 18 pcs of 1x4x16 pt to be deliver and add to framing package. Delete from package the 1x2x10 pt * not used on site. --------------------------------------------------------------- FRMMAT.NDICP-3A/NDICP-3C (12"PARTY WALL).84LUMBER 1x2x10 PT: Old: 83, New: 0 1x4x16 PT: Old: 0, New: 18 | 05/26/23 | 05/26/23 | |||
| Complete | 05/24/23 | Ross Johnson | Sobel Co | OFPPR 01B Parkway Preserve | 3-Unit | ADB | Masonry Steel & Hardware *** | Adding Corner Bars & Epoxy | Ross Johnson: Please create a white cap fill in for 3 tubes of epoxy and 8 corner bars for the tie beam company (top notch) on the second lift for building B. We need to add these items to a p.o. For the second lift on all future homes moving forward. ----------------------------------------------------------------------- PCMS-DROP2.OFPPR-ADB.LOTTSFTMYERS #5, 30x30 Corner Bars: Old: 0, New: 8 HDW.OFPPR-ADB.WHITECAP Epoxy, Set10: Old: 2, New: 5 | 05/24/23 | 05/24/23 | |||
| Complete | 05/19/23 | Sam Rathbun | Bella Vista Building Group | BVRDG 002 Rivers Edge | 6-Unit | ABAABA | Frame Drop 2 *** | Adding 15/32" Fire Rated CDX | Sharon: Sam says the take off must be short. please have this checked. this is the first building we have started in this community. Angie: Add only 20 sheets to the package, for the new building. Buildings 8 and 2 are covered with the 60-sheet fill that has already been made. ------------------------------------------------------------- FRMMAT-DROP2.BVRDG-ABAABA.BFS 15/32 Fire Rated CDX: Old: 134, New: 154 | 05/19/23 | 05/24/23 | Angie | 05/24/23 | |
| Complete | 05/18/23 | Omar | Minto | NDICP 1338 Isles of Collier | Cottage 4 | A | Hardware *** | Adding (1) ECCLLQ444 | Omar: Building requires 3 corner caps. Please order for pick up and add one more corner cap to hardware po. ----------------------------------------------------- HDW.NDICP-4A (12"PARTY WALL).WHITECAP ECCLLQ444: Old: 2, New: 3 | 05/18/23 | 05/18/23 | |||
| Complete | 05/17/23 | Steven Gilbert | Richmond | ROSUT 070 Sutton Preserve | F927/Slate | B | Slab Prep *** | Swapping Visqueen | Steven Gilbert: Please change package remove 10 x 100 and replace it with a 20 x 100. Need a total of two 20 x 100‘ rolls of plastic. -------------------------------------------------------------- SLABPREP.RA-Slate-F927-B.LOTTSORLANDO 10mil Visqueen, 10 x 100: Old: 1, New: 0 10mil Visqueen, 20 x 100L Old: 1, New: 2 | 05/17/23 | 05/17/23 | |||
| Complete | 05/16/23 | Omar | Minto | NDICP 1334 Isles of Collier | Cottage 4 | A, B | Frame Material *** | Adding 2x6x14 Spruce | Omar: Fill in 2x6. 35 pcs of 2x6x14 spruce. Needed for facia. Don’t know why it was deleted. ----------------------------------------------------------------------------- I can't find a record of a package change on the 2x6x14 Spruce but for some reason some of the Cottage 4-A Jobs/POs have it (#1370) and the other do not. It's in the takeoff for both the A & B but missing from cost-groups for some reason (Adam). FRMMAT.NDICP-4A (12"PARTY WALL).84LUMBER 2x6x14 Spruce: Old: 0, New: 43 FRMMAT.NDICP-4A (12"PARTY WALL).MARJAM No Changes. Note: This CG was correct. FRMMAT.NDICP-4B(12"PARTY WALL).84LUMBER 2x6x14 Spruce: Old: 0, New: 39 | 05/16/23 | 05/16/23 | |||
| Complete | 05/15/23 | Jason Bridges | Richmond | ROPAL 414 Palisades | F924/Ammolite | J | Hardware *** | Adding VGT & Threaded Rod | Jason Bridges: Please add fill in to package. (2) vgt (2) 5/8” threaded rod -------------------------------------------------- HDW.RA-Ammolite-F924-J.WHITECAP VGT: Old: 0, New: 2 5/8 x 12" Threaded Rod: Old: 0, New: 2 | 05/15/23 | 05/15/23 | |||
| Complete | 05/10/23 | Jeff Rotert | Minto | NDLTS 3037 Latitudes | 50-179 | A | Masonry *** | Adding Column Block | Jeff Rotert: Missing 12” x 12” column block on this model. Please get with estimating on this. This house is supposed to have column block and has none on the PO. Please correct this I need it expedited as Masons are in progress. ----------------------------------------------------------------- Estimating Review: 5/10/23 - I assume we have built this model (50-179) before? There has never been 12" column block. in the takeoff to the best of my knowledge. However, if we want to start sending them some then he needs (28) 12"x8"x12" column block -Chris Plantz ----------------------------------------------------------------- MASMAT.NDLTS50-179-A.FLBESTBLOCKORLANDO 12x8x12 Column Block: Old: 0, New: 28 | 05/10/23 | 05/10/23 | Chris Plantz | 05/10/23 | |
| Complete | 05/10/23 | Angie | Sobel Co | All | All | All | Frame *** | Adding 5/8 CDX | Angie Rodriguez: Adam can you include this in the package 2 sheets of 5/8 CDX only in each end units (4 sheets per building) --------------------------------------------------------------------- FRMMAT-DROP1.OFPPR-ACB.84LUMBER FRMMAT-DROP1.OFPPR-ADB.84LUMBER 5/8 CDX: Old: 220, New: 224 | 05/10/23 | 05/10/23 | |||
| Complete | 05/09/23 | Chad Brewster | Marmer Contruction | All | All | All | Masonry, 1st Lift *** | Swapping 9-Highs w/ Regulars | Chad Brewster: All , please note that the builder was able to delete the 1-1/2” Recess around the perimeter of the buildings at Cypress Gardens. This does eliminate the need for and 9” high block that is on our takeoffs. Please delete all 9” high block from the future p.o.’s and replace that quantity with regulars. Thanks. ---------------------------------------------------------------- MASMAT-DROP1.MACGA-TYPE1.JAHNA 9-High Block: Old: 600, New: 0 Regulars: Old: 7637, New: 8237 MASMAT-DROP1.MACGA-TYPE2.JAHNA 9-High Block: Old: 522, New: 0 Regulars: Old: 7673, New: 8195 MASMAT-DROP1.MACGA-TYPE3.JAHNA 9-High Block: Old: 573, New: 0 Regulars: Old: 8070, New: 8643 | 05/09/23 | 05/09/23 | |||
| Complete | 05/02/23 | Omar | Minto | NDICP 1330 Isles of Collier | Cottage 4 | B | Slab Prep *** | Swapping Visqueen to 10 mil | Omar Hernandez: In the Slab Prep Material please replace the visquuen 6mil poly 20 x 100 roll with Visqueen 10mil poly 20’x100’ roll. ------------------------------------------------------ SLABPREP.NDICP-4A (12"PARTY WALL).CASTCRETE SLABPREP.NDICP-4A (12"PARTY WALL).WHITECAP SLABPREP.NDICP-4B (12" PARTY WALL).WHITECAP SLABPREP.NDICP-4B (12" PARTY WALL).CASTCRETE SLABPREP.NDICP-3A/NDICP-3C (12"PARTY WALL).WHITECAP SLABPREP.NDICP-3B (12"PARTY WALL).CASTCRETE SLABPREP.NDICP-3B (12"PARTY WALL).LOTTSORLANDO SLABPREP.NDICP-3B (12"PARTY WALL).WHITECAP SLABPREP.NDICP-2A (12"PARTY WALL).WHITECAP SLABPREP.NDICP-2B (12"PARTY WALL).CASTCRETE SLABPREP.NDICP-2B (12"PARTY WALL).WHITECAP SLABPREP.NDICP-2C (12"PARTY WALL).CASTCRETE SLABPREP.NDICP-2C (12"PARTY WALL).WHITECAP SLABPREP.NDICP-1A (12"PARTY WALL).CASTCRETE SLABPREP.NDICP-1A (12"PARTY WALL).WHITECAP SLABPREP.NDICP-1B (12"PARTY WALL).CASTCRETE SLABPREP.NDICP-1B (12"PARTY WALL).WHITECAP SLABPREP.NDICP-1C (12"PARTY WALL).CASTCRETE SLABPREP.NDICP-1C (12"PARTY WALL).WHITECAP 6 mil, 20 x 100: Old: 2, New: 0 10 mil, 20 x 100: Old: 0, New: 2 | 05/02/23 | 05/03/23 | |||
| Complete | 04/27/23 | Bobby Neller | Richmond | ROFCR 077 Forest Creek | F936 | B | Hardware *** | Reducing SP2 & Washers | Bobby Neller: Package change removing additional hardware SP2-old-99, New-50 2”x2”x1/2” Square washer-old-32, New-20 ------------------------------------------------------ HDW.RA-Palm-F936-B.WHITECAP SP2: Old: 99, New: 50 1/2 Washers: Old: 32, New: 20 | 04/27/23 | 04/27/23 | |||
| Complete | 04/26/23 | Cyndi Mullee | Minto | NDLTC 3108 Latitudes | ALL | ALL | Frame *** | Adding Gable Bracing | Cyndi Mullee: Lumber package change to incorporate gable end bracing (all models) and added lumber for Aloha models (189). Across all models, Please add: (22) 2x4x14’ SYP (12) 2x6x14 SYP ALOHA MODEL (189) only please add: (8) 2x12x12’ PT borate ------------------------------------------------------------------- FRMMAT.NDLTC1A.84LUMBER FRMMAT.NDLTC1A.BFS FRMMAT.NDLTC1A.MARJAM FRMMAT.NDLTC1C.84LUMBER FRMMAT.NDLTC1C.BFS FRMMAT.NDLTC1C.MARJAM 2x4x14 SYP: Old: 273, New: 295 2x6x14 SYP: Old: 2, New: 14 2x12x12 PT: Old: 0, New: 8 FRMMAT.NDLTC1B.84LUMBER FRMMAT.NDLTC1B.BFS FRMMAT.NDLTC1B.MARJAM 2x4x14 SYP: Old: 250, New: 272 2x6x14 SYP: Old: 2, New: 14 2x12x12 PT: Old: 0, New: 8 FRMMAT.NDLTC2A.84LUMBER FRMMAT.NDLTC2A.BFS FRMMAT.NDLTC2A.MARJAM FRMMAT.NDLTC2B.84LUMBER FRMMAT.NDLTC2B.BFS FRMMAT.NDLTC2B.MARJAM FRMMAT.NDLTC2C.84LUMBER FRMMAT.NDLTC2C.MARJAM 2x4x14 SYP: Old: 274, New: 296 2x6x14 SYP: Old: 3, New: 15 FRMMAT.NDLTC3A.84LUMBER FRMMAT.NDLTC3A.BFS FRMMAT.NDLTC3A.MARJAM FRMMAT.NDLTC3B.84LUMBER FRMMAT.NDLTC3B.BFS FRMMAT.NDLTC3B.MARJAM FRMMAT.NDLTC3C.84LUMBER FRMMAT.NDLTC3C.BFS FRMMAT.NDLTC3C.MARJAM 2x4x14 SYP: Old: 273, New: 295 2x6x14 SYP: Old: 3, New: 15 2x12x12 PT: Old: 0, New: 8 FRMMAT.NDLTC4A.84LUMBER FRMMAT.NDLTC4A.BFS FRMMAT.NDLTC4A.MARJAM FRMMAT.NDLTC4B.84LUMBER FRMMAT.NDLTC4B.BFS FRMMAT.NDLTC4B.MARJAM 2x4x14 SYP: Old: 279, New: 301 2x6x14 SYP: Old: 2, New: 14 FRMMAT.NDLTC4C.84LUMBER FRMMAT.NDLTC4C.BFS FRMMAT.NDLTC4C.MARJAM 2x4x14 SYP: Old: 270, New: 292 2x6x14 SYP: Old: 2, New: 14 | 04/26/23 | 04/27/23 | |||
| Complete | 04/24/23 | Jeff Rotert | Minto | NDLTS 3039 Latitudes | 50-179-II | B | Masonry *** | Removing 90 Regulars | Jeff Rotert: Please remove (90) regular block from this model. ---------------------------------------------------------------- MASMAT.NDLTS50-179-II-B.FLBESTBLOCKORLANDO Regulars: Old: 2462, New: 2372 | 04/24/23 | 04/24/23 | |||
| Complete | 04/18/23 | Cyndi Mullee | Minto | NDLTC 3110 Latitudes | ALL | ALL | Masonry *** | Removing Four & Six High Block | Cyndi Mullee: Masonry Block package change- all models/elevations. Remove all Four & Six High Block. Revise PO’s on: 3110, 3114, 3154, 3150. ------------------------------------------------------------------- MASMAT.NDLTC1A.FLBESTBLOCKORLANDO MASMAT.NDLTC1A.PREFERREDDAYTONA MASMAT.NDLTC1B.FLBESTBLOCKORLANDO MASMAT.NDLTC1B.PREFERREDDAYTONA MASMAT.NDLTC1C.FLBESTBLOCKORLANDO MASMAT.NDLTC1C.PREFERREDDAYTONA MASMAT.NDLTC2A.FLBESTBLOCKORLANDO MASMAT.NDLTC2A.PREFERREDDAYTONA MASMAT.NDLTC2B.FLBESTBLOCKORLANDO MASMAT.NDLTC2B.PREFERREDDAYTONA MASMAT.NDLTC2C.FLBESTBLOCKORLANDO MASMAT.NDLTC2C.PREFERREDDAYTONA MASMAT.NDLTC3A.FLBESTBLOCKORLANDO MASMAT.NDLTC3A.PREFERREDDAYTONA MASMAT.NDLTC3B.FLBESTBLOCKORLANDO MASMAT.NDLTC3B.PREFERREDDAYTONA MASMAT.NDLTC3C.FLBESTBLOCKORLANDO MASMAT.NDLTC3C.PREFERREDDAYTONA MASMAT.NDLTC4A.FLBESTBLOCKORLANDO MASMAT.NDLTC4A.PREFERREDDAYTONA MASMAT.NDLTC4B.FLBESTBLOCKORLANDO MASMAT.NDLTC4B.PREFERREDDAYTONA MASMAT.NDLTC4C.FLBESTBLOCKORLANDO MASMAT.NDLTC4C.PREFERREDDAYTONA 8x4x16: Old: 24, New: 0 8x6x16: Old: 40, New: 0 | 04/18/23 | 04/18/23 | |||
| Complete | 04/17/23 | Steven Gilbert | Richmond | ROFLK 037 Forest Lake | F926/Emerald | K | Precast *** | Swapping Lintels & Sills | Steven Gilbert: Precast and sill for front window is incorrect. Remove (1) 4’6” precast Remove (1) 3’1” sill Add (1) 5’10” precast Add (1) 4’0” sill ------------------------------------------------------------------------ PCMS.RA-Emerald-F926-A/F926-K.LOTTSORLANDO 4'-6" Lintel: Old: 3, New: 2 5'-10" Lintel: Old: 2, New: 3 3'-1" Sill: Old: 2, New: 3 4'-0" Sill: Old: 2, New: 3 | 04/17/23 | 04/17/23 | |||
| Complete | 04/14/23 | Jeff Rotert | Minto | NDLTS 3041 Latitudes | 50-184 | A | Masonry*** | Removing Regulars | Jeff Rotert: Remove (90) regular block from this model ------------------------------------------------------------ MASMAT.NDLTS50-184-A.FLBESTBLOCKORLANDO Regulars: Old: 2028, New: 1938 | 04/14/23 | 04/14/23 | |||
| Complete | 04/13/23 | Sam Rathbun | Surrey Homes | SOFXH 039 Fox Hammock | Azalea | A | Masonry***, Lintel Concrete | Reducing Pre-Blend & Lintel Concrete | Sam Rathbun: This house needs the takeoff adjusted down by 20 bags of pre blend. This lintel pour only needed 8 yds even with the rear patio option. The base Azalea should only need 9 yds on the very safe side. --------------------------------------------------------------- MASMAT.SO-AZALEA-A.BESTBLOCKORLANDO MASMAT.SO-AZALEA-A.TITANORLANDO Pre-Blend: Old: 136, New: 116 LINCON.SO-AZALEA-A.TITANORLANDO LINCON.SO-AZALEA-A.TITANBREVARD LINCON.SO-AZALEA-A.PREFERREDORLANDO Lintel Concrete: Old: 10 yds, New: 9 yds | 04/13/23 | 04/13/23 | |||
| Complete | 04/12/23 | Ryan Corrigan | Dart Interests | DIEVM 010 Evermore Resort | 10-Bedroom | Theater | Frame *** | Swapping 8x8x10 to 12' Post | Ryan Corrigan: Package change: Please change all 8x8PT posts to 12’ instead of 10’ on all 10 bedroom houses left. -------------------------------------------------------------- FRMMAT-DROP2.DIEVM-10BR-NONE.HAVEN FRMMAT-DROP2.DIEVM-10BR-THEATRE.HAVEN 8x8x10' Post: Old: 2, New: 0 8x8x12' Post: Old: 0, New: 2 | 04/12/23 | 04/12/23 | |||
| Complete | 04/11/23 | Ross Johnson | Sobel Co | - | 3-Unit | ACB, ADB, BDA | Hardware *** | Adding 5/8 Wedge Anchors & Washers | Sharon: Ross Johnson is needing to order 50 5/8x5” wedge anchors and 50 2X2 square washers that would go with the wedge anchors. He is saying ¼” but I do not believe they make a square washer this size. I think where he sees this on the plans refers to the opening of the hole. Ross can confirm but I believe he will need 5/8x2x2 sq washers. He is needing this same order for bldg. D, E and F and says this needs to be added to the packages. I would add them to the hardware po’s on G, H, J these have not been scheduled or delivered yet. --------------------------------------------------------------------------- HDW.OFPPR-ACB.WHITECAP HDW.OFPPR-ADB.WHITECAP 5/8x5 Wedge Anchors: Old: 0, New: 50 5/8x2x2 Washers: Old: 130, New: 180 | 04/11/23 | 04/11/23 | |||
| Complete | 04/05/23 | Jeff Rotert | Minto | NDLTS 2761 Latitudes | 40-177 | A, B | Masonry *** | Removing 90 Regulars | Jeff Rotert: Please remove 90 regular block from this model. ------------------------------------------------------------------ MASMAT.NDLTS40-177-B.FLBESTBLOCKORLANDO Regulars: Old: 1764, New: 1674 MASMAT.NDLTS40-177-A.FLBESTBLOCKORLANDO Regulars: Old: 1854, New: 1764 | 04/05/23 | 04/05/23 | |||
| Complete | 04/05/23 | David Purvis | Dart Interests | - | 10 -Bedroom, 11-Bedroom | ALL | Hardware *** | Revising Package | David Purvis: Good afternoon here is updated hardware packs for 10 and 11 bedrooms. Please make them the same for both. This is for only the highlighted materials. Totals hga10kt new total of 6 Sp1 new total of 25 Sp2 new total of 25 Sp4 new total of 200 Sp6 new total of 100 Tapcon 1/4”x2 3/4” new total of 2 boxes Tapcon 1/4x 3 1/4” new total of 4 boxes Tapcon 1/4x 4” new total of 4 boxes Tapcon 1/4x5” new total of 9 boxes 3x3x 3/4 square washer new total of 200 2x2 3/4 washers: Old: 185, New: 0 3/4”x10” wedge anchor new total of 200 #8 x 2 1/2” wstd212s new total of 3 boxes Dtc new total of 4 boxes ----------------------------------------------------------------------------- HDW.DIEVM-10BR-NONE.WHITECAP HGA10KT: Old: 4, New: 6 SP1: Old: 77, New: 25 SP2: Old: 77, New: 25 SP4: Old: 18, New: 200 SP6: Old: 29, New: 100 Tapcons 1/4 x 2 3/4: Old: 0, New: 2 Tapcons 1/4 x 3 1/4: Matches, No Change Tapcons 1/4 x 4: Old: 6, New: 4 Tapcons 1/4 x 5: Old: 0, New: 9 3/4 x 3 x 3 Washers: Old: 0, New: 200 3/4 x 2 x 2 Washers: Old: 185, New: 0 3/4 x 10 Wedge Anchors: Old: 185, New: 200 #8 x 2 1/2" WSTD212: Old: 0, New: 3 #8 x 2 1/2 Wood Screws: Old: 3, New: 0 DTC Clips: Old: 0, New: 400 HDW.DIEVM-10BR-THEATRE.WHITECAP HGA10KT: Old: 4, New: 6 SP1: Old: 77, New: 25 SP2: Old: 77, New: 25 SP4: Old: 18, New: 200 SP6: Old: 29, New: 100 Tapcons 1/4 x 2 3/4: Old: 1, New: 2 Tapcons 1/4 x 3 1/4: Matches, No Change Tapcons 1/4 x 4: Old: 6, New: 4 Tapcons 1/4 x 5: Old: 0, New: 9 3/4 x 3 x 3 Washers: Old: 0, New: 200 3/4 x 2 x 2 Washers: Old: 185, New: 0 3/4 x 10 Wedge Anchors: Old: 185, New: 200 #8 x 2 1/2" WSTD212: Old: , New: 3 #8 x 2 1/2 Wood Screws: Old: 3, New: 0 DTC Clips: Old: 0, New: 400 HDW.DIEVM-11BR-CORNER.WHITECAP HGA10KT: Old: 3, New: 6 SP1: Old: 101, New: 25 SP2: Old: 101, New: 25 SP4: Old: 12, New: 200 SP6: Old: 33, New: 100 Tapcons 1/4 x 2 3/4: Old: 1, New: 2 Tapcons 1/4 x 3 1/4: Old: 2, New: 4 Tapcons 1/4 x 4: Old: 9, New: 4 Tapcons 1/4 x 5: Old: 0, New: 9 3/4 x 3 x 3 Washers: Old: 0, New: 200 3/4 x 2 x 2 Washers: Old: 165, New: 0 3/4 x 10 Wedge Anchors: Old: 165, New: 200 #8 x 2 1/2" WSTD212: Old: 0, New: 3 #8 x 2 1/2 Wood Screws: Old: 3, New: 0 DTC Clips: Old: 0, New: 400 HDW.DIEVM-11BR-NONE/11BR-THEATRE.WHITECAP HGA10KT: Old: 3, New: 6 SP1: Old: 101, New: 25 SP2: Old: 101, New: 25 SP4: Old: 6, New: 200 SP6: Old: 36, New: 100 Tapcons 1/4 x 2 3/4: Old: 1, New: 2 Tapcons 1/4 x 3 1/4: Old: 2, New: 4 Tapcons 1/4 x 4: Old: 9, New: 4 Tapcons 1/4 x 5: Old: 0, New: 9 3/4 x 3 x 3 Washers: Old: 0, New: 200 3/4 x 2 x 2 Washers: Old: 165, New: 0 3/4 x 10 Wedge Anchors: Old: 165, New: 200 #8 x 2 1/2" WSTD212: Old: 0, New: 3 #8 x 2 1/2 Wood Screws: Old: 3, New: 0 DTC Clips: Old: 0, New: 400 | 04/05/23 | 04/05/23 | |||
| Complete | 04/05/23 | Jeff Subbert | Dart Interests | DIEVM 004 Evermore Resort | ALL | ALL | Precast/Masonry Steel, Drop 2 *** | Adding HETA20s Back | Jeff Subbert: At one point in time we were heavy on HETA20 straps, and I requested them to be taken off of Po’s. At this time I am requesting all lots concrete second lift precast PO’s to once again have the straps on the takeoff I think you. --------------------------------------------------------- PCMS-DROP2.DIEVM-9BR-CORNER.LOTTSORLANDO PCMS-DROP2.DIEVM-9BR-CORNER/THEATRE.LOTTSORLANDO PCMS-DROP2.DIEVM-9BR-NONE.LOTTSORLANDO HETA20: Old: 0, New: 142 PCMS-DROP2.DIEVM-8BR-NONE.LOTTSORLANDO HETA20: Old: 0, New: 102 PCMS-DROP2.DIEVM-8BR-CORNER.LOTTSORLANDO HETA20: Old: 0, New: 104 PCMS-DROP2.DIEVM-7BR-THEATRE.LOTTSORLANDO PCMS-DROP2.DIEVM-7BR-NONE.LOTTSORLANDO HETA20: Old: 0, New: 117 PCMS-DROP2.DIEVM-5BR-NONE.LOTTSORLANDO HETA20: Old: 0, New: 125 PCMS-DROP2.DIEVM-11BR-THEATRE.LOTTSORLANDO PCMS-DROP2.DIEVM-11BR-NONE.LOTTSORLANDO PCMS-DROP2.DIEVM-11BR-CORNER.LOTTSORLANDO PCMS-DROP2.DIEVM-11BR-B.LOTTSORLANDO HETA20: Old: 0, New: 156 PCMS-DROP2.DIEVM-10BR-THEATRE.LOTTSORLANDO PCMS-DROP2.DIEVM-10BR-NONE.LOTTSORLANDO HETA20: Old: 0, New: 146 | 04/05/23 | 04/05/23 | |||
| Complete | 04/04/23 | John Rathbun | Dart Interests | DIEVM 060 Evermore Resort | 11-Bedroom | Corner | Frame Drop 2 *** | Revising Package | John Rathbun: Per Dave after todays meeting with all the framers we need to send the following as a fill in /package change . Package change - please add 50 2x6x10 SYP to frame drop two for a new total of 106 on the 11 BR homes. Please remove 50 2x6x10 spruce frame frame drop two for a new total of 387 on the 11 BR homes. Please send 50 2x4x14 SYP Please send 50 2x6x10 SYP Please send this same fill in for lot 60,61,62. Thank you ---------------------------------------------------------------------- FRMMAT-DROP2.DIEVM-11BR-CORNER.HAVEN 2x6x10 SYP: Old: 56, New: 106 2x6x10 Spruce: Old: 447, New: 397 | 04/04/23 | 04/04/23 | |||
| Complete | 04/04/23 | Kyle Jolly | Dart Interests | DIEVM 056 Evermore Resort | 5-Bedroom | None | Hardware *** | Adding #10 x 5" Wood Screws | Kyle Jolly: Needed for detail that was overlooked. Needed for 5’s and 7’s: 56, 43, 9, 47. #10x5” exterior wood screws (1000) Split between those 4 lots ------------------------------------------------------------ HDW.DIEVM-5BR-NONE.WHITECAP #10 x 5" Screws: Old: 0, New: 250 HDW.DIEVM-7BR-NONE/7BR-THEATRE.WHITECAP #10 x 5" Screws: Old: 0, New: 250 | 04/04/23 | 04/04/23 | |||
| Complete | 04/03/23 | Ryan Corrigan | Dart Interests | DIEVM 065 Evermore Resort | 10-Bedroom | None | Frame Drop 2 *** | Revising Package | Ryan Corrigan: Please make this package change for any lot that the second lift has not been delivered. Add (50) 2x6x10 SYP (50) 2x4x10 SYP Remove (50) 2x6x10 Spruce --------------------------------------------------------------------------- FRMMAT-DROP2.DIEVM-10BR-NONE.HAVEN 2x4x10 SYP: Old: 0, New: 50 2x6x10 SYP: Old: 137, New: 187 2x6x10 Spruce: Old: 318, New: 268 | 04/03/23 | 04/03/23 | |||
| Complete | 03/31/23 | John Rathbun | Dart Interests | DIEVM 052 Evermore Resort | 11-Bedroom | None, Theater | Frame Drop 2 *** | Revising Package | John Rathbun: Per Dave after todays meeting with all the framers we need to send the following as a fill in /package change . Package change - please add 50 2x6x10 SYP to frame drop two for a new total of 106 on the 11 BR homes. Please remove 50 2x6x10 spruce frame frame drop two for a new total of 387 on the 11 BR homes. Please send 50 2x4x14 SYP Please send 50 2x6x10 SYP ------------------------------------------------------------------ FRMMAT-DROP2.DIEVM-11BR-NONE/11BR-THEATRE.HAVEN 2x6x10 SYP: Old: 56, New: 106 2x6x10 Spruce: Old: 437, New: 387 | 03/31/23 | 03/31/23 | |||
| Complete | 03/31/23 | John Rathbun | Dart Interests | DIEVM 050 Evermore Resort | 10-Bedroom | Theater | Frame Drop 2 *** | Revising Package | John Rathbun: Per Dave after todays meeting with all the framers we need to send the following as a fill in /package change . Package change - please add 50 2x6x10 SYP to frame drop two for a new total of 187 on the 10 BR homes. Please remove 50 2x6x10 spruce frame frame drop two for a new total of 268 on the 10 BR homes. Please send 50 2x4x14 SYP Please send 50 2x6x10 SYP ---------------------------------------------------------------------------------- FRMMAT-DROP2.DIEVM-10BR-THEATRE.HAVEN 2x4x10 SYP: Old: 0, New: 50 2x6x10 SYP: Old: 137, New: 187 2x6x10 Spruce: Old: 318, New: 268 | 03/31/23 | 03/31/23 | |||
| Complete | 03/28/23 | Larry Sims | Sobel Co | OFPPR 01G Parkway Preserve | 3-Unit | BDA | Frame *** | Removing Materials | Larry Sims: Package change for ADB model and release to vendor. Change package to remove lumber for door and window bucks remove excess material. Delete 557) 1 x 2 x 10 PT 87) 1 x 4 x 12 PT 66) 1 x 6 x 12 PT 160) 2 x 4 x 14 Spruce 155) 2 x 4 x 16 SYP 20) 2 x 6 x14 SYP 9) 2 x 6 x 8 PT 17) 2 x 8 x 14 SYP 30) 5/8 x 4 x 8 CDX Sheathing -- 6) 2 x 12 x 12’ SYP 8) 2 x 12 x 16’ PT 3) 2 x 12 x 16’ SYP 3) 2 x 12 x 20’ SYP 3) 2 x 12 x 8’ SYP 12) 2 x 4 x 10 SYP 17) 2 x 4 x 14’ PT 59) 2 x 4 x 14’ SYP 32) 2 x 4 x 14 Spruce 25) 2 x 4 x 16 PT 200) 2 x 4 x 16’ SYP 3) 2 x 6 x 10’ PT 64) 2 x 6 x 10’ SYP 17) 2 x 6 x 14’ SYP 8) 2 x 6 x 16’ PT 10) 2 x 6 x 8 PT 20) 2 x 8 x 14’ SYP 16) 2 x 8 x 16’ PT 6) 2 x 8 x 8’ SYP 48) 23/32 x 4 x 8 OSB T&G EDGE GREEN FLOORING 64) 5/8 x 4 x 8 CDX Fire Rated Sheathing 220) 5/8 x 4 x 8 CDX Sheathing 1) Housewrap DuPont Tyvek 9 x 100 30) 2 x 8 x 16 Rough Sawn Spruce Primed ------------------------------------------------------------------------ FRMMAT-DROP1.OFPPR-ADB.84LUMBER 1x2x10 PT: Old: 557, New: 0 1x4x12 PT: Old: 87, New: 0 1x6x12 PT: Old: 66, New: 0 2x4x14 Spruce: Old: 192, New: 32 2x4x16 SYP: Old: 355, New: 200 2x6x14 SYP: Old: 37, New: 17 2x6x8 PT: Old: 19, New: 10 2x8x14 SYP: Old: 37, New: 20 5/8 CDX: Old: 30, New: 0 Notes: Moved 5/8 CDX from 2nd Drop to 1st Drop and deleted the 2nd Drop Cost-Group (Adam). | 03/28/23 | 03/28/23 | |||
| Complete | 03/27/23 | Larry Sims | Sobel Co | OFPPR 01D Parkway Preserve | 3-Unit | ACB | Frame *** | Removing Materials | Larry Sims: Need to change package to reflect that we are not doing window bucking or furring. This change will apply to all ACB buildings package should be: 0) 1 x 2 x 10 #2 pt 0) 1 x 4 x 12 # 2 PT 0) 1 x 6 x 12 #2 PT 6) 2 x 12 x 12’ #2 Syp 8) 2 x 12 x 16 #2 PT 3) 2 x 12 x 20 #2 SYP 12) 2 x 4 x 10 #2 SYP 11) 2 x 4 x 14 #2 PT 59) 2 x 4 x 14 #2 SYP 32) 2 x 4 x 14 spruce 20) 2 x 4 x 16 #2 PT 200) 2 x 4 x 16 #2 SYP 3) 2 x 6 x 10 #2 PT 30) 2 x 6 x 10 #2 SYP 10) 2 x 6 x 14 #2 SYP 2) 2 x 6 16 #2 PT 10) 2 x 6 x 8 #2 PT 3) 2 x 6 x 8 #2 SYP 10) 2 x 8 x 10 #2 PT 20) 2 x 8 x 14 #2 SYP 10) 2 x 8 x 16 #2 PT 6) 2 x 8 x 8 #2 SYP 41) 23/32 x 4 x 8 OSB T&G EDGE GREEN FLOORING 64) 5/8 x 4 x 8 CDX Fire Rated Sheathing 220) 5/8 x 4 x 8 CDX Sheathing 1) Housewrap DuPont Tyvvek 9 x 100 30) 2 x 8 x 16 Rough Sawn Spruce primed -------------------------------------------------------------------------- FRMMAT-DROP1.OFPPR-ACB.84LUMBER 1x2x10 PT: Old: 552, New: 0 1x4x12 PT: Old: 85, New: 0 1x6x12 PT: Old: 63, New: 0 2x4x14 PT: Old: 17, New: 11 2x4x14 Spruce: Old: 192, New: 32 2x4x16 SYP: Old: 355, New: 200 2x6x14 SYP: Old: 30, New: 10 2x6x8 PT: Old: 19, New: 10 2x8x14 SYP: Old: 37, New: 20 2x8x16 PT: Old: 16, New: 10 5/8 CDX: Old: 14, New: 220 -------------------------------------------------------------------------- Larry wanted the CDX at the same time as everything else so removing 2nd Drop Materials - Moved to 1st Drop (Adam). FRMMAT-DROP2.OFPPR-ACB.84LUMBER 5/8 CDX: Old: 220, New: 0 | 03/27/23 | 03/27/23 | |||
| Complete | 03/21/23 | Bobby Neller | Minto | NDLTM 3042 Latitudes | Villa 9 | A | Masonry Steel *** | Swapping 1x13 for 1x9 Dowels | Bobby Neller: 1x13 dowels-old-16, New-0 1x9 dowels-old-87, New-103 ---------------------------------------------------- PCMS.NDLTM9-A.CASTCRETE 1x13 Dowels: Old: 16, New: 0 1x9 Dowels: Old: 87, New 103 | 03/21/23 | 03/22/23 | |||
| Complete | 03/17/23 | Jeff Subbert | Dart Interests | DIEVM 024 Evermore Resort | 8-Bedroom | None | Hardware *** | Adding HUC212-3 | Jeff Subbert: Instead of me, doing it to do for every eight bedroom, this goes for all eight bedrooms, PO only shows two, but I need four 4) HUC212-3 -------------------------------------------------------------- HDW.DIEVM-8BR-NONE/8BR-CORNER.WHITECAP HUC212-3: Old: 2, New: 4 | 03/17/23 | 03/17/23 | |||
| Complete | 03/15/23 | Jeff Subbert | Dart Interests | DIEVM 006 Evermore Resort | 8-Bedroom | None | Hardware *** | Swapping ABU44 w/ ABU66 | Jeff Subbert: On my framing hardware PO‘s calls for 4, ABU44s. I’m not sure where these are supposed to go but the blueprint I’m reading does not show 4 x 4 bases. But it does car for 4 ABU66 on the front, but for some reason they are not on the PO takeoff. ------------------------------------------------------ HDW.DIEVM-8BR-NONE/8BR-CORNER.WHITECAP ABU44: Old: 4, New: 0 ABU66: Old: 0, New: 4 ABU88: Old: 3, New: 0 ABU88Z: Old: 0, New: 3 | 03/15/23 | 03/15/23 | |||
| Complete | 03/14/23 | Larry Sims | Sobel Co | OFPPR 01C Parkway Preserve | 3-Unit | ADB, ACB | Hardware *** | Adding 3/4" Wedge Anchors for Red Iron | Larry Sims: 3/4” wedge anchors called for in plan are not in the po. Need 24) 3/4” x 7” wedge anchors for fabricated red iron floor joist buckets. 24) 3/4” x 7” wedge anchors ( exact length of the wedge anchor is not specified but they are going into a 7 5/8” wall so anything between 6” and 8” will work. ------------------------------------------------------------------ HDW.OFPPR-ADB.WHITECAP HDW.OFPPR-ACB.WHITECAP 3/4"x 6-1/4" Wedge Anchors: Old: 0, New: 24 | 03/14/23 | 03/14/23 | |||
| Complete | 03/08/23 | Bobby Neller | Minto | NDLTM 3050 Latitudes | Villa 11 | A | Shaftwall *** | Reducing Quantities | Bobby Neller: Removing 20 H track for a new total of 42 and removing 10 C track for new total of 30. Requesting a package change Interior Exterior‘s H track-12’ old-62, New-42. C track-10’ old-40, New-30. --------------------------------------------------------- SHAFTWALL.NDLTM11-A.INTERIOREXTERIOR SHAFTWALL.NDLTM11-B.INTERIOREXTERIOR H track-12’ old-62, New-42. C track-10’ old-40, New-30. | 03/08/23 | 03/08/23 | |||
| Complete | 03/07/23 | Dane Jones | Mattamy Homes | MOMER 035 Meridian | 5-Unit | CCACC/PR | Precast, Frame, Hardware *** | Revising Precast, Adding 6x6 Posts | Dane Jones: Precast: Need: 7) 4’-6” U Lintel, have 5 need 12 Remove: 4) 7’-6” U Lintel, have 5 need 1 Lumber: Need: 16) 6x6x10’ PT, Have 0 Hardware; Remove: 4) ABU66 post base, have 20 need 16. ----------------------------------------------------------------- PCMS.MOMER035.LOTTSORLANDO 4'-6" Lintels: Old: 5, New: 12. 7'-6" Lintels: Old: 5, New: 1. FRMMAT-DROP1.MOMER035.HAVEN 6x6x10 PT Posts: Old: 0, New: 16 HDW.MOMER035.WHITECAP ABU66: Old: 20, New: 16 | 03/07/23 | 03/07/23 | |||
| Complete | 03/07/23 | Rick Higgins | Minto | - | ALL | ALL | Precast *** | Removing Duro Wall | Rick Higgins: Isle of collier please credit back 7 bundles of 8” durawall and do not ship anymore to that neighborhood they don’t use it even though it’s on po todd is bringing it back now -- -------------------------------------------------------- PCMS.NDICP-1A (12"PARTY WALL).CASTCRETE PCMS.NDICP-1A (12"PARTY WALL).LOTTSORLANDO PCMS.NDICP-1B (12"PARTY WALL).CASTCRETE PCMS.NDICP-1B (12"PARTY WALL).LOTTSORLANDO PCMS.NDICP-1C (12"PARTY WALL).CASTCRETE PCMS.NDICP-1C (12"PARTY WALL).LOTTSORLANDO PCMS.NDICP-2A (12"PARTY WALL).CASTCRETE PCMS.NDICP-2A (12"PARTY WALL).LOTTSORLANDO PCMS.NDICP-2B (12"PARTY WALL).CASTCRETE PCMS.NDICP-2B (12"PARTY WALL).LOTTSORLANDO PCMS.NDICP-2C (12"PARTY WALL).CASTCRETE PCMS.NDICP-2C (12"PARTY WALL).LOTTSORLANDO PCMS.NDICP-3B (12"PARTY WALL).CASTCRETE PCMS.NDICP-3B (12"PARTY WALL).LOTTSORLANDO PCMS.NDICP-4A (12"PARTY WALL).CASTCRETE PCMS.NDICP-4A (12"PARTY WALL).LOTTSORLANDO PCMS.NDICP-4B (12"PARTY WALL).CASTCRETE PCMS.NDICP-4B (12"PARTY WALL).LOTTSORLANDO Duro Wall: Old: 6, New: 0 | 03/07/23 | 03/07/23 | |||
| Complete | 03/02/23 | Adrian Hart | Dart Interests | DIGFL 0D1 Garden Flats | 6-Unit | - | Hardware *** | Swapping HTS20 for HTSM20 | Adrian Hart: Fill-In/Package Change. Please revise po digflod1-0029rev. Adjust po delete hts20 and replace with htsm 20. ------------------------------------------------------------- HDW.DIGFL-0D1.WHITECAP HTS20: Old: 12, New: 0 HTSM20: Old: 0, New: 12 | 03/02/23 | 03/02/23 | |||
| Complete | 03/01/23 | Bobby Neller | Minto | NDLTM 3052 Latitudes | Villa 7 | II-B | Shaftwall *** | Adding DensGlass | Bobby Neller: Package change needs to be read 77 pieces going to be needing a fill in order for eight additional pieces as well please. Only 69 pieces of Shaftwall on this takeoff the number needs to be 77. Old-69, New-77-2’x10’x1” --------------------------------------------------------------- SHAFTWALL.NDLTM7-B/NDLTM7-II-B.INTERIOR/EXTERIOR BUILDING SUPPLY DensGlass 2x10x1: Old: 69, New: 77 SHAFTWALL.NDLTM7-B/NDLTM7-II-B.ALLIED DensGlass 2x10x1: Old: 74, New: 77 | 03/01/23 | 03/01/23 | |||
| Sent to Bids | 03/01/23 | Kyle Jolly | Dart Interests | DIEVM 058 Evermore Resort | 10-Bedroom | Theater | Frame *** | Adding 5/8 OSB | Kyle Jolly: Package change and fill in. Please add to all 10BR lots and fill in to this lot only. Needed for all 10BR’s. (+40sheets) 5/8 OSB plywood. Add to future packages and fill in to this lot. ---------------------------------------------------------------- | 03/01/23 | ||||
| Sent to Bids | 03/01/23 | Kyle Jolly | Dart Interests | DIEVM 055 Evermore Resort | 11-Bedroom | B | Frame *** Patio Roofs | 2x4 & 2x8 for Perlins on Patios | Kyle Jolly: We need to add PT 2x4’s to the packages on houses that get corrugated metal roofs on patios as they take 2x4 purlins. Fill-In: These were taken from here to finish patio roofs on other lots. Materials use to finish patios on other lots. 2x4x16PT (68) 2x8x16PT (70) Kyle says that Dart has sent a chart on which lots have patios with this kind of roof and that it’s not per model or plan. ----------------------------------------------------------------------- | 03/01/23 | ||||
| Sent to Bids | 02/22/23 | Kyle Jolly | Dart Interests | DIEVM 057 Evermore Resort | 10-Bedroom | None | Frame Drop 2 *** | Interiors and Stair Window Details | Kyle Jolly: Fill in and package change. Please add to 2nd lumber drop on all 10BR’s moving forward. Needed for interiors and stair window details. Please fill in for this lot and add to upcoming 10BR drop 2. 100 pcs of 2x6x10 syp 30 pcs of 2x8x10 syp 1 pcs of 8x8x12 pt post Note: There are 10 lots where the 2nd Drop Frame Material PO has not yet been loaded/released. ----------------------------------------------------------------------- FRMMAT-DROP2.DIEVM-10BR-NONE.HAVEN | 02/22/23 | ||||
| Sent to Bids | 02/22/23 | Kyle Jolly | Dart Interests | DIEVM 056 Evermore Resort | 5-Bedroom, 7-Bedroom | All | Hardware *** | Hardware for Patios | Adam Sowers: Needed to finish patios. This is for 5 and 7 BR lots. For: 56, 51, 67, 12, 43, 30, 34, 39, 9 and 47 (100) LSSJ210RZ (100) LSSJ210LZ ----------------------------------------------------------------- Kyle wants to add (10) of each item above to the 5 and 7 bedroom packages (Adam). | 02/22/23 | ||||
| Complete | 02/21/23 | Bobby Neller | Minto | NDLTM 2676 Latitudes | Villa 11 | A | Shaftwall *** | Adding 12' Densglass Back | Bobby Neller: Need additional shaft liner added to the takeoff the number is roughly 75. 2’x12’x1”-old-50, New-70 Adding 20. For a total of 70-12’ -------------------------------------------------------- We had a package change on 1/19/2023 from Bobby reducing the DensGlass. Now we're adding it back. Not going back and forth on this one anymore (Adam). SHAFTWALL.NDLTM11-A.INTERIOREXTERIOR 12' DensGlass: Old: 50, New: 70 | 02/21/23 | 02/21/23 | |||
| Complete | 02/21/23 | Omar Hernandez | Minto | NDICP 1424 Isles of Collier | Cottage 1 | B | Slab Prep Material *** | Adjusting Rod Chairs | Omar Hernandez: Please delete the 33 pcs of Rod Chairs 16” - 3 bar Please add to the slab hardware package 1 box of Rod Chairs 12” - 2 bars. The 16” Rod chairs are not used. And we’re always short 12” Rod chairs. Thank you ---------------------------------------------------------------------------- SLABPREP.NDICP-1B (12"PARTY WALL).WHITECAP SLABPREP.NDICP-1B (12"PARTY WALL).CASTCRETE 3-Bar Chairs: Old: 23, New: 0 2-Bar Chairs: Old: 91, New: 200 (switched to 2 boxes instead of 'each') | 02/21/23 | 02/21/23 | |||
| Declined | 02/17/23 | Larry Sims | Sobel Co | OFPPR 01C (ADB) Parkway Preserve | 3-Unit | ADB | Precast *** | Adding (1) 17'-4" Lintel | Larry Sims: Fill-In / Package Change. Missing 17-4 lintel. Package needs to be changed on ADB model to have 3) 17-4 lintels instead of 2 and issue a po to Lott’s concrete to deliver one more here. 1) 17-4 x 8 precast lintel --------------------------------------------------------------------- PCMS-DROP1.OFPPR-ADB.LOTTSFTMYERS 2/20/23: Package Change Declined. 2/20/23: Larry: They used the 17-4 lintel on the right side lanai. You are right a 15-4 lintel will have 6” bearing on that spot which is good. I don’t know what they did with the 15-4 lintel that was supposed to be used there. I took over this job while this was in progress not sure if it was broken or cut I will dig into this package and see what happened but I will need a 17-4 lintel for the middle lanai. 2/20/23: Angie: @sharonheim1 @adamsowers1 according to the plans, I only need (2) 17-4 (1)for the garage door and (1) for the lanai, unless they change the Beam B-2 that is on the SGD for a precast to. I have attached the email I sent to Larry to confirm the info. | 02/17/23 | 02/17/23 | Angie | 02/20/23 | |
| Sent to Bids | 02/16/23 | Kyle Jolly | Dart Interests | DIEVM 026 Evermore Resort | 8-Bedroom | None | Frame *** | Short 1/2" OSB & Zip | Kyle Jolly: Fill in and package change. Running short consistently on this model. Running short on 8BR models. (60) 1/2”OSB (30) 1/2ZIP -------------------------------------------------------------- | 02/16/23 | ||||
| Complete | 02/15/23 | Ted Mozzott | Marmer Contruction | MACSA 006 Casa San Alfonso | 4-Bedroom | STD | Frame *** | Adjusting Package | Ted Mozzott: Need to fix package one more time please add to existing package for lot 6/7/8/9/10/11/12 all four bedrooms. Short materials for the next lots 6/7/8/9/10/11/12 four bedrooms please add to existing package list .please add to this list pic above and we should be good thank you Ted. Need 36- 1x4x12 ft #2 pt borate 100- 1x2x8ft pt borate 10 - 1x6x12 ft pt borate 4 - sheets of cdx 5/8 plywood ---------------------------------------------------------- Angie: @sharonheim1 This material is the one corresponding to the furring, in our initial proposal we are not including the furring, the builder wanted it for Chad, I'm not sure if he already did the EWO for that reason. I will send an email to @adamsowers1 that this must be included in the package, what must be found out is where this is going to be charged if through an EWO or we must send a proposal. ------------------------------------------------------------ FRMMAT.MACSA-4BR.HAVEN 1x2x8 PT: Old: 120, New Total: 220 1x4x12 PT: Old: 0, New Total: 36 1x6x12 PT: Old: 20, New Total: 30 5/8 CDX: Old: 60, New: 64 | 02/15/23 | 02/16/23 | Angie | 02/16/23 | |
| Sent to Bids | 02/15/23 | Jeff Subbert | Dart Interests | DIEVM 026 Evermore Resort | 8-Bedroom | None | Frame *** | Removing Materials | Jeff Subbert: Every eight bedroom we are heavy (160) 2 x 6 x 10 spruce. Lot 26 extra bunk lot 31 extra bunk lot, 45 extra bunk. It’s up to you guys what you wanna do we can either pick three bunks up a bunk equals 160) 2 x 6’s, or take off of next house and use on site in Lou of ordering anymore. ------------------------------------------------------------------ | 02/15/23 | ||||
| Declined | 02/15/23 | Larry Sims | Sobel Co | OFPPR 01F (ADB) Parkway Preserve | ADB | - | Masonry *** | Adding 9-Highs | Larry Sims: Need 210 ) 9” high foundation block to account for 1 1/2” block recess called for on this building to achieve 9’ beam height and avoid issues at party walls ------------------------------------------------------------- (Latest) Sharon: @angierodriguez61 @adamsowers1 per John her will get with Mark. we are not doing 9's. he said they figured out a way to use 4 highs. Angie: @sharonheim1 at takeoff we have them as regular, you can add 210 9" and remove 210 regular Sharon: @angierodriguez61 once this is checked please let us know. Mark spoke to larry and agrees 9's should have been included in the take off due to a recess. | 02/15/23 | 02/16/23 | Angie | 02/16/23 | |
| Complete | 02/15/23 | John Rathbun | Surrey Homes | SOFXH 016 Fox Hammock | Violet | A, B | Frame *** | Adding (2) Sheets of 3/4 PT | John Rathbun: Please add two sheets of 3/4 PT plywood to the Violet model . A and B elevations. This is for the A/c stand and a tub deck . New total of two sheets . Need a fill in P.O. For two sheets of 3/4 PT plywood . ------------------------------------------------------------------------- FRMMAT.SO-VIOLET-A.BFS FRMMAT.SO-VIOLET-B.BFS 3/5 CDX PT: Old: 0, New: 2 | 02/15/23 | 02/15/23 | |||
| Complete | 02/13/23 | Bobby Neller | Minto | NDLTM 3052 Latitudes | Villa 7 | II-B | Precast *** | Removing (1) 4'-6" Lintel | Bobby Neller: we have one extra header on this takeoff 4‘6“ precast header Old-7, New-6 ----------------------------------------------------------- PCMS.NDLTM7-II-A/NDLTM7-II-B.CASTCRETE 4'-6" Lintel: Old: 7, New: 6 | 02/13/23 | 02/14/23 | |||
| Complete | 02/13/23 | Bobby Neller | Minto | NDLTM 2614 Latitudes | Villa 9 | B | Masonry *** | Reducing Half Block | Bobby Neller: Removing (70) 8 x 8 x 8 half block Old-237, New-167 Need to add more nine highs to the takeoff Old-191, New-220 ----------------------------------------------------- MASMAT.NDLTM9-B.FLBESTBLOCKORLANDO MASMAT.NDLTM9-B.PREFERREDDAYTONA Half Block: Old: 237, New: 167 9-Highs: Old: 191, New: 220 | 02/13/23 | 02/14/23 | |||
| Complete | 02/13/23 | Ryan Corrigan | Richmond | ROSVB 021 Silver Basin | F927/Slate | All | Precast/Masonry Steel *** | Adding (2) 1x9 Dowels | Ryan Corrigan: Fill in order/ package change. Please add this change to lot 22 and 26 as well in separate PO’s. (2) 1’x9’ down rods for a total of 48. ----------------------------------------------------- PCMS.RA-Slate-F927-A.LOTTSORLANDO PCMS.RA-Slate-F927-B.LOTTSORLANDO PCMS.RA-Slate-F927-C.LOTTSORLANDO 1x9 Dowels: Old: 46, New: 48 | 02/13/23 | 02/14/23 | |||
| Complete | 02/10/23 | Hermes | Dart Interests | DIEVM 019 Evermore Resort | 9-Bedroom | Corner/Theater | Hardware *** | Adding LTT19 & H3 | Hermes: I only have two and I need 8 LTT 19in total 8 pcs LTT 19 500 pcs H3 -------------------------------------------------------------- HDW.DIEVM-9BR-CORNER/9BR-THEATRE.WHITECAP LTT19: Old: 0, New: 19 H3: Old: 252, New: 500 | 02/10/23 | 02/10/23 | |||
| Complete | 02/10/23 | Omar Hernandez | Minto | NDICP 1422 Isles of Collier | Cottage 2 | A | Slab Prep*** | Adding 1 Box of 12" Rod Chairs | Omar Hernandez: Needed to finish prepping slab so I need to pick one up today. We are always short. Would you add a box to the package please. 1 box of rod chair 12”-2bar (each) ------------------------------------------------------ 12" Rod Chairs: Old: 176, New: 276 | 02/10/23 | 02/10/23 | |||
| Sent to Bids | 02/10/23 | Jeff Subbert | Dart Interests | DIEVM 029 Evermore Resort | 9-Bedroom | Corner | Frame *** | 2x4, 2x6n 2x8 SYP | 02/10/23 | |||||
| Complete | 02/09/23 | Jeff Subbert | Dart Interests | DIEVM 052 Evermore Resort | 11-Bedroom | None | 2nd Lift - Precast/Masonry Steel | Adding Anchor Bolts | Jeff Subbert: I need to start getting 10 inch by half-inch J bolts on precast packages second lift. All houses 50) bolts ------------------------------------------------------------------------- PCMS-DROP2.DIEVM-10BR-NONE.LOTTSORLANDO PCMS-DROP2.DIEVM-10BR-THEATRE.LOTTSORLANDO PCMS-DROP2.DIEVM-11BR-B.LOTTSORLANDO PCMS-DROP2.DIEVM-11BR-CORNER.LOTTSORLANDO PCMS-DROP2.DIEVM-11BR-NONE.LOTTSORLANDO AB1210: Old: 0, New: 50 PCMS-DROP2.DIEVM-5BR-NONE.LOTTSORLANDO AB1210: Old: 15, New: 50 PCMS-DROP2.DIEVM-7BR-NONE.LOTTSORLANDO PCMS-DROP2.DIEVM-7BR-THEATRE.LOTTSORLANDO AB1210: Old: 30, New: 50 PCMS-DROP2.DIEVM-9BR-CORNER.LOTTSORLANDO PCMS-DROP2.DIEVM-9BR-CORNER/THEATRE.LOTTSORLANDO PCMS-DROP2.DIEVM-9BR-NONE.LOTTSORLANDO AB1210: Old: 40, New: 50 | 02/09/23 | 02/10/23 | |||
| Complete | 02/09/23 | Omar | Minto | NDICP 1430 Isles of Collier | Cottage 2 | A | Hardware *** | Removing SP2's - Too Many in Boneyard | Omar Hernandez: Delete sp2 from hardware package. I have hundreds of SP-2 in my bone yard. When I need to add it back on I will do so then. Thank you ------------------------------------------------------------------ HDW.NDICP-1A (12"PARTY WALL).WHITECAP SP2: Old: 23, New: 0 HDW.NDICP-1B (12"PARTY WALL).WHITECAP SP2: Old: 32, New: 0 HDW.NDICP-1C (12"PARTY WALL).WHITECAP SP2: Old: 44, New: 0 HDW.NDICP-2A (12"PARTY WALL).WHITECAP SP2: Old: 16, New: 0 HDW.NDICP-2B (12"PARTY WALL).WHITECAP SP2: Old: 31, New: 0 HDW.NDICP-2C (12"PARTY WALL).WHITECAP SP2: Old: 33, New: 0 HDW.NDICP-3B (12"PARTY WALL).WHITECAP SP2: Old: 40, New: 0 HDW.NDICP-4A (12"PARTY WALL).WHITECAP SP2: Old: 23, New: 0 HDW.NDICP-4B(12"PARTY WALL).WHITECAP SP2: Old: 23, New: 0 | 02/09/23 | 02/10/23 | |||
| Complete | 02/09/23 | Adrian Hart | Dart Interests | DIGFL 0C1 Garden Flats | 12-Unit, 10-Unit | - | Hardware *** | Adjusting Hardware | Adrian Hart: 1) 28-HTSM20 needed per detail. S511 Regular hts we’re delivered and not suitable for wood to concrete connections. 2) 12 mgt needed inleau of column caps 3)12- 5/8x 7 1/2” anchor wedge bolts 4) 2 220z Simpson epoxy tubes --------------------------------------------------------- HDW.DIGFL-0C1/0C2/0C3.WHITECAP HTS20: Old: 28, New: 0 HTSM20: Old: 0, New: 28 5/8 x 8/-1/2 Wedge Anchors: Old: 0, New: 12 SET22 Epoxy: Old: 0, New: 2 MGT: No Change. Cost-Group doesn't match the amount on the PO from 0C1 - Change must have already been made. --------------------------------------------------------- HDW.DIGFL-0B1.WHITECAP HTS20: Old: 24, New: 0 HTSM20: Old: 0, New: 24 | 02/09/23 | 02/09/23 | |||
| Complete | 02/08/23 | Bobby Neller | Minto | NDLTM 3054 Latitudes | Villa 9 | A | Frame *** | Adjusting 2x8 PT | Bobby Neller: Removing extra 2 x 8 PT 2x8x10-old-4, New-0 2x8x12-old-1, New-0 2x8x8-old 4, New -8 -all borate --------------------------------------------------- FRMMAT.NDLTM9-A.84LUMBER FRMMAT.NDLTM9-A.BFS FRMMAT.NDLTM9-A.MARJAM 2x8x8 PT: Old: 4, New: 8 2x8x10 PT: Old: 4, New: 0 2x8x12 PT: Old: 1, New: 0 | 02/08/23 | 02/08/23 | |||
| Complete | 02/08/23 | Dane Jones | Toll Brothers | TBLPT 037 Laurel Pointe | ALL | ALL | Precast *** | Adding Bar Ties | Dane Jones: Need one bundle of 6” bar ties on every future precast PO for all of laurel pointe. Including this lot. ------------------------------------------------------------- PCMS.TBLPT008.LOTTSORLANDO PCMS.TBLPT009.LOTTSORLANDO PCMS.TBLPT010.LOTTSORLANDO PCMS.TBLPT013.LOTTSORLANDO PCMS.TBLPT018.LOTTSORLANDO PCMS.TBLPT037.LOTTSORLANDO PCMS.TBLPT048.LOTTSORLANDO PCMS.TBLPT053.LOTTSORLANDO PCMS.TBLPT054.LOTTSORLANDO PCMS.TBLPT055.LOTTSORLANDO PCMS.TBLPT058.LOTTSORLANDO 6" Bar Ties: Old: 0, New: 1 | 02/08/23 | 02/08/23 | |||
| Complete | 02/06/23 | Bobby Neller | Minto | NDLTM 3048 Latitudes | Villa 11 | B | Precast *** | Removing (1) 8'-8" Lintel | Bobby Neller: This job only requires 2/8‘8“ Precast headersl not three. Old-3-8’8”-precast headersl New-2-8’8”-precast headersl --------------------------------------------------------------------- PCMS.NDLTM11-B.CASTCRETE 8'-8" Lintel: Old: 3, New: | 02/06/23 | 02/06/23 | |||
| Complete | 02/03/23 | Bobby Neller | Minto | NDLTM 2672 Latitudes | ALL Villas | All | Frame Materials *** | Plant Shelves | Bobby Neller: Initially we were getting three-quarter inch plywood sent out for plant shelves typically two pieces. In some cases some of the models only require one piece. These are the models that require only one sheet 2670/69 Villa 12 171 B 2- only one sheet required 4x8x 3/4” CDX 2671/72 Villa 12 171 A 2-only one sheet required 2673/74 Villa 4 171-B-only one sheet required 2689/90 Villa 7 171 A 2-only one sheet required All other villas require two sheets.(4x8x3/4”)-plywood ------------------------------------------------------------------------------ FRMMAT.NDLTM12-B/NDLTM12-II-B.84LUMBER FRMMAT.NDLTM12-B/NDLTM12-II-B.BFS No Change, Already has 1 sheet. FRMMAT.NDLTM12-A/NDLTM12-II-A.84LUMBER FRMMAT.NDLTM12-A/NDLTM12-II-A.BFS FRMMAT.NDLTM12-A/NDLTM12-II-A.MARJAM 3/4 CDX: Old: 2, New: 1 FRMMAT.NDLTM4-A/NDLTM4-II-A.84LUMBER FRMMAT.NDLTM4-A/NDLTM4-II-A.BFS FRMMAT.NDLTM4-A/NDLTM4-II-A.MARJAM FRMMAT.NDLTM4-B/NDLTM4-II-B.84LUMBER FRMMAT.NDLTM4-B/NDLTM4-II-B.BFS FRMMAT.NDLTM4-B/NDLTM4-II-B.MARJAM 3/4 CDX: Old: 0, New: 1 FRMMAT.NDLTM7-A/NDLTM7-II-A.84LUMBER FRMMAT.NDLTM7-A/NDLTM7-II-A.BFS FRMMAT.NDLTM7-A/NDLTM7-II-A.MARJAM FRMMAT.NDLTM7-B/NDLTM7-II-B.84LUMBER FRMMAT.NDLTM7-B/NDLTM7-II-B.BFS FRMMAT.NDLTM7-B/NDLTM7-II-B.MARJAM 3/4 CDX: Old: 0, New: 1 All Other Models/Elevations Require 2 Sheets of 3/4 CDX. All Except: 12, 7, & 4. ------------------------------------------------------------------------------- FRMMAT.NDLTM10-A.84LUMBER FRMMAT.NDLTM10-A.BFS FRMMAT.NDLTM10-A.MARJAM FRMMAT.NDLTM10-B.84LUMBER FRMMAT.NDLTM10-B.BFS FRMMAT.NDLTM10-B.MARJAM FRMMAT.NDLTM11-A.84LUMBER FRMMAT.NDLTM11-A.BFS FRMMAT.NDLTM11-A.MARJAM FRMMAT.NDLTM11-B.84LUMBER FRMMAT.NDLTM11-B.BFS FRMMAT.NDLTM11-B.MARJAM FRMMAT.NDLTM13-A.84LUMBER FRMMAT.NDLTM13-A.BFS FRMMAT.NDLTM13-A.MARJAM FRMMAT.NDLTM13-B.84LUMBER FRMMAT.NDLTM13-B.BFS FRMMAT.NDLTM13-B.MARJAM FRMMAT.NDLTM2-A.84LUMBER FRMMAT.NDLTM2-A.BFS FRMMAT.NDLTM2-A.MARJAM FRMMAT.NDLTM2-B.84LUMBER FRMMAT.NDLTM2-B.BFS FRMMAT.NDLTM2-B.MARJAM FRMMAT.NDLTM3-A.84LUMBER FRMMAT.NDLTM3-A.BFS FRMMAT.NDLTM3-A.MARJAM FRMMAT.NDLTM3-B.84LUMBER FRMMAT.NDLTM3-B.BFS FRMMAT.NDLTM3-B.MARJAM FRMMAT.NDLTM5-A.84LUMBER FRMMAT.NDLTM5-A.BFS FRMMAT.NDLTM5-A.MARJAM FRMMAT.NDLTM5-B.84LUMBER FRMMAT.NDLTM5-B.BFS FRMMAT.NDLTM5-B.MARJAM FRMMAT.NDLTM6-A.84LUMBER FRMMAT.NDLTM6-A.BFS FRMMAT.NDLTM6-A.MARJAM FRMMAT.NDLTM6-B.84LUMBER FRMMAT.NDLTM6-B.BFS FRMMAT.NDLTM6-B.MARJAM FRMMAT.NDLTM8-A.84LUMBER FRMMAT.NDLTM8-A.BFS FRMMAT.NDLTM8-A.MARJAM FRMMAT.NDLTM8-B.84LUMBER FRMMAT.NDLTM8-B.BFS FRMMAT.NDLTM8-B.MARJAM FRMMAT.NDLTM9-A.84LUMBER FRMMAT.NDLTM9-A.BFS FRMMAT.NDLTM9-A.MARJAM FRMMAT.NDLTM9-B.84LUMBER FRMMAT.NDLTM9-B.BFS FRMMAT.NDLTM9-B.MARJAM 3/4 CDX: Old: 0, New: 2 | 02/03/23 | 02/08/23 | |||
| Complete | 02/02/23 | Bobby Neller | Minto | NDLTM 2670 Latitudes | Villa 12 | A, B, II-A, II-B | Shaftwall Materials *** | Removing DensGlass | Adam Sowers: Shaft liner-old-95, New-75 H track-old-57, New-37 Burn clips-old-500, New-100 The 20 extra sheets I have left from this one are the ones I’m going to remove from lot 2700 that we’ve revised once already. For a total of zero shaft liner going to 2700. ------------------------------------------------------- SHAFTWALL.NDLTM12-A/NDLTM12-II-A.INTERIOR/EXTERIOR DensGlass: Old: 95, New: 75 SHAFTWALL.NDLTM12-B/NDLTM12-II-A.INTERIOR/EXTERIOR DensGlass: Old: 80, New: 75 SHAFTWALL.NDLTM12-II-B/NDLTM12-II-B.INTERIOR/EXTERIOR DensGlass: Old: 95, New: 75 H Studs 10': Old: 57, New: 37 Burn Clips (Box 500): Old: 1, New: 0 Burn Clips (Box 100): Old: 0, New: 1 | 02/02/23 | 02/02/23 | |||
| Complete | 02/01/23 | Steven Gilbert | Richmond | ROSUT 089 Sutton Preserve | F956/Zinc | B | Hardware *** | Adding HUS26 | Steven Gilbert: 2nd house missing HUS26s Need total of 21 on package need fill in also for this lot. ------------------------------------------------------- HDW.RA-F956-B.WHITECAP HUS26: Old: 0, New: 21 | 02/01/23 | 02/01/23 | |||
| Complete | 01/30/23 | Steven Gilbert | Richmond | ROEDH 039-02 Eden Hills | F924/Ammolite | J | Frame *** | Swapping SYP w/ Spruce | Steven Gilbert: Need SYP swapped for spruce. Need bundle of SYP swapped for spruce. (230) 2x4x92 5/8” need to be spruce. SYP will bow and cause issues later to exterior or interior’s walls. --------------------------------------------------------------- FRMMAT.RA-Ammolite-F924-J.84LUMBER FRMMAT.RA-Ammolite-F924-J.BFS FRMMAT.RA-Ammolite-F924-J.HAVEN FRMMAT.RA-Ammolite-F924-J.MARJAM 2x4x92 5/8 SYP: Old: 230, New: 0 2x4x92 5/8 Spruce: Old: 206, New: 436 | 01/30/23 | 01/30/23 | |||
| Complete | 01/27/23 | Jeff Subbert | Dart Interests | DIEVM 034 Evermore Resort | 7-Bedroom | None | Frame Materials *** | Reducing 1x2, 2x6x10 spruce | Jeff Subbert: Remove material from PO 25) 2 x 6 x 10 spruce 50) 1 x 2 x 10 pt -------------------------------------------- There's one more lot where the 2nd Drop Frame PO hasn't been released and Jeff would like to remove some materials. FRMMAT-DROP2(SHINGLE).DIEVM-7BR-NONE/7BR-THEATRE.HAVEN 1x2x10 PT: Old: 202, New: 192 2x6x10 Spruce: Old: 198, New: 148 | 01/27/23 | 02/03/23 | |||
| Complete | 01/27/23 | Bobby Neller | Minto | NDLTM 2680 Latitudes | Villa 11 | A | Frame *** | Removing Materials | Bobby Neller: All this material is sitting in unit 2679 and can be picked up and credited. 2x8x10 borate-old-9 new 6 2x8x12 borate -old-2. New 0 2x8x14 borate old-3. New 0 2x12x8 borate-old-3. New 0 ---------------------------------------------------------- FRMMAT.NDLTM11-A.84LUMBER FRMMAT.NDLTM11-A.BFS FRMMAT.NDLTM11-A.MARJAM 2x8x10 PT: Old: 9, New: 6 2x8x12 PT: Old: 2, New: 0 2x8x14 PT: Old: 3, New: 0 2x12x8 PT: Old: 3, New: 0 | 01/27/23 | 01/27/23 | |||
| Complete | 01/27/23 | Kyle Jolly | Dart Interests | DIEVM 069 Evermore Resort | 8-Bedroom | None | Hardware*** | Adding HW for ECC98s | Kyle Jolly: ECC98 did not come with hardware to install it. This is needed on each 8BR . (4) 3/4x12” all threads (8) 2x2x3/4 square washers (8) 3/4 nuts (4) 3/4”x3.5” wood lag bolts ------------------------------------------------ HDW.DIEVM-8BR-NONE/8BR-CORNER.WHITECAP TR3412 Threaded Rod 3/4"x12": Old: 0, New: 4 2x2x3/4 washers: Old: 0, New: 8 N34: Old: 0, New: 8 | 01/27/23 | 01/27/23 | |||
| Complete | 01/24/23 | Ted Mozzott | Marmer Contruction | MACSA 017 Casa San Alfonso | 4-BR | STD | Frame *** | Revising Package | Adam Sowers: Ted sent in a package change via email for the 4-Bedrooms. Adding to the log. FRMMAT.MACSA-4BR.HAVEN 1x2x10 PT: Old: 64, New: 20 1x6x12 PT: Old: 0, New: 20 2x4x14 PT: Old: 0, New: 15 2x4x16 PT: Old: 15, New: 0 2x6x16 PT: Old: 0, New: 1 2x4x14 SYP: Old: 0, New: 25 2x6x10 SYP: Old: 0, New: 8 2x6x12 SY: Old: 10, New: 0 2x6x14 SYP: Old: 0, New: 10 5/8 CDX: Old: 70, New: 60 1x2x8 PT: NA-Matches 2x4x16 SYP: NA-Matches 2x4x8 SYP: NA-Matches 2x6x16 Spruce: NA-Matches Will be revising POs for lots: 3-12 | 01/24/23 | 01/24/23 | |||
| Complete | 01/24/23 | Jeff Rotert | Minto | NDLTS 2864 Lastitudes | 40-176-II | B | Precast *** | Removing (1) Recess 4'-6" Lintel | Jeff Rotert: Totals needed: (1) 4-6 precast recessed door header, take has (2) on it. Please remove (1). ----------------------------------------------------------- PCMS.NDLTS40-175-II-B.LOTTS PCMS.NDLTS40-175-II-B.CASTCRETE Recess 4'-6" Lintel: Old: 2, New: 1 | 01/24/23 | 01/24/23 | |||
| Complete | 01/23/23 | Omar Hernandez | Sobel Co | OFPPR 01C (ADB) Parkway Preserve | ALL | ALL | Precast - 1st Lift | Adding Corner Bars | Omar Hernandez: Would you please order for delivery and add to the Precast/Masonry Steel-1st package 35 pcs of #5 30 x30 corner bars. Thank you ------------------------------------------------------------------ PCMS-DROP1.OFPPR-ADB.LOTTSFTMYERS PCMS-DROP1.OFPPR-ACB.LOTTSFTMYERS #5 30"x30" Corner Bars: Old: 0, New: 35 | 01/23/23 | 01/23/23 | |||
| Complete | 01/20/23 | Omar Hernandez | Sobel Co | OFPPR 01C (ADB) Parkway Preserve | ALL | ALL | Slab Prep *** | Adding Corner Bars | Omar Hernandez: Would you please order 50 pcs of 3x3 #5 corner bars to the slab package. There’s none in the package. ----------------------------------------------------------------------------- Omar want's to add 50 to the slab prep packages. SLABPREP.OFPPR-ADB.WHITECAP SLABPREP.OFPPR-ACB.WHITECAP #5 30"x30" Corner Bars: Old: 0, New: 50 | 01/20/23 | 01/20/23 | |||
| Complete | 01/19/23 | Bobby Neller | Minto | NDLTM 2680 Latitudes | Villa 11 | A | Shaftwall Materials - Densglass | Reducing Quantity | Bobby Neller: We’ve got an extra 30 sheets of den‘s glass on this job that need to be removed from the takeoff. 2’x12’x1”-old-80, New-50 ---------------------------------------------------------- SHAFTWALL.NDLTM11-A.INTERIOREXTERIOR DensGlass Ultra Shaftliner 2' x 12' x 1": Old: 80, New: 50 Inititally made the package change to both elevations but then reversed the package change on the "B" after speaking with Bobby (he wanted to hold off on that one for now). | 01/19/23 | 01/19/23 | |||
| Complete | 01/18/23 | Bobby Neller | Minto | NDLTM 2670 Latitudes | Villa 12 | B, II-B | Frame *** | Missing 15/32 CDX | Adam Sowers: Bobby said the packages are short on 15/32 CDX. It looks like when the 12 B and 12 II-B were combined the CDX count was lost / changed to only 1 sheet. Bobby says it should be 19 sheets. The Takeoff for the Villa 12 B has only 1 sheet. The Takeoff for the Villa 12 II-B has 14 sheets. FRMMAT.NDLTM12-B/NDLTM12-II-B.84LUMBER FRMMAT.NDLTM12-B/NDLTM12-II-B.BFS 15/32 CDX: Old: 1, New: 14 1/2 Fire Rated CDX: Old: 62, New: 0 15/32 Fire Rated CDX: Old: 0, New: 62 | 01/18/23 | 01/18/23 | |||
| Complete | 01/17/23 | Omar Hernandez | Soebel Co | OFPPR 01E Parkway Preserve | ALL | ALL | Slab Prep *** | Swapping 3-Bar Chairs w/ WPB Chairs | Omar Hernandez: Would you please change on the Slab Prep Material package the 6 boxes of Rod Chair 16” - 3 bar to Chair 16” WPB 3bar. Footers schedule specified one bar on top two bars on the bottom requiring WPB chairs. ---------------------------------------------------------------------------- Materials are out for delivery today. Sending Return/Credit POs on Lots: 01E & 01F and following with package changes on both models/elevations. SLABPREP.OFPPR-ACB.WHITECAP Rod Chairs - 16" - 3 Bar (Box - 100): Old: 6, New: 0 Rod Chairs - WPB 16": Old: 0, New: 6 Besser Brick: Old: 0, New: 100 SLABPREP.OFPPR-ADB.WHITECAP Rod Chairs - 16" - 3 Bar (Box - 100): Old: 6, New: 0 Rod Chairs - WPB 16": Old: 0, New: 6 Besser Brick: Old: 0, New: 100 | 01/17/23 | 01/17/23 | |||
| Sent for Review | 01/12/23 | Carlos Garcia | Dart Interests | DIGFL 0B1 Garden Flats | 10 Unit | - | Hardware *** | Adding SDS Screws | Carlos Garcia: Package change and fill in probably for each building. SDS screws are needed per detail, see attachment -Carlos 1/4 x 4-1/2 SDS (1900) pcs 1/4 x 3-1/2 SDS (300) pcs ----------------------------------------------------------------- Waiting to hear back from Carlos on this one. Sharon is going to have Angie check to see if it was missed, we didn't have the detail, or something changed (Adam) | 01/12/23 | ||||
| Complete | 01/12/23 | Bobby Neller | Minto | NDLTM 2684 Latitudes | Villa 12 | II-A | Frame *** | Swapping 2x6x8 w/ 10' | Bobby Neller: This is a fill in order/package change these two by eights are 2 feet too short for my garage door bucks need to be a minimum of 10 feet. 84 lumber is going to pick up these eight footers and credit us however I need to do the package change and fill in order to replace with 10 footers. Old-2x6x8-borate-8 New-2x6x10-borate -------------------------------------------------------------------------- It looks like I completed a similar package change for all models/elevations in LTS. Found in this log under the same PCDetails (col) for 'Swapping 2x6x8 w/ 10'. FRMMAT.NDLTM12-A/NDLTM12-II-A.84LUMBER FRMMAT.NDLTM12-A/NDLTM12-II-A.BFS FRMMAT.NDLTM12-A/NDLTM12-II-A.MARJAM 2x6x8 PT: Old: 8, New: 0 2x6x10 PT: Old: 0, New: 8 | 01/12/23 | 01/12/23 | |||
| Complete | 01/11/23 | Jason Bridges | Richmond | ROSVB 020 Silver Basin | F926/Emerald | ALL | Frame *** | Swapping 2) LVLs for 2x12x22 | Jason Bridges: Please remove (2)1.75x11.25 LVL 24’ Please add (2) 2x12x22’ for all emerald elevations. Plans have changed for the back porch beam. --------------------------------------------------------- FRMMAT.RA-Emerald-F926-A.BFS FRMMAT.RA-Emerald-F926-A.84LUMBER FRMMAT.RA-Emerald-F926-A.HAVEN FRMMAT.RA-Emerald-F926-A.MARJAM FRMMAT.RA-Emerald-F926-B.84LUMBER FRMMAT.RA-Emerald-F926-B.BFS FRMMAT.RA-Emerald-F926-B.HAVEN FRMMAT.RA-Emerald-F926-B.MARJAM FRMMAT.RA-Emerald-F926-C.84LUMBER FRMMAT.RA-Emerald-F926-C.BFS FRMMAT.RA-Emerald-F926-C.HAVEN FRMMAT.RA-Emerald-F926-C.MARJAM FRMMAT.RA-Emerald-F926-G.84LUMBER FRMMAT.RA-Emerald-F926-G.BFS FRMMAT.RA-Emerald-F926-G.HAVEN FRMMAT.RA-Emerald-F926-G.MARJAM FRMMAT.RA-EMERALD-F926-H.84LUMBER FRMMAT.RA-EMERALD-F926-H.BFS FRMMAT.RA-EMERALD-F926-H.HAVEN FRMMAT.RA-EMERALD-F926-H.MARJAM FRMMAT.RA-Emerald-F926-J.84LUMBER FRMMAT.RA-Emerald-F926-J.BFS FRMMAT.RA-Emerald-F926-J.HAVEN FRMMAT.RA-Emerald-F926-J.MARJAM FRMMAT.RA-Emerald-F926-K.84LUMBER FRMMAT.RA-Emerald-F926-K.BFS FRMMAT.RA-Emerald-F926-K.HAVEN FRMMAT.RA-Emerald-F926-K.MARJAM FRMMAT.RA-Emerald-F926-L.84LUMBER FRMMAT.RA-Emerald-F926-L.BFS FRMMAT.RA-Emerald-F926-L.HAVEN FRMMAT.RA-Emerald-F926-L.MARJAM FRMMAT.RA-Emerald-F926-M.84LUMBER FRMMAT.RA-Emerald-F926-M.BFS FRMMAT.RA-Emerald-F926-M.HAVEN FRMMAT.RA-Emerald-F926-M.MARJAM 1.75x11.25 LVL 24’: Old: 2, New: 0 2x12x22 SYP: Old: 0, New: 2 | 01/11/23 | 01/11/23 | |||
| Declined | 01/11/23 | Jeff Subbert | Dart Interests | DIEVM 031 Evermore Resort | ALL | ALL | Slab Pre, Precast *** | Missing Bar Ties | Jeff Subbert: We are not getting any tie wires coming out with second left precast. Therefore I am going to order a bulk order unless you guys want to split it up for house don’t matter to me. I am in need of (8) rolls of 6” tie wire --------------------------------------------------------------------- No Bar Ties in Slab Prep or Precast POs/CGs. Sent to Bids because this is going to be a community-wide package change (Adam). Package Change Declined because all buildings are in the ground already and if we get awarded another phase we'll resestimate per Kevin. | 01/11/23 | ||||
| Complete | 01/10/23 | Jason Bridges | Dream Finders | DOTAL 074 Talichet | Avalon II | A | Precast*** | Adding (1) 17'-4" Lintel | Jason Bridges: There should be (2) 17-4 lintels on all Avalon models. We are missing 1 and the other is damaged (2) 17-4 u-shaped lintels ---------------------------------------------------- Note: None of the Avalon's have more than (1) 17'-4" Lintel and zero fill-ins for them. I let Sharon know about this one and she is going to add to the board for estimating to review (Adam) 1/25/23 - Angie Rodriguez: in the specific plans of the lot it shows that it must be precast lintel @sharonheim1 1/11/23 - Chris Plantz: @sharonheim1 The master plans that the estimates were based on show (2) 1.75" x 12" LVL at the rear lanai. I attached a picture of it. The lot specific plans for lot 74 show a lintel at the rear lanai. Master plan Lanai Beam.png ---------------------------------------------------- PCMS.DF-AVALON-A.LOTTSORLANDO PCMS.DF-AVALON-B.LOTTSORLANDO PCMS.DF-AVALON-C.LOTTSORLANDO 17'-4": Old: 1, New: 2 ---------------------------------------------------- 3/7/2023 - Revised: Made the same changes to all of the Avalon-II Cost-Groups (Adam). PCMS.DF-AVALON-II-A.LOTTSORLANDO PCMS.DF-AVALON-II-B.LOTTSORLANDO PCMS.DF-AVALON-II-C.LOTTSORLANDO 17'-4": Old: 1, New: 2 | 01/10/23 | 03/07/23 | Chris, Angie | 03/07/23 | |
| Complete | 01/10/23 | Jack Corrigan | Steel X | SXAVP 480 Oak | X-1460 | - | Masonry *** | Removing 90 Regulars | Jack Corrigan: For steel x model X-1460 remove 90 regular block from future POs. ----------------------------------------- MASMAT.SX-X1460.JAHNA Regulars: Old: 1771, New: 1681 | 01/10/23 | 01/10/23 | |||
| Complete | 01/06/23 | Cyndi Mullee | Minto | NDLTC 3096 Latitudes | Cottage 2 | A | Shaftwall Materials | Reducing H Studs | Cyndi Mullee: Current: (27) “H” shaft wall stud 12’ New: (17) “H” shaft wall stud 12’ Across all cottage models ----------------------------------------------------------- SHAFTWALL.NDLTC1A/NDLTC1B/NDLTC1C.INTERIOR/EXTERIOR BUILDING SUPPLY 12' H Stud: Old: 20, New: 17 SHAFTWALL.NDLTC3A/NDLTC3B/NDLTC3C.INTERIOR/EXTERIOR BUILDING SUPPLY 12' H Stud: Old: 30, New: 17 SHAFTWALL.NDLTC2A/NDLTC2B/NDLTC2C.INTERIOR/EXTERIOR BUILDING SUPPLY 12' H Stud: Old: 27, New: 17 SHAFTWALL.NDLTC4A/NDLTC4B/NDLTC4C.INTERIOR/EXTERIOR BUILDING SUPPLY 12' H Stud: Old: 17, New: 17 | 01/06/23 | 01/06/23 | |||
| Complete | 01/05/23 | Bobby Neller | Minto | NDLTM 2688 Latitudes | Villa 5 | A | Frame & Shaftwall | Removing Materials | Bobby Neller: 2 x 8 x 8 southern yellow pine removing six pieces from the takeoff. Old-20 New-14 Removing 10 pieces of C track from our shaft wall. Old-35 New-25 --------------------------------------------------------- FRMMAT.NDLTM5-A.84LUMBER FRMMAT.NDLTM5-A.BFS FRMMAT.NDLTM5-A.MARJAM 2x8x8 SYP: Old: 20, New: 14 SHAFTWALL.NDLTM5-A.INTERIOR/EXTERIOR BUILDING SUPPLY C-Track: Old: 35, New: 25 | 01/05/23 | 01/05/23 | |||
| Complete | 12/20/22 | Adrian Hart | Dart Interests | DIGFL 0B1 Garden Flats | 10-Unit | 3rd Lift, Precast/Masonry Steel | Removing Materials | Adrian Hart: See highlighted screen shot. These materials are not needed. This applies to all further buildings. Remove: #7 Rebar, 1x5 Dowels #7 Rebar, 20' #8 Rebar, 1x7'-8" 13'-4" Lintels ----------------------------------------------------------------- PCMS-DROP3.DIGFL-0B1 # 7 Rebar - 1' x 5' Dowels: Old: 202, New: 0 # 7 Rebar - 20' Length: Old: 74, New: 0 # 8 Rebar - 1' x 7' 8" Dowels: Old: 80, New: 0 13'-4" Lintels: Old: 4, New: 0 | 12/20/22 | 12/20/22 | ||||
| Complete | 12/20/22 | Steven Gilbert | Richmond | ROEDH 205-02 Eden Hills | F923 | J | FRMMAT.RA-F923-J.HAVEN | Adding 23/32 OSB T&G Edge Gold | Steven Gilbert: Missing T&G from frame package. Missing TNG from frame package please create a fill-in order for Haven. --------------------------------------------------------- Per Sam this should have 61 sheets (Adam) FRMMAT.RA-F923-J.HAVEN 23/32 OSB T&G Edge Gold: Old: 0, New: 61 | 12/20/22 | 12/20/22 | |||
| Complete | 12/14/22 | Bobby Neller | Minto | NDLTM 0274 Latitudes | Villa 13 | B | Precast | Swapping 10'-6" Lintels for 8'-8" Lintels | Bobby Neller: Not exactly sure what happened here. Should only be (1)- 10 foot six and I’ve got two extras. There should be (2)-8’ 8” I don’t have any. I will be able to use the extra 10 foot sixes in Lou of the 8 foot eights on this particular job 10’6”precast: Old-3, New-1 8’8”precast: Old-0, New-2 ------------------------------------------------------------------------- PCMS.NDLTM13-B.CASTCRETE (doesn't exist) PCMS.NDLTM13-A/NDLTM13-B.CASTCRETE 10'-6" Lintel: Old: 3, New: 1 8'-8" Lintel: Old: 0, New: 2 | 12/14/22 | 12/14/22 | |||
| 12/14/22 | Jeff Subbert | Dart Interests | DIEVM 069 Evermore Resort | 8-Bedroom | Corner | Various | Various | Jeff Subbert: There are some issues that we need to address with the lumber take offs. 1) I’ve checked all lumber PO’s and cannot find a 5 1/4” x 7” 1.8 PSL post. 2) per second drop PO I am seeing 7/16 OSB. This needs to be changed to 5/ 8 OSB or 19/32 osb. 4) we are always running short on 2x8x16 pt. We are using this material on all truss tails and under the out lookers on gable ends and drip edges. 3) a total of 4) 5/8 wedge Anchors. | 12/14/22 | |||||
| Waiting on Review | 12/12/22 | Kyle Jolly | Dart Interests | DIEVM 043 Evermore Resort | 7-Bedroom | None | Frame *** | Swapping 7/16 OSB for 5/8 OSB | Kyle: EWO has been made and sent into DART awaiting approval. Roof is metal and requires 5/8 OSB ------------------------------------------------------------ Sharon sent an email to everyone to confirm what we're doing on this. Will update as needed. FRMMAT-DROP2.DIEVM-7BR-NONE.HAVEN 7/16 OSB: 5/8 OSB: | 12/12/22 | ||||
| Complete | 12/11/22 | Steven Gilbert | Richmond | ROHSQ 012 Heritage Square | F924/Ammolite | C | Frame *** | Adding 2x10x12 SYP | Steven Gilbert: Please fix p.o.s and send fill in for 2x10s for window headers 2nd floor. Need 21 feet total so send me (2) 2x10x12’ also add to package for window headers. ---------------------------------------------------------------------- FRMMAT.RA-Ammolite-F924-C.HAVEN FRMMAT.RA-Ammolite-F924-C.84LUMBER FRMMAT.RA-Ammolite-F924-C.BFS FRMMAT.RA-Ammolite-F924-C.MARJAM 2x10x12 SYP: Old: 0, New: 2 | 12/11/22 | 12/20/22 | |||
| Complete | 12/07/22 | Bobby Neller | Minto | NDLTM 2810 Latitudes | Villa 11 | B | Frame *** | Removing Materials | Bobby Neller: 2x8x8 SYP old-30, New-25-remove five 2x6x10 SYP old-14, New 2-remove 12 2x12x8 borate -old-3, New-0 2x6x12 SYP-old -2, New-0 2x6x14 SYP -old-2, New-0 Like to remove five sheets of 15/32 CD X from this takeoff Old-20, New-15 -------------------------------------------------------------- FRMMAT.NDLTM11-B.84LUMBER FRMMAT.NDLTM11-B.BFS FRMMAT.NDLTM11-B.MARJAM 2x12x8 PT: Old: 3, New: 0 2x6x10 SYP: Old: 14 , New: 2 2x6x12 SYP: Old: 2, New: 0 2x6x14 SYP: Old: 2, New: 0 2x8x8 SYP: Old: 30, New: 25 15/32 CDX: Old: 20, New: 15 | 12/07/22 | 12/07/22 | |||
| Complete | 12/07/22 | Jeff Subbert | Dart Interests | DIEVM 019 Evermore Resort | 9-Bedroom | Corner/Theater | 2nd Lift - Precast/Masonry Steel | Changing 2nd Lift | Jeff Subbert: Here’s a list of headers and windowsills that I will need for this specific nine bedroom C elevation with theater room. Headers 3)3’6” 4) 4’6” 5) 5’4” 4) 8’ Sills ( Wind flush) 3)27” 1) 35” 1) 39” -------------------------------------------------------------------------------- PCMS-DROP2.DIEVM-9BR-CORNER/THEATRE.LOTTSORLANDO 3’-6” Lintel: Old: 0, New: 3 4'-0" Lintel: Old: 3, New: 0 4’-6” Lintel: Old: 8, New: 4 4'-8" Lintel: Old: 1, New: 0 5’-4” Lintel: Old: 0, New: 5 8’-0" Lintel: Old: 0, New: 4 2'-2.5" Sill: Old: 0, New: 3 3'-1" Sill: Old: 4, New: 2 | 12/07/22 | 12/07/22 | |||
| Complete | 12/07/22 | Jeff Subbert | Dart Interests | DIEVM 014 Evermore Resort | 9-Bedroom | None | 2nd Lift - Precast/Masonry Steel | Changing 2nd Lift | Jeff Subbert: Here’s a list of header sizes and sales sizes that we will need for a nine bedroom non-elevation. Headers 1) 3’6” 4) 4’6” 5) 5’4” 1) 7’8” 3) 8’ Sills 1) 27” 2) 39” 1) 71” --------------------------------------------------------------------------- PCMS-DROP2.DIEVM-9BR-A.LOTTSORLANDO (doesn't exist) PCMS-DROP2.DIEVM-9BR-NONE.LOTTSORLANDO 3’-6” Lintel: Old: , New: 4'-0" Lintel: Old: 1, New: 0 4’-6” Lintel: Old: 1, New: 4 4'-8" Lintel: Old: 1, New: 0 5’-4” Lintel: Old: 7, New: 5 7’-6” Lintel: Old: 1, New: 1 (no change) 8’-0" Lintel: Old: 3, New: 3 (no change) 2'-2.5" Sill: Old: 0, New: 1 3'-1" Sill: Old: 1, New: 2 4'-0" Sill: Old: 2, New: 0 6'-0" Sill: Old: 1, New: 1 (no change) | 12/07/22 | 12/07/22 | |||
| Complete | 12/07/22 | Jeff Subbert | Dart Interests | DIEVM 069 Evermore Resort | 8-Bedroom | Corner | 2nd Lift - Precast/Masonry Steel | Changing 2nd Lift | Jeff Subbert: This is what I’m finding for an eight bedroom corner as far as headers and sills go. I do not have any second lift PO generated to compare and contrast. 8 bedroom, corner 3) 3’6” 7) 4’6” 3) 5’4” 3) 8’ Sills 3) 27” windflush sills -------------------------------------------------- PCMS-DROP2.DIEVM-8BR-CORNER.LOTTSORLANDO 3'-6" Lintel: Old: 0, New: 3 4'-0" Lintel: Old: 4, New: 0 4'-6" Lintel: Old: 7, New: 7 (No Change) 5'-4" Lintel: Old: 0, New: 3 7'-6" Lintel: Old: 1, New: 0 8'-0" Lintel: Old: 4, New: 3 2'-2.5" Sill: Old: 0, New: 3 3'-1" Sill: Old: 1, New: 0 | 12/07/22 | 12/07/22 | |||
| Complete | 12/07/22 | Sharon | Marmer Contruction | MACSA 020 Casa San Alfonso | 4-Bedroom | STD | Masonry *** | Swapping Column Block for Regulars | Sharon Heim: Ted says they are not using the 12x8x12 column block that are on the po’s. It appears that the 4 bedroom is the only one I see that has 12x8x12 column block on the po’s Please delete the 24 12x8x12 column block and replace with 40 8x8x16 reg block -------------------------------------------------- MASMAT.MACSA-4BR.JAHNA 12x8x12 Column Block: Old: 24, New: 0 Regulars: Old: 954, New: 978 | 12/07/22 | 12/07/22 | |||
| Complete | 12/06/22 | Jeff Subbert | Dart Interests | DIEVM 045 Evermore Resort | 8-Bedroom | None | 2nd Lift - Precast/Masonry Steel | Changing 2nd Lift | Jeff Subbert: Lot 45 is an eight bedroom none elevation. Here are the headers on this model. 3) 8’ 5) 3’6” 3) 5’4” 1) 4’6” Sills 5) 27” wind flush --------------------------------------------- PCMS-DROP2.DIEVM-8BR-NONE.LOTTSORLANDO 3'-6" Lintel: Old: 6, New: 5 4'-6" Lintel: Old: 3, New: 1 7'-6" Lintel: Old: 3, New: 0 8'-0" Lintel: Old: 0, New: 3 2'-2.5" Sill: Old: 0, New: 5 3'-1" Sill: Old: 1, New: 0 6'-2" Sill: Old: 1, New: 0 | 12/06/22 | 12/06/22 | |||
| Sent to Bids | 12/05/22 | Dane Jones | Toll Brothers | TBLPT 009 Laurel Pointe | Barbera | MO | Precast *** | Adding Lintel & Sill | Dane Jones: +1) 10’ 6 U Lintel package change (this is at the front door, entry way) +1) 8’ hi dri sill- fill in, extra window on the revised drawings – We don’t have anything over 6’-2”. Dane says a 3’-1” will work. -------------------------------------------------------------------- Sent to bids for review (Adam) | 12/05/22 | ||||
| Complete | 11/28/22 | Joey Ramos | Richmond | ROSPN 093-05 Southern Pines | F913/Pearl | M | Frame *** | Adding 2x10x12 SYP | Joey Ramos: Plans changed so we have to put the correct header in place. Was told by area manager David to make these changes. (3) 2x10 yellow pine. 12’ -------------------------------------------------------------- FRMMAT.RA-Pearl-F913-M.HAVEN FRMMAT.RA-Pearl-F913-M.BFS FRMMAT.RA-Pearl-F913-M.84LUMBER FRMMAT.RA-Pearl-F913-M.MARJAM 2x10x12 SYP: Old: 0, New: 3 | 11/28/22 | 11/28/22 | |||
| Complete | 11/28/22 | Jeff Subbert | Dart Interests | DIEVM 043 Evermore Resort | 7-Bedroom | None | Precast, 2nd Lift *** | Swapping (1) 14' for 15'-4" Lintel | Jeff Subbert: Instead of a 14 footer I need a 15’4” header, all 7 bedrooms. --------------------------------------------------------------- Jeff said this only applies to the 2nd Lift. PCMS-DROP2.DIEVM-7BR-NONE.LOTTSORLANDO 14' Lintel: Old: 1, New: 0 15'-4" Lintel: Old: 0, New: 1 | 11/28/22 | 11/28/22 | |||
| Complete | 11/28/22 | Joey Ramos | Richmond | ROSPN 028-05 Southern Pines | F914/Moonstone | L | Frame *** | Adding 2x10x12 SYP | Joey Ramos: Plans changed so we have to put the correct header in place. Was told by area manager David to make these changes. (3) 2x10 yellow pine. 12’ -------------------------------------------------------------- FRMMAT.RA-Moonstone-F914-L.HAVEN FRMMAT.RA-Moonstone-F914-L.MARJAM FRMMAT.RA-Moonstone-F914-L.BFS FRMMAT.RA-Moonstone-F914-L.84LUMBER 2x10x12 SYP: Old: 0, New: 3 | 11/28/22 | 11/28/22 | |||
| Complete | 11/23/22 | John Rathbun | Surrey Homes | SOFXH 049 Fox Hammock | Clover | B | Precast *** | Removing Lintel Adding Sill | John Rathbun: Clover model B elevation Precast package change / fill in. Please remove one of the 2-2.5 sills for a new total of one . Please add one 4-0 sill for a new total of one. --------------------------------------------------------------------- PCMS.SO-Clover-B.LOTTSORLANDO 2-2.5 Sill: Old: 2, New: 1 4'-0" Sill: Old: 0, New: 1 | 11/23/22 | 11/23/22 | |||
| Complete | 11/21/22 | Steven Gilbert | Richmond | ROHSQ 012 Heritage Square | F924/Ammolite | C | Precast *** | Precast Package Change | Steven Gilbert: Remove (2) 10’6” precast need only 1 Remove (3) 4’5” sills need only 2 Add (1) 7’6” precast need one Add (1) 6’2” sills need only 1 ------------------------------------------------------------ PCMS.RA-Ammolite-F924-C.LOTTS 10'-6" Lintel: Old: 3, New: 1 7'-6" Lintel: Old: 0, New: 1 4'-5" Sill: Old: 6, New: 2 6'-2" Sill: Old: 0, New: 1 | 11/21/22 | 11/21/22 | |||
| Complete | 11/21/22 | Kyle Jolly | Dart Interests | DIEVM 067 Evermore Resort | 5-Bedroom | None | PCMS-DROP2.DIEVM-5BR-NONE | Adding Anchor Bolts | Kyle Jolly: Plans call for anchor bolts 4’ on center. Anchor bolts needed for truss hold down. All 5br need these added. (15) 1/2x10” anchor bolts ---------------------------------------------------------- PCMS-DROP2.DIEVM-5BR-NONE.LOTTSORLANDO AB1210: Old: 0, New: 15 | 11/21/22 | 11/21/22 | |||
| Complete | 11/07/22 | Bobby Neller | Minto | NDLTM 2756 Latitudes | ALL | ALL | Masonry *** | Remove 50 Regulars | Bobby Neller: Requesting 50 regulars come off of all of the Villa take offs please. ------------------------------------------------------------------------------------- Bobby says they keep having to pay best block or someone else to move them down. Doesn't affect pre-blend (Adam). MASMAT.NDLTM2-A.FLBESTBLOCKORLANDO MASMAT.NDLTM2-A.PREFERREDDAYTONA MASMAT.NDLTM2-B.FLBESTBLOCKORLANDO MASMAT.NDLTM2-B.PREFERREDDAYTONA Regulars: Old: 1983, New: 1933 MASMAT.NDLTM3-A.FLBESTBLOCKORLANDO MASMAT.NDLTM3-A.PREFERREDDAYTONA MASMAT.NDLTM3-B.FLBESTBLOCKORLANDO MASMAT.NDLTM3-B.PREFERREDDAYTONA Regulars: Old: 2110, New: 2060 MASMAT.NDLTM4-A/NDLTM4-II-A.FLBESTBLOCKORLANDO MASMAT.NDLTM4-A/NDLTM4-II-A.PREFERREDDAYTONA MASMAT.NDLTM4-B/NDLTM4-II-B.FLBESTBLOCKORLANDO MASMAT.NDLTM4-B/NDLTM4-II-B.PREFERREDDAYTONA Regulars: Old: 2200, New: 2150 MASMAT.NDLTM5-A.FLBESTBLOCKORLANDO MASMAT.NDLTM5-A.PREFERREDDAYTONA MASMAT.NDLTM5-B.FLBESTBLOCKORLANDO MASMAT.NDLTM5-B.PREFERREDDAYTONA Regulars: Old: 2099, New: 2049 MASMAT.NDLTM6-A.FLBESTBLOCKORLANDO MASMAT.NDLTM6-A.PREFERREDDAYTONA MASMAT.NDLTM6-B.FLBESTBLOCKORLANDO MASMAT.NDLTM6-B.PREFERREDDAYTONA Regulars: Old: 1991, New: 1941 MASMAT.NDLTM7-A/NDLTM7-II-A.FLBESTBLOCKORLANDO MASMAT.NDLTM7-A/NDLTM7-II-A.PREFERREDDAYTONA Regulars: Old: 2113, New: 2063 MASMAT.NDLTM7-B/NDLTM7-II-B.FLBESTBLOCKORLANDO MASMAT.NDLTM7-B/NDLTM7-II-B.PREFERREDDAYTONA Regulars: Old: 2148, New: 2098 MASMAT.NDLTM8-A.FLBESTBLOCKORLANDO MASMAT.NDLTM8-A.PREFERREDDAYTONA MASMAT.NDLTM8-B.FLBESTBLOCKORLANDO MASMAT.NDLTM8-B.PREFERREDDAYTONA Regulars: Old: 1941, New: 1891 MASMAT.NDLTM9-A.FLBESTBLOCKORLANDO MASMAT.NDLTM9-A.PREFERREDDAYTONA Regulars: Old: 2070, New: 2020 MASMAT.NDLTM9-B.FLBESTBLOCKORLANDO MASMAT.NDLTM9-B.PREFERREDDAYTONA Regulars: Old: 2192, New: 2142 MASMAT.NDLTM10-A.FLBESTBLOCKORLANDO MASMAT.NDLTM10-A.PREFERREDDAYTONA Regulars: Old: 1957, New: 1907 MASMAT.NDLTM10-B.FLBESTBLOCKORLANDO MASMAT.NDLTM10-B.PREFERREDDAYTONA Regulars: Old: 1967, New: 1917 MASMAT.NDLTM11-A.FLBESTBLOCKORLANDO Regulars: Old: 2250, New: 2200 MASMAT.NDLTM11-B.FLBESTBLOCKORLANDO Regulars: Old: 2168, New: 2018 MASMAT.NDLTM12-A/NDLTM12-II-A.FLBESTBLOCKORLANDO MASMAT.NDLTM12-A/NDLTM12-II-A.PREFERREDDAYTONA MASMAT.NDLTM12-B/NDLTM12-II-B.FLBESTBLOCKORLANDO MASMAT.NDLTM12-B/NDLTM12-II-B.PREFERREDDAYTONA Regulars: Old: 2089, New: 2039 MASMAT.NDLTM13-B.FLBESTBLOCKORLANDO MASMAT.NDLTM13-B.PREFERREDDAYTONA Regulars: Old: 1953, New: 1903 | 11/07/22 | 11/08/22 | |||
| Complete | 11/07/22 | Jarrod Rathbun | Minto | NDLTS 2399 Latitudes | 50-179-II, 40-175-II | B | Hardware *** | Adding (1) HTT4 | Jarrod Rathbun: LMD 40-175 (lot 2904/2909) need (1) HTT4 a piece LMD 50-179 (lots 2399/2393/2411/2423/2417/2451/2446) need (1) HTT4 per lot ------------------------------------------------------------------ There is (1) HTT4 on the 40-175 and 50-179 but not on the II's for some reason (takeoffs and jobs). Jarrod says they are needed and should be in the II packages. HDW.NDLTS40-175-II-A.WHITECAP HDW.NDLTS40-175-II-B.WHITECAP HDW.NDLTS50-179-II-A.WHITECAP HDW.NDLTS50-179-II-B.WHITECAP HTT4: Old: 0, New: 1 | 11/07/22 | 11/07/22 | |||
| Complete | 11/03/22 | Dane Jones | Toll Brothers | TBLPT 008 Laurel Pointe | Dolcetto | MO | Slab Prep *** | Adding 1 Roll of Visqueen | Dane Jones: This model requires three total rolls of plastic for the slab pack Previous amount-2 New total-3 ------------------------------------------------------------- SLABPREP.TBLPT008.WHITECAP Visqueen: Old: 2, New: 3 | 11/03/22 | 11/03/22 | |||
| Complete | 11/03/22 | Adrian Hart | Dart Interests | DIGFL 0C3 Garden Flats | 12-Unit | Precast, 2nd Lift *** | Changing #7 Dowels | Adrian Hart: Change 1x11’10” #7 dowels to 11’8”straight cut Change 17’8” straight #7 to 14’ straight #7 Delete 12” durowall. Add 40-20’ #5 rebar Please revise po 0016 on c3 and d1 Do the same to building d1 ------------------------------------------------------------- PCMS-DROP2.DIGFL-0C1/0C2/0C3.LOTTSORLANDO #7 - Dowel: 1x11'10: Old: 279 #7 - Dowel: 17'4 straight: Old: 537 #7 - Dowel: 1x11'8: New: 279 #7 - Dowel: 14' straight: New: 537 | 11/03/22 | 11/03/22 | ||||
| Sent to Bids | 11/02/22 | Adrian Hart | Dart Interests | DIGFL 0C1 Garden Flats | 12-Unit | Precast, 2nd Lift *** | Adding (6) 12" Wide Lintels, 8' | Adrian Hart: 6- 12” wide x8’ long precast needed for second lift. Please apply this to all further buildings. C1, c2, c3 d1. ------------------------------------------------------ Sending to bids (Adam) | 11/02/22 | |||||
| Complete | 11/02/22 | Larry Sims | Sobel Co | OFVMR 004 Villa Mar | 6-Unit | Type 2 | Masonry, 1st Lift *** | Adding 12" Block | Larry Sims: PO # OFVMR004-0003 needs 8 x 12 x 16 3/4 block added to po and release to preferred materials. 85) 12 x 8 x 12 column block 70) 12 x 8 x 16 box car 434) 8 x 6 x 16 6 highs 7200) 8 x 8 x 16 regular 144) 8 x 8 x 16 lintel block 389) 8 x 8 x 8 half block 60) 8 x 4 x 16 half high 60) 8 x 12 x 16 3/4 block 140) 80 pound bag masonry 19) yards builders sand --------------------------------------------------------- MASMAT-DROP1.OFVMR-TYPE2.PREFERREDNAPLES (OFVMR) 12" Block: Old: 0, New: 60 | 11/02/22 | 11/02/22 | |||
| Complete | 11/01/22 | Bryan Healy | Mattamy Homes | MOSLL 003 Soleil | 6-Unit | TCFFCV | HDW.MOSLL-TCFFCV(FT).WHITECAP | Adding (4) LUC26-2 | Bryan Healy: Every building needs 4 of the LUC26-2 for the overhangs on the side entries. All POs for framing hardware. X4 HUC26-2 ----------------------------------------------------------- HDW.MOSLL-TCFFCV(FT).WHITECAP HDW.MOSLL-TCFFFV(CR).WHITECAP HDW.MOSLL-VCFFCT(CR).WHITECAP HDW.MOSLL-VCFFCT(MO).WHITECAP LUS26: Old: 0, New: 4 LUS26-2: Old: 0, New: 4 | 11/01/22 | 11/01/22 | |||
| Sent to Bids | 10/31/22 | Omar | Sobel Co | OFPP 01B Parkway Preserve | 3-Unit | ADB | Precast *** | Package Change Request / Review | Omar Hernandez: Would you please correct the 1st lift Lotts PO to reflect the following lintels and sills 2pcs 17’4” 1pc 15’2” 1pc. 12’6” 1pc 12’ 3pcs. 9’4” 8 pcs 7’6” 3pcs . 4’8” 8 pcs. 4’6”. 1pc. 3’6”. Sills 5pcs. 74” wind resistant flush sill 7pcs 37”wind resistant flush sill 1pc. 26.5” wind resistant flush sill ---------------------------------------------------------------- Sent to bids (Adam) | 10/31/22 | ||||
| Sent to Bids | 10/31/22 | Omar | Sobel Co | OFPP 01D Parkway Preserve | 3-Unit | ACB | Precast *** | Package Change Request / Review | Omar Hernandez: Would you please correct the 1st lift Lotts PO to reflect the following lintels and sills 1pcs 17’4” 1pc. 15’2” 1pc. 12’6” 2pcs 12’ 2pcs . 9’4” 8 pcs 7’6” 3pcs . 4’8” 8 pcs. 4’6”. 1pc. 3’6”. Sills 5pcs. 74” wind resistant flush sill 7pcs 37”wind resistant flush sill 1pc. 26.5” wind resistant flush sill ---------------------------------------------------------- Sent to bids (Adam) | 10/31/22 | ||||
| Complete | 10/28/22 | David Purvis | Toll Brothers | TBLPT Laurel Pointe | Barbera | PB | Frame Drop 1 & 2 *** | Removing Materials | David Purvis: Please adjust the following on the lumber package. Delete 1x6x12 pt (1st drop) 24-10= new quantity of 14 2x6x10’ syp (2nd drop) 305-100= new quantity of 205 ----------------------------------------------------------------------- FRMMAT-DROP1.TBLPT053.84LUMBER 1x6x12 PT: Old: 24, New: 14 FRMMAT-DROP2.TBLPT053.84LUMBER 2x6x10 SYP: Old: 305, New: 205 | 10/28/22 | 10/28/22 | |||
| Complete | 10/25/22 | Brian Dinker | Minto | NDLTS 2474 Latitudes | ALL | ALL | Frame *** | Swapping 2x6x8 w/ 10' | Brian Dinker: 8’ are ending up short . Frames are requesting 10’. Please change 2x6 PT for garage door bucks from 8’ to 10’ for all single family. Models. Please. -------------------------------------------------------- All Models / Elevations. Swapping 2x6x8' with 2x6x10 (Adam). FRMMAT.NDLTS40-136-A.84LUMBER FRMMAT.NDLTS40-136-A.BFS FRMMAT.NDLTS40-136-A.MARJAM FRMMAT.NDLTS40-136-B.84LUMBER FRMMAT.NDLTS40-136-B.BFS FRMMAT.NDLTS40-136-B.MARJAM FRMMAT.NDLTS40-175-A.84LUMBER FRMMAT.NDLTS40-175-A.BFS FRMMAT.NDLTS40-175-A.MARJAM FRMMAT.NDLTS40-175-B.84LUMBER FRMMAT.NDLTS40-175-B.BFS FRMMAT.NDLTS40-175-B.MARJAM FRMMAT.NDLTS40-175-II-B.84LUMBER FRMMAT.NDLTS40-175-II-B.BFS FRMMAT.NDLTS40-175-II-B.MARJAM FRMMAT.NDLTS40-177-A.84LUMBER FRMMAT.NDLTS40-177-A.BFS FRMMAT.NDLTS40-177-A.MARJAM FRMMAT.NDLTS40-177-B.84LUMBER FRMMAT.NDLTS40-177-B.BFS FRMMAT.NDLTS40-177-B.MARJAM FRMMAT.NDLTS40-178-A.84LUMBER FRMMAT.NDLTS40-178-A.BFS FRMMAT.NDLTS40-178-A.MARJAM FRMMAT.NDLTS40-178-B.84LUMBER FRMMAT.NDLTS40-178-B.BFS FRMMAT.NDLTS40-178-B.MARJAM FRMMAT.NDLTS40-178-II-A.84LUMBER FRMMAT.NDLTS40-178-II-A.BFS FRMMAT.NDLTS40-178-II-A.MARJAM FRMMAT.NDLTS40-178-II-B.84LUMBER FRMMAT.NDLTS40-178-II-B.BFS FRMMAT.NDLTS40-178-II-B.MARJAM FRMMAT.NDLTS50-184-A.84LUMBER FRMMAT.NDLTS50-184-A.BFS FRMMAT.NDLTS50-184-A.MARJAM FRMMAT.NDLTS50-184-B.84LUMBER FRMMAT.NDLTS50-184-B.BFS FRMMAT.NDLTS50-184-B.MARJAM 2x6x8 PT: Old: 3 FRMMAT.NDLTS40-176-A.84LUMBER FRMMAT.NDLTS40-176-A.BFS FRMMAT.NDLTS40-176-A.MARJAM FRMMAT.NDLTS40-176-B.BFS FRMMAT.NDLTS40-176-B.MARJAM FRMMAT.NDLTS40-176-II-A.84LUMBER FRMMAT.NDLTS40-176-II-A.BFS FRMMAT.NDLTS40-176-II-A.MARJAM FRMMAT.NDLTS40-176-II-B.84LUMBER FRMMAT.NDLTS40-176-II-B.BFS FRMMAT.NDLTS40-176-II-B.MARJAM 2x6x8 PT: Old: 5 FRMMAT.NDLTS50-179-A.84LUMBER FRMMAT.NDLTS50-179-A.BFS FRMMAT.NDLTS50-179-A.MARJAM FRMMAT.NDLTS50-179-B.84LUMBER FRMMAT.NDLTS50-179-B.MARJAM FRMMAT.NDLTS50-179-II-A.84LUMBER FRMMAT.NDLTS50-179-II-A.BFS FRMMAT.NDLTS50-179-II-A.MARJAM FRMMAT.NDLTS50-179-II-B.84LUMBER FRMMAT.NDLTS50-179-II-B.BFS FRMMAT.NDLTS50-179-II-B.MARJAM 2x6x8 PT: Old: 6 FRMMAT.NDLTS50-180-A.84LUMBER FRMMAT.NDLTS50-180-A.BFS FRMMAT.NDLTS50-180-A.MARJAM FRMMAT.NDLTS50-180-B.84LUMBER FRMMAT.NDLTS50-180-B.BFS FRMMAT.NDLTS50-180-B.MARJAM 2x6x8 PT: Old: 10. 2x6x10 New: 12 FRMMAT.NDLTS50-181-A.84LUMBER FRMMAT.NDLTS50-181-A.BFS FRMMAT.NDLTS50-181-A.MARJAM FRMMAT.NDLTS50-181-B.84LUMBER FRMMAT.NDLTS50-181-B.BFS FRMMAT.NDLTS50-181-B.MARJAM 2x6x8 PT: Old: 1 | 10/25/22 | 10/31/22 | |||
| Complete | 10/25/22 | Adrian Hart | Dart Interests | DIGFL 0C1 Garden Flats | ALL | ALL | 2nd Lift - Precast/Masonry Steel | Removing 12" Durowall | Adrian Hart: Please remove all 12” ladder joint from all second floor pos. We have plenty on site to complete work. ------------------------------------------------------------ Revised: 10/25/22 (AS) FILLIN-PCMS-DROP2.DIGFL-0B1.LOTTSORLANDO Duro Wall - 12": Old: 1, New: 0 PCMS-DROP2.DIGFL-0B1.LOTTSORLANDO PCMS-DROP2.DIGFL-0C1/0C2/0C3.LOTTSORLANDO Duro Wall - 12": Old: 3, New: 0 PCMS-DROP2.DIGFL-0D1.LOTTSORLANDO Duro Wall - 12": Old: 2, New: 0 | 10/25/22 | 10/25/22 | |||
| Complete | 10/21/22 | Jeff Subbert | Dart Interests | DIEVM 027 Evermore Resort | 10-Bedroom | None | Precast *** | Package Change Request / Review | Jeff Subbert: These are the headers that we need to build this house: 8) 3’6” 5) 4’6” 4) 5’10” 2) 9’4” 1) 14’ 1) 17’4” 1) 19’4” 3) 4’6” recess ------------------------------------------------------------------------------- Sending to bids (Adam) ------------------------------------------------------------------------------- So we are all clear this will be the 2nd package change that pertains to precast on this lot. Bryan Healey did the first request on 7/26 which was completed -Sharon Making Package Change (Adam) PCMS-DROP1.DIEVM-10BR-NONE.LOTTSORLANDO 4’6”: Old: 1, New: 5 5’10”: Old: 8, New: 4 | 10/21/22 | 10/26/22 | 10/26/22 | ||
| Sent to Bids | 10/21/22 | Jeff Subbert | Dart Interests | DIEVM 007 Evermore Resort | 9-Bedroom | None | Precast *** | Package Change Request / Review | Jeff Subbert: These are the headers that we need for a nine bedroom, none Option. 4) 3’6” 4) 4’6” 1) 5’10” 3) 7’6” 1) 9’4” 2)10’6” 1) 12’0” 1) 13’4” 1) 15’4” 1) 21’4” 2) 4’6” recess ------------------------------------------------------------------ Sent to bids for review (Adam). | 10/21/22 | ||||
| Sent to Bids | 10/21/22 | Jeff Subbert | Dart Interests | DIEVM 008 Evermore Resort | 8-Bedroom | None | Precast *** | Package Change Request / Review | Jeff Subbert: These are the headers we need to build an eight bedroom option none 4) 3’6” 7) 4’6” 1) 7’6 5) 9’4” 1) 13’4” 1) 17’4” 2) 4’6” resses --------------------------------------------------------- Sent to bids for review (Adam) | 10/21/22 | ||||
| Sent to Bids | 10/21/22 | Jeff Subbert | Dart Interests | DIEVM 067 Evermore Resort | 5-Bedroom | None | Precast *** | Package Change Request / Review | Jeff Subbert: This is the five bedroom option B elevation 6) 3’6” 3) 4’6” 5) 5’10” 1) 7’6” 1) 10’6” 1) 14’0” ---------------------------------------------------------- Sending to bids for review (Adam). | 10/21/22 | ||||
| Sent to Bids | 10/21/22 | Jeff Subbert | Dart Interests | DIEVM 038 Evermore Resort | 11-Bedroom | None | Precast *** | Package Change Request / Review | Jeff Subbert: This is an 11 bedroom, Option none. 10) 3’6” 2) 5’4” 2) 9’4” 1) 10’6” 1) 11’4” 2) 14’0” 1) 17’4” 1) 19’ 4” 2) 4’6” resses ---------------------------------------------------------- Sending to bids for review (Adam). | 10/21/22 | ||||
| Complete | 10/21/22 | Cyndi Mullee | Minto | NDLTC 3090 Latitudes | ALL | ALL | Shaftwall Materials - Densglass | Adding Densglass | Cyndi Mullee: Package change for all cottage models Please add 8 pieces of Densglass Ultra Shaftliner 2’x10’x1” ----------------------------------------------------------------- Sent to bids for review (Adam) Kevin approved this package change. SHAFTWALL.NDLTC1A/NDLTC1B/NDLTC1C.INTERIOR/EXTERIOR BUILDING SUPPLY Densglass: Old: 32, New: 40 SHAFTWALL.NDLTC2A/NDLTC2B/NDLTC2C.INTERIOR/EXTERIOR BUILDING SUPPLY Densglass: Old: 35, New: 43 SHAFTWALL.NDLTC3A/NDLTC3B/NDLTC3C.INTERIOR/EXTERIOR BUILDING SUPPLY Densglass: Old: 32, New: 40 SHAFTWALL.NDLTC4A/NDLTC4B/NDLTC4C.INTERIOR/EXTERIOR BUILDING SUPPLY Densglass: Old: 35, New: 43 | 10/21/22 | 10/21/22 | 10/21/22 | ||
| Complete | 10/21/22 | Adrian Hart | Dart Interests | DIGFL 0C1 Garden Flats | 12-Unit | Slab Prep Level 2 *** | Removing Mesh Ups, Wire Mesh, & Chairs | Adrian Hart: Please delete wire mesh,meshup chairs and rod chairs from all flats 2nd floor slab pos. We are using commercial fiber in leau of welded wire. Package change 2nd floor slab c1-00132, c2-0016. -------------------------------------------------------------- SLABPREP-LEVEL2.DIGFL-0C1/0C2/0C3.LOTTSORLANDO 16" Rod Chairs: Old: 12, New: 0 Wire Mesh Chairs: Old: 1536, New: 0 Welded Wire Mesh Fabric Sheets: Old: 94, New: 0 SLABPREP-LEVEL2.DIGFL-0B1.LOTTSORLANDO 16" Rod Chairs: Old: 10, New: 0 Wire Mesh Chairs: Old: 1274, New: 0 Welded Wire Mesh Fabric Sheets: Old: 79, New: 0 SLABPREP-LEVEL2.DIGFL-0D1.LOTTSORLANDO 16" Rod Chairs: Old: 6, New: 0 Wire Mesh Chairs: Old: 786, New: 0 Welded Wire Mesh Fabric Sheets: Old: 49, New: 0 | 10/21/22 | 10/21/22 | ||||
| Complete | 10/19/22 | Bryan Healy | Mattamy Homes | MOSLL 003 Soleil | TCFFCV | FT | Hardware *** | Adding (1) MSTA49 | Bryan Healy: The plans require 2 of the MSTA49 strap tie. One for each end unit. -------------------------------------------------------------- Not sending to bids because the item is less than $10 and he's only adding one of them. HDW.MOSLL-TCFFCV(FT).WHITECAP MSTA49: Old: 1, New: 2 | 10/19/22 | 10/19/22 | |||
| Declined/No Change | 10/19/22 | Cyndi Mullee | Minto | NDLTC 3088 Latitudes | Cottage 4 | B | Frame*** | Adding 2x6x12' SYP | Cyndi Mullee: Please add to existing package (12) 2x6x12’ southern yellow pine for the Gable ends and bracing that call for 2x6 in detail. Current package (17) 2x6x12’ southern yellow pine Change package to (29) 2x6x12’ southern yellow pine Fill in needed for current/in progress builds: 3076 3078 3080 3082 3084 3086 3088 3090 3124 3126 3128 3130 Sending to bids for review (Adam) --------------------------------------------------- 10/19/22 - Chris Plantz: I don't see anything changed in the gable detail. There is only one gable detail in the plans.The 2x6 diagonals shown in the detail are standard on all gables. The vertical piece that appears to be 2x6 isn't actually specified as such in the detail and plainly states. "By Truss Company" for that member. My question again is, why are they just now asking for this? We have been building these cottages for some time now. --------------------------------------------------- 10/27/22 - Package Change Declined. | 10/19/22 | 10/27/22 | Chris Plantz | ||
| Complete | 10/18/22 | Steven Gilbert | Richmond | ROHSQ 019 Heritage Square | F924/Ammolite | A | Frame *** | Changed to 2x10's | Steven Gilbert: Requesting a package change for this model/elevation. The garage door bucks and window headers changed to 2x10’s on the plans. ---------------------------------------------------------- Sent to bids (Adam) Chris Plantz: On the Richmond model F924 elevation "A" make the following change for these frame headers: (-1) 2" x 6" x 8'0" SYP (-1) 2" x 6" x 14'0" SYP (+4) 2" x 10" x 8'0" SYP ---------------------------------------------------------- FRMMAT.RA-Ammolite-F924-A.84LUMBER FRMMAT.RA-Ammolite-F924-A.BFS FRMMAT.RA-Ammolite-F924-A.HAVEN FRMMAT.RA-Ammolite-F924-A.MARJAM 2x6x8 SYP: Old: 10, New: 9 2x6x12 SYP: Old: 19, New: 18 2x10x8 SYP: Old: 0, New: 4 | 10/18/22 | 10/18/22 | Chris Plantz | 10/18/22 | |
| Complete | 10/12/22 | Jeff Subbert | Dart Interests | DIEVM 069 Evermore Resort | 8-Bedroom | Corner | Masonry Steel *** | Adding more #5 16' Dowels | Jeff Subbert: PO calls for 75) 16’ straights, but I am in need of 83 per eight bedroom. ---------------------------------------------------------- Sent to bids for review (Adam). PCMS-DROP1.DIEVM-8BR-C.LOTTSORLANDO changed to: PCMS-DROP1.DIEVM-8BR-CORNER.LOTTSORLANDO #5 Rebar Dowel - 16' 0": Old: 75, New: 83 | 10/12/22 | 10/19/22 | Angie | 10/19/22 | |
| Sent to Bids | 10/12/22 | Jeff Subbert | Dart Interests | DIEVM 033 Evermore Resort | 11-Bedroom | B | Masonry Steel *** | Adding more #5 16' Dowels | Jeff Subbert: PO calls for 112) 16’ straights, but I am actually in need of 125 per 11 bedroom ---------------------------------------------------------- Sent to bids for review (Adam). | 10/12/22 | ||||
| Sent to Bids | 10/12/22 | Jeff Subbert | Dart Interests | DIEVM 019 Evermore Resort | 9-Bedroom | Corner/Theater | Masonry Steel *** | Adding more #5 16' Dowels | Jeff Subbert: We are in need of 110) 16’ straights, po calls for 49 ---------------------------------------------------------- Sent to bids for review (Adam). | 10/12/22 | ||||
| Complete | 10/12/22 | Jeff Subbert | Dart Interests | DIEVM 021 Evermore Resort | 10-Bedroom | None | Masonry Steel *** | Adding more #5 16' Dowels | Jeff Subbert: We are in need of 105) 16’ straights, PO calls for 73. ---------------------------------------------------------- Sent to bids for review (Adam). ---------------------------------------------------------- PCMS-DROP1.DIEVM-10BR-A.LOTTSORLANDO changed to: PCMS-DROP1.DIEVM-10BR-NONE.LOTTSORLANDO #5 Rebar Dowel - 16': Old: 73, New: 105 | 10/12/22 | 10/19/22 | Angie | 10/19/22 | |
| Sent to Bids | 10/12/22 | Jeff Subbert | Dart Interests | DIEVM 067 Evermore Resort | 5-Bedroom | None | Masonry Steel *** | Adding more #5 16' Dowels | Jeff Subbert: I am in need of 103) 16’ straights, PO calls for 45. ---------------------------------------------------------- Sent to bids for review (Adam). | 10/12/22 | ||||
| Complete | 10/11/22 | Dane Jones | Toll Brothers | TBLPT 018 Laurel Pointe | Barbera | MO | Precast *** | Adding (1) 9'-4" Lintel | Dane Jones: Precast PO is short 1) 9’-4” U Lintel. Need 4 total for this model. Locations: single car garage, garage window, 8’ SGD and the secondary lintel at the front door. ------------------------------------------------------------ Sent to Isa for review (Adam) Isa: According to the takeoff and the list of materials there is the following: (3) 9'-4" lintels: (1) SGD / (1) Single Garage door / (1) for secondary header on front door. (1) 10'-6" header for garage window. If a 9'-4" lintel works on this window, you can change it. ------------------------------------------------------------ TBLPT018.LOTTSORLANDO 9'-4": Old: 2, New: 3 10'-6" Lintel: Old: 3, New: 2 | 10/11/22 | Isa | 10/11/22 | ||
| Complete | 10/04/22 | John Rathbun | Surrey Homes | SOSVL 019-A Savannah Landing | Pearl | A | Hardware *** | Adding 5/8 Nuts | John Rathbun: I need 35 5/8 x2x2 square washers and 35 5/8 nuts .These where delivered and are now gone frame the garage on this home . The nuts are not on the P.O. And will be a package change . Total of 35 needed . ----------------------------------------------------- HDW.RA-PEARL-F913-A.WHITECAP 5/8 Nuts: Old: 0, New: 35 5/8 Washers: Old: 0, New: 35 | 10/04/22 | 10/04/22 | |||
| Complete | 10/04/22 | John Rathbun | Surrey Homes | SOFXH 032 Fox Hammock | Violet | A & B | Hardware *** | Adding more SPH4 | John Rathbun: Need to change this quantity again after another recount .I need a total of 200 SPH4 on the Violet model . Need to pick up another 40 of these to finish the frame -John Rathbun -------------------------------------------- HDW.SO-VIOLET-A.WHITECAP HDW.SO-VIOLET-B.WHITECAP SPH4: Old: 173, New: 200 | 10/04/22 | 10/04/22 | |||
| Complete | 09/21/22 | Bobby Neller | Minto | NDLTM 2918 Latitudes | Villa 11 | A & B | Precast *** | Adding 4'-0" Sills | Bobby Neller: Should be a total of 4-4’foot high and dry windowsills on this takeoff. Package change: Old-0, New-4 ------------------------------------------------------------------------- 9/22/22 - Chris Plantz reviewed. Chris Plantz: After talking to Adam it appears we have made a sill change at the fields request on other villas with the same window group. To keep things similar I told Adam to make the following changes to Villa 11 sills. I emailed this to Adam as well so he had a means of tracking the change. (-2) 3'1" sills (-4) 2'2.5" sills (+4) 4'0" sills -------------------------------------------------------------------------- PCMS.NDLTM11-A.CASTCRETE 2'-2.5": Old: 10, New: 6 3'-1": Old: 8, New: 6 4'-0": Old: 0, New: 4 PCMS.NDLTM11-B.CASTCRETE 2'-2.5": Old: 10, New: 6 3'-1": Old: 10, New: 6 4'-0": Old: 0, New: 4 | 09/21/22 | 09/22/22 | Chris Plantz | 09/22/22 | |
| Complete | 09/19/22 | Larry Sims | Sobel Co | OFVMR 008 Villa Mar | 4-Unit | Type 1 | FRMMAT.OFVMR-TYPE1.RAYMOND | Frame Package Change | Larry Sims: Package needs to be changed and released to vendor package should be as follows: 80) 1 x 2 x 10’ #2 PT 10) 1 x 4 x 12’ #2 PT 80) 1 x 4 x 14’ #2 SYP 40) 2 x 4 x 14’ #2 PT 175) 2 x 4 x 16’ #2 SYP 30) 2 x 6 x 14’ #2 PT 30) 2 x 6 x 14’ #2 SYP 52) 2 x 6 x 16’ rough sawn spruce primed 14) 2 x 6 x 8’ #2 PT 40) 5/8 x 4’ x 8’ CDX Fire rated sheathing 260) 5/8 x 4’ x 8’ CDX sheathing ------------------------------------------------------------ 9/20/22 - Went over this with Pete and running the package change (Adam) FRMMAT.OFVMR-TYPE1.RAYMOND New Cost-Group: $18,415.46 80) 1 x 2 x 10’ #2 PT 10) 1 x 4 x 12’ #2 PT 80) 1 x 4 x 14’ #2 SYP 40) 2 x 4 x 14’ #2 PT 175) 2 x 4 x 16’ #2 SYP 30) 2 x 6 x 14’ #2 PT 30) 2 x 6 x 14’ #2 SYP 52) 2 x 6 x 16’ rough sawn spruce primed 14) 2 x 6 x 8’ #2 PT 40) 5/8 x 4’ x 8’ CDX Fire rated sheathing 260) 5/8 x 4’ x 8’ CDX sheathing Old Cost-Group: $27,878.87 1650) 1 x 2 x 10’ #2 PT 200) 1 x 4 x 12’ #2 PT 158) 1 x 6 x 12’ #2 PT 6) 2 x 4 x 14’ #2 PT 140) 2 x 4 x 14’ Spruce 12) 2 x 4 x 16’ #2 PT 250) 2 x 4 x 16’ #2 SYP 8) 2 x 6 x 14’ #2 PT 30) 2 x 6 x 14’ #2 SYP 46) 2 x 6 x 16’ rough sawn spruce primed 14) 2 x 6 x 8’ #2 PT 16) 2 x 8 x 10’ #2 PT 8) 2 x 8 x 14’ #2 PT 6) ¾ x 4 x 8 CDX Sheathing 30) 5/8 x 4’ x 8’ CDX Fire rated sheathing 260) 5/8 x 4’ x 8’ CDX sheathing | 09/19/22 | 09/20/22 | |||
| Complete | 09/16/22 | Chris Plantz | Minto | NDLTS 2902 Latitudes | 40-176-II | ALL | Precast *** | Base Precast & MBATH | Adam Sowers: Chris Plantz had to estimate an Option for Susan on this lot and re-ran the estimate for base precast as well. After comparing to the current Cost-Group I noticed differences so adding to the log and making the changes. ----------------------------------------------------------------------------------- Chris Plantz: Susan has a "Minto / NDLTS 2902 / 40-176 II" on the books. She needed an estimate for the optional master bath on it. Since we both know it's coming eventually I went ahead and did the precast only takeoffs for the model. S:\Estimating\Minto\Latitude Margaritaville DAYTONA\Single Family\Precast Takeoffs - 6-24-2022\40-176 II This gives the field the 8" of bearing at each end of the lintels as they've been requesting. They should have no reason to deviate from it, but they probably will. 🙂 ------------------------------------------------------------------------------------ PCMS.NDLTS40-176-II-A.LOTTS PCMS.NDLTS40-176-II-B.LOTTS 6'-6" Lintel: Old: 1, New: 0 7'-6" Lintel: Old: 2, New: 3 | 09/16/22 | 09/16/22 | Chris Plantz | 09/16/22 | |
| Under Review | 09/14/22 | Dane Jones | Toll Brothers | TBLPT 018 Laurel Pointe | Barbera | MO | SGD Precast *** | Swapping (1) 17'-4" w/ 12" Wide 17'-4" | Dane Jones: We need a 12” wide 17’6” lintel for the back SGD. ------------------------------------------------------------- We had this same problem on lot #013 (Barbera/FH).. I revised the original precast order to remove (1) 8" 17'-4" Lintel and sent the 12" wide 17'-4" Lintel separately. Sending to bids for review. ----------------------------------------------------------------------------- 9/16/22 - Lots of emails back and forth on this yesterday. Last email was from Isa w/ takeoff for what this should require. Following up w/ Pete today on how we're going to run this package change (Adam). Isa: This wall is 10'-8" high / 22'-8" long ((3'-4" x 2) + 16'). According to the specifications in the S200 drawing, to make this wall 12" wide, it is required: (70) 12"x8"x16" Boxcar Block (56) 12"x8"x16" Lintel Block (1) Pre-Cast 12" U Lintel - 17'-4" ----------------------------------------------------------------------------- | 09/14/22 | 09/15/22 | Isa | ||
| Complete | 09/13/22 | Bryan Healy | Mattamy Homes | MOSLL 002 Soleil | 6-Unit | TCFFCV | Frame *** | Adding 1/2 Fire Rated CDX | Bryan Healy: Fill in for lumber and hardware. Framers say that they need additional material. X60 2x6 16' southern yellow pine X1 Bunk CDX 1/2 fire rated (72 sheets) X150 nuts 1/2 X150 washers 1/2 X30 MSTAM36 X30 MSTA36 ---------------------------------------------------------------- 9/14/22 - Carlos said Pete is running this package change (Adam). 9/14/22 - The CDX was missed in the takeoff and will be part of an incoming package change per Carlos, confirmed w/ Angie. We'll be removing OSB for whatever CDX is added. Adding this to the Package Change Log (Adam) | 09/13/22 | Angie | 09/14/22 | ||
| Complete | 09/12/22 | Steven Gilbert | Richmond | ROHSQ 019 Heritage Square | F924/Ammolite | A | Precast *** | Package Change Request | Steven Gilbert: Remove (6) 4’5” sills Remove (3) 10’6” precast Add (2) 7’6” precast Add (2) 6’2” sills PO Revised/Re-Relased. Sent to bids (Adam) --------------------------------------------------------------- 9/13/22 - Revised by Chris Plantz Base elevation A (1) 3'6" lintel (3) 7'6" lintel (1) 13'4" lintel (1) 17'4" lintel (1) 4'6" recessed (3'0" Door) (1) 2'-2.5" sill (3) 6'2" sill Updated Cost-Groups: PCMS.RA-Ammolite-F924-A.LOTTS Removed (3) 10'-6" Lintels & (6) 4'-5" Sills. Added: (3) 7'-6" Lintels & (3) 6'-2" Sills. | 09/12/22 | 09/13/22 | Chris Plantz | 09/13/22 | |
| Sent to Bids | 09/07/22 | Larry Sims | Sobel Co | OFVMR 007 Villa Mar | 8-Unit | Type 4 | MASMAT-DROP2.OFVMR-TYPE4 | PCR - 2nd Drop Masonry | Larry Sims: We have 592) 8 x 6 x 16 6 highs in the second lift masonry order and no 8 x 4 x 16 half high. Need to do a package change also need a fill in to get the half highs. There should be: 92) 8 x 6 x 16 6 high 500) 8 x 4 x 16 half highs --------------------------------------------------------------------- The job matches the takeoff in the BuilderTrend Templates folder. There is a previous package change on this from March. The PO had the 92) six highs so I sent a fill-in for the 500) four-highs. Sent to bids for review (AS) | 09/07/22 | ||||
| Sent to Bids | 09/01/22 | Larry Sims | Sobel Co | OFVMR 009 Villa Mar | 4-Unit | Type 1 | FRMMAT.OFVMR-TYPE1.RAYMOND | Package Change Request | Larry Sims: Roof lumber package changes and release to vendor. Larry says the the totals should be the following.. Frame Totals Should be as follows: 80) 1 x 2 x 10’ #2 PT 10) 1 x 4 x 12’ #2 PT 80) 1 x 4 x 14’ #2 SYP 40) 2 x 4 x 14’ #2 PT 175) 2 x 4 x 16’ #2 SYP 30) 2 x 6 x 14’ #2 PT 30) 2 x 6 x 14’ #2 SYP 52) 2 x 6 x 16’ rough sawn spruce primed 14) 2 x 6 x 8’ #2 PT 40) 5/8 x 4’ x 8’ CDX Fire rated sheathing 260) 5/8 x 4’ x 8’ CDX sheathing Hardware Totals should be as follows: 100) H3 hurricane clip 6) box HETA 20 heavy truss anchor 1) box 3” hilti pin with washer 20) HTU 210 6) LGT3 SDS2.5 100) LSTA 18 flat straps 20 gage 18” 20) SP4 top plate anchor 1) SUL210 45 degree 8” high bucket - left 1) SUR210 45 degree 8” high bucket - right 1) tar paper 6” 4) box TH 14214 Tapcon hex head 1/4 x 2 1/4” 8) USP HU28 40) wedge anchor 3/8 x 5” ---------------------------------------------------------------------------------- Sending to bids for review (Adam) FRMMAT.OFVMR-TYPE1.RAYMOND | 09/01/22 | ||||
| Complete | 08/31/22 | Lotts Concrete | Minto | NDLTS 2387 Latitudes | 50-179 | B | Option Related - GSD Precast *** | Swapping out 6" High 4'-6" | Adam Sowers: I received an email from Mary at Lotts asking me to get with Jeff to review the POs on two lots: 2387 & 2388 because they both had 6" 4'-6" Lintels in them and we're missing Recess 4'6" (3'0 dr) Lintels. We have been making package changes recently with a lot of these models/elevations. Plantz has been reviewing them and I've been updating them. It looks like I missed one of the Recess Lintels on one of the recent package changes and the other missing lintels were due to an incorrect Option on each job. Since Platnz has been reviewing each model/elevation and options I've been creating new options on the A Elevation Templates. X-Options brought in so that's why they were missing. I've updated the X-Options now so we shouldn't run into this problem anymore. Updated Selections from X-OPTIONS - Minto: X-RMV GSD-4280-30291-Lotts X-RMV GSD-4280-30291-Cast Swapped out (1) 6" High 4'-6" w/ (1) Recess 4'6" (3'0 dr) Lintel | 08/31/22 | 08/31/22 | |||
| Complete | 08/31/22 | Jeff Rotert | Minto | NDLTS 2520 Latitudes | 40-136 | A | Precast *** | Package Review / Change | Jeff Rotert: Totals need: (7) 7-6, (0) 5-10, (5) 4-6. Please run this by estimating, as I haven’t built this model out here yet. This is the first house in the new, phase 7. Precast has not been delivered yet. Sent to bids (Adam) ------------------------------------------------------------ Reviewed by Chris Plantz on 9/6/22 Combined the A & B Cost-Groups (AS) >Precast Pacakge was correct. Option was wrong. Added MBATH Option to the 40-136-A Template (Adam) | 08/31/22 | 09/06/22 | Chris Plantz | 09/06/22 | |
| Complete | 08/29/22 | David Purvis | Bella Vista Building Group | BVSLS 008 Sand Lake Station | 9-Unit | Type A | Precast *** | Adding 11'-4" Lintels | David Purvis: Need (8) 11’4” precast 8” headers, building requires 17 total only 9 on po ------------------------------------------------ PCMS-DROP1.BVSLS-TYPEA-9UNIT.LOTTSORLANDO 11'-4" Lintel: Old: 7, New: 17 7'-6" Lintel: Old: 0, New: 9 | 08/29/22 | 08/29/22 | |||
| Complete | 08/25/22 | NA | Minto | - | Villa 12 | ALL | Hardware *** | Adjustments | Adam Sowers: Revised Cost-Groups for the Villa 12 and matched them to the takeoffs. Combined the A, II-A, & II-B. The 12-B is separate since the takeoff was different. (Adam) | 08/25/22 | 08/25/22 | |||
| Complete | 08/25/22 | David Purvis | Bella Vista Building Group | BVSLS 007 Sand Lake Station | 8-Unit | Type B | Precast *** | Adding (8) 7'-6" Lintels | Adam Sowers: David requested a Fill-In for (8) 7'-6" Lintels. It looks like they were in Angie's takeoff but didn't make it to the compiled takeoff. They are for the Sliding Glass Doors. Sent the 8 and now adding to the cost-group. ----------------------------------------------------------------------- PCMS-DROP1.BVSLS-TYPEB-8UNIT.LOTTSORLANDO 7'-6" Lintel: Old: 0, New: 8 | 08/25/22 | 08/25/22 | |||
| Complete | 08/23/22 | Jeff Rotert | Minto | NDLTS 2388 Latitudes | 50-180 | A | Precast *** | Package Review / Change | Jeff Rotert: Please have estimating look at this to double check me. This is the first model like this for me out here. Totals needed: (1) 9-4, (6) 7-6, (0) 6-6 Takeoff totals: (3) 9-4, (3) 7-6, (1) 6-6 --------------------------------------------------------------------------- Job matches the takeoff but I don’t think this model has been reviewed since the package matches the takeoff from 2017. PO Revised. Sent to bids for review (Adam). --------------------------------------------------------------------------- Cost-Groups revised per Chris Plants' Revised Takeoff: PCMS.NDLTS50-180-A.CASTCRETE PCMS.NDLTS50-180-A.LOTTS Deleted the 50-180-B Cost-Groups and changed the A to A&B (Adam) | 08/23/22 | 08/24/22 | |||
| Complete | 08/23/22 | Jeff Subbert | Dart Interests | DIEVM 040 Evermore Resort | ALL | ALL | Precast *** | Adding Bar Ties | Jeff Subbert: Evermore every lot I need wire ties, 1000 extra per lot. At this time I need 13 rolls of 1000, 8 inch wire ties --------------------------------------------------- There's only 1 bundle in the job. Jeff says to add 1 bundle of 8" to the precast pacakge (Adam). PCMS-DROP1.DIEVM-10BR-NONE.LOTTSORLANDO PCMS-DROP1.DIEVM-10BR-THEATRE.LOTTSORLANDO PCMS-DROP1.DIEVM-11BR-B.LOTTSORLANDO PCMS-DROP1.DIEVM-11BR-CORNER.LOTTSORLANDO PCMS-DROP1.DIEVM-11BR-NONE.LOTTSORLANDO PCMS-DROP1.DIEVM-11BR-THEATRE.LOTTSORLANDO PCMS-DROP1.DIEVM-5BR-NONE.LOTTSORLANDO PCMS-DROP1.DIEVM-7BR-NONE.LOTTSORLANDO PCMS-DROP1.DIEVM-7BR-THEATRE.LOTTSORLANDO PCMS-DROP1.DIEVM-8BR-CORNER.LOTTSORLANDO PCMS-DROP1.DIEVM-8BR-NONE.LOTTSORLANDO PCMS-DROP1.DIEVM-9BR-CORNER/THEATRE.LOTTSORLANDO PCMS-DROP1.DIEVM-9BR-NONE.LOTTSORLANDO 8" Bar Ties: Old: 0, New: 1 | 08/23/22 | 08/23/22 | |||
| Complete | 08/18/22 | Josh Counts | Minto | NDICP 1394 Isles of Collier | Cottage 2 | B | Masonry *** | Adding Pre-Blend | Adam Sowers: Josh is ordering 224 bags of pre-blend and after looking at the job and takeoff I realized that we're short. Only 103 bags of PB in the takeoff & job. 3,538 Total Block / 15 = 236 bags of preblend. MASMAT.NDICP-2B (12"PARTY WALL).FLBESTBLOCKFT.MYERS MASMAT.NDICP-2B (12"PARTY WALL).PREFERREDNAPLES(NDICP) Pre-Blend: Old: 103, New: 236 | 08/18/22 | 08/18/22 | |||
| Complete | 08/15/22 | Jonathan Himes | Dart Interests | DIEVM 010 Evermore Resort | 10-Bedroom | Theater | Hardware *** | Adding #14 x 3" Screws | Jonathan Himes: Lumber to truss connection. Framers need more of these screws. Bryan Nealy indicated a package change has already been completed. Please add this tot he package change. (1000) 14x3” self tapping screws ------------------------------------------------------- I spoke with Jonathan about this and he said to add 1,000 of these just to the 10besrooms for now (Adam) HDW.DIEVM-10BR-THEATRE.WHITECAP HDW.DIEVM-10BR-NONE.WHITECAP #14 x 3” Hex Head Tek Screws: Old: 0, New: 1000 | 08/15/22 | 08/15/22 | |||
| Complete | 08/12/22 | Jeff Subbert | Dart Interests | DIEVM 050 Evermore Resort | 10-Bedroom | Theater | 1st lift Masonry Steel | Adding #3 Rebar 5x29 Stirrups | Jeff Subbert: Only (67) #3 Rebar - Stirrups 5” x 29” are being ordered per lot. I have been advised that (80) is needed per house for the package change. As of now, (240) is needed to finish up the lots that the cast in place is currently being installed. ---------------------------------------------------- Split between lots 35, 50, & 59. Sending to bids for review (Adam) ----------------------------------------------------- PCMS-DROP1.DIEVM-10BR-THEATRE.LOTTSORLANDO # 3 Rebar - Stirrups 5" x 29": Old: 67, New: 80 PCMS-DROP1.DIEVM-10BR-NONE.LOTTSORLANDO # 3 Rebar - Stirrups 5" x 29": Old: 64, New: 80 | 08/12/22 | 08/16/22 | |||
| Complete | 08/09/22 | Bobby Neller | Minto | NDLTM 2460 Latitudes | Villa 11 | A | Frame *** | Adding & Removing Materials | Bobby Neller: Would like to void out old PO and re-issue a new one to accommodate changes please/ 15/32-OSB-new-170. Old-217 2x8x8 SYP-new-30. Old-37 2x8x12 PT- new-2. Old-17 2x6x1085/8-new-0. Old-14 2x6x14 spruce- new-0 old-31 2x6x92 5/8- New-0. Old-4 2x4x12 PT- New-10. Old 33 15/32-CDX-new-20. Old-0 2x10x10 SYP new-2. Old-0 2x10x10 PT-new-4. Old-0 -------------------------------------------------------------- Since we're removing more than we're adding I'm running with Bobby's requested changes (Adam). FRMMAT.NDLTM11-A.BFS -------------------------- FRMMAT.NDLTM11-A.MARJAM -------------------------- -- Revised ------ 15/32 OSB: Old: 217, New: 170 2x4x12 PT: Old: 33, New: 10 2x6x14 spruce: Old: 31, New: 0 2x6x92 5/8 SYP Precuts: Old: 4, New: 0 2x6x108 5/8 SYP Precuts: Old: 14, New: 0 2x8x12 PT: Old: 17, New: 2 2x8x8 SYP: Old: 37, New: 30 -- New ------ 15/32-CDX: Old: 0, New: 20 2x10x10 SYP: Old: 0, New: 2 2x10x10 PT: Old: 0, New: 4 FRMMAT.NDLTM11-A.84LUMBER -------------------------- -- Revised ------ 15/32 OSB: Old: 217, New: 170 2x4x12 PT: Old: 33, New: 10 2x6x14 spruce: Old: 31, New: 0 2x6x92 5/8 SYP Precuts: Old: 4, New: 0 2x6x108 5/8 SYP Precuts: Old: 0, New: 0 2x8x12 PT: Old: 17, New: 2 2x8x8 SYP: Old: 37, New: 30 -- New ------ 15/32-CDX: Old: 0, New: 20 2x10x10 SYP: Old: 0, New: 2 2x10x10 PT: Old: 0, New: 4 --------------------------------------------------------------------- 8/22/22 - Package Change should have been made to the A & B per Bobby/Brian (Adam) 15/32-OSB-new-170. Old-217 2x8x8 SYP-new-30. Old-37 2x8x12 PT- new-2. Old-17 2x6x1085/8-new-0. Old-14 2x6x14 spruce- new-0 old-31 2x6x92 5/8- New-0. Old-4 2x4x12 PT- New-10. Old 33 15/32-CDX-new-20. Old-0 2x10x10 SYP new-2. Old-0 2x10x10 PT-new-4. Old-0 FRMMAT.NDLTM11-B.84LUMBER -- Revised ------ 15/32 OSB: Old: 195, New: 170 2x4x12 PT: Old: 10, New: N/A 2x6x14 spruce: Old: 0, New: N/A 2x6x92 5/8 SYP Precuts: Old: 0, New: N/A 2x6x108 5/8 SYP Precuts: Old: 0, New: N/A 2x8x12 PT: Old: 4, New: 2 2x8x8 SYP: Old: 32, New: 30 -- New ------ 15/32-CDX: Old: 0, New: 20 2x10x10 SYP: Old: 0, New: 2 2x10x10 PT: Old: 0, New: 4 FRMMAT.NDLTM11-B.BFS -- Revised ------ 15/32 OSB: Old: 195, New: 170 2x4x12 PT: Old: 10, New: N/A 2x6x14 spruce: Old: 0, New: N/A 2x6x92 5/8 SYP Precuts: Old: 0, New: N/A 2x6x108 5/8 SYP Precuts: Old: 0, New: N/A 2x8x12 PT: Old: 4, New: 2 2x8x8 SYP: Old: 32, New: 30 -- New ------ 15/32-CDX: Old: 0, New: 20 2x10x10 SYP: Old: 0, New: 2 2x10x10 PT: Old: 0, New: 4 FRMMAT.NDLTM11-B.MARJAM -- Revised ------ 15/32 OSB: Old: 195, New: 170 2x4x12 PT: Old: 10, New: N/A 2x6x14 spruce: Old: 0, New: N/A 2x6x92 5/8 SYP Precuts: Old: 0, New: N/A 2x6x108 5/8 SYP Precuts: Old: 0, New: N/A 2x8x12 PT: Old: 4, New: 2 2x8x8 SYP: Old: 32, New: 30 -- New ------ 15/32-CDX: Old: 0, New: 20 2x10x10 SYP: Old: 0, New: 2 2x10x10 PT: Old: 0, New: 4 | 08/09/22 | 08/09/22 | |||
| Complete | 08/09/22 | Bryan Healy | Dart Interests | DIEVM 016 Evermore Resort | 11-Bedroom | Theater | Hardware *** | Adding #8 Screws | Bryan Healy: Need an additional 600 screws for each lot #8x1 1/2” self drilling screws -------------------------------------------- HDW.DIEVM-11BR-THEATRE.WHITECAP #8 x 1-1/2" Flat Head Phillips Tek Screw (Box 100): Old: 40, New: 46 | 08/09/22 | 08/09/22 | |||
| Review | 08/08/22 | Dane Jones | Mattamy Homes | MOMER 031 Meridian | 6-Unit | MCAACC/PR | Slab Prep & Precast *** | Slab Prep & Precast | Dane Jones: 192 dowels(need 29 more) original count-163 3 bundles of rod ties(remove 3) OC-6 12 boxes of chairs(remove 3) OC-15 -- 2) 7’-6” Lintel/ OC-6 12) 4’-6” lintel/ OC-5 12) 3’-1” sills/ OC-5 2) 6’-2” sills/ OC-6 1 roll of bar ties --------------------------------------------------------------- POs revised and Fill-Ins sent. Sent to bids for review. | 08/08/22 | ||||
| NA - Cancelled | 08/05/22 | Skip Doyle | Minto | NDICP 1390 Isles of Collier | ALL | ALL | Precast/Masonry Steel *** | Swapping Lintel Screen & Duro Wall | Skip Doyle: Exchange 1 roll of of 6” lintel screen for 1 roll of 10” Exchange 1 bundle of 8” durowall for 1 bundle of 12” ---------------------------------------------------- Sending price request for 10" Lintel Screen (Adam) | 08/05/22 | ||||
| Review | 08/05/22 | Adrian Hart | Dart Interests | DIGFL 0B1 Garden Flats | 10 Unit | CIP Form Hardware *** | Adding Black Drill Ties | Adrian Hart: 18” Drill ties needed for 18” columns Black drill tie 18”x21/4” $85 per bundle of 50 500 needed ---------------------------------------------------------------- Waiting on Adrian to confirm package change on this building after he sees how the fill-in works out (Adam) | 08/05/22 | |||||
| Complete | 08/05/22 | John Rathbun | Surrey Homes | SOFXH 056 Fox Hammock | Violet | B | Hardware *** | Removing LSTA24 & DSP Clips | John Rathbun: Please remove all LSTA24 (128) and replace with 70 LSTA42 Please remove all DSP clips total of zero Please send a fill in P.O. For the following items. 50 - SPH4 12 - LSTA42 50 - 6” SDS screws --------------------------------------------------------------- White Cap doesn't have LSTA in 42" so John asked to supplement the CS18 Coil Strap instead (Adam) HDW.SO-VIOLET-B.WHITECAP LSTA24: Old: 128, New: 0 DSP Stud Plate Tie: Old: 18, New: 0 CS18 Coil Strap: Old: 0, New: 1 | 08/05/22 | 08/05/22 | |||
| Review | 08/03/22 | Kyle Jolly | Encore | ECRUN 006 Spectrum | No Elevator | Frame Drop 3 *** | Adding 2x8 for Eyebrows | Kyle Jolly: 2x8 eyebrows - Encore told me they added this to our buildings going forward. Please verify on the portal. Please also adjust packages for future buildings to include this on the 3rd lumber drop. (8) 2x8x14PT I need the following fill-in made to the following buildings: 6-47-46-7-18-31 ---------------------------------------------------------- | 08/03/22 | |||||
| Complete | 08/02/22 | Dane Jones | Toll Brothers | TBLPT 040 Laurel Point | Dolcetto | MO | Slab Prep *** | Adding Corner Bars | Dane Jones: I need 48 pieces of #5 30”x30” corner bars as stated in the foundation notes and on page S401 detail 2. These are for each building corner(3each) and doubled for T walls(6each) ------------------------------------------------------- 8/4 - Package Change Approved by Estimating. The change of package can be done by including (49) 30"x30" corner bars. Although it is specified in the foundation notes and the detail is in the plans, I did not include them because the detail is not call out in the foundation plan -Isa SLABPREP.TBLPT040.WHITECAP #5 30x30 Corner Bars: Old: 0, New: 48 -------------------------------------------------------- 8/17/22: SLABPREP.TBLPT040.WHITECAP: #5 30x30 Corner Bars: Old: 48, New: 49 SLABPREP.TBLPT054.WHITECAP #5 30x30 Corner Bars: Old: 51, New: 54 SLABPREP.TBLPT053.WHITECAP #5 30x30 Corner Bars: Old: 37, New: 54 | 08/02/22 | 08/04/22 | Isa | 08/05/22 | |
| Complete | 08/02/22 | Dane Jones | Toll Brothers | TBLPT 054 Laurel Point | Corbeil | MO | Slab Prep *** | Adding Corner Bars | Dane Jones: I need 51 pieces of #5 30”x30” corner bars as stated in the foundation notes and on page S401 detail 2. Also short 3 dowels. ----------------------------------------------------- Isa reviewed the package change request on the lot 40 and it was approved so moving forward with adding these as well (Adam) ----------------------------------------------------- SLABPREP.TBLPT054.WHITECAP #5 30x30 Corner Bars: Old: 0, New: 51 | 08/02/22 | 08/04/22 | Isa | 08/05/22 | |
| Complete | 07/20/22 | Larry Sims | Sobel Co | OFVMR 005 Villa Mar | 6-Unit | Type 3 | Precast | Precast Package Change | Larry Sims: Change 2) 4-0 x 8” to 4-6 x 8”, castcrete does not carry 4-0 lintels anymore. Change 10-0 x 12” lintel to 10-6 x 12”, it only comes in that size. Change 60” flush sills to 54”, which are correct for the opening --------------------------------------------------------- PRECAST-DROP1.OFVMR-TYPE3.CASTCRETE PO revised/re-released. The 12" 10' lintels were already correct. Sending to bids for review (Adam) 8/18/22 - Completed (Adam) | 07/20/22 | 08/18/22 | |||
| Review | 07/18/22 | Jonathan Himes | Bella Vista Building Group | BVSLS 008 Sand Lake Station | 9-Unit | Type A | Precast | Precast Package Change | Jonathan Himes: Please update Bldg 6 with this same change. 9 Unit Original Order. (7) Pre-cast 8” lintel 11’-4” (0) Pre-cast 8” lintel 7’-6” New P.O. (9) Pre-cast 8” lintel 11’-4” (9) Pre-cast 8” lintel 7’-6” ------------------------------------------------------------------- PO revised and re-released. Sending this to bids for package change review (Adam) | 07/18/22 | ||||
| Complete | 07/14/22 | Bobby Neller | Minto | NDLTM 2536 Latitudes | Villa 11 | A | Frame *** | Adding 2x6x16 R/S Spruce | Adam Sowers: Can't find the entry for this but was on the Trello board so adding for history of change. Chris said to proceed w/ the fields request. -------------------------------------------------- FRMMAT.NDLTM11-A.MARJAM FRMMAT.NDLTM11-A.BFS FRMMAT.NDLTM11-A.84LUMBER 2x6x16 R/S Spruce: Old: 12. New: 29 | 07/14/22 | 07/19/22 | Chris Plantz | 07/19/22 | |
| Complete | 07/13/22 | Adrian Hart | Dart Interests | DIGFL 0C2 Garden Flats | 12-Unit | Precast *** | Swapping (4) 7'-6" w/ 8'-0" Lintels | Adrian Hart: 4- 7’6” lintels on po do not allow for 8”bearing on both sides of6’5” block openings. Need to swap these out for 8’ u lintels. Digfloc1-0008 this is for c1 as well. ------------------------------------------------------ sending to bids (Adam) 7/26/22 - Angie reviewed this and Pete completed the change (Adam) ------------------------------------------------------ 9/15/22 - It doesn't look like this package change was completed so revisiting. Per Adrian: (6) of the 7'-6" Lintels should be 8'-0"'s. I created a Return/Credit PO for the 7'-6" Lintels and a fill-in for the 8'-0" Lintels (Adam) PCMS-DROP1.DIGFL-0C1/0C2/0C3.LOTTSORLANDO 7'-6" Lintels: Old: 17, New: 11 8'-0" Lintels: Old: 0, New: 6 | 07/13/22 | 07/26/22 | ||||
| Complete | 07/12/22 | Jonathan Himes | Bella Vista Building Group | BVSLS 009 Sand Lake Station | 6-Unit | Type C | PCMS-DROP1.BVSLS-TYPEC-6UNIT | Swapping Stirrups | Jonathan Himes: Old: (58) 8”x17” stir-ups New: (58) 5”x17” Stir-ups. Pleas change this on Bldg 9, 8, 7 & 6 ----------------------------------------------------- #010 - 6-Unit / Type C #009 - 6-Unit / Type C #008 - 9-Unit / Type A No POs Yet: #007 - 8-Unit / Type B (No Cost Group Yet) #006 - 9-Unit / Type A Updated: PCMS-DROP1.BVSLS-TYPEC-6UNIT.LOTTSORLANDO PCMS-DROP1.BVSLS-TYPEA-9UNIT.LOTTSORLANDO | 07/12/22 | 07/12/22 | |||
| Complete | 07/11/22 | Bryan Healy | Dart Interests | DIEVM 027 Evermore Resort | 10-Bedroom | No Elevator | PCMS-DROP1.DIEVM-10BR-A | Swap (4) 4'-6" w/ 5'-10" | Bryan Healy: 5’4” precast header x4 each. 4’6” header doesn’t meet the 8” overlap per plans with the revised window openings. ------------------------------------------------------------- Already created Return/Credit POs for the (4) 4'-6" Lintels and sent fill-ins for the 5'-10"'s. Sent to Bids for Package Change Approval -Adam --------------------------------------------------------------- Sam spoker with Joe Matthews and this is coming from the Engineer, not the inspector so he said go ahead with the package change. PCMS-DROP1.DIEVM-10BR-A.LOTTSORLANDO 4'-6": Old: 9, New: 5 5'-10": Old: 0, New: 4 | 07/11/22 | 07/11/22 | Sam Rathbun | 07/11/22 | |
| Review | 07/07/22 | Dane Jones | Mattamy Homes | MOMER 030 Meridian | 6-Unit | CCACCM/CO | PCMS.MOMER030.LOTTSORLANDO | Precast Package Change/Review | Dane Jones: I tried to schedule a drop date today, Mary with lotts said she could not view the job at all. It says released, but building 30 doesn’t come up on her end. Please revise precast to reflect: +1) 7’ 6” lintel /new total= 7 +1) 6’ 2” sill /new total= 7 +1) 3’ 6” lintel /new total=1 +1) 2’ 2.5” sill /new total=1 -3) 4’ 6” lintel /new total=2 -3) 3’ 1” sill /new total=2 +1) roll of bar ties ---------------------------------------------------------------------- PO Revised/re-released. Sent to bids for review (Adam) PCMS.MOMER030.LOTTSORLANDO PO says it used the above Cost-Group but it doesn't exist in the BuilderTrend for some reason (AS) | 07/07/22 | ||||
| Review | 06/29/22 | Larry Sims | Sobel Co | OFVMR 013 Villa Mar (Type 4) | 8-Unit | Type 4 | Frame *** | Frame for Roof | Larry Sims: Need to add to package and send po for material needed to complete roof type 4 building 35) sheets 5/8 x 4 x 8 fire rated CDX 35) sheets 5/8 x 4 x 8 CDX plywood 10) 2 x 4 x 14 PT ------------------------------------------------------------------ Sent to bids for review (Adam) | 06/29/22 | ||||
| Complete | 06/29/22 | John Rathbun | Surrey Homes | SOFXH 053 Fox Hammock | Violet | A & B | Hardware*** | Adding SPH4 | John Rathbun: Please add 50 SPH4 to the Violet model for a new total of 173. I will need a fill in P.O. For 50 of the SPH4. ---------------------------------------------------------- Updated: HDW.SO-VIOLET-A.WHITECAP HDW.SO-VIOLET-B.WHITECAP | 06/29/22 | 06/29/22 | |||
| Complete | 06/28/22 | Chris Plantz | Richmond | NA | 50-181 | Precast *** | Precast Package Review Changes | Adam Sowers: Chris Plantz is re-estimating all of these as well as the options since we've been having so many issues out here. I'm running with the revised takeoffs that he has been leaving on the S Drive. All of the revised takeoffs that he's putting together are located: S/Estimating/Minto/Latitudes Margarita Daytona/Single Family/Precast Takeoffs - 6-24-2022/ I'm uploading the PDF of the new package to each Cost-Group and combining Cost-Groups where Chris has said the new pacakge applies to all elevations. Also creating / updating all of the options he is re-estimating as well (Adam) ------------------------------------------------------------------------------------ Combined A & B. Updated: PCMS.NDLTS.50-181-A/50-181-B.CASTCRETE PCMS.NDLTS.50-181-A/50-181-B.LOTTS | 06/28/22 | Chris Plantz | 07/05/22 | |||
| Complete | 06/28/22 | Chris Plantz | Richmond | NA | 50-184 | Precast *** | Precast Package Review Changes | Adam Sowers: Chris Plantz is re-estimating all of these as well as the options since we've been having so many issues out here. I'm running with the revised takeoffs that he has been leaving on the S Drive. All of the revised takeoffs that he's putting together are located: S/Estimating/Minto/Latitudes Margarita Daytona/Single Family/Precast Takeoffs - 6-24-2022/ I'm uploading the PDF of the new package to each Cost-Group and combining Cost-Groups where Chris has said the new pacakge applies to all elevations. Also creating / updating all of the options he is re-estimating as well (Adam) ------------------------------------------------------------------------------- Combined A & B Updated: PCMS.NDLTS.50-184-A/50-184-B.CASTCRETE PCMS.NDLTS.50-184-A/50-184-B.LOTTS ------------------------------------------------------------------------------- 7/5/22 - Revised both cost-groups again per Chris Plantz revised takeoff (Adam) | 06/28/22 | Chris Plantz | 07/05/22 | |||
| Complete | 06/28/22 | Chris Plantz | Richmond | NA | 40-178-II | Precast *** | Precast Package Review Changes | Adam Sowers: Chris Plantz is re-estimating all of these as well as the options since we've been having so many issues out here. I'm running with the revised takeoffs that he has been leaving on the S Drive. All of the revised takeoffs that he's putting together are located: S/Estimating/Minto/Latitudes Margarita Daytona/Single Family/Precast Takeoffs - 6-24-2022/ I'm uploading the PDF of the new package to each Cost-Group and combining Cost-Groups where Chris has said the new pacakge applies to all elevations. Also creating / updating all of the options he is re-estimating as well (Adam) --------------------------------------------------------------------------------- Combined A & B Updated: PCMS.NDLTS.40-178-II-A/40-178-II-B.CASTCRETE PCMS.NDLTS.40-178-II-A/40-178-II-B.LOTTS | 06/28/22 | Chris Plantz | 07/05/22 | |||
| Complete | 06/28/22 | Chris Plantz | Richmond | NA | 40-177 | Precast *** | Precast Package Review Changes | Adam Sowers: Chris Plantz is re-estimating all of these as well as the options since we've been having so many issues out here. I'm running with the revised takeoffs that he has been leaving on the S Drive. All of the revised takeoffs that he's putting together are located: S/Estimating/Minto/Latitudes Margarita Daytona/Single Family/Precast Takeoffs - 6-24-2022/ I'm uploading the PDF of the new package to each Cost-Group and combining Cost-Groups where Chris has said the new pacakge applies to all elevations. Also creating / updating all of the options he is re-estimating as well (Adam) -------------------------------------------------------------------------------- Combined A & B Updated: PCMS.NDLTS.40-177-A/40-177-B.CASTCRETE PCMS.NDLTS.40-177-A/40-177-B.LOTTS | 06/28/22 | Chris Plantz | 07/05/22 | |||
| Complete | 06/24/22 | Chris Plantz | Richmond | NA | 50-179 | A & B | Precast *** | Precast Package Review Changes | Adam Sowers: Chris Plantz is re-estimating all of these as well as the options since we've been having so many issues out here. I'm running with the revised takeoffs that he has been leaving on the S Drive. All of the revised takeoffs that he's putting together are located: S/Estimating/Minto/Latitudes Margarita Daytona/Single Family/Precast Takeoffs - 6-24-2022/ I'm uploading the PDF of the new package to each Cost-Group and combining Cost-Groups where Chris has said the new pacakge applies to all elevations. Also creating / updating all of the options he is re-estimating as well (Adam) | 06/24/22 | Chris Plantz | 06/24/22 | ||
| Complete | 06/24/22 | Chris Plantz | Richmond | NA | 50-179-II | A & B | Precast *** | Precast Package Review Changes | Adam Sowers: Chris Plantz is re-estimating all of these as well as the options since we've been having so many issues out here. I'm running with the revised takeoffs that he has been leaving on the S Drive. All of the revised takeoffs that he's putting together are located: S/Estimating/Minto/Latitudes Margarita Daytona/Single Family/Precast Takeoffs - 6-24-2022/ I'm uploading the PDF of the new package to each Cost-Group and combining Cost-Groups where Chris has said the new pacakge applies to all elevations. Also creating / updating all of the options he is re-estimating as well (Adam) | 06/24/22 | Chris Plantz | 06/24/22 | ||
| Review | 06/21/22 | Jeff Rotert | Minto | NDLTS 2474 Latitudes | 50-179-II | B | Precast Package Review/Change | Jeff Rotert: Remove (1) 8-8 Add (1) 5-10, (1) 8-0 ----------------------------------------- sent to bids for review (Adam) | 06/21/22 | |||||
| Complete | 06/20/22 | Steven Gilbert | Richmond | ROHSQ 034 Heritage Square | F913/Pearl | F | PCMS.RA-PEARL-F913-F.LOTTSORLANDO | Missing (1) 4'-6" Lintel | 06/20/22 | 06/20/22 | ||||
| Complete | 06/15/22 | John Rathbun | Sobel Co | SOSVL 005-C Savannah Landing | Pearl | B | Precast *** | Precast Package Change | John Rathbun: Please update the following precast on The Pearl model B elevation only template . Add two 9’-4” headers (one for the garage and one for the front porch ) new total of two 9’-4” headers . Remove one 7’-6” header and one 6’-2” sill (this is the front window change from an A to a B elevation ) new total of One 7’-6” header and one 6’-2” sill. Please add three 2’-2.5” sills for the front three windows for a new total of 9 needed on the B elevation. I will need a P.O. For two 9’-4” and three 2’-2.5” sills And one 7’-6” six inch tall header sent over to Lotts. ----------------------------------------------------------- PCMS.SO-Pearl-B.LOTTSORLANDO 7'-6" Lintel: Old: 2, New: 1 9'-4" Lintel: Old: 0, New: 2 2'-2.5' Sill: Old: 6, New: 9 6'-2" Sill: Old: 2, New: 1 | 06/15/22 | 06/15/22 | |||
| Declined/No Change | 06/15/22 | Scott Deason | Dream Finders | DOSHV 044 South Haven | Mulberry | A | Precast *** | Precast Package Review/Change | Scott Deason: Need lotts to pick up and credit us for 2 lintels at 4’-6” Need 1- 74”sill -------------------------------------------------- 8/29/22 - @adamsowers1 and @petepallis1 Pete/Adam I don't know whom handled that back when it came in , but we should not be changing this package according to this request. This package was correct, It should NOT be changed -Sam Rathbun Package Change Request Closed/Declined (Adam) | 06/15/22 | 08/29/22 | Sam Rathbun | 08/29/22 | |
| No Changes | 06/15/22 | Scott Deason | Dream Finders | DOSHV 041 South Haven | Auburndale | A | Precast *** | Precast Package Review/Change | Adam Sowers: Scott is requesting to return Lintels & Sills that were not on the original PO. He's also requesting a Package Change. Sent to bids (Adam) ---------------------------------------- Closing this one out with No Changes to the Package. It seems there was a bit of confusion from Scott because he was trying to return some headers and sills that weren't even in the package on this job. Chris Plantz has reviewed this package and doesn't see any necessary changes. Windows in plans used for original estimates match windows in plans for lot 41 South Haven. Current precast package is exactly what I would send. I don't know what Scott wants to change. See attached GCC_SH 41 Precast Review 6-23-22.png Looks exactly right to me. -Chris Plantz | 06/15/22 | 06/23/22 | Chris Plantz | 06/23/22 | |
| Review | 06/14/22 | Joe Matthews | Dart Interests | DIEVM 015 Evermore Resort | 10 Bedroom | A | Hardware *** | Clips for Trusses | Joe Matthews: Need estimating to add these clips to take off every house is diff takes 8 clips per truss (sp/rcac225/97-r55 ---------------------------------------------------------- Sent to bids (Adam) | 06/14/22 | ||||
| Complete | 06/14/22 | Brian Dinker | Minto | NDLTM 2342 Latitudes | Villa 2 II | B | Precast *** | Precast Package Review | Brian Dinker: We need to void this PO out re submit correct package with changes. We will let castcrete know there will be a new po for this lot. Package is not here yet. Precast. Old. New 4’6”. 6. 9 5’4”. 3. 2 8’8”. 1. 3 9’4”. 3. 2 12’0”. 2. 1 14’8”. 0. 1 Sills 3’1”. 4. 7 4’0”. 2 4 1’7”. 1. 0 6’2”. 3. 2 ---------------------------------------------------- PCMS.NDLTM2-II-A/NDLTM2-II-B.CASTCRETE 7/5/2022 - Updated per Chris Plantz review and attached the image to the Cost-Group (Adam) | 06/14/22 | 07/05/22 | Chris Plantz | ||
| Review | 06/13/22 | Cyndi Mullee | Minto | NDLTC 2200 Latitudes | Cottage-3 | B | Frame *** | 2x12x10 SYP for Eyebrow | Cyndi Mullee: Need asap. Fill in for lots 2200; 2246; and 2240. Will do Package change for all cottage 3 -Cyndi Mullee Need (18) 2’x12’x10’ ------------------------------------ Cyndi says Cottage 3 has an Eyebrow over the front-door and they make the whole thing with the 2x12's. She says there isn't enough in the package. FRMMAT.NDLTC3B.MARJAM | 06/13/22 | ||||
| Complete | 06/13/22 | Bobby Neller | Minto | NDLTM 2546 Latitudes | Villa 11 | B | Frame *** | 15/32 CDX for Bird Box? | Bobby Neller: Requesting a PO for CD X plywood 4x8- 15/32 that didn’t make the takeoff -Bobby Neller Old-0 New-20 ----------------------------------------------------------- I made a package change to this model/elevation in May per Brian Dinker. Not sure how we're all of the sudden needing these if they weren't in the package before. Bobby says they are needed for a bird box on top. Adding to the Package Change log and Sharon is adding to the Trello Board (Adam) 7/14/22 - Figured out that the package change was made on the B elevation but not the A. Updating the A CGs now (Adam) FRMMAT.NDLTM11-A.84LUMBER FRMMAT.NDLTM11-A.BFS FRMMAT.NDLTM11-A.MARJAM 15/32 Fire Rated CDX: Old: 41, New: 56 | 06/13/22 | 07/14/22 | |||
| Review | 06/09/22 | Cyndi Mullee | Minto | NDLTC 2258 Latitudes | Cottage 2 | B | Hardware *** | Caulking for Door Bucks | Cyndi Mullee: Clear silicone caulking 10oz. Not on any cottage take off -Cyndi Mullee 12 tubes --------------------------------------------- Cyndi says that this is in our scope of work but for some reason isn't in any of the Cottages. She said that someone was walking by the bucking yesterday and noticed that there wasn't any caulking but we have it in the Single Families. Sending here for now and she's going to determine how much each Cottage needs (Adam) | 06/09/22 | ||||
| Complete | 06/07/22 | Jeff Rotert | Minto | NDLTS 2482 Latitudes | 50-179 | B | Precast *** | Precast Package Review/Change | Jeff Rotert: There are multiple discrepancies identified. Please have estimating review and make all necessary changes. ------------------------------------------- Sent to bids for review (Adam) PCMS.NDLTS50-179-B.CASTCRETE PCMS.NDLTS50-179-B.LOTTS 4'-6": Old: 10, New: 9 5'-4": Old: 1, New: 2 8'-0": Old: 0, New: 1 9'-4": Old: 2, New: 1 10'-6": Old: 0, New: 1 3'-1" HiDri: Old: 12, New: 11 4'-0" HiDri: Old: 1, New: 2 ------------------------------------------------- All Elevations are the same for Pre-Cast so combining the Cost-Groups (Adam) New Cost-Groups (Combined) PCMS.NDLTS.50-179-A/50-179-B.CASTCRETE PCMS.NDLTS.50-179-A/50-179-B.LOTTS | 06/07/22 | 06/07/22 | Chris Plantz | 06/07/22 | |
| Review | 06/07/22 | Larry Sims | Sobel Co | OFVMR 013 Villa Mar (Type 4) | 8-Unit | Type 4 | Frame *** | Frame Package Review/Change | Larry Sims: Roof lumber package change. Material on po should be as follows: 120) 1 x 2 x 10’ #2 PT Borate 14) 1 x 4 x 12’ #2 PT Borate 110) 1 x 4 x 14’ #2 SYP 55) 2 x 4 x 14’ #2 PT Borate 470) 2 x 4 x 16’ #2 SYP 24) 2 x 6 x 10’ #2 PT Borate 46) 2 x 6 x 14’ #2 PT Borate 60) 2 x 6 x 14’ #2 SYP 64) 2 x 6 x 16’ rough sawn spruce primed 78) 5/8 x 4 x 8 CDX Fire rated sheathing 350) 5/8 x 4 x 8 CDX Sheathing ---------------------------------------------- PO has already been revised/re-released per Larry's request. Sent to bids for PC Review -Adam | 06/07/22 | ||||
| Complete | 06/06/22 | Jeff Rotert | Minto | NDLTS 2485 Latitudes | 50-181 | A & B | Precast *** | Precast Package Review/Change | Jeff Rotert: Please have estimating review this and make necessary corrections. Precast not delivered yet -------------------------------------------------- Chris Plantz review the package and submitted a new takeoff for this. Updated Cost-Groups: PCMS.NDLTS50-181-A.CASTCRETE PCMS.NDLTS50-181-A.LOTTS PCMS.NDLTS50-181-B.CASTCRETE PCMS.NDLTS50-181-B.LOTTS 17'-4": Old: 2, New: 3 15'-4": Old: 1, New: 0 10'-6: Old: 1, New: 2 7'-6": Old: 5, New: 4 3'-1" HiDri: Old: 10, New: 8 4'-0" HiDri: Old: 0, New: 1 | 06/06/22 | 06/07/22 | Chris Plantz | 06/07/22 | |
| Complete | 06/03/22 | Cyndi Mullee | Minto | NDLTC 2264 Latitudes | All | All | Slab Prep *** | Removing Welded Wire Mesh | Cyndi Mullee: Across the board, all models Remove 1 piece welded fabric flat sheet 6”x6” 10/10 - 8x20’ sheet Old- 25 New- 24 --------------------------------------------- All Cost-Groups updated. Not all of them had the same amount of Welded Wire Mesh but they all only have 24 now (Adam) | 06/03/22 | 06/03/22 | |||
| Complete | 06/03/22 | David Purvis | Richmond | NA | F927/Slate | J | Hardware *** | Adding H2.5A | David Purvis: Can we please review the take-off for the F927 hardware takeoff as the “J” elevation is consistently missing (45) h2.5 clips for the front gables. Please review other elevation that have gables. Not certain how many total elevations have gables. ---------------------------------------------------- HDW.RA-Slate-F927-J.WHITECAP I added 45 H2.5A's to the Cost-Group (Adam) | 06/03/22 | 06/03/22 | |||
| Complete | 05/26/22 | Brian Dinker | Minto | NDLTM 2546 Latitudes | Villa 11 | A & B | Frame *** | Multiple Cost-Codes/Groups | Adam Sowers: This initially came in via email in January but it slipped through the cracks since it wasn't a To-Do. Brian submitted photos of handwritten notes on a Material Package but the photos are extremely hard to read. ------------------------------------- FRMMAT.NDLTM11-B.84LUMBER FRMMAT.NDLTM11-B.BFS FRMMAT.NDLTM11-B.MARJAM 15/32 CDX Fire Rated: Old: 44, New: 56 15/32 OSB Sheathing: Old: 215, New: 195 2x4x12 PT: Old: 33, New: 10 2x6x92 5/8 SYP: Old: 4, New: 0 2x8x10 PT: Old: 9, New: 0 2x8x12 PT: Old: 19, New: 4 2x8x14 PT: Old: 3, New: 0 2x8x14 SYP: Old: 10, New: 5 2x8x8 SYP: Old: 37, New: 32 2x6x14 Spruce -->Changed to 2x6x16 R/S Spruce. Old: 31, New: 31 2x4x108 5/8 SYP: Old: , New: 0 (Not in CG) 2x4x92 5/8 SYP: Old: , New: 0 (Not in CG) 2x6x108 5/8 SYP: Old: , New: 0 (Not in CG) SLABPREP.NDLTM11-B.CASTCRETE Wire Mesh Chairs: Old: 462, New: 200 LINCON.NDLTM11-A.ARGOSLATITUDES Yards: Old: 27, New: 19 HDW.NDLTM11-A.WHITECAP MSTA36: Old: 40, New: 20 SP2: Old: 90, New: 70 | 05/26/22 | 05/26/22 | |||
| Complete | 05/25/22 | Hermes | Bella Vista Building Group | BVSOD 003 SODO House | 2-Unit | DD | Hardware *** | Adding H10A-2 | Hermes: I need 60 pieces H10A-2for the double trusses on the roof . 60 pcs H10A-2 ------------------------------------------------------- HDW.BVSOD-DD.WHITECAP H10A-2: Old: 48, New: 60 | 05/25/22 | 05/25/22 | |||
| Review | 05/24/22 | Dane Jones | Mattamy Homes | MOMER 023 Meridian | 5-Unit | CACAC/? | Precast *** | Swapping Lintels & Sills | Dane Jones: This building has three units- the Catalina and the Catalina II model that call for two separate 3’0 windows each. Not twin 3’0 -Dane Jones Will need to return 3) 7’-6” U Lintels 3) 6’-2” sills Order 6)4’-6” U Lintels 6)3’-1” sills ------------------------------------------------------------ PCMS.MOMER023.LOTTSORLANDO Sent to bids. Waiting on Review/Approval (Adam) | 05/24/22 | ||||
| Complete | 05/24/22 | Brian Dinker | Minto | NDLTM 2580 Latitudes | Villa 12 | A | MASMAT.NDLTM12-A/NDLTM12-II-A | Adding Pre-Blend | Brian Dinker: Need to add 50 bags of mortar to take off. Old 246 new 296. Need a fill in order of 84 bags. ------------------------------------------------------------ MASMAT.NDLTM12-A/NDLTM12-II-A.FLBESTBLOCKORLANDO MASMAT.NDLTM12-A/NDLTM12-II-A.PREFERREDDAYTONA Pre-Blend: Old: 260, New: 296 | 05/24/22 | 05/24/22 | |||
| Complete | 05/23/22 | Johnny Vargas | Richmond | ROEDH 093 Eden Hills | F924/Ammolite | K | HDW.RA-Ammolite-F924-K | Wedge Anchors, LUS28, MSTAM36 | Johnny Vargas: These items were NOT in the original take off list please add these items to all future homes make a change order for all Ammolite homes. 30 pieces of 1/2x7 inch wedge - all anchor Simpson. 12 pieces of LUS28 joist hangers. 5 pieces of MSTAM36. --------------------------------------------------------- HDW.RA-Ammolite-F924-K.CONSTRUCTIONMATERIALS WA127: Old: 0, New: 30 LUS28: Old: 0, New: 12 MSTAM36: Old: 0, New: 5 | 05/23/22 | 05/23/22 | |||
| Complete | 05/23/22 | Carlos Garcia | Richmond | ROEDH 074 Eden Hills | F924/Ammolite | L | HDW. RA-Ammolite-F924-L.WHITECAP | Hardware Changes | Carlos Garcia: After deleting or adjusting the items per the edited take off in the attachments please add the following that are not in the takeoff at all 2 pieces Simpson DTT2Z, 25 pieces of MTS 12, 10 pieces MSTAM 36, 5 pcs MSTA 36 flat straps, 35 pieces SP1, 70 pieces SP2 20 pieces of SP4, 40 each 1/4x1-3/4” hex head tap cons, 25 pieces 1/2x8’” wedge anchors. ---------------------------------------------------------------- There's an image that Carlos attached to this To-Do with revisions and the above additions as well. HDW. RA-Ammolite-F924-L.CONSTRUCTIONMATERIALS Revised Items: H8: Old: 94, New: 60 HTS20: Old: 10, New: 13 HUC28-2: Old: 4, New: 2 LSTA12: Old: 14, New: 0 LSTA18: Old: 12, New: 0 LSTA36: Old: 58, New: 0 Tapcons 14334: Old: 48, New: 0 New Items: 2 pieces Simpson DTT2Z, 25 pieces of MTS 12, 10 pieces MSTAM 36, 5 pcs MSTA 36 flat straps, 35 pieces SP1, 70 pieces SP2 20 pieces of SP4, 40 each 1/4x1-3/4” hex head tap cons, 25 pieces 1/2x8’” wedge anchors, | 05/23/22 | 05/23/22 | |||
| Complete | 05/23/22 | Carlos Garcia | Richmond | ROEDH 093 Eden Hills | F924/Ammolite | K | HDW.RA-Ammolite-F924-K | Hardware Changes | Carlos Garcia: After deleting or adjusting the items per the edited take off in the attachments please add the following that are not in the takeoff at all two pieces of DTT2Z, 13 pieces of HTS 20, 25 pieces of MTS 12, 5 pieces MSTA36 inch flat straps, 10 pieces of MSTAM 36 35 pcs SP1, 70 pcs SP2, 20 pieces SP4, 40 pieces of 1/4x1-3/4 tap cons hex head, 25 pieces of 1/2“ x 8“ wedge anchors, 37 pieces of 3“ x 3“ by half inch square washers, ---------------------------------------------------------------- There's an image that Carlos attached to this To-Do with revisions and the above additions as well. HDW.RA-Ammolite-F924-K.CONSTRUCTIONMATERIALS New Items: 25 pieces of 1/2“ x 8“ wedge anchors, 37 pieces of 3“ x 3“ by half inch square washers, two pieces of DTT2Z, 13 pieces of HTS 20, 25 pieces of MTS 12, 40 pieces of 1/4x1-3/4 tap cons hex head, 5 pieces MSTA36 inch flat straps, 35 pcs SP1, 70 pcs SP2, 20 pieces SP4, 10 pieces of MSTAM 36 | 05/23/22 | 05/23/22 | |||
| Complete | 05/23/22 | Hermes | Bella Vista Building Group | BVSOD 003 SODO House | 2-Unit | DD | FRMMAT-DROP3.BVSOD-DD.BFS | Adding (6) LVL's | Hermes: Missing lvl for the openings of the third level, see plan check detail H5 -Hermes 6) 1.75 x14” x 14’ ------------------------------------------------------------------ Went over this with Angie and she said this was good to send / to add to the package and that there was a problem with the formulas in the takeoff. FRMMAT-DROP3.BVSOD-DD.BFS 1.75 x14” x 14’: Old: 0, New: 6 | 05/23/22 | 05/23/22 | |||
| Complete | 05/20/22 | Dane Jones | Mattamy Homes | MOMER 023 Meridian | 5-Unit | CACAC/PR | SLABPREP.MO-CACAC(CO).WHITECAP | Move Bar Ties to Precast | Dane Jones: Please remove 2 rolls of bar ties from the slab pack Old total-5 New total-3 Please add those two rolls to precast delivery on all future buildings ------------------------------------------- SLABPREP.MO-CACAC(CO).WHITECAP 6" Bar Ties: Old: 5, New: 3 PCMS.MO-CACAC(CO).LOTTSORLANDO 6" Bar Ties: Old: 0, New: 2 | 05/20/22 | 05/20/22 | |||
| Complete | 05/20/22 | Dane Jones | Mattamy Homes | MOMER 023 Meridian | 5-Unit | CACAC/PR | MASMAT.MO-CACAC(CO) | Adding 2-Hour Regulars | Dane Jones: Add 100 more 8x8x16 regular 2 hour fire block Old total- 4,225 New total- 4,325 ---------------------------------------------- MASMAT.MO-CACAC(CO).FLBESTBLOCKORLANDO 8" x 8" x 16" Regular 2 Hour: Old: 4225, New: 4325 | 05/20/22 | 05/20/22 | |||
| No Cost-Groups | 05/20/22 | Dane Jones | Mattamy Homes | MOMER 026 Meridian | 6-Unit | CCACCM/CO | ? | Adding 2-Hour Regulars | Danes Jones: Add 100 more 8x8x16 regular 2 hour fire block Old total- 4,876 New total- 4,976 -------------------------------------------------- Can't find a CG for this. The one used in this job does not exist in the catalog. Petes updating the compiler | 05/20/22 | ||||
| Complete | 05/20/22 | Skip Doyle | Minto | NDICP 1362 Isles of Collier | ALL | ALL | Multiple | Many Changes | Skip Doyle: Delete the following on all lots: 84 Lumber - 1 x 2 furring strips Whitecap & Lotts slab packs & precast - delete bar ties, replace with rolled tie wire. Whitecap hardware - TR 58 threaded rod, N58 hex nut, Set 10 epoxy tie kits, AB 128 anchor bolts, SS312 sill seal Add to each model Sanibel 84 Lumber - 1” x 4” x 16’ PT (10) Whitecap hardware - 1/2” x 7” wedge anchor (35), 1/2” 2” x 2” square washer (35), 5/8” x 6” wedge anchor (12), 5/8” 2” x 2” square washer (12) Useppa 84 Lumber - 1” x 4” x 16’ PT (10) Whitecap hardware - 1/2” x 7” wedge anchor (25), 1/2” 2” x 2” square washer (25), 5/8” x 6” wedge anchor ( 12), 5/8” 2” x 2” square washer (12) Captiva 84 Lumber - 1” - 4” x 16’ PT (10) Whitecap hardware - 1/2” x 7” wedge anchor (35), 1/2” 2” x 2” square washer, 5/8” x 6” wedge anchor (12), 5/8” 2” x 2” square washer. Marco 84 Lumber - 1” x 4” x 16’ PT (6) Whitecap hardware - 1/2” x 7” wedge anchor (60), 1/2” 2” x 2” square washer (60), 5/8” x 6” wedge anchor (12), 5/8” 2” x 2” square washer. ------------------------------------------------------------------------------- Pete is running the additions. I removed/ updated the following: SLABPREP.NDICP-1B (12"PARTY WALL).CASTCRETE SLABPREP.NDICP-1B (12"PARTY WALL).WHITECAP SLABPREP.NDICP-2B (12"PARTY WALL).CASTCRETE SLABPREP.NDICP-2B (12"PARTY WALL).WHITECAP SLABPREP.NDICP-3B (12"PARTY WALL).CASTCRETE SLABPREP.NDICP-3B (12"PARTY WALL).LOTTS SLABPREP.NDICP-3B (12"PARTY WALL).WHITECAP SLABPREP.NDICP-4A (12"PARTY WALL).CASTCRETE SLABPREP.NDICP-4A (12"PARTY WALL).WHITECAP SLABPREP.NDICP-4B (12" PARTY WALL).CASTCRETE SLABPREP.NDICP-4B (12" PARTY WALL).WHITECAP PCMS.NDICP-1B (12"PARTY WALL).CASTCRETE PCMS.NDICP-1B (12"PARTY WALL).LOTTSORLANDO PCMS.NDICP-2B (12"PARTY WALL).CASTCRETE PCMS.NDICP-2B (12"PARTY WALL).LOTTSORLANDO PCMS.NDICP-3B (12"PARTY WALL).CASTCRETE PCMS.NDICP-3B (12"PARTY WALL).LOTTSORLANDO PCMS.NDICP-4A (12"PARTY WALL).CASTCRETE PCMS.NDICP-4A (12"PARTY WALL).LOTTSORLANDO PCMS.NDICP-4B (12"PARTY WALL).CASTCRETE PCMS.NDICP-4B (12"PARTY WALL).LOTTSORLANDO FRMMAT.NDICP-1B (12"PARTY WALL).84LUMBER 1x2x10 PT: Old: 49, New: 0 FRMMAT.NDICP-2B (12"PARTY WALL).84LUMBER 1x2x10 PT: Old: 104, New: 0 FRMMAT.NDICP-3B (12"PARTY WALL).84LUMBER 1x2x10 PT: Old: 45, New: 0 FRMMAT.NDICP-4A (12"PARTY WALL).84LUMBER 1x2x10 PT: Old: 116, New: 0 FRMMAT.NDICP-4B(12"PARTY WALL).84LUMBER 1x2x10 PT: Old: 108, New: 0 HDW.NDICP-1B (12"PARTY WALL).WHITECAP HDW.NDICP-2B (12"PARTY WALL).WHITECAP HDW.NDICP-3B (12"PARTY WALL).WHITECAP HDW.NDICP-4A (12"PARTY WALL).WHITECAP HDW.NDICP-4B(12"PARTY WALL).WHITECAP | 05/20/22 | 05/20/22 | |||
| Complete | 05/18/22 | Larry Sims | Sobel Co | OFVMR 003 Villa Mar (Type 2) | 6-Unit | Type 2 | PRECAST-DROP1.OFVMR-TYPE2.CASTCRETE | Swap (2) 12" 11'-4" w/ 13'-4" | Larry Sims: 11-4 x 12” lintels do not work on type 2 building need to be 13-4 x 12” lintels. Need to order 2) 13-4 x 12” lintels for building 3 to replace 11-4 lintels delivered. ------------------------------------------- PRECAST-DROP1.OFVMR-TYPE2.CASTCRETE Pre Cast 12" U Lintel - 11'-4": Old: 2, New: 0 Pre Cast 12" U Lintel - 13'-4": Old: 0, New: 2 | 05/18/22 | 05/18/22 | |||
| Complete | 05/17/22 | John Rathbun | Surrey Homes | SOFXH 012 Fox Hammock | Clover | A | LANAI Option | Swap 13'-4" for 14'-0" | John Rathbun: Clover model lanai option package change. Please remove the single 13- 4 header and replace this with a 14’ -0” header on the Clover model lanai option . Plans show that the headers are mitered in the corners due to the lack of bearing area available on the top of a 12x12 column . ------------------------------------------------ LANAI Option on the Clover A Template: Swapped (1) 13'-4" for (1) 14'-0" Lintel. | 05/17/22 | ||||
| Review | 05/16/22 | Hermes | Bella Vista Building Group | BVSOD 003 SODO House | 2-Unit | DD | HDW.BVSOD-DD.WHITECAP | TSP & SP6 | Hermes: 24 pcs Simpson TSP Stud Plate Tie - G90 Galvanized 80 pcs Simpson Sp6 ---------------------------------------------- Job matches the takeoff. Sending to Angie for review before making the changes. HDW.BVSOD-DD.WHITECAP TSP: Old: 0, New: SP6: Old: 0, New: | 05/16/22 | Angie | 05/17/22 | ||
| Complete | 05/16/22 | John Rathbun | Surrey Homes | SOFXH 054 Fox Hammock | Violet | A & B | Siding *** | Removing (33) 8" Lap Siding | John Rathbun: Please remove 33 pieces of the 8” lap siding . Old total of 103 pieces . New total of 70 pieces. We will need to pull back and fix P.Os on the following lots . 23 27 53 55 56 59 ----------------------------------------------------- SIDINGMAT.SO-VIOLET-A/VIOLET-B.BFS Hardiplank Lap Siding Smooth - 9 1/4 - 8" Exp Old: 103, New: 70 | 05/16/22 | 05/16/22 | |||
| Complete | 05/16/22 | David Purvis | Richmond | ROPAL 458 Palisades | FC10/Azure | ALL | Masonry *** | Removing Pre-Blend | David Purvis: Need to adjust package for preblend mortar type “S” Need a NEW total of 124 previously was 139. Needs to be across all elevations. --------------------------------------------- MASMAT.RA-Azure-FC10-J.TITANORLANDO MASMAT.RA-Azure-FC10-J.FLBESTBLOCKORLANDO Pre-Blend: Old: 140, New: 124 MASMAT.RA-Azure-FC10-A.FLBESTBLOCKORLANDO MASMAT.RA-Azure-FC10-A.FLBESTBLOCKTAMPA MASMAT.RA-Azure-FC10-A.MCMASTERORLANDO MASMAT.RA-Azure-FC10-A.TITANORLANDO MASMAT.RA-Azure-FC10-B.FLBESTBLOCKORLANDO MASMAT.RA-Azure-FC10-B.FLBESTBLOCKTAMPA MASMAT.RA-Azure-FC10-B.MCMASTERORLANDO MASMAT.RA-Azure-FC10-B.TITANORLANDO MASMAT.RA-Azure-FC10-C.A1BLOCK MASMAT.RA-Azure-FC10-C.FLBESTBLOCKORLANDO MASMAT.RA-Azure-FC10-C.FLBESTBLOCKTAMPA MASMAT.RA-Azure-FC10-C.MCMASTERORLANDO MASMAT.RA-Azure-FC10-C.TITANORLANDO MASMAT.RA-Azure-FC10-G.FLBESTBLOCKORLANDO MASMAT.RA-Azure-FC10-G.TITANORLANDO Pre-Blend: Old: 135, New: 124 MASMAT.RA-Azure-FC10-H.FLBESTBLOCKORLANDO MASMAT.RA-Azure-FC10-H.TITANORLANDO Pre-Blend: Old: 138, New: 124 MASMAT.RA-Azure-FC10-K.FLBESTBLOCKORLANDO MASMAT.RA-Azure-FC10-K.FLBESTBLOCKTAMPA MASMAT.RA-Azure-FC10-K.MCMASTERZONE2 MASMAT.RA-Azure-FC10-K.TITANORLANDO Pre-Blend: Old: 122, New: 124 MASMAT.RA-Azure-FC10-L.TITANORLANDO Pre-Blend: Old: 141, New: 124 MASMAT.RA-Azure-FC10-M.FLBESTBLOCKTAMPA MASMAT.RA-Azure-FC10-M.MCMASTERORLANDO MASMAT.RA-Azure-FC10-M.TITANORLANDO Pre-Blend: Old: 144, New: 124 | 05/16/22 | 05/16/22 | |||
| Complete | 05/13/22 | Mike Cooper | Richmond | ROPAL 463 Palisades | F913/Pearl | H | FRMMAT.RA-F913-H.84LUMBER | 2x6x10 PT | Adam Sowers: 2x6x12 PT in the takeoff on the S Drive but not in this job/PO/Cost Group. FRMMAT.RA-F913-H.84LUMBER 2x6x12 PT: Old: 0, New: 2 | 05/13/22 | 05/13/22 | |||
| Review | 05/12/22 | Kyle Jolly | Encore | ECRUN 030 Spectrum | ? | ? | FRMMAT-DROP1.ECRUN-NOELEVATOR.BFS | 2x4 & 2x6 SYP | Kyle Jolly: Framers ran short of the following materials for first drop, they took from building 19 to finish bearing walls. Please adjust first drop on all future buildings including 19, 6 and 47 and reorder the materials to here and 19 2x4x10SYP (100) 2x6x10SYP (120) ------------------------------------------------------------ FRMMAT-DROP1.ECRUN-NOELEVATOR.BFS 5/12/22 - Both jobs (30 & 19) match what's in the takeoff. Sent to bids for review (Adam) Old: 2x4x10' SYP: 2x6x10' SYP: New: 2x4x10' SYP: 2x6x10' SYP: | 05/12/22 | ||||
| Complete | 05/11/22 | Ross Holland | Walters Construction | WCWAL 815 Custom | Custom | Custom | Footer Prep *** | Swapped Rod Chairs to 'each' | Adam Sowers: Ross sent an email and noticed the Footer Prep PO had 144 Boxes of 3-Bar Chairs (100 per Box) instead of 'Each'. FOOTERPREP.WCWAL817.WHITECAP Removed the 144 Boxes (3-bar chairs). Added 144 'each'. Updated Taxes | 05/11/22 | 05/11/22 | |||
| Confirm/Review | 05/11/22 | Mike Cooper | Richmond | ROPAL 421 Palisades | F927/Slate | J | Masonry *** | *** | Mike Cooper: I have a full cube of block left and 3 pieces of 20’ #5 bar after block work ------------------------------------------------------ Mike says he thinks it's 90 Block per cube. | 05/11/22 | ||||
| Confirm/Review | 05/11/22 | Mike Cooper | Richmond | ROPAL 478 Palisades | FC10/Azure | G | Masonry *** | *** Preblend | Mike Cooper: Need to remove 4 bags of mortar from this model PO. We have 7 extra bags of mortar after completion of blockwork. ---------------------------------------- | 05/11/22 | ||||
| Complete | 05/10/22 | Jeff Rotert | Minto | NDLTS 2380 Latitudes | 40-177 | B | *** | Precast Review Needed | Jeff Rotert: Precast takeoff wrong- send to estimating to correct. Too many discrepancies. Please have estimating revise and resend to the vendor with the correct takeoff Precast has NOT been delivered yet ---------------------------------------------------- Sam reviewed the package and sent me a new one. Jeff said he didn't have a chance to review what Sam sent and just to go ahead with the changes. PCMS.NDLTS40-177-B.LOTTS PCMS.NDLTS40-177-B.CASTCRETE Old Package 3'-6": 2 New: -2 4'-6": 6 New: +1 5'-10": 1 New: +1 7'-6": 2 No Change 10'-6": 3 New: -1 12'-0": 1 New: +1 13'-4": 2 No Change 17'-4": 1 No Change Recess 4'-6": 1 No Change 2'-2.5" HiDri: 2 New: -2 3'-1" HiDri: 8 New: -2 4'-0" HiDri: 1 New: +1 5'-0" HiDri: 2 New: -2 6'-2" HiDri: 2 New: -1 4'-5" HiDri: 0 New: +1 New Package: 4'-6": 7 5-10": 2 7'-6": 2 10'-6": 2 12'-0": 2 13'-4": 2 17'-4": 1 Recess 4'-6": 1 3'-1" HiDri: 6 4'-0" HiDri: 2 4'-5" HiDri: 1 6'-2" HiDri: 1 | 05/10/22 | 05/10/22 | Sam | 05/10/22 | |
| Complete | 05/10/22 | Hermes | Bella Vista Building Group | BVSOD 003 SODO House | 2-Unit | DD | FRMMAT-DROP1.BVSOD-DD.BFS | Adding Parallams | Hermes: Missing posts.. 4 pcs 3.5” x 5.25” x10’ PL 1.8 E FB 2400 psi 4 pcs 3.5”x 7” x 10’ PL 1.8 E FB 2400 psi 8 pcs 5.25” x 5.25”x 10’ PL 1.8 E FB 2400 psi --------------------------------------------------------- Went over this with Angie and they're in her takeoff just didn't make it into the Cost-Groups. Old: 0, 0, 0 New: (4) 3.5 x 5.25 x 10' Parallam (4) 3.5 x 7 x 10' Parallam (8) 5.25 x 5.25 x 10' Parallam | 05/10/22 | 05/10/22 | Angie | 05/10/22 | |
| Complete | 05/10/22 | Steven Gilbert | Dream Finders | DODFM 036 Deerfield Manor | Mulberry | A | Masonry *** | Add 12" Block | Steven Gilbert: Package change missing 12” block. Need (75) 12” block added to takeoffs for front columns. ----------------------------------------------- There are no 12" Block in this job but there is 12" Block in the takeoff that I found on the S Drive so I'm going to move forward with what's in the takeoff. MASMAT.8'PLATE-DF-MULBERRY-A.MCMASTERORLANDO MASMAT.8'PLATE-DF-MULBERRY-A.MCMASTERORLANDO(ZONE2) 12" Block: Old: 0, New: 75 Note: These packages (between vendors) don't seem to match. Some have 12" & 14" Block, this one didn't. Also, we don't have 14" Block from McMaster in the catalog. ---------------------------------------------- MASMAT.8'PLATE-DF-MULBERRY-A.FLBESTBLOCKORLANDO 12" Block: Old: 20, New: 75 14" Block: Old: 30, New: 50 | 05/10/22 | 05/10/22 | |||
| Complete | 05/06/22 | Brian Dinker | Minto | NDLTM 2322 Latitudes | Villa 12 | A | Slab Prep, | Slab Prep,Masonry, Lintel, Shaftwall, Frame | Adam Sowers: Brian turned this package change in person, written notes over the material package. ----------------------------------------------------------------------- SLABPREP.NDLTM12-A/NDLTM12-II-A.CASTCRETE 16" Rod Chairs: Changed to 12" 2 Bar. Old: 4, New: 2 Boxes Wire Mesh Chairs: Old: 538, New: 400 ----------------------------------------------------------------------- MASMAT.NDLTM12-A/NDLTM12-II-A.FLBESTBLOCKORLANDO MASMAT.NDLTM12-A/NDLTM12-II-A.PREFERREDDAYTONA 8x8x12: Old: 0, New: 60 8x8x14: Old: 0, New: 75 Pre-Blend: Old: 246, New: 260 ----------------------------------------------------------------------- LINCON.NDLTM12-A/NDLTM12-II-A.ARGOSLATITUDES Old: 22 Yards, New: 20 Yards ----------------------------------------------------------------------- SHAFTWALL.NDLTM12-A/NDLTM12-II-A.INTERIOR/EXTERIOR H Shaft Wall Stud 10': Old: 57, New: 40 DensGlass - 2x10x1: Old: 115, New: 95 Burn Clips: Old: 500, New: 100 ----------------------------------------------------------------------- FRMMAT.NDLTM12-A/NDLTM12-II-A.84LUMBER FRMMAT.NDLTM12-A/NDLTM12-II-A.BFS FRMMAT.NDLTM12-A/NDLTM12-II-A.MARJAM 1x4x12 PT: Old: 23, New: 0 1x6x12 PT: Old: 9, New: 0 1/2" OSB: Old: 47, New: 60 2x4x14 PT: Old: 17, New: 10 2x4x14 Spruce: Old: 120, New: 30 3/4" CDX: Old: 14, New: 2 7/16 OSB: Changed to 15/32 OSB: Quantitiy stayed the same. | 05/06/22 | 05/06/22 | |||
| Complete | 05/05/22 | John Rathbun | Surrey Homes | SOFXH 003 Fox Hammock | Azalea | A & B | Hardware *** | Adding SPH4's | John Rathbun: Hardware fill in / package change. Please add 20 SPH4 to the azalea model A and B elevations. New total of 30. Send a fill in for the 20 pieces to white cap please. -------------------------------------- HDW.SO-AZALEA-A.WHITECAP SPH4 Old: 10 New: 30 HDW.SO-AZALEA-B.WHITECAP SPH4 Old: 0 New: 30 | 05/05/22 | 05/05/22 | |||
| Complete | 05/05/22 | Jeff Rotert | Minto | NDLTS 2375 Latitudes | 40-178 | A | Precast *** | Adding (1) 7'-6" Lintel | Jeff Rotert: Takeoff has (4) 7-6 precast on it and we need a total of (5) 7-6 precast. Please add (1). Precast has not been delivered yet -------------------------------------------------- Talked to Pete about this and we initially thought this was supposed to be a 40-178-II-A but that package doesn't match the takeoff because of recent package changes so we decided to just add (1) 7'-6" here. PCMS.NDLTS40-178-A.LOTTS Old: 4 New: 5 PCMS.NDLTS40-178-A.CASTCRETE No change, this package was already correct. Old: 5 New: no change. | 05/05/22 | 05/05/22 | |||
| Complete | 05/02/22 | Bobby Neller | Minto | NDLTM 2330 Laittudes | Villa 7 | II-A | MASMAT.NDLTM7-A/NDLTM7-II-A | Adding Pre-Blend | Bobby Neller: Need additional motor added to the take off all villas have been taking six pallets Old-223 New-252 ----------------------------------------------------- Sent the 42 bags of mortar that Bobby requested and emailed this package change request to bids for review / approval. There are currently 223 bags of Pre-Blend in the Package, with a total of 3,844 Block. 3,844 / 15 = 185 (appears that the job should have enough Pre-Blend) ----------------------------------------------------- I spoke to Mark about this and he got with Bobby. He said to go ahead and make this change to this package (VILLA 7 II-A). Bobby will keep an eye out and let us know if we need to scale back or not -Sharon Heim --------------------------------------------------- MASMAT.NDLTM7-A/NDLTM7-II-A.FLBESTBLOCKORLANDO MASMAT.NDLTM7-A/NDLTM7-II-A.PREFERREDDAYTONA Old Count: 223 New Count: 252 | 05/02/22 | 05/02/22 | 05/02/22 | ||
| Complete | 05/02/22 | Skip Doyle | CNC | CNCNC 001 Custom (Pine Key) | Pine Key | Stemwall Footer Prep | Removing Plastic Grade Stakes | Ship Doyle: 24” plastic grade stakes sent back, not needed. Same for all 4 lots. -------------------------- FOOTERPREP.CNC-PINEKEY.WHITECAP FOOTERPREP.CNC-BONITA.WHITECAP Old Count: 25 New Count: 0 | 05/02/22 | 05/02/22 | ||||
| Review | 04/29/22 | Carlos Garcia | Richmond | ROASQ 016 Arlington Square | F913/Pearl | D | Precast Package | Doesn't match takeoff | Carlos Garcia: Package change? Takeoff is missing the 13’4” lintel needed for the multi panel slider, Need to get a purchase order to Lotts as soon as possible as they will be on the lookout for it --------------------------------------------------------- Sent this to bids for review since we already had a pacakge change this week on this job/model/elevation from Steven Gilbert. Waiting for review (Adam). PCMS.RA-PEARL-F913-D.LOTTSORLANDO Old Count Totals: 13'-4": 0 New Count Totals: 13'-4": ? | 04/29/22 | ||||
| Complete | 04/26/22 | John Rathbun | Surrey Homes | SOSVL 009-C Savannah Landing | Sanctuary | A | Precast | Adding (1) 7'-6" Lintel | John Rathbun: Precast Fill in / package change. Please add one 7-6 header for a new total of three to the sanctuary model elevation A only. Need two for the windows on each side of the entry . And one more on the back left window . A total of three needed --------------------------------------------------------------- PCMS.SO-Sanctuary-A.LOTTSORLANDO Old Count Totals: 7'-6" Lintel: 2 New Count Totals: 7'-6" Lintel: 3 | 04/26/22 | 04/26/22 | |||
| Complete | 04/25/22 | Steven Gilbert | Richmond | ROASQ 016 Arlington Square | F913/Pearl | D | Precast Package | Doesn't match takeoff | Steven Gilbert: Change precast package. Remove Lotts precast to many: (1) 7’6” precast (1) 4’6” precast (1) 6’2” sill (1) 3’1” sill --------------------------------------------------------- PCMS.RA-PEARL-F913-D.LOTTSORLANDO Old Count Totals: 4'-6" Lintel: 2 7'-6" Lintel: 2 3'-1" Sill: 2 6'-2" Sill: 2 New Count Totals: 4'-6" Lintel: 1 7'-6" Lintel: 1 3'-1" Sill: 1 6'-2" Sill: 1 | 04/25/22 | 04/25/22 | |||
| Complete | 04/21/22 | Steven Gilbert | Richmond | ROFLK 042 Forest Lake | F924/Ammolite | M | Precast Package | Remove AB1210's from Precast | Steven Gilbert: Remove all 10” j bolts total=(18) from this precast package for this model. -------------------------------------------------------- PCMS.RA-Ammolite-F924-M.LOTTS Removing: AB1210 Anchor Bolt 1/2" x 10" Old: 18, New: 0 | 04/21/22 | 04/21/22 | |||
| Complete | 04/21/22 | Steven Gilbert | Richmond | ROFLK 043 Forest Lake | F926/Emerald | K | HDW.RA-Emerald-F926-A/F926-K | Remove AB1210's from HW | Steven Gilbert: These are unusable at this stage of the house . Please remove all j bolts from hardware packs. Remove (5) 10” j bolts ------------------------------------------------------ HDW.RA-Emerald-F926-A/F926-K.CONSTRUCTIONMATERIALS AB1210 Anchor Bolts: Old: 5. New: 0 | 04/21/22 | 04/21/22 | |||
| 04/20/22 | Hermes | Bella Vista Building Group | BVSOD 003 SODO House | 2-Unit | DD | PCMS.SODO07.CASTCRETE | Swapping #4 Dowels for #5 | Hermes: I have some wrong dowels in the Po that should be changed, it receives #4 1x9’8” but the plan marks them as #5 1x9’8” there are 8 pieces per building -------------------------------------------------- PCMS.SODO07.CASTCRETE NOTE: This Cost-Group no longer exists in BT so can't make the package change. Will do some investigating. Old Totals: # 4 Rebar - 1' X 9' 8" Dowels: # 5 Rebar - 1' X 9' 8" Dowels New Totals: # 4 Rebar - 1' X 9' 8" Dowels: # 5 Rebar - 1' X 9' 8" Dowels | 04/20/22 | |||||
| Review | 04/18/22 | Steven Gilbert | Richmond | ROASQ 042 Arlington Square | FC11/Ruby | A (Metal) | Frame*** | Missing 2x4 Spruce for Doors | Steven Gilbert: Fill in missing 2x4s for door openings. Need (60) 2x4x108 5/8” spruce precuts. ------------------------------------------------------- There are none in the Metal Frame versions of the FC11-A. Sent to bids for review (Adam) | 04/18/22 | ||||
| Complete | 04/14/22 | Scott Deason | Dart Interests | DIEVM 012 Evermore Resort | 5 Bedroom | A | Swapping (4) 4'-6" for (5) 5'-10" | Scott Deason: 5’-4” lintels were not on order list. --------------------------------------------------- Scott says that there are too many 4'-6" Lintels in the 1st Lift Precast PO. He says that it should be 4 total 4'-6"'s and that he needs (5) 5'-4"'s to the package. PCMS-DROP1.DIEVM-5BR-A.LOTTSORLANDO Old Totals: 4'-6" Lintels: 8 5'-10" Lintels: 0 New Totals: 4'-6" Lintels: 4 5'-10" Lintels: 5 | 04/14/22 | 04/14/22 | ||||
| Complete | 04/11/22 | Jeff Rotert | Minto | NDLTS 2437 Latitudes | 40-178 | II-A | Precast*** | Headers & Sills Package | Jeff Rotert: Can you please have estimating check this there are quite a few discrepancies... We need (2) 17-4, takeoff has (1), please add (1) We can use the 14-8 for the 11’ lanai opening, but it’s a little big We can use the 13-4 for the 10-8’ lanai opening, but it’s a little big Takeoff has (2) 10-6, plans call for (1), please remove (1) Takeoff has (4) 7-6, plans call for (3), please remove (1) Takeoff has (4) 4-6, plans call for (6), please add (2) Precast has not been delivered yet. --------------------------------------------------------------- PCMS.NDLTS40-178-II-A.LOTTS REVIEW: Chris Plantz: I compared lot specific plans to type "II" bay plans recv'd in January 2021 and all openings match. This is for model #40-178 II elev A only / Windows change by elevation and are different for model #40-178. Old Package: (2) 3' 6" precast lintel (4) 4' 6" precast lintel (1) 5' 10" precast lintel (4) 7' 6" precast lintel (2) 10' 6" precast lintel (1) 13' 4" precast lintel (1) 14' 8" precast lintel (1) 17' 4" precast lintel (1) 4' 6" Recess lintel (3'0" door) (2) 2' 2-1/2" flush sill (4) 3' 1" flush sill (1) 4' 0" flush sill (3) 6' 2" flush sill --------------------------------------------------------------- 4/12/22 - Chris Plantz reviewed this and verified that the package is incorrect. Per CP the Package should be as follows: New Package: (2) 3' 6" precast lintel ::: (no change) (6) 4' 6" precast lintel ::: (+2) (1) 5' 4" precast lintel ::: (no change, 5'-10" substituted) (3) 7' 6" precast lintel ::: (-1) (1) 10' 6" precast lintel ::: (-1) (2) 12' 0" precast lintel ::: (+2) (0) 13' 4" precast lintel ::: (-1) (0) 14' 8" precast lintel ::: (-1) (2) 17' 4" precast lintel ::: (+1) (1) 4' 6" Recess lintel (3'0" door) ::: (no change) (2) 2' 2-1/2" flush sill ::: (no change) (6) 3' 1" flush sill ::: (+2) (1) 4' 0" flush sill ::: (no change) (2) 6' 2" flush sill ::: (-1) Cost Groups Updated: PCMS.NDLTS40-178-II-A.LOTTS PCMS.NDLTS40-178-II-A.CASTCRETE | 04/11/22 | 04/12/22 | Chris Plantz | 04/12/22 | |
| Hold | 04/06/22 | Carlos Garcia | Richmond | ROEDH 070 Eden Hills | F914/Moonstone | K | Frame *** | Swap SYP Precuts w/ Spruce | Carlos Garcia: Subs are complaining that the pre-cuts are southern yellow pine, it makes them heavier and they tend to twist more. Why do we have southern yellow pine pre-cuts? --------------------------------------------------------------------- Plans at Eden Hills call for SPF studs but SYP plates. Estimating template wasn't designed to mix lumber, either walls are SPF or SYP, not both. This meant a manual substitution on every elevation of every model so I was instructed to make bearing walls SYP, studs included. This was before John Corrigan was hired. We have sent SYP for bearing walls for years and this is the first I've heard about any issues -Chris Plantz --------------------------------------------------------------------- Carlos says they need to be swapped out (Adam). FRMMAT.RA-Moonstone-F914-K.HAVEN Old Totals (SYP Precuts) 2x4x92 5/8 SYP: 211 2x4x108 5/8 SYP: 58 2x6x92 5/8 SYP: 10 2x6x108 5/8 SYP: 23 Old Totals (Spruce Precuts) 2x4x92 5/8 Spruce: 204 2x4x108 5/8 Spruce: 44 2x6x92 5/8 Spruce: 34 2x6x108 5/8 Spruce: 12 Carlos is going to double check on this before I make any changes (Adam). | 04/06/22 | ||||
| Complete | 04/01/22 | Steven Gilbert | Richmond | ROFLK 039 Forest Lake | F924/Ammolite | K | Hardware | Missing MTS12 & HTS20 | Steven Gilbert: Missing hardware on p.o. All mts12s and HTS20s. 4/1/22 - The takeoff I originally looked at didn't have these either but I found a revised Takeoff in the Estimating Folder on the S Drive that does have these items. Steven didn't know how many he needed so sending what's in this takeoff and will add to package change log (Adam). ------------------------------------------------------- HDW.RA-Ammolite-F924-K.CONSTRUCTIONMATERIALS Old Totals: MTS12: 0 HTS20: 0 New Totals: MTS12: 27 HTS20: 10 | 04/01/22 | 04/01/22 | |||
| Complete | 04/01/22 | John Rathbun | Surrey Homes | SOSVL 007-A Savannah Landing | Harbor | A & B | Hardware | Add HSTM16 & Tapcons | John Rathbun: Harbor model A and B elevations. Please add the following: 2 - HTSM16 One box of 1” x 1/4” hex head tapcons ----------------------------------------- John said that he doesn't need an entire box of tapcons for this, and since that's how they send them he said he'll just order them as fill-ins. HDW.SO-Harbor-A.CONSTRUCTIONMATERIALS HDW.SO-Harbor-B.CONSTRUCTIONMATERIALS HTSM16: Old: 0, New: 2 | 04/01/22 | 04/01/22 | |||
| Complete | 03/31/22 | Steven Gilbert | Richmond | ROFLK 048 Forest Lake | F924/Ammolite | L | *** | Remove Duro Wall | Steven Gilbert: We have never used durowall in my area please remove from all orders. PCMS. RA-Ammolite-F924-L.LOTTS Old: 3, New: 0 | 03/31/22 | 03/29/22 | |||
| Review | 03/31/22 | Jack Corrigan | Richmond | RORVC 049 River Chase | F928 | A | Option? | Missing 2x12x18 SYP (Sel?) | Jack Corrigan: I’m missing all 2x12s for the back porch detail. I attached a picture of the detail -Jack Corrigan Missing: (6) 2x12x8 syp (4) 2x12x18 syp For lot 49: Model: Bronze Elevation: A 3/31/22 - Job matches the takeoff but not sure about the options. Either missed option, needs to be updated, or change. Will forward to bids for review (Adam). --------------------------------------------------------------- | 03/31/22 | ||||
| Review | 03/31/22 | Larry Sims | Sobel Co | OFVMR 011 Villa Mar | 4-Unit | Type 1 | Precast Drop 1 | Missing (2) 13'-4" | Larry Sims: There are 2) 13-4 x 8” lintels on the interior of the type 1 and type 2 building that where not included in the package. We will need to add them to the packages of both building types and I need to send a po to cast Crete for 2) 13-4 x 8” lintels to complete building 11 thanks. 2) 13-4 x 8” lintels 3/31/22 - Sending for now and will send to bids for package change review (Adam). ------------------------------------------------- | 03/31/22 | ||||
| 03/31/22 | Bobby Neller | Minto | NDLTM 2582 Latitudes | Villa 7 | B | *** | Adding META 20 Straps | Bobby Neller: Been running short truss straps in the villas. I was wondering why, because I remember doing a package change for truss straps but it was in the cottages lol. However we need to do one as well in the villas. Just got done counting all my Truss straps after pouring a Lentil. Took 310 straps. All villas are similar. Package change: Old-283 New-315 ---------------------------------------------------- PCMS.NDLTM7-A/NDLTM7-B.CASTCRETE PCMS.NDLTM7-II-A/NDLTM7-II-B.CASTCRETE Old: 283, New: 315 | 03/31/22 | |||||
| Complete | 03/28/22 | Bobby Neller | Minto | NDLTM 2588 Latitudes | Villa 9 | A | All Models/Elevations | Remove All Precut Studs | Bobby Neller: Villa package change: Removing all precut studs across the board not necessary in the villas. 92 5/8- Spruce Pre-cuts: Old-35, New-0 104 5/8-Spruce Pre-cuts: Old-21, New-0 ---------------------------------------- FRMMAT.NDLTM9-A.84LUMBER FRMMAT.NDLTM9-A.BFS FRMMAT.NDLTM9-A.MARJAM FRMMAT.NDLTM9-B.84LUMBER FRMMAT.NDLTM9-B.BFS FRMMAT.NDLTM9-B.MARJAM 92 5/8 Old: 35, New: 0 104 5/8 Old:21 , New: 0 FRMMAT.NDLTM8-A.84LUMBER FRMMAT.NDLTM8-A.BFS FRMMAT.NDLTM8-A.MARJAM FRMMAT.NDLTM8-B.84LUMBER FRMMAT.NDLTM8-B.BFS FRMMAT.NDLTM8-B.MARJAM FRMMAT.NDLTM7-A/NDLTM7-II-A.84LUMBER FRMMAT.NDLTM7-A/NDLTM7-II-A.BFS FRMMAT.NDLTM7-A/NDLTM7-II-A.MARJAM FRMMAT.NDLTM7-B/NDLTM7-II-B.84LUMBER FRMMAT.NDLTM7-B/NDLTM7-II-B.BFS FRMMAT.NDLTM7-B/NDLTM7-II-B.MARJAM FRMMAT.NDLTM6-A.84LUMBER FRMMAT.NDLTM6-A.BFS FRMMAT.NDLTM6-A.MARJAM FRMMAT.NDLTM6-B.84LUMBER FRMMAT.NDLTM6-B.BFS FRMMAT.NDLTM6-B.MARJAM 92 5/8 Old: 26, New: 0 FRMMAT.NDLTM5-A.84LUMBER FRMMAT.NDLTM5-A.BFS FRMMAT.NDLTM5-A.MARJAM FRMMAT.NDLTM5-B.84LUMBER FRMMAT.NDLTM5-B.BFS FRMMAT.NDLTM5-B.MARJAM 92 5/8 Old: 36, New: 0 104 5/8 Old:21 , New: 0 FRMMAT.NDLTM4-A/NDLTM4-II-A.84LUMBER FRMMAT.NDLTM4-A/NDLTM4-II-A.BFS FRMMAT.NDLTM4-A/NDLTM4-II-A.MARJAM FRMMAT.NDLTM4-B/NDLTM4-II-B.84LUMBER FRMMAT.NDLTM4-B/NDLTM4-II-B.BFS FRMMAT.NDLTM4-B/NDLTM4-II-B.MARJAM 92 5/8 Old: 26, New: 0 FRMMAT.NDLTM3-A.84LUMBER FRMMAT.NDLTM3-A.BFS FRMMAT.NDLTM3-A.MARJAM FRMMAT.NDLTM3-B.84LUMBER FRMMAT.NDLTM3-B.BFS FRMMAT.NDLTM3-B.MARJAM 92 5/8 Old: 35, New: 0 104 5/8 Old:21 , New: 0 FRMMAT.NDLTM2-A.84LUMBER FRMMAT.NDLTM2-A.BFS FRMMAT.NDLTM2-A.MARJAM FRMMAT.NDLTM2-B.84LUMBER FRMMAT.NDLTM2-B.BFS FRMMAT.NDLTM2-B.MARJAM 92 5/8 Old: 26, New: 0 FRMMAT.NDLTM10-A.84LUMBER FRMMAT.NDLTM10-A.BFS FRMMAT.NDLTM10-A.MARJAM FRMMAT.NDLTM10-B.84LUMBER FRMMAT.NDLTM10-B.BFS FRMMAT.NDLTM10-B.MARJAM 92 5/8 Old: 26, New: 0 FRMMAT.NDLTM11- * Has SYP Pre-cuts instead of Spruce Pre-cuts FRMMAT.NDLTM11-A.84LUMBER FRMMAT.NDLTM11-A.BFS FRMMAT.NDLTM11-B.84LUMBER FRMMAT.NDLTM11-B.BFS 92 5/8 Old: 41, New: 0 108 5/8 Old:14 , New: 0 FRMMAT.NDLTM12-A/NDLTM12-II-A.84LUMBER FRMMAT.NDLTM12-A/NDLTM12-II-A.MARJAM FRMMAT.NDLTM12-B/NDLTM12-II-A.84LUMBER FRMMAT.NDLTM12-II-B/NDLTM12-II-B.84LUMBER 92 5/8 Old: 34, New: 0 FRMMAT.NDLTM13-B.84LUMBER FRMMAT.NDLTM13-B.BFS FRMMAT.NDLTM13-B.MARJAM 92 5/8 Old: 26, New: 0 | 03/28/22 | 03/29/22 | |||
| Complete | 03/25/22 | Jeff Subbert | Mattamy Homes | MOWAT 028 Waterbrooke | 8-Unit | CACAACAC/FT | FRMMAT-DROP1.MO-CACAACAC(FT).84LUMBER | Removing 6x6 Posts | Adam Sowers: Jeff Subbert asked about these saying he didn't think they were supposed to be in the package. Chris Plants reviewed and determined yes, they're not supposed to be in there. I created a Return/Credit PO for the Posts and now removing them from the Cost-Group. --------------------------------------------------- FRMMAT-DROP1.MO-CACAACAC(FT).84LUMBER Old: 6x6x8 PT: 16, New: 0 | 03/25/22 | 03/28/22 | Chris Plantz | 03/28/22 | |
| Complete | 03/23/22 | Johnny Vargas | Richmond | ROLKS 003 Lake Smart (F927-B) | F927/Slate | B | *** Hardware | Removing HGA10KT | Johnny Vargas: Please take off HGA10KT Gable End Wall connector Simpson. For all future homes I have way to many of these connectors. Each house only needs one connector and every box comes with ten pieces. So please take this item off the take off list. Each box cost $98.80. I have and collected 12 boxes that I’ve found through my walk through that’s 120 houses I can do. ----------------------------------------- HDW.RA-Slate-F927-B.CONSTRUCTIONMATERIALS HDW.RA-Slate-F927-A.CONSTRUCTIONMATERIALS HDW.RA-Slate-F927-C.CONSTRUCTIONMATERIALS HDW.RA-Slate-F927-G.CONSTRUCTIONMATERIALS Old: 2, New: 1 HDW.RA-SUNSTONE-F919-B.WHITECAP Old: 2, New: 1 HDW.RA-Moonstone-F914-G.CONSTRUCTIONMATERIALS HDW.RA-Moonstone-F914-H.WHITECAP HDW.RA-MOONSTONE-F914-J.CONSTRUCTIONMATERIALS Old: 2, New: 1 HDW.RA-F913-G/F913-H.WHITECAP Old: 2, New: 1 HDW.RA-Onyx-F9C2-G.CONSTRUCTIONMATERIALS Old: 2, New: 1 | 03/23/22 | ||||
| Complete | 03/21/22 | Bobby Neller | Minto | NDLTM 2570 Latitudes | All Villas | All | *** | Removing H-Track | Bobby Neller: H track package change interior exterior. Like to remove 10 pieces of each track from the take off. Across-the-board! Old-43 New-33 ------------------------------------------------------------ SHAFTWALL.NDLTM9-A.ALLIED Old Totals: "H" Shaft Wall Stud 10': 43 New Totals: "H" Shaft Wall Stud 10': 33 SHAFTWALL.NDLTM9-A.INTERIOR/EXTERIOR BUILDING SUPPLY Old Totals: "H" Shaft Wall Stud 10': 43 New Totals: "H" Shaft Wall Stud 10': 33 Package Changes Made to the following Cost-Groups: SHAFTWALL.NDLTM9-B.ALLIED SHAFTWALL.NDLTM9-B.INTERIOR/EXTERIOR BUILDING SUPPLY SHAFTWALL.NDLTM10-A.INTERIOR/EXTERIOR BUILDING SUPPLY SHAFTWALL.NDLTM10-B.ALLIED SHAFTWALL.NDLTM10-B.INTERIOR/EXTERIOR BUILDING SUPPLY SHAFTWALL.NDLTM11-A.INTERIOREXTERIOR SHAFTWALL.NDLTM11-B.INTERIOREXTERIOR Old: 72, New: 62 SHAFTWALL.NDLTM13-B.ALLIED SHAFTWALL.NDLTM13-B.INTERIOR/EXTERIOR BUILDING SUPPLY SHAFTWALL.NDLTM2-A.ALLIED SHAFTWALL.NDLTM2-A.INTERIOR/EXTERIOR BUILDING SUPPLY Old: 41, New: 31 SHAFTWALL.NDLTM2-B.ALLIED SHAFTWALL.NDLTM2-B.INTERIOR/EXTERIOR BUILDING SUPPLY Old: 41, New: 31 SHAFTWALL.NDLTM3-A.ALLIED SHAFTWALL.NDLTM3-A.INTERIOR/EXTERIOR BUILDING SUPPLY SHAFTWALL.NDLTM3-B.ALLIED SHAFTWALL.NDLTM3-B.INTERIOR/EXTERIOR BUILDING SUPPLY SHAFTWALL.NDLTM4-A/NDLTM4-II-A.ALLIED SHAFTWALL.NDLTM4-A/NDLTM4-II-A.INTERIOR/EXTERIOR Old: 41, New: 31 SHAFTWALL.NDLTM4-B/NDLTM4-II-B.ALLIED SHAFTWALL.NDLTM4-B/NDLTM4-II-B.INTERIOR/EXTERIOR Old: 41, New: 31 SHAFTWALL.NDLTM5-A.ALLIED SHAFTWALL.NDLTM5-A.INTERIOR/EXTERIOR BUILDING SUPPLY Old: 41, New: 31 SHAFTWALL.NDLTM5-B.ALLIED SHAFTWALL.NDLTM5-B.INTERIOR/EXTERIOR BUILDING SUPPLY Old: 41, New: 31 SHAFTWALL.NDLTM6-A.ALLIED SHAFTWALL.NDLTM6-A.INTERIOR/EXTERIOR BUILDING SUPPLY Old: 41, New: 31 SHAFTWALL.NDLTM6-B.ALLIED SHAFTWALL.NDLTM6-B.INTERIOR/EXTERIOR BUILDING SUPPLY Old: 41, New: 31 SHAFTWALL.NDLTM7-A/NDLTM7-II-A.ALLIED SHAFTWALL.NDLTM7-A/NDLTM7-II-A.INTERIOR/EXTERIOR Old: 42, New: 32 SHAFTWALL.NDLTM7-B/NDLTM7-II-B.ALLIED SHAFTWALL.NDLTM7-B/NDLTM7-II-B.INTERIOR/EXTERIOR BUILDING SUPPLY SHAFTWALL.NDLTM8-A.ALLIED SHAFTWALL.NDLTM8-A.INTERIOR/EXTERIOR BUILDING SUPPLY SHAFTWALL.NDLTM8-B.ALLIED SHAFTWALL.NDLTM8-B.INTERIOR/EXTERIOR BUILDING SUPPLY | 03/21/22 | 03/21/22 | |||
| Complete | 03/21/22 | Bobby Neller | Minto | NDLTM 2566 Latitudes | Villa 3 | A & B | *** Masonry | Adding Pre-Blend | Adam Sowers: Bobby Neller called me about this. Not exactly sure why all of the sudden we're having problems with being short on Pre-Blend in this community but what's currently in the package here is incorrect. There are only 227 bags of Pre-Blend and it should be at least 266 bags. Total Block = 3983 (Adam). -------------------------------------- Old: 227, New: 266 MASMAT.NDLTM3-A.FLBESTBLOCKORLANDO MASMAT.NDLTM3-A.PREFERREDDAYTONA MASMAT.NDLTM3-B.FLBESTBLOCKORLANDO MASMAT.NDLTM3-B.PREFERREDDAYTONA | 03/21/22 | 03/21/22 | |||
| Complete | 03/17/22 | John Rathbun | Surrey Homes | SOSVL 010-C Savannah Landing | Sanctuary | A & B | HDW.SO-Sanctuary-A & B | Hardware Changes | John Rathbun: Sanctuary model A&B elevations. Please remove 35 / all 1/2”x8” hex bolts. Please add 50 (1/4” x 4 1/4” SDS screws) Alternate built up column nail pattern . Please add 10 SPH6 for a new total of 124. Please send the 10 SPH6 & the 50 SDS screws as a fill in ------------------------------------------------ HDW.SO-Sanctuary-A.CONSTRUCTIONMATERIALS Old Totals: HB127 Hex Bolt, 1/2" x 8": 35 SDS25412 Simpson 1/4" x 4 1/2" Wood Screw: 0 SPH6: 114 New Totals: HB127 Hex Bolt, 1/2" x 8": 0 SDS25412 Simpson 1/4" x 4 1/2" Wood Screw: 50 SPH6: 124 ------------------------------------------------- HDW.SO-Sanctuary-B.CONSTRUCTIONMATERIALS Old Totals: HB127 Hex Bolt, 1/2" x 8": 45 SDS25412 Simpson 1/4" x 4 1/2" Wood Screw: 0 SPH6: 72 New Totals: HB127 Hex Bolt, 1/2" x 8": 0 SDS25412 Simpson 1/4" x 4 1/2" Wood Screw: 50 SPH6: 82 | 03/17/22 | 03/17/22 | |||
| Complete | 03/11/22 | Scott Deason | Dart Interests | DIEVM 010 Evermore Resort | 10 Bedroom | A | Slab Prep | Swapping Visqueen to 10 mil | Adam Sowers: Swapping all Visqueen to 10mil instead of 6mil in every Cost-Group. taxes updated as well (Adam) SLABPREP.DIEVM-LOT10.LOTTSORLANDO SLABPREP.DIEVM-LOT11.LOTTSORLANDO SLABPREP.DIEVM-LOT12.LOTTSORLANDO SLABPREP.DIEVM-LOT13.LOTTSORLANDO SLABPREP.DIEVM-LOT14.LOTTSORLANDO SLABPREP.DIEVM-LOT15.LOTTSORLANDO SLABPREP.DIEVM-LOT16.LOTTSORLANDO SLABPREP.DIEVM-LOT17.LOTTSORLANDO SLABPREP.DIEVM-LOT18.LOTTSORLANDO SLABPREP.DIEVM-LOT19.LOTTSORLANDO | 03/11/22 | 03/11/22 | |||
| Complete | 03/11/22 | Bobby Neller | Minto | NDLTM 2590 Latitudes | Villa 11 | B | PCMS.NDLTM11-B.CASTCRETE | Swapping META12 for 20s | Adam Sowers: Bobby said that the truss anchors in this are the incorrect sizes. It matches the takeoff on the S Drive but all of the other takeoffs that I looked at had META16 or bigger. PCMS.NDLTM11-B.CASTCRETE Old Totals: META12: 300 META20: 7 New Totals: META12: 0 META20: 300 Note: They were the same price. So, I just made the change and didn't forward to bids for review (Adam). | 03/11/22 | 03/11/22 | |||
| Complete | 03/11/22 | Bobby Neller | Minto | NDLTM 2564 Latitudes | ALL | ALL | Hardware | Removing 1 Box of Tapcons | Bobby Neller: I’ve already removed 36 inch straps from all the take offs I need to remove one box of these hex head tap cons as well1-4”x1 3/4” Old-two boxes New-One box ------------------------------------------------ Old Count Totals: TH14134 Tapcon 1/4" x 1 3/4" (box): 2 New Count Totals: TH14134 Tapcon 1/4" x 1 3/4" (box): HDW.NDLTM8-A.CONSTRUCTIONMATERIALS HDW.NDLTM8-B.CONSTRUCTIONMATERIALS Old Count: 2, New Count: 1 HDW.NDLTM10-A.CONSTRUCTIONMATERIALS HDW.NDLTM10-B.CONSTRUCTIONMATERIALS Old Count: 2, New Count: 1 HDW.NDLTM11-A.WHITECAP HDW.NDLTM11-B.WHITECAP TH14314: Old Count: 12, New Count: 1 HDW.NDLTM2-A.CONSTRUCTIONMATERIALS HDW.NDLTM2-B.CONSTRUCTIONMATERIALS Old Count: 2, New Count: 1 HDW.NDLTM3-A.CONSTRUCTIONMATERIALS HDW.NDLTM3-B.CONSTRUCTIONMATERIALS Old Count: 2, New Count: 1 HDW.NDLTM4-A/NDLTM4-II-A.WHITECAP HDW.NDLTM4-B/NDLTM4-II-B.WHITECAP Old Count: 2, New Count: 1 HDW.NDLTM5-A.CONSTRUCTIONMATERIALS HDW.NDLTM5-B.CONSTRUCTIONMATERIALS Old Count: 2, New Count: 1 HDW.NDLTM6-A.CONSTRUCTIONMATERIALS HDW.NDLTM6-B.CONSTRUCTIONMATERIALS Old Count: 2, New Count: 1 HDW.NDLTM7-A/NDLTM7-II-A.WHITECAP HDW.NDLTM7-B/NDLTM7-II-B.WHITECAP Old Count: 2, New Count: 1 HDW.NDLTM9-A.CONSTRUCTIONMATERIALS HDW.NDLTM9-B.CONSTRUCTIONMATERIALS Old Count: 2, New Count: 1 | 03/11/22 | 03/11/22 | |||
| Complete | 03/10/22 | Bobby Neller | Mintoi | NDLTM 2590 Latitudes | Villa 11 | B | SLABPREP.NDLTM11-B.CASTCRETE | Removing Corner Bars | Bobby Neller: Like to remove all 30“ x 30“ corner bars total of 33 Old-72 New-0 Corner bars are being wasted out here we need to remove them from the package we weren’t receiving them to begin with but I think what we started doing takeoffs for down south is when I started seeing them in latitudes again. ------------------------------------------------------ I removed all Corner Bars from the following Cost-Groups: SLABPREP.NDLTM11-A.CASTCRETE SLABPREP.NDLTM11-B.CASTCRETE | 03/10/22 | 03/10/22 | |||
| Complete | 03/10/22 | Bobby Neller | Minto | NDLTM 2564 Latitudes | Villa 8 | B | MASMAT.NDLTM8-B.FLBESTBLOCKORLANDO | Adding Pre-Blend | Adam Sowers: Bobby had a To-Do on this job for Pre-Blend w/ notes saying he thought the package was short. I ran the numbers and it appears to be short by about 40 bags of pre-blend so I'm adding it to the package. MASMAT.NDLTM8-B.FLBESTBLOCKORLANDO MASMAT.NDLTM8-B.PREFERREDDAYTONA Old Totals: Pre- Blend: 212 New Totals: Pre-Blend: 252 | 03/10/22 | 03/10/22 | |||
| Review | 03/08/22 | Jeff Rotert | Minto | NDLTS 2499 Latitudes | 40-179-II | B | PCMS.NDLTS40-178-II-B.LOTTSORLANDO | Precast Changes | Jeff Rotert: Please have estimating look at this. Takeoff vs prints in the field don’t match up. Takeoff has (1) 17-4 and we need (2), please add (1) Takeoff has (2) 10-6 and we need (1), please remove (1) Takeoff has (4) 7-6 and we need (3), please remove (1) Takeoff has (4) 4-6 and we need (6), please add (2) Precast has not been delivered yet ---------------------------------------------------------------------- Sent to bids for review. Will update as necessary (Adam). | 03/08/22 | ||||
| Complete | 03/03/22 | Bobby Neller | Minto | NDLTM 2598 Latitudes | Villa 13 | B | *** | Remove MSTAM 36 | Bobby Neller: I’d like to remove the following hardware from the take offs on all villas. No longer needed I’m wet setting straps. MSTAM 36 strap tie Old-40 New-0 ------------------------------------------- HDW.NDLTM13-B.CONSTRUCTIONMATERIALS Old Totals: MSTAM36: 40 New Totals: MSTAM36: 0 ------------------------------------------- Removed ALL MSTAM36 from the following Cost-Groups: Cost-Group: # Removed (Old Total) HDW.NDLTM10-A.CONSTRUCTIONMATERIALS: 40 HDW.NDLTM10-B.CONSTRUCTIONMATERIALS: 40 HDW.NDLTM11-A.WHITECAP: 45 HDW.NDLTM11-B.WHITECAP: 45 HDW.NDLTM12-A/NDLTM12-II-A.WHITECAP: 30 HDW.NDLTM12-B/NDLTM12-II-B.WHITECAP: 30 HDW.NDLTM12-II-B/NDLTM12-II-B.WHITECAP: 30 HDW.NDLTM2-A.CONSTRUCTIONMATERIALS: 40 HDW.NDLTM2-B.CONSTRUCTIONMATERIALS: 40 HDW.NDLTM3-A.CONSTRUCTIONMATERIALS: 40 HDW.NDLTM3-B.CONSTRUCTIONMATERIALS: 40 HDW.NDLTM4-A/NDLTM4-II-A.WHITECAP: 20 HDW.NDLTM4-B/NDLTM4-II-B.WHITECAP: 40 HDW.NDLTM5-A.CONSTRUCTIONMATERIALS: 25 HDW.NDLTM5-B.CONSTRUCTIONMATERIALS: 25 HDW.NDLTM6-A.CONSTRUCTIONMATERIALS: 25 HDW.NDLTM6-B.CONSTRUCTIONMATERIALS: 25 HDW.NDLTM7-A/NDLTM7-II-A.WHITECAP: 20 HDW.NDLTM7-B/NDLTM7-II-B.WHITECAP: 20 HDW.NDLTM8-A.CONSTRUCTIONMATERIALS: 40 HDW.NDLTM8-B.CONSTRUCTIONMATERIALS: 40 HDW.NDLTM9-A.CONSTRUCTIONMATERIALS: 25 HDW.NDLTM9-B.CONSTRUCTIONMATERIALS: 25 | 03/03/22 | 03/03/22 | |||
| Complete | 03/01/22 | Adrian Hart | Dart Interests | DIGFL 0B1 Garden Flats (10 Unit) | 10-Unit | ? | FOOTERPREP.DIEVM-B1.LOTTSORLANDO | Footer Pacakge Change | Adrian Hart: Footer package change: 1) 45-Besser brick needed per unit. 2) Please delete3bar chair rods. The chair rods do not support the weight of rebar. 3) Also, 6” loop tie wire will not wrap #7 rebar properly. Please change to rolls of wire. I need this asap to maintain on schedule. ----------------------------------------------------------------- Sent Fill-In for Besser Brick. Sent another PO to return 3-Bar Chairs and Bar Ties. FOOTERPREP.DIEVM-B1.LOTTSORLANDO Old Package Totals: Besser Brick: 80 16", 3-Bar Rod Chairs (Box): 15 Bar Ties, 6": 5 Tie Wire #2: 0 New Package Totals: Besser Brick: 450 16", 3-Bar Rod Chairs (Box): 0 Bar Ties, 6": 0 Tie Wire #2: 2 | 03/01/22 | 03/01/22 | |||
| Complete | 03/01/22 | Larry Sims | Sobel Co | OFVMR 001 Villa Mar (Type 3) | 6-Unit | Type 3 | Adding LSTA18 & HHUS28-2 | Larry Sims: Hardware needed for roof. Needed to fly roof but not provided by truss company will need to be added to package. 100 LSTA 18 Flat straps 8 HHUS 28-2 Truss buckets ------------------------------------------------ There aren't Cost-Groups for this Job/Model/Elevation so making the package changes the old way on the template level. OFVMR - 6 Unit - Type 3 - Unit C-D-E-F Old Package Totals: LSTA 18 Flat straps: 0 HHUS 28-2 Truss buckets: 0 New Package Totals: LSTA 18 Flat straps: 100 HHUS 28-2 Truss buckets: 8 | 03/01/22 | 03/01/22 | ||||
| Complete | 03/01/22 | Scott Deason | Dart Interests | DIEVM 010 Evermore Resort | 10-Bedroom | A - Theater | FOOTERPREP.DIEVM-LOT10.LOTTSORLANDO | Adding Grade Stakes | Scott Deason: Need grade stakes in every footer for inspector. 2 lots per box (10 Boxes). ------------------------------------------------------------ After speaking w/ Scott this is what I determined: 1) 100 Grade Stakes per Box. 2) He need 18" Grade Stakes. 3) He only needs a total of 500 (50 per lot, 10 lots). FOOTERPREP.DIEVM-LOT10.LOTTSORLANDO Old Pacakge Totals: 18" Plastic Grade Stakes: 0 New Pacakge Totals: 18" Plastic Grade Stakes: 50 Added (50) 18" Grade Stakes to the following Cost-Groups: FOOTERPREP.DIEVM-LOT10.LOTTSORLANDO FOOTERPREP.DIEVM-LOT11.LOTTSORLANDO FOOTERPREP.DIEVM-LOT12.LOTTSORLANDO FOOTERPREP.DIEVM-LOT13.LOTTSORLANDO FOOTERPREP.DIEVM-LOT14.LOTTSORLANDO FOOTERPREP.DIEVM-LOT15.LOTTSORLANDO FOOTERPREP.DIEVM-LOT16.LOTTSORLANDO FOOTERPREP.DIEVM-LOT17.LOTTSORLANDO FOOTERPREP.DIEVM-LOT18.LOTTSORLANDO FOOTERPREP.DIEVM-LOT19.LOTTSORLANDO | 03/01/22 | 03/01/22 | |||
| Complete | 02/25/22 | Sharon | Richmond | * | F913/Pearl | B | 3-CAR & COVP Options, RA-Pearl-F913-A *** | Removing Sand & Mortar | Adam Sowers: Sharon noticed Sand and Mortar on a job and it appeared to be coming from the 3CAR and COVP options. This started a complete review of the options in the templates and I found that nearly all of them have Sand and Mortar. Because there are so many I have to do these Template by Template to keep track of them. ------------------------------------------------- Sand & Mortar swapped to Pre-Blend in the following Templates / Cost-Groups: RA-Pearl-F913-B *** 1) F913-RA-3CAR (Argos,Marjam) 2) F913-RA-3CAR (HD,Argos,Marjam) 3) F913-RA-COVP (Argos, Haven) 4) F913-RA-COVP (Argos, Marjam) 5) F913-RA-COVP (Cemex, Haven) 6) F913-RA-COVP (HD, Argos, Marjam) 7) F913-RA-COVP (HD, Argos,BBO, Haven) 8) F913-RA-COVP (HD, Argos,BBT, Haven) 9) F913-RA-COVP (HD, Cemex, Haven) 10) F913-RA-COVP (HD, Maschmeyer, Haven) 11) F913-RA-COVP (Lotts, Argos,BBT, Haven) 12) F913-RA-COVP (Maschmeyer, Haven) | 02/25/22 | 03/01/22 | |||
| Complete | 02/25/22 | Sharon | Richmond | ROPAL 388 Palisades | F913/Pearl | G | 3-CAR & COVP Options, RA-Pearl-F913-A *** | Removing Sand & Mortar | Adam Sowers: Sharon noticed that there was Sand and Mortar in the Masonry PO on this job. It's coming from the 3-CAR & COVP Options for the F913. There are 11 Variations of the COVP/COVPX in just the F913-A Template. I've updated the Masonry items in each 3-CAR & COVP/COVPX Option in the RA-Pearl-F913-A *** Template (Adam). | 02/25/22 | 02/25/22 | |||
| Complete | 02/24/22 | Larry Sims | Sobel Co | OFVMR 001 Villa Mar (Type 3) | 6-Unit | Type 3 | Old Template | Adding 64 Wedge Anchors | Larry Sims: Need to change roof hardware package to include 64) 3/8” x 5” wedge anchors to be used for LGT3 truss hold downs and send po to southern for bolts needed for building 2 we will pick them up. 64) 3/8” x 5” wedge anchors ----------------------------------------------- OFVMR - 6 Unit - Type 3 - Unit C-D-E-F We didn't have these in the catalog so I had to get a price from Southern. Added them to the catalog and sent the fill-in. Also added the (64) Wedge Anchors to the Template. Note: The package change here was done "the old way", to the Template, not Cost-Group (Adam). | 02/24/22 | 02/24/22 | |||
| Complete | 02/22/22 | John Rathbun | Surrey Homes | SOFXH 054 Fox Hammock | Violet | A | *** | Precast Changes | John Rathbun: Violet model precast package change. Please remove one 5’-10” header and add one 7’-6” header. Please remove one 6’-6” header and add one 8’-8” header. ----------------------------------------------------- PCMS.SO-VIOLET-A.LOTTSORLANDO Old Totals: 5'-10" Lintel: 1 6'-6" Lintel: 0 7'-6" Lintel: 3 8'-8" Lintel: 1 New Totals: 5'-10" Lintel: 0 6'-6" Lintel: 0 7'-6" Lintel: 4 8'-8" Lintel: 2 There was no 6'-6" Lintel in the package on this job. i let John know that all other changes were made. He said he's going to dig in and get back to me (Adam). -------------------------------------------------- Per John (after digging in): Remove (1) 8'-8", new total of (1). Lotts sent different sized lintels than were in the package (Adam). | 02/22/22 | 02/22/22 | |||
| Complete | 02/22/22 | Carlos Garcia | Richmond | ROPAL 473 Palisades | F924/Ammolite | J | HDW.RA-Ammolite-F924-J | Hardware, See Note | Carlos Garcia: The attached hardware list as what is exactly needs to be for this lot model and elevation. ------------------------------------------------------- Carlos submitted a photo on this to-do with handwritten notes for this pacakge change. Per Carlos, Totals should be as follows: HUC212-2: 4 SP1: 35 SP2: 65 MASTAM36: 8 MASTA36: 6 HGA10KT: 1 WA1285: 30 Washers 1/2": 42 Hex Nut 1/2": 12 H2.5: 100 MTS12: 30 ? Tapcons: 30 & 40 Note: I didn't inlcude items that already matched what was in the base for this model/elevation. ---------------------------------------------------------- HDW.RA-Ammolite-F924-J.CONSTRUCTIONMATERIALS 1) MTS12 is missing entirely from the package. Should be 24, Adding 30 per Carlos 2) H2.5: Only have T's in the Job, T's & A's in the TOS. Should be: A: 27, T: 62 3) Tapcons: Reduced both exisiting sizes to 1 box. | 02/22/22 | 03/03/22 | |||
| Complete | 02/21/22 | John Rathbun | Surrey Homes | SOFXH 054 Fox Hammock | Violet | A | *** | Swapping 2x12x16 w/ 18' | John Rathbun: Violet model package change . Please remove the three 2x12x16 syp and add three 2x12x18 SYP. Please send the 18 footers as a fill in . --------------------------------------- FRMMAT.SO-VIOLET-A.BFS FRMMAT.SO-VIOLET-B.BFS: 4/5/2022 (Adam) Old Totals: 2x12x16 SYP: 3 2x12x18 SYP: 0 New Totals: 2x12x16 SYP: 0 2x12x18 SYP: 3 | 02/21/22 | 04/05/22 | |||
| Review | 02/21/22 | Jeff Rotert | Minto | NDLTS 2494 Latitudes | 40-178-II | A | *** | Precast Changes | Jeff Rotert: Takeoff shows (4) 4-6, we need (6), please add (2) Takeoff shows (4) 7-6, we need (3), please remove (1) Takeoff shows (2) 10-6, we need (1), please remove (1) Takeoff shows (1) 17-4, we need (2), please add (1) Precast not delivered yet -------------------------------------------- Spoke with Sam about this and sent him the details and he's going to check it out and get back to me (Adam). | 02/21/22 | ||||
| Review | 02/21/22 | Steven Gilbert | Richmond | ROASQ 058 Arlington Square | F927/Slate | B | *** | Missing 2x4x108 5/8 Spruce for Door Frames | Steven Gilbert: Missing lumber for doors not on p.o. -Steven Gilbert (60) 2x4x108 5/8” spruce ------------------------------------------------------------------- The job matches the takeoff that I found for this Model/Elevation. Steven said this is needed for the frame of all the doors, must be spruce. I asked if this was for just this lot and he said that's what the framer's asked for and that it could be heavy and to just send whatever is in the takeoff but there isn't any in the takeoff (Adam). | 02/21/22 | ||||
| Review | 02/16/22 | Kyle Jolly | Encore | ECRUN 029 Spectrum | ? | ? | HDW-GENERAL.ECRUN-NOELEVATOR.WHITECAP | Adding Threaded Rods | Adam Sowers: Did not see on plans before as it was covered by stamp. W1/D3 detail shows 1/2” all thread on overhang. Will need these added to all future buildings. 1/2”x26” all thread 4 Per Building --------------------------------------------------- | 02/16/22 | ||||
| Review Status? | 02/10/22 | Steven Gilbert | Richmond | ROFLK 031 Forest Lake | F924/Ammolite | K | *** | Short 2x4x14 & 2x4x92 5/8 Spruce | Steven Gilbert: Fill in ammolite short please add to package and fill in. The ammolite has been short the whole time according to framers they have been able to pull from other houses to fix please fix package and send fill in. (30) 2x4x14’ spruce add this amount to package (40) 2x4x92 5/8 spruce add to package ------------------------------------------------------------ The job quantities match the takeoff I found on the S Drive for this. Sending the fill-in for now and sending the package change to estimating for review (Adam). Old Totals: 2x4x14 Spruce: 75 2x4x92 5/8 Spruce: 284 New Totals: 2x4x14 Spruce: ? 2x4x92 5/8 Spruce: ? | 02/10/22 | ||||
| Review Status? | 02/10/22 | Steven Gilbert | Richmond | ROFLK 080 Forest Lake | F924/Ammolite | M | *** | Short 2x4x14 & 2x4x92 5/8 Spruce | Steven Gilbert: Fill in ammolite short please add to package and fill in. The ammolite has been short the whole time according to framers they have been able to pull from other houses to fix please fix package and send fill in. (30) 2x4x14’ spruce add this amount to package (40) 2x4x92 5/8 spruce add to package ------------------------------------------------------------ The job quantities match the takeoff I found on the S Drive for this. Sending the fill-in for now and sending the package change to estimating for review (Adam). Old Totals: 2x4x14 Spruce: 96 2x4x92 5/8 Spruce: 204 New Totals: 2x4x14 Spruce: ? 2x4x92 5/8 Spruce: ? | 02/10/22 | ||||
| Complete | 02/10/22 | Kyle Jolly | Richmond | ECRUN 020 Spectrum | ? | ? | *** | Adding 2x2x10 for Drip Edge | Kyle Jolly: Drip edge fill in and package change. I just went thru this building yesterday with Angie. I need to adjust the amount of 2x2’s for this building and order some extra here. I was not ordering enough 2x2 drip edge for each building. This will be for the entire building. (60) 2x2x10PT +20 to takeoff for a total of 60 for future buildings --------------------------------------- Called Pete about this one because I wasn't sure about the Models/Elevations/Cost-Groups for these job (Adam) | 02/10/22 | ||||
| Review | 02/07/22 | Steven Gilbert | Richmond | ROASQ 012 Arlington Square | F913/Pearl | F | *** | Short 2x4x92 5/8 Spruce | Steven Gilbert: Fill in and package change material on p.o. On site short material for door openings. Fill in and package change short material for the door openings Add (40) 2x4x92 5/8” spruce precuts ------------------------------------------------------ Job matches the takeoff I found on the S Drive (172). Old Totals: 2x4x92 5/8 Spruce: 172 New Totals: 2x4x92 5/8 Spruce: ? | 02/07/22 | ||||
| Review | 02/07/22 | Steven Gilbert | Richmond | ROASQ 013 Arlington Square | F9C3/Coral | D | *** | Short 2x4x92 5/8 Spruce | Steven Gilbert: Short spruce studs all materials ordered accounted for. Need more for the door openings. Lot 13 Arlington square need 40- 2x4x92 5/8. ------------------------------------------------------ Job matches the takeoff I found on the S Drive. Steven wants to add 40 to what's in the package, for a new total of 163. Old Totals: 2x4x92 5/8 Spruce: 123 New Totals: 2x4x92 5/8 Spruce: | 02/07/22 | ||||
| Complete | 02/04/22 | Steven Gilbert | Richmond | ROFLK 041 Forest Lake | F924/Ammolite | L | *** | Precast Changes | Steven Gilbert: Remove sills to many on p.o. 2’2.5” sills remove (2) should be 3 total 4’0” sills remove (1) should be 1 total ------------------------------------------------------- Note: Previous package change on 8/10/21 added (2) 2'-2.5" Sills. Now we're removing them. PCMS. RA-Ammolite-F924-L.LOTTS Old Totals: 2'-2.5" Sill: 3 4'-0" Sill: 1 New Totals: 2'-2.5" Sill: 1 4'-0" Sill: 1 (No Change) | 02/04/22 | 02/04/22 | |||
| Review/Hold | 02/04/22 | Johnny Vargas | Richmond | ROLKS 053 Lake Smart | F913/Pearl | D | F913-RA-COVP (Lotts, Argos, McMaster, Haven) | COVP Option - Precast Changes | Johnny Vargas: 1 piece of precast 8” U lintel - 13-04 was not in the original take off list. Please see attachment. -Johnny Vargas 1 piece of precast 8” U lintel - 13-04 -------------------------------------------------- Note: Package Changes on Options are going to be very difficult. This specific option, for example, isn't even in the F913-D Template. It's spread out amongst all of the other F913 Templates though. I checked a few and none appeared to have any Lintels in the COVP option so going to have estimating review and put on the Trello because making package changes on these is going to be a problem. We have the same option over and over in multiple templates w/ different vendors and potentialls different line-items. ***************************** Johnny submitted a detail in this to-do showing a 13'4" needed for the COVP option on this job and there isn't one in the COVP option. F913-RA-COVP (Lotts, Argos, McMaster, Haven) Old Totals: 13'-4" Lintel: 0 New Totals: 13'-4" Lintel: | 02/04/22 | ||||
| Complete | 02/01/22 | Scott Deason | Richmond | ROEDH 069 Eden Hills | F913/Pearl | K | WDWGREAT*** | Swapping Sills | Scott Deason: The precast package has 2 sills at 26.5” but they need to be 3’-1” because the windows in the great room are 37-1/4” x 60-1/2”. ------------------------------------------------------- The sills that he's mentioning are coming from the WDWGREAT Option. F913-RA-WDWGREAT (Lotts) Old Totals: 2'-2.5" WRF Sill: 2 3'-1" WRF Sill: 0 New Totals: 2'-2.5" WRF Sill: 0 3'-1" WRF Sill: 2 | 02/01/22 | 02/01/22 | |||
| Complete | 02/01/22 | Steven Gilbert | Richmond | ROFLK 035 Forest Lake | F914/Moonstone | M | *** | Removing AB1210's | Steven Gilbert: Some reason we are getting 10” anchors with the precast please remove from all other orders. -------------------------------------- PCMS.RA-Moonstone-F914-M.LOTTS Old Package Totals: AB1210: 44 New Package Totals: AB1210: 0 | 02/01/22 | 02/01/22 | |||
| Complete | 02/01/22 | Jeff Rotert | Minto | NDLTS 1786 Latitudes | 50-179-II | B | Adding Sills Removed on 8/10/21 | Precast Changes | Jeff Rotert: Takeoff shows (8) 3-1 HiDri sills and we need (11). Please add (3) House is blocked and missing these (3) sills needed to complete house ---------------------------------------------------- Note: Pacakge change on 8/10/21 from Kyle removed 2 of these Sills. Now we're adding them back? PCMS.NDLTS50-179-II-B.CASTCRETE PCMS.NDLTS50-179-II-B.LOTTS Old Totals: 3'-1" HiDri Sill: 8 New Totals: 3'-1" HiDri Sill: 11 | 02/01/22 | 02/01/22 | |||
| Complete | 02/01/22 | John Rathbun | Surrey Homes | SOFXH 058 Fox Hammock | Iris | B | *** | Adding 2x6x14 Spruce & 2x4x14 SYP | John Rathbun: Iris model A & B elevations package change 2x6x14 spruce . add 6 for a new total of 28. 2x4x14 SYP add 16 for a new total of 100. Please send the 6 and16 as a fill in please . -------------------------------------------------------------- FRMMAT.SO-Iris-B.BFS Old Package Totals: 2x6x14 Spruce: 22 2x4x14 SYP: 108 New Package Totals: 2x6x14 Spruce: 28 2x4x14 SYP: 132 | 02/01/22 | 02/01/22 | |||
| Review | 01/31/22 | Jeff Rotert | Minto | NDLTS 1776 Latitudes | 50-181 | A | *** | Precast Changes | Jeff Rotert: Precast takeoff wrong. Takeoff shows (0) 4-6 door header and we need (1), please add (1) Takeoff shows (0) 9-8 (or next size bigger) header and we need (1), please add (1) Precast has not been delivered yet -------------------------------------------------- Leaving this open because it needs to be reviwed again (Adam). | 01/31/22 | ||||
| Complete | 01/24/22 | Steven Gilbert | Richmond | ROFLK 076 Forest Lake | F924/Ammolite | K | *** | Precast Changes | Steven Gilbert: Precast and sill deleted for some reason. Add (1) 7’6” precast Add (1) 6’2” sill -------------------------------------------------------- Package Change was already complete but I don't see it in the log so leaving this here -Adam. -------------------------------------------------------- PCMS.RA-Ammolite-F924-K.LOTTS Old Package Totals: 7'-6" Lintel: 1 6'-2" Sill: 1 New Package Totals: 7'-6" Lintel: 2 6'-2" Sill: 2 | 01/24/22 | ? | |||
| Complete | 01/24/22 | Jeff Subbert | Mattamy Homes | MOSOL 024-2 Solara | 8-Unit | QEFFFFEQ/CO | SHAFTWALL-DROP2.MOSOL-QEFFFFEQ(CO).INTERIOREXTERIOR | DensGlass Changes | Jeff Subbert: After counting material I came up with that’s what I did 742 sheets of dens glass 66 for the bottom walls at 10’ And 40 sheets above ceiling at 12’. 280 sheets of 12’, and 462 sheets of 10’. This goes for building 25–2 as well ------------------------------------------------- Old Cost-Group: SHAFTWALL-DROP1.MOSOL024.INTERIOREXTERIOR New Cost-Group: SHAFTWALL-DROP2.MOSOL-QEFFFFEQ(CO).INTERIOREXTERIOR The amounts on the estimates added up correctly for this building are: 420-10'0" sheets and 320-12'0" sheets -Chris Plantz ------------------------------------------------ Current Package Totals 2x10x1: 246 2x12x1: 180 New Package Totals 2x10x1: 420 2x12x1: 320 | 01/24/22 | Chris Plantz | 01/25/22 | ||
| Complete | 01/24/22 | Brian Dinker | Minto | NDLTM 2604 Latitudes | Villa 10 | A | PCMS.NDLTM10-A.CASTCRETE | Adding Downrods | Brian Dinker: 9x1 down rods old 77 new 100 13x1 down rods old 15 new 8 Need fill in order for (23)9’x1’ down rods. ---------------------------------------------- PCMS.NDLTM10-A.CASTCRETE Old Package Totals: 1x13 Dowels: 15 1x9 Dowels: 77 New Package Totals: 1x13 Dowels: 8 1x9 Dowels: 100 | 01/24/22 | 01/24/22 | |||
| Complete | 01/21/22 | Kyle Jolly | Encore | ECRUN 020 Spectrum | ? | ? | *** | Adding 2x2x10 for Drip Edge | Kyle Jolly: 2x2 drip edge. Needed for drip edge. Not enough on po. (40) 2x2x10 PT ---------------------------------------------------------- Proposal doesn't mention Drip Edge so not sure if this is included or excluded. There are 15 2x2x10 PT in this job on Frame Drop 3 but I don't see any in the takeoff that I found on the S Drive. Old Package Totals: 2x2x10 PT: New Package Totals: 2x2x10 PT: Waiting to hear back from Sharon on what she thinks about this one. No changes made yet (Adam) | 01/21/22 | 02/11/22 | |||
| Review | 01/20/22 | Brian Dinker | Richmond | NDLTM 2302 Latitudes | Villa 5 | A | *** | Precast Changes | Brian Dinker: Precast is tight in length. Would like to change take off. I would like to remove (2) 15’4” Precast headers And add (2) 17’4” precast headers. I am getting barely making my bearing on 2 openings that are 14’8” wide. I need a fill in order for (2) 17’4” precast. 15’4” precast old (3) new (1) 17’4” precast old (2) new (4) --------------------------------------------------------------- Old Package Totals: 15'-4" Lintel: 3 17'-4" Lintel: 2 New Package Totals: 15'-4" Lintel: 17'-4" Lintel: | 01/20/22 | ||||
| Complete | 01/19/22 | Steven Gilbert | Richmond | ROFLK 082 Forest Lake | F924/Ammolite | M | *** | Precast Changes | Steven Gilbert: Precast wrong. Remove (1) 5’10” precast Add (1) 7’6” precast Add (1) 6'-2" sill (added this over the phone) --------------------------------------------------------------------------- PCMS.RA-Ammolite-F924-M.LOTTS Old Package Totals: 5'-10" Lintel: 1 7'-6" Lintel: 1 6'-1" Sill: 1 New Package Totals: 5'-10" Lintel: 0 7'-6" Lintel: 2 6'-1" Sill: 2 | 01/19/22 | 01/19/22 | |||
| Review | 01/19/22 | Jeff Rotert | Minto | NDLTS 1782 Latitudes | 50-184 | A | *** | Precast Changes | Jeff Rotert: Precast takeoff wrong. Takeoff shows (1) 5-4 and we don’t need any, please remove Takeoff shows (5) 4-6 and we need (6), please add (1) Precast has Not been delivered yet to this lot. -------------------------------------------------- I made the requested changes to the PO but didn't make any package changes here. Sending this to Estimating for review because I just did a package change on this model/elevation on 1/7/2022 for Jeff where he removed this 4'-6", now adding it back. Something is going on here (Adam). | 01/19/22 | ||||
| Pete | 01/19/22 | Steven Gilbert | Richmond | ROASQ 004 Arlington Square | F9C1/Amethist | C | *** | Adding Katz | Steven Gilbert: All metal packs need 100 Katz not 10 for all houses . According to the metal crew they need 100 Katz to complete install I’ve sent this in before please fix all takeoffs for the future ---------------------------------------------------------- I don't see any fill-ins for Kats (this many anyway). We had a package change where they went from 16" to 24" but nothing chaning the quantity (Adam). ---------------------------------------------------------- 1/19/2022 - Waiting to confirm this w/ someone before changing the package here (Adam). METALFRMMAT.RA-Amethyst-F9C1-A/B/C.INTERIOREXTERIOR Old Package Total: 24" Katz: 7 New Package Total: 24" Katz: 100? | 01/19/22 | ||||
| Complete | 01/18/22 | Dane Jones | Mattamy Homes | MOMER 018 Meridian | 6-Unit | MCAACM/CO | *FRMMAT-DROP1.MOMER018.HAVEN | Adding 1x2x10 PT | Dane Jones: Only receiving 50% of what is needed for 1x2x10. To complete the job we need 100 per unit. Fill-In: 270) 1x2x10 --------------------------------------------------------------------- Confirmed with Angie that this was good to go. She said this is how much she originally had for the 1x2. Old Package Totals: 1x2x10 PT: 330 New Package Totals: 1x2x10 PT: 600 | 01/18/22 | Angie | 01/19/22 | ||
| Complete | 01/17/22 | Steven Gilbert | Richmond | ROFLK 078 Forest Lake | F924/Ammolite | K | PCMS.RA-Ammolite-F924-K.LOTTS | Precast Changes | Steven Gilbert: Add precast and sill p.o. Incorrect. Takeoff error also I don’t think we need Durowall. Add (1) 7’6” precast Add (1) 6’2” sill Remove durowall ---------------------------------------------------------- Old Package Totals: 7'-6" Lintel: 1 6'-2" Sill: 1 Duro Wall: 3 New Package Totals: 7'-6" Lintel: 2 6'-2" Sill: 2 Duro Wall: 0 | 01/17/22 | 01/17/22 | |||
| Complete | 01/17/22 | Steven Gilbert | Richmond | ROFLK 077 Forest Lake | F926/Emerald | L | PCMS.RA-Emerald-F926-L.LOTTS | Precast Changes | Steven Gilbert: Change precast takeoff. Remove (1) 3’6” precast Remove (1) 2’2.5” sill --------------------------------------------------------- Old Package Totals: 3'-6" Lintel: 1 2'-2.5" Sill: 1 New Package Totals: 3'-6" Lintel: 0 2'-2.5" Sill: 0 | 01/17/22 | 01/17/22 | |||
| Complete | 01/17/22 | John Rathbun | Surrey Homes | SOFXH 061 Fox Hammock | Clover | A | Adding SPH4 | John Rathbun: Clover model package change / fill in. Please add 30 SPH4 for a new total of 48 for both A and B elevations on the clover model . I am heading to pick up the 30 of these now. ------------------------------------------ HDW.SO-Clover-A.WHITECAP Old Package Totals: SPH4: 18 New Package Totals: SPH4: 48 | 01/17/22 | 01/17/22 | ||||
| Complete | 01/13/22 | Scott Deason | Richmond | ROMPT 019 Mattie Pointe | F913/Pearl | D | Slab Prep | Removing 8 #5 20' | Scott Deason: Please eliminate 8- #5’s 20’-0” Package has 32 and there are 11 leftover --------------------------------------------- SLABPREP.RA-PEARL-F913-D.HDSUPPLYORLANDO SLABPREP.RA-PEARL-F913-D.LOTTSORLANDO Old Package Total: # 5 Rebar - 20' Length Grade 40: 32 New Package Total: # 5 Rebar - 20' Length Grade 40: 24 | 01/13/22 | 01/13/22 | |||
| Complete | 01/13/22 | Nick Cazares | Minto | NDLTS 1758 Latitudes | 50-179 | A | PCMS.NDLTS50-179-A | Precast Changes | Nick Cazares: -PO calls for (10) 4’ 6” headers, plans call for (8). Need (2) 4’ 6” headers removed please -PO calls for (1) 5’ 4” header, plans call for (2) 5’ 4” headers, need (1) more added to PO please. -PO calls for (0) 8’ 0” header, plans call for (1) 8’ 0” header, need to add to PO please -PO calls for (2) 9’ 4” headers, plans call for only (1) 9’ 4” header, need this added to PO ------------------------------------------------------------------ PCMS.NDLTS50-179-A.CASTCRETE PCMS.NDLTS50-179-A.LOTTS Old Package Totals: 4'-6" Lintel: 10 5'-4" Lintel: 1 8'-0" Lintel: 0 9'-4" Lintel: 2 New Package Totals: 4'-6" Lintel: 8 5'-4" Lintel: 2 8'-0" Lintel: 1 9'-4" Lintel: 1 | 01/13/22 | 01/13/22 | |||
| Complete | 01/12/22 | Jeff Rotert | Minto | NDLTS 1757 Latitudes | 50-184 | B | PCMS.NDLTS50-184-B | Precast Changes | Jeff Rotert: Takeoff shows (0) 5-4, we need (1) please add Takeoff shows (6) 4-6, we need (5), please remove (1) Precast has not been delivered ---------------------------------------------------- PCMS.NDLTS50-184-B.CASTCRETE PCMS.NDLTS50-184-B.LOTTS Old Package Totals: 4'-6" Lintel: 6 5'-4" Lintel: 0 Old Package Totals: 4'-6" Lintel: 5 5'-4" Lintel: 1 | 01/12/22 | 01/12/22 | |||
| Review | 01/12/22 | Jeff Rotert | Minto | NDLTS 1771 Latitudes | 50-181 | B | PCMS.NDLTS50-181-B | Precast Changes | Jeff Rotert: Precast takeoff wrong. Takeoff shows (0) and we need (1) 9-8 precast header for the back lanai per plan. Precast has not been delivered yet. ---------------------------------------------------- We don't have a 9'-8" in the catalog and we've done multiple package changes on this model/elevation. We removed (1) 11'-4" yesterday and now today short (1) 10'-6" so going to add this to the list for estimating to review. Since I removed (1) 11'-4" yesterday I'm not sending the 10'-6" as a variance PO (Adam). | 01/12/22 | ||||
| Review | 01/12/22 | Jeff Rotert | Minto | NDLTS 1783 Latitudes | 50-181 | B | *** | Precast Changes | Jeff Rotert: Precast takeoff wrong Takeoff (0) 9-8, we need (1) please add Takeoff (8) 4-6, we need (7), please remove ---------------------------------------------------------- This conflicts with package changes made to the same model yesterday. Needs review (Adam) | 01/12/22 | ||||
| Complete | 01/11/22 | Kyle Jolly | Encore | ECRUN 048 Spectrum | Custom | Custom | HDW-DROP1.ECSPC001.WHITECAP | Adding Anchor Bolts & Washers | Kyle Jolly: Detail 1/SD3 calls for 1/2” anchor bolts in all bearing walls We did not receive any on take off. Will need to be added. 270 1/2” anchor bolts 270 2x2 square washers ------------------------------------------------ Note: WEDGE ANCHORS. Not Anchor Bolts. ECSPC001 HDW-DROP1.ECSPC001.WHITECAP Old Package Totals: WA1285 Wedge Anchors: 170 WS22916 Washers: 170 New Package Totals: WA1285 Wedge Anchors: 270 WS22916 Washers: 270 | 01/11/22 | 01/11/22 | |||
| Complete | 01/10/22 | Jeff Subbert | Mattamy Homes | MOWAT 027 Waterbrooke | 8 Unit | SACAACAC | *** | Removing (2) 4'-6" Lintels | Jeff Subbert: Take off calls for 3) 4’6” headers, when I only need 1) 4’ 6” header. Please adjust on takeoff for future thank you ---------------------------------------- PCMS.MOWAT27.LOTTSORLANDO Old Package Totals: 4'-6" Lintel: 3 New Package Totals: 4'-6" Lintel: 1 | 01/10/22 | 01/10/22 | |||
| Complete | 01/10/22 | Nick Cazares | Minto | NDLTS 1752 Latitudes | 50-181 | B | *** | Precast Changes | Nick Cazares: Plans only call for (8) 4’ 6” headers, PO has (10) we need to remove (2) of these headers off the takeoff please. Also plans call for (1) 5’ 4” header and PO has (0) on it and plans call for (0) 11’ 4” headers and the PO has (1) Remove (2) 4’ 6” headers from PO Add (1) 5’ 4” to PO Remove (1) 11’ 4” from PO ------------------------------------------- PCMS.NDLTS50-181-B.CASTCRETE PCMS.NDLTS50-181-B.LOTTS Looks like package change was already half-way done. The only thing I had to remove was the 11'-4". Everything else was already good. Old Package Totals: 4'-6" Lintel: 8 5'-4" Lintel: 0 11'-4" Lintel: 1 New Package Totals: 11'-4" Lintel: 0 | 01/10/22 | 01/10/22 | |||
| Complete | 01/10/22 | Jeff Rotert | Minto | NDLTS 1786 Latitudes | 50-179-II | B | *** | Precast Changes | Jeff Rotert: (2) 9-4 on takeoff, only need (1), please remove (2) 5-4 on takeoff, only need (1), please remove (7) 4-6 on take off, need (9) total, please add (0) 7-8 door on takeoff, need (1), please add (1) 13-4 on takeoff, need (0), please remove (1) 6-8 door on takeoff, need (0), please remove PRECAST PACK NOT DELIVERED YET ----------------------------------------------------------------- PCMS.NDLTS50-179-II-B.CASTCRETE PCMS.NDLTS50-179-II-B.LOTTS Old Package Totals: 9'-4" Lintel: 2 5'-4" Lintel: 2 4'-6" Lintel: 8 13'-4" Lintel: 1 6'-8" Recess Lintel: 1 7'-6" Recess Lintel: 0 New Package Totals: 9'-4" Lintel: 1 5'-4" Lintel: 1 4'-6" Lintel: 9 13'-4" Lintel: 0 6'-8" Recess Lintel: 0 7'-6" Recess Lintel: 1 | 01/10/22 | 01/10/22 | |||
| Complete | 01/10/22 | Zane Heck | Minto | NDLTM 1840 Latitudes | Villa 11 | A | Frame | Adding 2x6x16 R/S Spruce | Adam Sowers: Zane submitted a To-Do saying that Rockafuerte took these from this job but they weren't in the package. Missing from the takeoff as well. He says he needs 12. ------------------------------------------------------ FRMMAT.NDLTM11-A.84LUMBER FRMMAT.NDLTM11-A.BFS Old Package Totals: 2x6x16 R/S Spruce: 0 Old Package Totals: 2x6x16 R/S Spruce: 12 | 01/10/22 | 01/10/22 | |||
| Complete | 01/07/22 | Mike Schlosser | ? | EICHB Condo 002 Cape Harbour | B | 1 | *** | Swapping Bar Ties w/ Tie Wire | Mike Schlosser: Sudb contractor asked to wire rolls, instead of bar ties. ------------------------------------------- *SLABPREP.EICHB1.LOTTS *PCMS-DROP1.EICHB1.LOTTS *PCMS-DROP2.EICHB1.LOTTS Removing Bar Ties from the Pre-cast Cost-Groups. Old Package Totals (SlabPrep, PCMS-Drop1&2) 8" Bar Ties: 3 Tie Wire #2 Roll: 0 New Package Totals (SlabPrep, PCMS-Drop1&2) 8" Bar Ties: 0 Tie Wire #2 Roll: 3 | 01/07/22 | 01/07/22 | |||
| Complete | 01/07/22 | Mike Schlosser | ? | EICHB Condo 002 Cape Harbour | B | 2 | *** | Swapping Bar Ties w/ Tie Wire | Mike Schlosser: Sudb contractor asked to wire rolls, instead of bar ties. ------------------------------------------- *SLABPREP.EICHB2.LOTTS *PCMS-DROP1.EICHB2.LOTTS *PCMS-DROP2.EICHB2.LOTTS Removing Bar Ties from the Pre-cast Cost-Groups. Old Package Totals (SlabPrep, PCMS-Drop1&2) 8" Bar Ties: 4 Tie Wire #2 Roll: 0 New Package Totals (SlabPrep, PCMS-Drop1&2) 8" Bar Ties: 0 Tie Wire #2 Roll: 4 | 01/07/22 | 01/07/22 | |||
| Complete | 01/07/22 | Nick Cazares | Minto | NDLTS 1753 Latitudes | 50-181 | A | *** | Precast Changes | Adam Sowers: Didn't have time to add this to the log yesterday when I completed this package change. I ran a few of these yesterday and will have to go back though my emails and cost-groups to update. ---------------------------------------------- 50-181-A (Precast Cost-Groups) Note: We don't have a 5'-4" Lintel for Lotts Orlando in the catalog. I believe they may have discontued this size. I added (1) 5'-10" in lieu of the missing 5'-4" to the Lotts Cost-Group for this model/elevation (Adam). (-2) 4'-6" Lintels (+1) 5'-4" Lintels (-1) 11'-4" Lintel Old Package Totals: 4'-6" Lintels: 10 5'-4" Lintels: 0 11'-4" Lintels: 1 New Package Totals (Cast Crete): 4'-6" Lintels: 8 5'-4" Lintels: 1 11'-4" Lintels: 0 New Package Totals (Lotts): 4'-6" Lintels: 8 5'-10" Lintels: 1 (*in lieu of the 5'-4") 11'-4" Lintels: 0 | 01/07/22 | 01/07/22 | |||
| Complete | 01/07/22 | Jeff Rotert | Minto | NDLTS 1788 Latitudes | 50-184 | A | *** | Precast Changes | Jeff Rotert: Takeoff has (6) 4-6 headers and we only need (5), please remove (1). Takeoff has (0) 5-4 headers and we need (1), please add and ship ----------------------------------------------------- PCMS.NDLTS50-184-A.CASTCRETE Old Package Totals: 4'-6" Lintels: 6 5'-4" Lintels: 0 New Package Totals: 4'-6" Lintels: 5 5'-4" Lintels: 1 PCMS.NDLTS50-184-A.LOTTS Old Package Totals: 4'-6" Lintels: 6 5'-4" Lintels: 0 New Package Totals: 4'-6" Lintels: 5 5'-10" Lintels: 1 (Added in lieu of the 5'-4") | 01/07/22 | 01/07/22 | |||
| Complete | 01/07/22 | Jeff Rotert | Minto | NDLTS 1787 Latitudes | 50-179-II | A | *** | Precast Changes | Jeff Rotert: Takeoff has (10) 4-6 and we only need (8), please remove (2) Takeoff has (1) 8-8 and we need (2), please add one and ship ----------------------------------------------------- PCMS.NDLTS50-179-II-A.CASTCRETE Old Package Totals: 4'-6" Lintels: 9 8'-8" Lintels: 1 New Package Totals: 4'-6" Lintels: 8 8'-8" Lintels: 2 PCMS.NDLTS50-179-II-A.LOTTS Old Package Totals: 4'-6" Lintels: 9 8'-8" Lintels: 1 New Package Totals: 4'-6" Lintels: 8 8'-8" Lintels: 2 | 01/07/22 | 01/07/22 | |||
| Complete | 01/06/22 | Jeff Rotert | Minto | NDLTS X Latitudes | 50-181 | A | *** | Precast Changes | Adam Sowers: Didn't have time to add this to the log yesterday when I completed this package change. I ran a few of these yesterday and will have to go back though my emails and cost-groups to update. ---------------------------------------------- 50-181-A (Precast Cost-Groups) Note: We don't have a 5'-4" Lintel for Lotts Orlando in the catalog. I believe they may have discontued this size. I added (1) 5'-10" in lieu of the missing 5'-4" to the Lotts Cost-Group for this model/elevation (Adam). (-2) 4'-6" Lintels (+1) 5'-4" Lintels (-1) 11'-4" Lintel Old Package Totals: 4'-6" Lintels: 10 5'-4" Lintels: 0 11'-4" Lintels: 1 New Package Totals (Cast Crete): 4'-6" Lintels: 8 5'-4" Lintels: 1 11'-4" Lintels: 0 New Package Totals (Lotts): 4'-6" Lintels: 8 5'-10" Lintels: 1 (*in lieu of the 5'-4") 11'-4" Lintels: 0 | 01/06/22 | 01/07/22 | |||
| on Hold | 01/05/22 | Jeff Subbert | Mattamy Homes | MOSL2 027 Solara | 8-Unit | QEFFFFEQ/MO | Adding LVLs | Jeff Subbert: LVL’s needed for headers that did not come or even is on takeoff. Please fix takeoff/PO accordingly so I do not have to do a to do fill-in on building 25–2 -Jeff Subbert (2) 9 1/4 x 2 x 14’ LVL (1) 9 1/4 x 2 x 8’ LVL --------------------------------------------------------------------- 1/5/2022 - Holding off on package change for now because Jeff is going to verify some things first. The only LVLs that are in this job are: (4) 1.75x9.25x8' LVLs, which matches the takeoff I found on the S drive. Pete has mentioned problems with estimating missing LVLs. Old Totals: 1.75 x 9.25 x 8': 4 1.75 x 9.25 x 14': 0 New Totals: 1.75 x 9.25 x 8': 1.75 x 9.25 x 14': | 01/05/22 | |||||
| Complete | 01/04/22 | Jeff Rotert | Minto | NDLTS 1794 Latitudes | 50-179-II | A | MASMAT.NDLTS50-179-II-A.FLBESTBLOCKORLANDO | Adding Column & Boxcar Block | Jeff Rotert: (24) 12”x8”x12” column block (6) 12”x8”x16” boxcar WHY ARE THESE STILL GETTING MISSED? ------------------------------------------------------------------- Looks like a package change was made for this on another model, not on this one... So, addding it in now. Old Count Totals: 12”x8”x12” column block: 0 12”x8”x16” boxcar: 0 New Count Totals: 12”x8”x12” column block: 24 12”x8”x16” boxcar: 6 | 01/04/22 | 01/04/22 | |||
| Complete | 12/30/21 | Nick Cazares | Minto | NDLTM 2610 Latitudes | Villa 11 | B | PCMS.NDLTM11-B.CASTCRETE | Swapping Flush Sills w/ HiDri's | Nick Cazares: PO has Flush Sills. We don't use them out here, we use HiDris. --------------------------------------------- Not sure how but the Cost-Group for the Villa 11-B has Flush sills. Swapping them all to HiDris (Adam) | 12/30/21 | 12/30/21 | |||
| Complete | 12/28/21 | Steven Gilbert | Richmond | ROASQ 033 Arlington Square | F913/Pearl | D | PCMS.RA-PEARL-F913-D.LOTTSORLANDO | Updating Precast | Steven Gilbert: Fix precast on p.o. Wrong. Precast order is wrong. Remove 13’4” precast Add (2) 4’6” precast Add (2) 3’1” sills --------------------------------------------------- PO updated and re-released. Ccost-Group updated. | 12/28/21 | 12/28/21 | |||
| Complete | 12/28/21 | Kyle Jolly | Encore | ECRUN 029 Spectrum | *** | *** | HDW-GENERAL.ECRUN-NOELEVATOR.WHITECAP | Adding 5/8 Ply Clips | Kyle Jolly: I don’t see plywood clips on take off If they are in there remove all of them and replace with 5/8 clips. 2 boxes 5/8 plywood clips -Kyle Jolly -------------------------------------------- Sent 2 boxes and added 2 boxes to the cost-group. | 12/28/21 | 12/28/21 | |||
| Complete | 12/21/21 | Sharon | Richmond | RORVC 050 River Chase | F914/Moonstone | *** | ALL Options with Sand & Mortar (3CAR, COVP)*** | Remove Sand & Mortar, Add Pre-Blend | Adam Sowers: Request came via email from Sharon about there being Sand and Mortar in the options on some of these jobs. Specifically, RORVC 050 River Chase. After looking at all of the F914-F Templates there appear to be MANY incorrect options with sand and mortar instead of pre-belend. I went through all of the new templates, marked *, and updated each option that I found sand and mortar. We have TOO MANY variations of the same options w/ different vendors. This will make package changes extremely difficult / nerarly impossible. We have multiple variations of 3CARs, COVPs, with different variations of vendors as well. I went through all ofi them and updated them where I saw sand or mortar and removed them both and added pre-blend. I added up all block and divided by 15 to get the # of PB Bags. I did not update taxes on them. | 12/21/21 | 12/21/21 | |||
| Complete | 12/20/21 | Scott Deason | Richmond | ROMPT 013 Mattie Pointe | F9C1/Amethist | C | FRMMAT.RA-Amethyst-F9C1-C.HAVEN | Removing (45) 2x4x108 Spruce Precuts | Scott Deason: Please eliminate 45- 2x4x108-5/8” spruce precuts from this model. ------------------------------------- Job Totals: 2x4x108 5/8 Spruce Precuts: 289 Cost-Group Totals: 2x4x108 5/8 Spruce Precuts: 289 New Cost-Group Totals: 2x4x108 5/8 Spruce Precuts: 244 | 12/20/21 | ||||
| Complete | 12/20/21 | Scott Deason | Richmond | ROMPT 008 Mattie Pointe | FC10/Azure | B | FRMMAT.RA-AZURE-FC10-B.HAVEN | Removing (25) 2x4x14 SYP | Scott Deason: Please eliminate 25 - 2x4x14 SYP. Had 40 leftover ------------------------------------- Job Totals: 2x4x14 SYP: 120 Cost-Group Totals: 2x4x14 SYP: 108 New Cost-Group Totals: 2x4x14 SYP: 95 | 12/20/21 | 12/20/21 | |||
| Complete | 12/17/21 | Johnny Vargas | Richmond | ROLKS 049 Lake Smart | F9C2/Onyx | B | F9C2-RA-COVP | Fixing Frame Materials | Johnny Vargas: Missing 2x12x12 #2 Spruce for the back patio. Material arrived yesterday afternoon and I have my framer starting this morning I need this PO’s to be released as soon as possible so I could go and pick up the material as soon as possible. +4 pieces of 2x12x12#2 Spruce. ------------------------------------------------------------------------------------------ After going over this with Chris Plantz and Johnny I've determined that a couple of things are going on here. 1) The COVP option was re-estimated on 11/29 but was never updated in BT. 2) Johnny needed 2x12x10 PT, not 2x12x12 spruce. I had to make updates to each cost-group of materials in 3 different COVP Selections (multiple vendors). Too many changes to list them all so I'm only listing the frame changes: Old COVP Frame Totals: 2 x 4 x 12' Spruce: 3 2 x 6 x 12' Spruce: 3 2 x 4 x 12' SYP: 3 2 x 4 x 16' SYP: 2 2 x 12 x 16' SYP: 2 7/16" x 4' x 8' OSB: 7 New COVP Frame Totals: 1 x 2 x 10 PT: 3 2 x 12 x 10 PT: 4 2 x 12 x 16 PT: 2 2 x 4 x 12 Spruce: 13 2 x 6 x 14 Spruce: 2 2 x 4 x 14 SYP: 10 7/16 OSB: 17 Updated: F9C2-RA-COVP (HD, Titan, Lotts, Haven, CM) F9C2-RA-COVP (Lot, Argos, Best, Haven) F9C2-RA-COVP (Lot, Argos,MCM,Haven) | 12/17/21 | 12/17/21 | |||
| Complete | 12/14/21 | Bobby Neller | Minto | *** | Cottages | All | All Cottages *** | Adding Fire Rated CDX | Adam Sowers: Adding 6 sheets of Fire Rated CDX to each Cottage. 1/2" CDX Fire Rated Counts: Old -- New Cottage 1 - A: 56 -- 62 Cottage 1 - B: 56 -- 62 Cottage 1 - C: 56 -- 62 Cottage 2 - A: 68 -- 74 Cottage 2 - B: 68 -- 74 Cottage 2 - C: 68 -- 74 Cottage 3 - A: 62 -- 68 Cottage 3 - B: 62 -- 68 Cottage 3 - C: 62 -- 68 Cottage 4 - A: 56 -- 62 Cottage 4 - B: 56 -- 62 Cottage 4 - C: 56 -- 62 (Adam) | 12/14/21 | 12/14/21 | |||
| Complete | 12/13/21 | Larry Sims | Sobel Co | OFVMR 002 Villa Mar | 6 Unit | Type 3 | OFVMR - 6 Unit - Type 3 - Unit C-D-E-F | Adding Garage Door Bucks | Larry Sims: Garage door bucks not added to package. 12) 2 x 6 x 8 pt 6) 2 x 6 x 12 pt Needs to be added to package for garage door bucks ------------------------------------------------- Materials sent and added to the Template. No Cost-Groups for this one. (Adam) | 12/13/21 | 12/13/21 | |||
| Complete | 12/13/21 | Larry Sims | Sobel Co | OFVMR 002 Villa Mar | 6 Unit | Type 3 | OFVMR - 6 Unit - Type 3 - Unit C-D-E-F | Adding CIP Deck Form Materials | Larry Sims: Material needed to form deck and ribbon beams. Material needed to form cip deck: 50) 2 x 4 x 14 syp for deck and whalers 12) 2 x 6 x 12 syp for stairwells 40) 1 x 4 x 14 syp for recess 40) 4 x 8 x 3/4 form ply for deck and ribbon beam ----------------------------------------------------- Went over this one with Sam as well and he said it's in the budget but needs to be broken out in the jobs. Since this 6-Unit, Type 3 isn't in BT the new way I am making the package changes to the template. Adding the materials to their own cost-group. (Adam) | 12/13/21 | 12/13/21 | |||
| Complete | 12/13/21 | Larry Sims | Sobel Co | OFVMR 002 Villa Mar | 6 Unit | Type 3 | OFVMR - 6 Unit - Type 3 - Unit C-D-E-F | Adding 1x4x14 SYP | Larry Sims: We need 1 x4x14 for bracing while flying trusses this should be added to the 6 unit building roof lumber pkg 40) 1 x 4 x 14 syp --------------------------------------------- Went over this with Sam and he said to go ahead and send the materials and make the package change. Note: There isn't a new template for this with Cost-Groups so I made the package change to the Template in BT (Adam). | 12/13/21 | 12/13/21 | |||
| Complete | 12/13/21 | Dane Jones | Mattamy Homes | MOMER 017 Meridian | 6 Unit | MCAACM/PR | FRMMAT-DROP1.MOMER17.HAVEN | Adding 1x2x10 PT | Dane Jones: Each unit uses roughly 100 1x2x10 because of the ledger on the inside. 100 tapcons short for the strapping 300) 1x2x10 100) 1/4” x 2 3/4” tapcons ----------------------------------------------------------- Materials sent. Went over this with Angie and she said she initially had 100 for each unit (600 total) for this so it was good to send. Old Totals: 1x2x10: 300 New Totals: 1x2x10: 600 | 12/13/21 | 12/13/21 | |||
| Complete | 12/06/21 | Jonathan Himes | Toll Brothers | TBWIP 001 Whippoorwill | Grenache | MO | Frame Drop 1 & 2 *** | Changing LVLs | Jonathan Himes: Original 1 Drop P.O. (1) 1.75 x 7.25 LVL 14’ New 1st Drop P.O. (1) 5-1/4” x 5-1/4” Parallam Post. Original 2nd Drop P.O. (2) 1.75 x 11.25 LVL 12’ New 2nd Drop P.O. (0) 1.75 x 11.25 LVL 12’ Return: (1) 1.75 x 7.25 LVL 14’ (2) 1.75 x 11.25 LVL 24’ -------------------------------------------------------- Package Changes: Drop 1 Old Totals: 1.75 x 7.25 LVL 14’: 1 5-1/4” x 5-1/4” Parallam: 0 Drop 1 New Totals: 1.75 x 7.25 LVL 14’: 0 5-1/4” x 5-1/4” x 16' Parallam: 1 Drop 2 Old Totals: 1.75 x 11.25 LVL 12’: 2 Drop 2 New Totals: 0 | 12/06/21 | 12/06/21 | |||
| Complete | 12/02/21 | Jeff Rotert | Minto | NDLTS 1802 Latitudes | 50-184 | B | *** | Adding Column & Boxcar Block | Jeff Rotert: (2) front columns need 12” block to build. Please get with estimating to see how many is required for this product and expedite ------------------------------------------------------ The plans call for 8x12 columns but Jeff says that's not how they've been getting built in the field. He thinks they've been taking block from the villas or cottages. Sam reviewed and approved. Sent the materials and now making the package change. MASMAT.NDLTS50-184-B.FLBESTBLOCKORLANDO: Old Count Totals: 12"x12" Block: 0 Boxcar Block: 0 New Count Totals: 12"x12" Block: 24 Boxcar Block: 6 | 12/02/21 | 12/02/21 | |||
| Complete | 11/30/21 | Jeff Subbert | Mattamy Homes | MOWAT 030 Waterbrooke | 6-Unit | CCCCCS/CO | FRMMAT-DROP1.MOWAT30 | Adding Furring Strips | Jeff Subbert: Po It’s calling for 120 thereabouts one by twos furring strips for this building I’m going to need around 400 please go back to print to get the exact count keep in mind anything on a party wall gets double furring strips due to the two by ledger on top ----------------------------------------------------- Job only has (120) 1x2x10 PT in Frame D-1. Which matches the takeoff on S Drive. Jeff says nowhere near enough and referenced lot 026 - Same situaiton and I sent an additional 350. Old Total: 120 New Total: 450 >requested change to 470 but putting 450 for now and will update accordingly (Adam) | 11/30/21 | 11/30/21 | |||
| Complete | 11/30/21 | Jeff Subbert | Mattamy Homes | MOWAT 029 Waterbrooke | 4-Unit | SAAC/CO | FRMMAT-DROP1.MOWAT29.84LUMBER | Adding Furring Strips | Jeff Subbert: 1“ x 2“ furring strip needed roughly 200. See notes in need of furring strips PO calls for 80 please go back to print keep in mind I’ll party walls are double due to two by ledger -Jeff Subbert ------------------------------------------------------ Sent 200. FRMMAT-DROP1.MOWAT29.84LUMBER: 1x2x10 PT Totals: Old Total: 80 New Total: 280 (Adam) | 11/30/21 | 11/30/21 | |||
| Complete | 11/30/21 | Kyle Jolly | Encore | ECRUN 048 Spectrum | Custom | 48 | FRMMAT-DROP3.ECSPC001.BFS | Adding 2x6x10 SYP to FD3 | Kyle Jolly: Package change and fill in. Needed for walls of third floor. Need to add this to 3rd lumber drop. (+40) 2x6x10 Syp ------------------------------------------------- Sent (40) 2x6x10 SYP (Fill-In) FRMMAT-DROP3.ECSPC001.BFS: 2x6x10 SYP Counts: Old Totals: 65 New Totals: 105 (Adam) | 11/30/21 | 11/30/21 | |||
| Complete | 11/29/21 | Carlos Garcia | Richmond | ROMPT 029 Mattie Pointe | F926/Emerald | C | FRMMAT.RA-Emerald-F926-C.HAVEN | Removing (36) 1x2 | Carlos Garcia: 48 sticks left over, please take out 36-this should leave us with 164 PCs total. ---------------------------------------------- Old Totals: 1x2x10 PT: 200 New Totals: 1x2x10 PT: 163 | 11/29/21 | 11/29/21 | |||
| Complete | 11/23/21 | Dane Jones | Richmond | ROSPN 065 Southern Pines | F913/Pearl | M | FRMMAT.RA-Pearl-F913-M.HAVEN | Adding missing lumber | Dane Jones: Need more lumber to finish. PO is short on material -Dane Jones 60- 2x4x16 spruce 20- 2x4x16 syp 1- 2x12x16 syp 30- 1/4x 2 1/2” tapcon ------------------------------------------------ Determined that this is a data/entry error because the items are in the takeoff that I found on the S Drive but not in the job for some reason. Takeoff on S Drive vs Job Total: >2x4x14 spruce: 83 vs 0 >2x4x14 syp: 105 vs 71 >2x12x8 syp: 5 vs 0 Package Changes: >2x4x14 spruce: changed from 0 to 83 >2x4x14 syp: changed from 71 to 105 >2x12x8 syp: changed from 0 to 5 | 11/23/21 | 11/24/21 | |||
| Complete | 11/19/21 | Carlos Garcia | Richmond | ROFOR 012 Forest Gate | F935/Hawthorne | A | Hardware*** | Removing Sill Seal | Carlos Garcia: Cannot believe I have to say this but please remove this from the takeoff, we do not use this ever we are at the end of the community and I am still seeing it. ------------------------------------------- Quick check at the F935/Hawthorne Cost-Groups and they all appear to have Sill Seal. If they've submitted package changes for this previously it wasn't on this model. Package Change: Removed ALL Sill Seal from: HDW.RA-Hawthorne-F935-A.CONSTRUCTIONMATERIALS HDW.RA-Hawthorne-F935-B.CONSTRUCTIONMATERIALS HDW.RA-Hawthorne-F935-C.CONSTRUCTIONMATERIALS (Adam) | 11/19/21 | 11/19/21 | |||
| Complete | 11/17/21 | Jonathan Himes | Toll Brothers | TBLPT 033 Laurel Point | Marsanne/Farmhouse | PCMS.TB-MARSANNE-FARMHOUSE.LOTTSORLANDO | Swapping WR Sills for HiDris | Jonathan Himes: Return and replace + Package change. Package change Original P.O. (8) 3’-1” Wind resistant Flush Sills (2) 4’-5” Wind resistant Flush Sills (2) 5’-0” Wind resistant Flush Sills (2) 6’-2” Wind Resistant Flush Sills New P.O. (8) 3’-1” 3 Step Flush Sills (2) 4’-5” 3 Step Flush Sills (2) 5’-0” 3 Step Flush Sills (2) 6’-2” 3 Step Flush Sills ------------------------------------- Swap complete on Cost-Group Adam) | 11/17/21 | 11/17/21 | ||||
| Complete | 11/17/21 | Zane Heck | Minto | NDLTS 1871 Latitudes | 50-179-II | B | LINCON.NDLTS50-179-II-B.ARGOSLATITUDES, LINTELPUMP1st.NDLTS50-179-II-B | Reducing Lintel Concrete | Zane Heck: Package change 1871 has a P.O for 19 yards. The only lintel out here that takes 19 is the villas. Just want to verify that this is correct or if it needs changed. On the 50 series (3 car garage) we usually poor 13 yards. Just want to verify that 19 yards is correct for single families. ----------------------------------------------------------------- Other Lots(same model/elevation): 1740, 1729, 1728, 1724 19 yards is what's in the takeoff for Lintel Concrete on the 50-179-II-A that I found in the Estimating folder. This job is a 50-179-II-B and I can't find the takeoff for that one. Making the package change because all of the other above lots have poured less. Changing from 19 to 13 (Adam) Updated Cost-Groups: LINCON.NDLTS50-179-II-B.ARGOSLATITUDES >Changed from 19 CY to 13 CY LINTELPUMP1st.NDLTS50-179-II-B >Changed from 9 CY to 3 CY (Over 10 Yards line-item) | 11/17/21 | 11/17/21 | |||
| Complete | 11/16/21 | Jonathan Himes | Toll Brothers | TBWIP 002 Whippoorwill | Corbeil | MO | HDW.CORBEIL-MODERN.CONSTRUCTIONMATERIALS | Swapping HUC212-2 to HUC212-3 | Jonathan Himes: Need to pick up the HUC212-2. Deliver a HUC212-3. Original P.O. : (0) HU212-2 New P.O. (1) HUC212-3 ------------------------------------------------ Updated the Cost-Group. Removed (1) HUC212-2 and added (1) HUC212-3. | 11/16/21 | 11/16/21 | |||
| Review | 11/16/21 | Brian Dinker | Minto | NDLTS 1863 Latitudes | 50-184 | B | Missing Precast for Shower? | Brian Dinker: Package change/ missing option shower window. There’s an optional shower window we are missing the precast and sill on. I’ve notice this coming up a lot. We are missing the(1) 5’4” precast and 48” window sill. The (1) 4’6” precast and 3’1” window sill is removed for it. Need 5’4” precast and 48” hi and dri sill ------------------------------------------------------------- Sent the two items Brian was asking for. Sent to bids for review from estimatin (Adam) | 11/16/21 | |||||
| Review | 11/16/21 | Jonathan Himes | Toll Brothers | TBWIP 002 Whippoorwill | Corbeil | MO | FRMMAT-DROP1.CORBEIL-MODERN.84LUMBER | Adding Parallams | Jonathan Himes: Original Package P.O. (0) 3-1/2” x 3-1/2” x 10’ Parallam Post (1) 3-1/2” x 5-1/4” x 10’ Parallam Post (4) 5-1/4” x 5-1/4” x 10’ Parallam Post New Package P.O. (1) 3-1/2” x 3-1/2” x 10’ Parallam Post (2) 3-1/2” x 5-1/4” x 10’ Parallam Post (5) 5-1/4” x 5-1/4” x 10’ Parallam Post Fill-In (1) 3-1/2” x 3-1/2” x 10’ Parallam Post (1) 3-1/2” x 5-1/4” x 10’ Parallam Post (1) 5-1/4” x 5-1/4” x 10’ Parallam Post (1) 2x12x12 SYP (30) 2x4x16 SYP (40) 2x4x16 White ( 30 ) 2x4x10 pt ------------------------------------------------------- Materials sent. Added for review for now (Adam) >Parallams Change | 11/16/21 | ||||
| Review | 11/16/21 | Jeff Subbert | Mattamy Homes | MOSL2 026 Solara | 4-Unit | QFEQ/FT | HDW.MOSL26.CONSTRUCTIONMATERIALS | Adding MGT & HDU4 | Jeff Subbert: On the Set of structural plans in three places on the second floor calls for note 14 which cars for (1) MGT and (1) HDU4 for each specified point. Jeff says he needs 3 of each. -------------------------------------------------- Materials sent, no other changes made. Need to determine if this was estimated prior to having structurals or if the plans changed (Adam) | 11/16/21 | ||||
| Complete | 11/11/21 | Jonathan Himes | Toll Brothers | TBWIP 007 Whippoorwill | Corbeil | MO | PCMS.CORBEIL-MODERN.LOTTSORLANDO | Wrong Sills, Swapping with HiDris | Jonathan Himes: Package change. Need to return all. 2 step window sills delivered and replace with 3 step per detail in blue prints. (2) 2.5 Wind Resistant Flush Sill (2) 3’-1” Wind Resistant Flush Sill (2) 4’-5” Wind Resistant Flush Sill (2) 5’-0” Wind Resistant Flush Sill (2) 6’-2” Wind Resistant Flush Sill Please return and replace the Recess Door Headers below with 8” headers per plan. (1) Pre Cast 8” U Recess Lintel 7’-6” (1) Pre Cast 8” U Recess Lintel 4’-4” ------------------------------------------------- Jonathan said they let it slide on all but 3 buildings. Swapping out all Wind Resistant Flush Sills with HiDris and replace 2 Recess Lintels with normal headers (Adam) Removed (1) 7'-6" Recess Lintel. Added (1) 7'-6" Header for a new total of: 3 (old: 2) | 11/11/21 | 11/11/21 | |||
| Review | 11/11/21 | Josh Counts | CC Homes | CCMA6 059 Maple Ridge | 55-H | 1 | Hardware | HUS26, HHUS46, HHUS26-2 | Josh Counts: Hardware was not delivered. Items not listed on PO. (2)-HUS26 (34)-HHUS46 (4)-HHUS26-2 ------------------------------------------------------------- materials sent. Sending to bids@ for review. | 11/11/21 | ||||
| Complete | 11/11/21 | Jeff Rotert | Minto | NDLTS 1863 Latitudes | 50-184 | B | SLABPREP.NDLTS50-184-B | Adding 1x4 Dowels | Jeff Rotert: Fill-In & Package Change? Need (17) 1x4 dowels for slab prep ---------------------------------------------- Jeff never submits old count new count totals when he submits these and rarely answers his phone. Adding 17 dowels to the Slab Prep Material Cost-Group. Old Cost-Group Totals: 1x4 Dowels: 85 New Cost-Group Totals: 1x4 Dowels: 99 | 11/11/21 | 11/12/21 | |||
| Complete | 11/11/21 | Jeff Rotert | Minto | NDLTS 1860 Latitudes | 40-176 | A | SLABPREP.NDLTS40-176-A | Adding 1x4 Dowels | Jeff Rotert: Fill-In & Package Change? Need (16) 1x4 dowels for slab prep. ---------------------------------------------- Jeff never submits old count new count totals when he submits these and rarely answers his phone. Adding 16 dowels to the Slab Prep Material Cost-Group. Old Cost-Group Totals: 1x4 Dowels: 63 New Cost-Group Totals: 1x4 Dowels: 79 | 11/11/21 | 11/11/21 | |||
| Complete | 11/11/21 | Jeff Rotert | Minto | NDLTS 1862 Latitudes | 50-184 | A | SLABPREP.NDLTS50-184-A | Adding 1x4 Dowels | Jeff Rotert: Fill-In & Package Change? Need (14) 1x4 dowels for slab prep ---------------------------------------------- Jeff never submits old count new count totals when he submits these and rarely answers his phone. Adding 14 dowels to the Slab Prep Material Cost-Group. Old Cost-Group Totals: 1x4 Dowels: 85 New Cost-Group Totals: 1x4 Dowels: 99 | 11/11/21 | 11/11/21 | |||
| Complete | 11/10/21 | John Rathbun | Surrey Homes | SOSVL C08 Savannah Landing | Pearl | B | HDW.SO-Pearl-B | Adding Hardware | John Rathbun: Please make the following changes to the pearl model B elevation. Add 30 MTS12 for a new total of 80 Add 50 SPH4 for a new total of 150 Add 2 LSTA36 for a new total of 2 . --------------------------------------------------- Old Cost-Group Totals: MTS12: 50 SPH4: 100 LSTA36: 0 New Cost-Group Totals: MTS12: 80 SPH4: 150 LSTA36: 2 | 11/10/21 | 11/10/21 | |||
| 11/10/21 | Zane Heck | Minto | NDLTS 1712 Latitudes | 40-175 | B | PCMS.NDLTS40-175-B | Adding 19'-4" Lintel | Zane Heck: Need (1)19’ 4” precast header to finish house. --------------------------------------------------- Confirmed with Sam that this job/pacakge is missing (1) 19'-4" Lintel, and has one too many 17'-4" Lintels. Package Change: Cast-Creete Cost-Group was already updated with these package changes. Made the following changes to the Lotts Cost-Group: Old Totals: 19'-4": 0 17'-4": 2 New Totals: 19'-4": 1 17'-4": 1 | 11/10/21 | 11/10/21 | ||||
| Complete | 11/09/21 | John Rathbun | Surrey Homes | SOSVL A08 Savannah Landing | Harbor | A | FRMMAT.SO-Harbor-A.BFS | Removing 25 sheets of OSB | John Rathbun: Harbor model package change. Please remove: 25 sheets of 5/8 4x8 OSB for a new total of 153. --------------------------------------- Old Cost-Group Totals: 5/8x4x8 OSB: 178 New Cost-Group Totals: 5/8x4x8 OSB: 153 | 11/09/21 | 11/09/21 | |||
| Complete | 11/09/21 | Joey Ramos | Mattamy Homes | MOMER 020 Meridian | 5-Unit | CACAC/PR | MASMAT.MOMER20 | Adding Boxcar Block | Joey Ramos: Guys cutting to much block. And we were paying them. (16)pcs 12x8x16 per unit. 5 unit total (80) pcs ------------------------------------------------------------------- There are currently no 12x8x16 Boxcar Block in this job, takeoff, or template/cost-groups. Sent Fill-In for 80 pieces. Sending an email to Estimating for Package Change Review before making any changes. (Adam) Update: Angie said Yes for this elevation only. Adding 80 Boxcar Block to the MOMER020 Masonry Cost-Group. | 11/09/21 | per Angie | 11/09/21 | ||
| Complete | 11/08/21 | Dane Jones | Richmond | ROSPN 054 Sourthern Pines | F936/Palm | K | 3CAR Option | Adding 12" Block | Dane Jones: Package change for ALL of the Palm 3 car garage models. 16 piece’s of 12” block needed for both sides of the 1 car garage. 3CAR Option Pacakge Totals: 12" Column Block: 0 New Totals: 12" Column Block: 16 | 11/08/21 | 11/08/21 | |||
| Complete | 11/05/21 | 84 Lumber | Toll Brothers | TBLPT 033 Laurel Point | Marsanne/Farmhouse | TB-MARSANNE-FARMHOUSE | Swapping 5/8" Zip with CDX | Adam Sowers: Got an email from Shawn @ 84 Lumber asking if the 5/8" Zip in the two Frame POs should be CDX like the other Toll Brothers jobs. Job Information says Grenache - MO but Cost-Groups are Marsanne/Farmhouse. Cost-Group & Option Updates: Swapped out 139 sheets in Frame Drop 1. Swapped out 68 sheets in Frame Drop 2. Swapped out 19 in the EXTCOVP Option. Swapped out 9 in the EXTMBR Option. | 11/05/21 | 11/05/21 | ||||
| Complete | 11/05/21 | Marcos Chico | Richmond | ROSPN 033 Southern Pines | F936/Palm | L | ALL Pine & Palm Elevations *** | Add 45 degree Butterfly Block | Marcos Chico & Dane Jones: Dane initially requested we add (25) 45 degree butterfly block to ALL Palm & Pine Elevations. It looks like I added them to the F936 & F937 L's but none of the others. There is a note saying I was waiting to confirm something with Marcos but I can't remember exactly what that was. F936/Palm (A,B,C,K) Cost-Group Totals: 45 Degree Butterfly Block: Old Totals: 0 New Totals: 25 F937/Pine (A,B,K,M) Cost-Group Totals: Old Totals: 0 New Totals: 25 | 11/05/21 | 11/05/21 | |||
| Complete | 11/03/21 | Dane Jones | Richmond | ROSPN 043 Southern Pines | F916/Ruby-II | K | MASMAT.RA-Ruby-II-F916-K.TITANORLANDO | Removing Pre-Blend | Dane Jones: Please remove 15 bags of pre blended mortar for all ruby models. --------------------------------------------------------------- Job / F916/Ruby-II K Totals: Pre-Blend: 145 Bags New Cost-Group Totals: Pre-Blend: 130 Bags Note: I only made this change on this model/elevation for now (Adam) | 11/03/21 | 11/03/21 | |||
| Complete | 11/03/21 | Dane Jones | Richmond | ROSPN 042 Southern Pines | F927/Slate | K | MASMAT. RA-Slate-F927-K | Removing Pre-Blend | Dane Jones: Package change for all slate models. Please remove 15 bags of pre blended mortar from the slate model PO. --------------------------------------------------------------- Job Totals: Pre-Blend: 147 Bags New Cost-Group Totals: Pre-Blend: 132 Bags Note: I only made this change on this model/elevation for now (Adam) | 11/03/21 | 11/03/21 | |||
| Complete | 11/02/21 | David Purvis | Richmond | ROPAL 356 Palisades | F927/Slate | G | Option: 3CAR | Missing Block Labor | David Purvis: Block masons saying they should be getting paid for 3CAR block labor. Nothing in the option on this job. -------------------------------------------------------- Found a file in the estimating folder where it looks like things were re-calcuated on 10/14 for the 3CAR on this model for certain elevations. I added a Block Labor line-item to each 3CAR option on the F927-A Template (where all the options are located). | 11/02/21 | 11/02/21 | |||
| Complete | 10/29/21 | Steven Gilbert | Richmond | ROASQ 026 Arlington Square | F9C1/Amethist | C | FRMMAT.METALINTERIOR.RA-Amethyst-F9C1-A/B/C.HAVEN | Removing Frame Materials | Steven Gilbert: Lumber package change. For metal stud house only. To many studs and bottom and top plates Remove (80) 2x4x108 5/8” spruce precuts Remove (10) 2x4x14’ spruce Remove All 2x4x14’ PT Remove (25) 2x4x14’ SYP -------------------------------------------------------- OLD Count Totals: 2x4x14’ PT: 29 2x4x108 5/8” spruce: 180 2x4x14’ spruce: 46 2x4x14’ SYP: 80 NEW Count Totals: 2x4x14’ PT: 0 2x4x108 5/8” spruce: 100 2x4x14’ spruce: 36 2x4x14’ SYP: 55 | 10/29/21 | 10/29/21 | |||
| Complete | 10/29/21 | Steven Gilbert | Richmond | ROASQ 025 Arlington Square | FC10/Azure | A | FRMMAT.METALINTERIOR.RA-AZURE-FC10-A.HAVEN | Removing Frame Materials | Steven Gilbert: To much lumber left over Remove 36 1x2x10’ PT Remove 25 2x4x14’ SYP Remove 11 2x4x10’ SYP ---------------------------------------------------------- OLD Count Totals: 1x2x10’ PT: 167 2x4x14’ SYP: 96 2x4x10’ SYP: 31 NEW Count Totals: 1x2x10’ PT: 131 2x4x14’ SYP: 71 2x4x10’ SYP: 20 | 10/29/21 | 10/29/21 | |||
| Complete | 10/28/21 | John Rathbun | Surrey Homes | SOSVL C08 Savannah Landing | Pearl | B | PCMS.SO-Pearl-B.LOTTSORLANDO | Precast Changes | John Rathbun: Pearl model elevation B precast package change Please remove three 2-2.5 sills for a new total of 6 from the pearl model B elevation only. These are to small for the opening . Please add three 37” sills for a new total of 9 to the pearl model B elevation only. Sills to short For the rough opening --------------------------------------------------------- PCMS.SO-Pearl-B.LOTTSORLANDO: Old Count Totals: 2'-2.5" WR Sill: 9 3'-1" WR Sill: 6 New Count Totals: 2'-2.5" WR Sill: 6 3'-1" WR Sill: 9 | 10/28/21 | 10/28/21 | |||
| Complete | 10/27/21 | Steven Gilbert | Richmond | ROFLK 199 Forest Lake | FC11/Ruby | M | FRMMAT.RA-Ruby-FC11-M.HAVEN | Missing Top & Bottom Plate Lumber | Steven Gilbert: The lumber was delivered with no tip or bottom plates for the wallls. Please create p.o. To get the bottom and top plates please. ---------------------------------------------------------------- I compared the job to the takeoff I found in the Estimating folder and the job appears to be missing a lot of lumber. Here's what was missing from the Cost-Group: 2x4x12 PT: 27 2x6x12 PT: 3 2x4x8 Spruce: 4 2x4x14 Spruce: 57 2x6x16 Spruce: 2 2x8x8 SYP: 2 I sent the above as a Fill-In on ROFLK#199 and added all of the above materials to the Cost-Group in the BT Catalo (Adam) | 10/27/21 | 10/27/21 | |||
| To-Do | 10/26/21 | Jonathan Himes | Toll Brothers | TBWIP 005 Whippoorwill | Corbeil | FH | *** | Adding 2 Parallams | Jonathan Himes: Package Change (2) 5-1/4”x 5-1/4” Parralam Post [ (3) on old PO, (5) on new PO ] Package change (1) HU212-2 [ 0= before change; 1= after] -------------------------------------------------------------- There are (3) in the package on this job. There are (3) in the Cost-Group. Requested Package Change: +2 Update 9/27: Added the HU212-2 to this packlage. None of the other materials have any quantity in this Cost-Group. Need to reach out to Pete. 9/26: NO CHANGES MADE. Cost-Group in the Catalog has 0 quantity for every item for some reason. Going to contact Pete to see if he's working on this one or something. | 10/26/21 | ||||
| Complete | 10/26/21 | Jeff Subbert | Mattamy Homes | MOSL2 023 Solara | 4-Unit | QEFQ/MO | PCMS.MOSL23.LOTTSORLANDO | Addind 1x9 Dowels | Adam Sowers: PO is only con for 12 9 x 1 dowels for the main building? He only calls for (12) 9 x 1 dowels. 9 x 1 dowels for main building -------------------------------------------------- The spreadsheet on the S Drive for this Unit Mix has (128) 1x9 Dowels. There are only 12 in the job and cost-group. Sent materials as data entry error. New Total for 1x9 Dowels: 128 | 10/26/21 | 10/26/21 | |||
| Complete | 10/21/21 | Jeff Subbert | Mattamy Homes | MOWAT 026 Waterbrooke | 6 Unit | SCAACS/CO | MOWAT26 | Adding furring and posts | Jeff Subbert: Po calls for only (120) furring strips, I’ll party walls have a 2 x 8 ledger. Therefore I need double the furring strips to match the thickness of the 2 x. Need (350) more 1 x 2 x 10 pt PO calls for (8)parallams but I also need (2)4 x 6 posts 350) 1 x 2 x 10 pt 2) 4 x 6 x10 posts ----------------------------------------------------------- Job Totals: 1 x 2 x 10 pt: 120 4 x 6 x10 posts: 0 New Totals: 1 x 2 x 10 pt: 470 4 x 6 x10 posts: 2 | 10/21/21 | 10/21/21 | |||
| Complete | 10/20/21 | John Rathbun | Surrey Homes | SOSVL A03 Savannah Landing | Harbor | A | *** | Hardware Changes | John Rathbun: Please add 40 mts12 for a new total of 60. I will be picking these up the 40 MTS12 tomorrow morning. I also need 8 HUS26 . This is a truss to truss connection that was not delivered with the truss pack. We also need to remove sill seal And HETA20 from hardware on this template . We do not use sill seal . HETA20 are used at lintel pour. ----------------------------------------------------- Cost-Group for Harbor-A updated (Adam) | 10/20/21 | 10/20/21 | |||
| Complete | 10/19/21 | Johnny Vargas | Richmond | RORVS 039-04 Riverstone | F924/Ammolite | B | *** | Sub Floor Adhesive | Johnny Vargas: Missing Sub Floor Adhesive. -------------------------------------------------------------- (16) in TOS in the Estimating Folder but none in the Job/POs/Template. Sent this fill-in on a couple lots as a normal PO instead of a variance. Added (16) SFA to the F924-B Cost-Group. | 10/19/21 | 10/19/21 | |||
| Complete | 10/19/21 | Jonathan Himes | Toll Brothers | TBWIP 006 Whippoorwill | Grenache | MO | *** | Adding 2x4x15 SYP & Spruce | Jonathan Himes: Lumber fill-In and package change. (50) 2x4x16’ SYP (60) 2x4x16’ Spruce (2) MSTC-28 flat strap SYP is short for truss engineering and details for cross bracing, 45 degree bracing. Spruced is short for tray ceilings and interior walls. ------------------------------------------------------ Job Totals: 2x4x16 SYP: >Drop 1: 55 >Drop 2: 35 2x4x16 Spruce: >Drop 1: 0 >Drop 2: 0 Takeoff / Spreadsheet Totals: 2x4x16 SYP: >Drop 1: 45 >Drop 2: 35 2x4x16 SYP: >Drop 1: 55 >Drop 2: 35 Send the requested materials and sent down the line for review by estimating (Adam) | 10/19/21 | per Chad | 10/19/21 | ||
| Complete | 10/19/21 | Johnny Vargas | Richmond | RORVS 021-10 Riverstone | F924/Ammolite | B & C | *** | Adding (4) 2x6x10 PT | Johnny Vargas: All my Ammolite style homes the take off list are being short with these material. I’ll be heading to the vendor to pick these items in an hour from now please make a pos for this one. 4 pieces of 2x6x10 pressure treated studs. --------------------------------------------------- There is currently no 2x6x10 PT in this job/template. It has been requested/sent on multiple ammolite jobs. Added 4 to the F924-B Cost-Group. Other Lots with 2x6x10PT Fill-Ins: RORVS: >#025 - F924-C (Added 4 to Cost-Group) >#023 - F914-F (No Change to Cost-Group) | 10/19/21 | 10/19/21 | |||
| Complete | 10/18/21 | Nick Cazares | Minto | NSLTM 1828 Latitudes | Villa 11 | A | *** | Changing Sills to HiDris | Nick Cazares: We do not get wind resistant flush sills, only Hi-Dri sills. We only get Hi-Dri sills, no flush sills ----------------------------------------------------------------- Sills swapped out on the job and updated the Cost-Groups (Adam). | 10/18/21 | 10/18/21 | |||
| Complete | 10/14/21 | Jonathan Himes | Toll Brothers | TBWIP 005 Whippoorwill | Corbeil | FH | *** | Adding Sub-Floor Adhesive | Jonathan Himes: Create P.O. and package change for this lot and model. Need to add sub floor adhesive as soon as possible. Matthew is getting a ticket ready for me now with 16 tubs matching Lot 6. ---------------------------- No SFA in the job. There are 30 SFA in the spreadsheet under TOLL BROTHERS\TBWIP 005 - Template List Material for BT.xlsx Sent 30. Adding 30 to Cost-Group (Adam). | 10/14/21 | 10/14/21 | |||
| Complete | 10/14/21 | John Rathbun | Surrey Homes | SOSVL A03 Savannah Landing | Harbor | A & B | *** | Adding SPH6 | John Rathbun: Please add 30 SPH6 to the Harbor model both Elevations for a new total of 63 pieces . I need a fill in of 50 pieces of SPH6 . I will be picking this up from CM. ------------------------------------------- SOSVL A03 SPH6 Totals: SPH6: 36 New Total A & B: 63 | 10/14/21 | 10/14/21 | |||
| Complete | 10/13/21 | Adam Sowers | Richmond | RORVS 027-04 Riverstone | F926/Emerald | All | All (Old & New) | TOO MANY Tapcons | Adam Sowers: I noticed this HW PO had 48 BOXES of Tapcons. Updated all of them to singles. Every single template for this model had boxes instead of singles. | 10/13/21 | 10/13/21 | |||
| Complete | 10/13/21 | Adrian Hart | Bella Vista Building Group | BVSOD 002 SODO House | 6-Unit | ABCCBA | BVSOD House / 6-Unit (ABCCBA) | Switching Lintel to 4000 PSI | Adrian Hart: Lintel Concrete Change: We need to change po bvsod002-0009 from 3000psi to match beam concrete 4000psi. There is not really a good way to pour beams independently, everything should be poured at the same time with the same 4000 psi mix. ------------------------------------------------------ Original Lintel Concrete PO Voided. New PO issued. | 10/13/21 | 10/13/21 | |||
| Complete | 10/13/21 | Jeff Subbert | Mattamy Homes | MOWAT 026 Waterbrooke | 6-Unit | SCCAAA/CO | *** | Removing LVLs | Jeff Subbert: Remove LVLs from all Waterbrooke jobs. They come with the truss packages now. -------------------------------------- Removed LVLs from the following: MOWAT26.84LUMBER: 6 Released a Material for Return/Credit PO on MOWAT 026 to return 5 LVLs per Jeff Subbert. | 10/13/21 | 10/13/21 | |||
| Complete | 10/13/21 | Johnny Vargas | Richmond | RORVS 039-04 Riverstone | F924/Ammolite | A & B | *** | Removing Duro Wall | Johnny Vargas: Ammolite style homes. Their not being used the material is being taken to the bone yard. Please have them taken back. It will be in lot #39-04 please change order on all Ammolite style homes. Regarding on both community Riverstone and Lake Smart. I will have all of them located on lot#39-04 for easy pickup. Thank you. -------------------------------------------------------------- Material for Return / Credit: 9 Bundles Old Package Total: 3 New Package Total: 0 Updated A & B Elevations. | 10/13/21 | 10/13/21 | |||
| Complete | 10/12/21 | John Rathbun | Surrey Homes | SOSVL A03 Savannah Landing | Harbor | A & B | *** | Removing 5 Yards | John Rathbun: Harbor model package change A&B elevations. Please remove 5 yards for a new total of 12 yards on the harbor model. ------------------------------------------------- Current Lintel Concrete Totals Harbor A: 17 Harbor-B: 17 New Lintel Concrete Totals Harbor A: 12 Harbor-B: 12 Updated Line Pump Labor as well. | 10/12/21 | 10/12/21 | |||
| Complete | 10/12/21 | Jeff Subbert | Mattamy Homes | MOWAT 030 Waterbrooke | 6-Unit | CCCCCS/CR | Remove Duro Wall | Jeff Subbert: Do not need dura wall. I do not see anywhere where I would need dura wall. I have no stack joints. ------------------------------------------------- Current Totals in MOWAT030: Duro Wall: 5 Bundles Removed Duro Wall from all MOWAT Cost-Groups and Templates (Adam) | 10/12/21 | 10/13/21 | ||||
| Complete | 10/11/21 | Jason Bridges | Dream Finders | ROSPH 085 Park Hill | FC10/Azure | B | *** | Removing 12 2x4x14 SYP | Jason Bridges: Please remove (12)2x4x14 syp from take off on azure “b” elevations 120-12=108 2x4x14 syp new total --------------------------------------- Updated Cost-Groups for FC10-B. | 10/11/21 | 10/11/21 | |||
| Complete | 10/11/21 | Jeff Rotert | Minto | NDLTS 1732 Latitudes | 50-179-II | A | *** | Adding 2x6x16 R/S Spruce | Jeff Rotert: Need (6) 2x6x16 R/S Spruce added to the pacakge. --------------------------------------------------------- Package has a total of (29) currently. New Total: 35 | 10/11/21 | 10/11/21 | |||
| Complete | 10/11/21 | John Burkett | Mattamy Homes | MOMER 014 Meridian | 4-Unit | CAAC/CR | *** | Adding 1x2x10 PT | John Burkett: Previous package change for furring strips. Need 200 total please. 98 were on this PO.Did package changes on bldg 15-16. ------------------------------------------------ No BT Template for this Unit Mix. Made the package change to the Cost-Group (Frame Drop 1) | 10/11/21 | 10/11/21 | |||
| Complete | 10/08/21 | Johnny Vargas | Richmond | Community | All | All | *** | Removing 1 Box of Ply Clips | Johnny Vargas: Remove 1 Box of Ply Clips from all models/elevations that have 3 boxes. 2 boxes are enough. --------------------------------------------------------------------- I removed 1 Box of Ply Clips from the following Model/Elevation Cost-Groups: F927 A & B FC10 A & B F9C1 A | 10/08/21 | 10/08/21 | |||
| Complete | 10/08/21 | Carlos Garcia | Richmond | ROFLK 187 Forest Lake | F913/Pearl | L | *** | Hardware & Frame Changes | Carlos Garcia: Please remove: 36 pcs 1 x 2 x 10 PT 2 pieces of 1 x 4 x 8 PT 1 piece of 1 x 6 x 12 PT 2 pieces of 2 x 4 x 14‘ Spruce 8 PCs 2x4x92-5/8 SYP Hardware takeoff is completely jacked up these are the only items that I need listed below. 25 PCs 1/4“ x 6“ SDS wood screws 25 pieces of 1/4 x 3 1/4 inch hex head tap cons 32 pieces of 1/4x1-3/4 hex head tap cons 15 PCs of 1/2x6 inch wedge anchors 35 pieces of 2 x 2 by 1/2” square washer 100 pieces H2.5 or H8 35 pieces MTS 12 8 pieces HTS 20 8 PCs MSTM 36 straps 5 PCs MSTA36 straps 2 pieces HUC28-2 2 pieces of HUC212-2 40 SP1 80 SP2 two boxes of 15/32 plywood clips Whatever subfloor adhesive was in original takeoff. This is all that’s needed -------------------------------------------------------------------- ROFLK 187 Forest Lake Frame Totals: 1x2x10 PT: 131 ---------------- New total: 95 1x4x8 PT: 4 --------------------- New total: 2 1x6x12 PT: 3 ------------------- New total: 2 2x4x14 Spruce: 110 ---------- New total: 108 2x4x92 5/8 SYP: 28 -------- New total: 20 ROFLK 187 Forest Lake Hardware Package ($898.02): H10A: 86 HB127: 9 HGA10KT: 1 HTS20: 9 HUC28-2: 4 LSTA24: 16 MSTA36: 1 MSTAM36: 10 MTS12: 5 N12: 9 PSCL716: 2 SP1: 49 SP2: 124 Sub Floor Adhesive: 14 TH 14234 (each): 80 TH 14314 (each): 26 TH 14334 (each): 48 WA1285: 18 WS22916: 49 | 10/08/21 | 10/08/21 | |||
| Complete | 10/08/21 | Adrian Hart | Bella Vista Building Group | BVSOD 001 SODO House | 6-Unit | ABCCBA | BVSODO House / 6-Unit (ABCCBA) | Adding Type C Densglass | Adrian Hart: Drywall needed to cover channels of firewall. There is a good chance this was not on original bid set. From what I have gathered, the original submitted plans used a fire rated assembly u347 that was denied by the city. This assembly does not require channels/studs to be covered with drywall. In addition, we need to reach out to vendor for fastener requirements. If someone could provide me with a contact I would be more than happy to call. -Adrian -------------------------------------------------------------------- This is in budget so not sending as a variance. Marcos got a price from Int/Ext for Type C Densglass for this (70) 1/2" x 4' x 12' Type C Densglass Added them to the Template (Adam) | 10/08/21 | 10/11/21 | |||
| NA | 10/07/21 | Johnny Vargas | Richmond | ROLKS 033 Lake Smart | F914/Moonstone | D | *** | Removing Frame | Johnny Vargas: Their is way to much lumber not being used and a stock pile is being created. Please remove these items from the take off. Only for Moonstone style homes. Thank you. 6 pieces of 2”x8”x10’ SYP 1 piece of 2”x6”x16’ Pressure treated. 1 piece of 2”x6”x14’ SYP 4pieces of 2”x4”x 8’ SYP 3 pieces of 2”x4”12’ SYP 3 pieces of 2”x6”x10’ SYP 2 pieces of 2”x6”x12’ Pressure treated 1 piece of 2”x8”x10’ Pressure treated ---------------------------------------------------------- Job Totals: 2x6x12 PT: 2 2x6x16 PT: NA 2x8x10 PT: 2 2x4x8 SYP: NA 2x4x12 SYP: 41 2x6x10 SYP: NA 2x6x14 SYP: NA 2x8x10 SYP: NA | 10/07/21 | 10/08/21 | |||
| Complete | 10/07/21 | Johnny Vargas | Richmond | RORVS 022-07 Riverstone | F927/Slate | J | *** | Removing Frame | Johnny Vargas: There is way no many lumber material not being used. Please change all take off regarding all (Slate style homes). 15 pieces of 2”x4”x14’ Southern yellow pine. 10 pieces of 7/6”x 4’x 8’ OSB Radiant Barrier Sheathing. 8 pieces of. 1”x2”x10’ PT Borate. --------------------------------------------------------- Job Totals: 1x2x10 PT: 144 2x4x14 SYP: 108 7/16 OSB Radiant Barrier: 145 New Cost-Group Totals: 1x2x10 PT: 136 2x4x14 SYP: 93 7/16 OSB Radiant Barrier: 135 | 10/07/21 | 10/07/21 | |||
| Complete | 10/07/21 | Jeff Rotert | Minto | NDLTS 1700 Latitudes | 40-176 | A | *** | Adding Frame | Jeff Rotert: Need (4) 2x4x16 pt (12) 2x4x16 syp --------------------------------------------------------- Job Totals: 2x4x16 PT: 2 2x4x16 SYP: 43 New Totals: 2x4x16 PT: 6 2x4x16 SYP: 55 | 10/07/21 | 10/07/21 | |||
| Complete | 10/07/21 | Dane Jones | Richmond | ROSPN 033 Southern Pines | F936/Palm | L | *** | Adding Butterfly Block | Dane Jones: Package change for ALL Palm and Pine models. Butterfly block needed for front doors. 25 total for each one. Butterfly block is needed for entry doors to block correctly. 25 butterfly block for each. --------------------------------------------------------- 10/8/2021 >F936/Palm - L - Now has 25 Butterfly Block >F937/Pine - L - Now has 25 Butterfly Block 10/7/2021 Added 25 Butterfly 45 Degree Block to the F936-L Cost-Group. Waiting to hear back from Marcos to confirm everything before making any other package changes to the other models. | 10/07/21 | 10/08/21 | |||
| Review | 10/07/21 | Jonathan Himes | Toll Brothers | TBWIP 002 Whippoorwill | Corbeil | MO | Adding Boxcar Block | Jonathan Himes: Missing 12”x8”x16” CMU for rear SGD. Please expedite this ASAP. Need delivery no later than 10/11. Missing the 12”x8”x16” block per Lot 5 fill in. Take off needs to be updated per this model. (311) 12”x 8” x 16” Block. ------------------------------------------------------------------ None in the job or the takeoff. Waiting to hear back from Estimating about this (Adam). | 10/07/21 | |||||
| Complete | 10/06/21 | Jeff Rotert | Minto | NDLTS 1732 Latitudes | 50-179-II | A | *** | Reducing Lintel Concrete | Jeff Rotert: The current PO shows 19 yards for the lentil pour. However, it is supposed to be 13 yards. Please correct. -------------------------------------- Package Change made to the Cost-Group (Adam) | 10/06/21 | 10/06/21 | |||
| Complete | 10/05/21 | Kyle Jolly | Minto | NDLTS 1874 Latitudes | 50-179-II | A | *** | Reducing Slab Concrete | Kyle Jolly: Concrete package change. Please change slab concrete for this model on this elevation. Package reads 72 yards for slab Only pour around 65-66. --------------------------------------------- Changed Slab Concrete Cost-Group from 72 yards to 66 yards (Adam). | 10/05/21 | 10/05/21 | |||
| Complete | 10/04/21 | John Rathbun | Surrey Homes | * | All | All | *** | Changing 7/16 OSB to 5/8 OSB | 10/04/21 | 10/04/21 | ||||
| Complete | 10/04/21 | John Rathbun | Surrey Homes | SOSVL B12 Savannah Landing | Cove | All | *** | Changing 7/16 OSB to 5/8 OSB | John Rathbun: Cove model hardware package change A&B elevations. remove sill seal from this model and all others. We do not use this. remove anchor bolts.These are wet set in concrete and come with the precast package. Add 40 SPH6 for a new total of 67 . Plans show bearing wall studs at 16” centers and SPH6 top and bottom of every stud. -------------------------------------------------- I only see an A (Elevation), No B. Package Change complete. (Adam) | 10/04/21 | 10/04/21 | |||
| Complete | 10/04/21 | John Burkett | Mattamy Homes | MOMER 020 Meridian | 5-Unit | CACAC/PR | *** | Adding 20 Dowels | John Burkett: (20) dowels for new total = 147. PO only has 127 ------------------------------------------ Cost-Group for MOMER20 Updated (Adam) | 10/04/21 | 10/04/21 | |||
| Complete | 10/01/21 | Jeff Subbert | Mattamy Homes | MOWAT 025 Waterbrooke | 6-Unit | SCAACS/FT | MO-WAT 6-Unit (SCAACS) - FT | HUC410 | Jeff Subbert: A quantity of six ( HUC410 )’s are needed at every front porch. Po calls for 28. I need 36. ------------------------------------------------------------ There was no Template in BT for this so I turned the job into a Template and removed all the bills, schedule, to-dos, documents, etc - and made the package change to the HUC410s. | 10/01/21 | 10/01/21 | |||
| Review | 09/30/21 | Marcos Chico | Bella Vista Building Group | BVSOD 002 SODO House | 6-Unit | ABCCBA | Precast Changes | Marcos Chico: Marcos is requesting to remove all of the precast headers (except two 4’4 recess lintels) because he says everything is cast in place. >The only ones they need are the (2) Recess Lintels - 4'-4 (2'8 dr). >Instead of the (6) 2'-2.5" Sills he needs 3' Sills. ------------------------------------- Waiting on Review from Estimating (Adam) | 09/30/21 | |||||
| Complete | 09/30/21 | John Burkett | Bella Vista Building Group | BVSOD 001 SODO House | 6-Unit | ABCCBA | BVSOD House / 6-Unit (ABCCBA) | Densglass | John Burkett: Densglass for rippers in attic per Marcos. (15) sheets densglass for new total of 235 --------------------------------------------------------- There are 3 Shaftwall Material Drops in this job. Each currently has 210 pieces of Densglass, for a total of: 630. John Burkett is requesting to update the package to: 235 pieces of Densglass per Drop, for a total of: 705. | 09/30/21 | 09/30/21 | |||
| Complete | 09/28/21 | Jack Corrigan | Richmond | RORVC 043 River Chase | F929/Pewter | A | Frame for RV Garage | Jack Corrigan: Need (3) 2x12x20 pt for back porch beams (4) 2x8x14 pt for RV garage door bucks (4) 2x8x10 pt for RV garage door bucks -------------------------------------------------------------- 2x12x20 Jack says is for the back porch of the house and thinks that it needs to be on the base. >Confirmed with Sam that this model needs (3) 2x12x20 for the back porch on the base. GDR1C Option Totals from RORVC #043: (1) 2x6x16 PT (2) 2x8x14 PT (0) 2x8x16 PT New GDR1C Option Totals: (0) 2x6x16 PT (2) 2x8x14 PT (2) 2x8x14 PT New Base Package: +(3) 2x12x20 PT Notes: Completed Package Change on Option and Base model - All Cost-Groups (frame vendors). (Adam) | 09/28/21 | 09/28/21 | ||||
| Complete | 09/28/21 | John Burkett | Mattamy Homes | MOMER 016 Meridian | 4-Unit | MAAC/PR | Fire-Rated CDX | John Burkett: Need more cdx. (20) sheets 15/32 fire rated cdx for new total of 120sheets. ----------------------------------------- Job & Template Totals: 15/32 Fire-Rated CDX: 100 New Total: 15/32 Fire-Rated CDX: 120 | 09/28/21 | 09/28/21 | ||||
| Complete | 09/28/21 | John Burkett | Mattamy Homes | MOMER 017 Meridian | 6-Unit | MCAACM/PR | MOMER17.HDSUPPLYORLANDO | Adding 1x5 Dowels | John Burkett: Not enough dowels. Please submit so I can get them delivered with prep pack tomorrow. (37) dowels for new total 199. ---------------------------------------------- MOMER #017 Meridian Totals: 1x5 Dowels: 162 New Template Totals: 1x5 Dowels: 199 (Adam) | 09/28/21 | 09/28/21 | |||
| Complete | 09/27/21 | Carlos Garcia | Richmond | RORVS 039-04 Riverstone | F924/Ammolite | B | Ammolite-F924-B CG | Removing Slab Prep Materials | Carlos Garcia: Extra materials after slab prep. Please delete (15) pieces of 20 foot number five rebar and (25) pieces of 30 x 30 corner bars. ---------------------------------------------------------------- RORVS 039-04 Riverstone Totals: #5 Rebar - 20': (48) 30x30 Corner Bars: (46) New Totals: #5 Rebar - 20': (33) 30x30 Corner Bars: (21) | 09/27/21 | 09/27/21 | |||
| Complete | 09/27/21 | Steven Gilbert | Richmond | ROASQ 027 Arlington Square | F9C3/Coral | D | F9C3-D Metal Frame Materials CG | Removing Metal Frame | Steven Gilbert: Remove metal studs from package. Remove some studs from metal Package. Remove (40) 3 5/8”x10’ studs metal Remove (10) 6”x10’ studs metal -------------------------------------------------------------------- ROASQ #027 Totals: 3 5/8”x10’ studs metal: (251) 6”x10’ studs metal: (35) New Totals: 3 5/8”x10’ studs metal: (211) 6”x10’ studs metal: (25) | 09/27/21 | 09/27/21 | |||
| Complete | 09/24/21 | John Burkett | Mattamy Homes | MOMER 016 Meridian | 4 Unit | MAAC/PR | MO-MER 4-Unit (MAAC) - PR | Shaftwall Materials: H-Track | John Burkett: Fill-In & Package Change: Need (50) PCs of H track to complete bldg. PO is (70) PCs with fill in of (50) = new total of (120) PCs ---------------------------------------------------- John said he needs the 12' for the attic area. Job has: (70) H Track 10' (70) H Track 12' Template updated (Adam) | 09/24/21 | 09/24/21 | |||
| Complete | 09/23/21 | John Rathbun | Surrey Homes | SOSVL A09 Savannah Landing | F913/Pearl | A | F913/Pearl (A&B Elevations) | SPH4 | John Rathbun: Hardware Package change pearl model A&B elevations. I need to add 50 SPH4 for a new total of 150 on the pearl model A&B elevations. Required on every stud top and bottom With 12” stud spacing on all bearing walls. --------------------------------------- SOSVL A09 Savannah Landing: SPH4: 100 Cost-Group: 145 Notes: Job is short by 45. New Cost-Group Total: 150 | 09/23/21 | 09/23/21 | |||
| Complete | 09/23/21 | Nick Cazares | Minto | NDLTS 1932 Latitudes | 40-177 | B | 40-177 (A&B Elevations) | Precast Changes | Nick Cazares: precast takeoff is incorrect. 6’2” sill +1 total of 2 3’1” sill +1 total of 7 ------------------------------------------------------- In the Job (#1932): 6'-2" HiDri Sill: 1 3'-1" HiDri Sill: 8 Notes: Nick said not to worry about the 3'-1"s for now and just change the 6'-2" sills. Updated Cost-Groups on All Elevations. (Adam) | 09/23/21 | 09/23/21 | |||
| Complete | 09/23/21 | John Rathbun | Surrey Homes | SOSVL A09 Savannah Landing | F913/Pearl | A | F913/Pearl (A&B Elevations) | 2x8x10 SYP for Truss Engineering | John Rathbun: Package change pearl model A&B elevations. Need to add four pieces of 2x8x10 SYP to the pearl model A&B elevation for a new total of 4 . This is for a new truss engineering detail. +(4) 2x8x10 SYP -------------------------------------------------------- SOSVL A09 Savannah Landing: 2x8x10 SYP: 0 Cost-Group: 0 Notes: Cost-Groups updated on A&B Elevations for all Frame Suppliers. New 2x8x10 SYP Total: 4 (Adam) | 09/23/21 | 09/23/21 | |||
| Complete | 09/22/21 | Chris Plantz | Richmond | NA | FC10/Azure | Option | RA-Azure-FC10-A *** | WDWLAUNDRY | Chris Plantz: Options revised by Chris Plantz. Updated on the RA-Azure-A *** Template and removed all other instances of the same options from the other Azure templates (Adam). | 09/22/21 | 09/22/21 | |||
| Complete | 09/22/21 | Chris Plantz | Richmond | NA | FC10/Azure | Option | RA-Azure-FC10-A *** | WDWGREAT | Chris Plantz: Options revised by Chris Plantz. Updated on the RA-Azure-A *** Template and removed all other instances of the same options from the other Azure templates (Adam). | 09/22/21 | 09/22/21 | |||
| Complete | 09/22/21 | Chris Plantz | Richmond | NA | FC10/Azure | Option | RA-Azure-FC10-A *** | WDWBA-2 | Chris Plantz: Options revised by Chris Plantz. Updated on the RA-Azure-A *** Template and removed all other instances of the same options from the other Azure templates (Adam). | 09/22/21 | 09/22/21 | |||
| Complete | 09/22/21 | Carlos Garcia | Richmond | RORVS 014-23 Riverstone | F9C1/Amethist | A | Removing Block | Carlos Garcia: Extras. Please remove 20 pieces of half block and 20 pieces of lintel block. See pics, splitting with the leftovers at 15-23 ----------------------------------------------------------------------- BT Cost-Groups updated for all Masonry Suppliers: Half Block - Changed from 80 to 60. Lintel Block - Changed from 152 to 132. (Adam) | 09/22/21 | 09/22/21 | ||||
| Complete | 09/22/21 | Carlos Garcia | Richmond | RORVS 015-23 Riverstone | F927/Slate | B | Removing Block | Carlos Garcia: Please delete 20 pieces of lintel block and 20 pieces of half block, see pictures-splitting between leftovers at 14-23. ----------------------------------------------------------------------- BT Cost-Groups updated for all Masonry Suppliers. Lintel Block - Changed from 185 to 165 Half Block - Changed from 94 to 74 (Adam) | 09/22/21 | 09/22/21 | ||||
| Complete | 09/22/21 | Chris Plantz | Richmond | NA | FC10/Azure | Option | RA-Azure-FC10-A *** | BDRM3-ILO-STUDY | Chris Plantz: Options revised by Chris Plantz. Updated on the RA-Azure-A *** Template and removed all other instances of the same options from the other Azure templates (Adam). | 09/22/21 | 09/22/21 | |||
| Complete | 09/20/21 | Mike Schlosser | CC Homes | CCMA6 013 Maple Ridge | 55-H | 3 | Add 20 Wedge Anchors | Mike Schlosser: Need wedge anchors. (20) 3/4x10” wedge anchors. Wedge anchors in the old is 35. New count total is now 55. (20) 3/4x10”. Adam ------------------------------------------------ HW Cost-Group for the 55-H3 has been updated Added (20) WA3410 for a new total of (55). Changed WS22916 from (60) to (48) to match the number of same size wedge anchors since all the others match and this one was off. | 09/20/21 | 09/20/21 | ||||
| Complete | 09/17/21 | Steven Gilbert | Richmond | ROFLK 199 Forest Lake | FC11/Ruby | M | Remove Pre-Blend (10) | Steven Gilbert: To much mortar left over. Remove 10 bags of mortar from package. ---------------------------------------------- Package had 146 bags of Pre-Blend. New Total: 136 (Adam) | 09/17/21 | 09/17/21 | ||||
| Complete | 09/16/21 | Steven Gilbert | Richmond | ROFLK 202 Forest Lake | F927/Slate | M | Removing (20) 1x2x10 PT & 2x4x108 5/8 Spruce | Steven Gilbert: To much lumber left over Remove 20 2x4x108 5/8” spruce pre cut studs Remove 20 1x2x10’ PT Borate -------------------------------------------------- Frame Totals from ROFLK #202: 1x2x10 PT: 180 2x4x108 5/8 Spruce: 352 New Template/Cost-Group Totals: 1x2x10 PT: 160 2x4x108 5/8 Spruce: 332 Cost-Groups Updated on F927-M (Adam) | 09/16/21 | 09/16/21 | ||||
| Complete | 09/16/21 | Steven Gilbert | Richmond | ROFLK 198 Forest Lake | 1927/Slate | L | Removing (15) 7/16 OSB & 2x4x14 SYP | Steven Gilbert: Lumber package heavy. Remove 15 sheets of OSB 7/16”x4’x8’ OSB sheathing Remove 15 2x4x14’ #2 Southern Yellow pine ---------------------------------------------- Package Change: 7/16 OSB: -15 2x4x14 SYP: -15 Totals on ROFLK 198 Forest Lake: 7/16 OSB: 137 2x4x14 SYP: 111 New Totals: 7/16 OSB: 122 2x4x14 SYP: 96 Package Change made to Cost-Groups in BT (Adam) | 09/16/21 | 09/16/21 | ||||
| Complete | 09/16/21 | Jack Corrigan | Dream Finders | DOFER 235 Fernanda | Poinciana | A | Added .5 Yards to Lintel Concrete | Jack Corrigan: Need to bump lentil PO for this model from 8 yards up to 9. This model runs short on mud often. ----------------------------------- Went over this with Estimating and Sam said to add .5 yards to the Lintel Concrete. Poinciana-A Updated. | 09/16/21 | 09/17/21 | ||||
| Complete | 09/14/21 | Chad Brewster | Toll Brothers | TBWIP 005 Whippoorwill | Corbeil | FH | Removing Slab Prep Materials | Chad Brewster: First time we have done this model and elevation. Just a few tweaks. Please change the following materials for this model and elevation OLD- 4 box of 100 Rod chairs 16”-3 bar NEW -3 box of 100 Rod Chairs 16”-3 bar OLD - 103 #5 Rebar-20’ Length Grade 60 NEW - 97 #5 Rebar-20’ Length Grade 60 | 09/14/21 | 09/14/21 | ||||
| Complete | 09/13/21 | Steven Gilbert | Richmond | ROFLK 171 Forest Lake | F914/Moonstone | M | Remove Pre-Blend (20) | Steven Gilbert: Too much Pre-Blend. Remove 20 bags from the base package. 120 Bags in package. Updated to 100 (Adam) | 09/13/21 | 09/13/21 | ||||
| Complete | 09/13/21 | Steven Gilbert | Richmond | ROFLK 188 Forest Lake | FC10/Azure | K | Remove Pre-Blend (18) | Steven Gilbert: Remove 18 bags of mortar from the base package. Base Package has 140 Bags of Pre-Blend. Removed 18 Bags for a new Total of 122 (Adam) | 09/13/21 | 09/13/21 | ||||
| Complete | 09/13/21 | Steven Gilbert | Richmond | ROASQ 007 Arlington Square | F9C1/Amethist | B | Remove Pre-Blend (15) | Steven Gilbert: Remove 15 bags of mortar from base package. 120 Bags if Pre-Blend in Base. Updated to 105 bags of Pre-Blend (Adam) | 09/13/21 | 09/13/21 | ||||
| Complete | 09/09/21 | Steven Gilbert | Richmond | ROASQ 017 Arlington Square | F914/Moonstone | D | META20 & Anchor Bolts | Steven Gilbert: The moonstone continues to get to many bolts and not enough straps please send me a box of 100 to replace box on my truck that I keep for this situation and please fix package. META 20: Change to 110 (from 46) Anchor Bolts: Change to 20 (from 55) | 09/09/21 | 09/09/21 | ||||
| Complete | 09/08/21 | Ronald Campbell | Richmond | ROSPN 064 Southern Pines | FC10/Azure | L | Remove All Corner Bars | Ronald Campbell: Remove all Corner Bars from Southern Pines models. Not being used. | 09/08/21 | 09/08/21 | ||||
| Complete | 09/07/21 | Jason Bridges | Richmond | ROSPC 023 Spring Creek | FC11/Ruby | J | Removing some Frame | Jason Bridges: Please remove the following lumber from all Ruby “J” elevations (5) 2x4x14 spruce (5) 2x4x14 syp (6) 2x6x10 spruce | 09/07/21 | 09/07/21 | ||||
| Complete | 09/01/21 | Joe | CC Homes | CCMA6 038 Maple Ridge | 55-W | 2 | Frame Materials | Joe Baller: Frame Short. Fill-In & Package Change: (7) 2x4x14 PT Need 9 total for package (0) 2x6x10 PT. Need 2 (0) 2x6x16 PT. Need 1 (0) 2x8x14 Spruce. Need 26 (6) 2x4x10 SYP. Need 15 (0) 2x4x14 SYP. Need 30 (5) 2x6x10 SYP. Need 15 (0) 2x6x14 SYP. Need 7 (2) 2x4x14 PT (2) 2x6x10 PT (1) 2x6x16 PT (26) 2x8x14 Spruce (14) 2x4x10 SYP (30) 2x4x14 SYP (15) 2x6x10 SYP (7) 2x6x14 SYP | 09/01/21 | 09/02/21 | ||||
| Complete | 08/31/21 | Steven Gilbert | Richmond | ROASQ 028 Arlington Square | FC11/Ruby | A | Removed 14 Bags of Preblend | Steven Gilbert: 28 bags leftover remove 14 bags of mortar from package. Remove 14 bags of mortar from package. | 08/31/21 | 08/31/21 | ||||
| Waiting | 08/30/21 | Steven Gilbert | Richmond | ROFLK 170 Forest Lake | F926/Emerald | K | Precast Changes | Steven Gilbert: Precast order missing precast and sills Add (1) 3’6” precast for total of 2 Add (2) 3’1” sills for total of 5 Remove (1) 2’2.5” sill for a total of 1 | 08/30/21 | |||||
| Complete | 08/30/21 | Jack Corrigan | Richmond | RORVC 021 River Chase | F929/Pewter | A | Door Bucks for RV Garage Option | Jack Corrigan: Missing garage door bucks for RV garage. Missing RV garage door bucks on the take off. I will pick up from BFS today if possible. Thank you. (4) 2x8x16PT (2) 2x8x14 pt | 08/30/21 | 08/30/21 | ||||
| Complete | 08/25/21 | John Rathbun | Surrey Homes | SOSVL A04 Savannah Landing | Seascape | A&B | Hardware (SPH6) | John Rathbun: I need 50 more SPH6 sent out . Needed at top and bottom of all bearing wall studs. Please add 50 SPH6 to the seascape model for a new total of 110. On A&B elevations Needed at top and bottom of all bearing wall studs | 08/25/21 | 08/25/21 | ||||
| Complete | 08/25/21 | John Rathbun | Surrey Homes | SOSVL A04 Savannah Landing | Seascape | A&B | (1) 2x12x12 SYP for Bearing Wall | John Rathbun: I need one 2x12x12 syp for a bearing wall header sent out . And one added to the seascape model A&B elevation. New total of one. Bearing wall header needed . Zero in P.O. | 08/25/21 | 08/25/21 | ||||
| Complete | 08/17/21 | John Rathbun | Surrey Homes | SOSVL B08 Savannah Landing | Harbor | A&B | Masonry Changes | John Rathbun: Extra block and mud left over Please remove 72 regular block for a new total of 2266 . Please remove 42 bags of preblend for a new total of 146 | 08/17/21 | 08/17/21 | ||||
| Complete | 08/16/21 | Carlos Garcia | Richmond | ROMPT 009 Mattie Pointe | F913/Pearl | E | F913-E | Masonry Changes | Carlos Garcia: Extra materials left over and building is complete. Remove five bags of mortar, and 30 regular block from takeoff | 08/16/21 | 08/16/21 | |||
| Complete | 08/16/21 | Kyle Jolly | Minto | NDLTS 1724 Latitudes | 50-179-II | B | Added (1) LGT3 | Kyle Jolly: Frame hardware pack change. I did this change on a house in phase 4 but I guess it did not go thru. LGT3 added to plans for truss tie down. +1 LGT3 | 08/16/21 | 08/16/21 | ||||
| Complete | 08/10/21 | Kyle Jolly | Minto | NDLTS 1724 Latitudes | 50-179-II | B | Precast Changes | Kyle Jolly: Package is a little off causing all of my other surrounding houses precast to be raided 13’4” header +1 total of 1 8’8” header +1 total of 2 4’6” header -3 total of 7 3’1”sill -2 total of 8 | 08/10/21 | 08/10/21 | ||||
| Complete | 08/10/21 | Steven Gilbert | Richmond | ROFLK 169 Forest Lake | F924/Ammolite | K | Precast Changes | Steven Gilbert: Precast package adjustments: Remove (2) 10’6” precast Add (1) 7’6” precast Remove (2) 3’1” sills Add (2) 2’2.5” sill Add (1) 6’2” sill Remove (4) 4’5” sills | 08/10/21 | 08/10/21 | ||||
| Complete | 08/10/21 | Steven Gilbert | Richmond | ROFLK 200 Forest Lake | F924/Ammolite | L | Precast Changes | Steven Gilbert: Precast package wrong: Add (1) 6’2” sill total Add (1) 7’6” precast Remove (1) 5’4” precast Add (2) 2’2.5” sills Remove (2) 3’1” sills | 08/10/21 | 08/10/21 | ||||
| Complete | 08/10/21 | Steven Gilbert | Richmond | ROVD3 027 Vista Del Lago 3 | F927/Slate | C | Precast Changes | Steven Gilbert: To many precast and sills. Remove (1) 4’6” precast Remove (1) 3’1” sill | 08/10/21 | 08/10/21 | ||||
| Complete | 08/05/21 | Jason Bridges | Dream Finders | DOTAL 045 Talichet | Avalon-I | B | Slab Prep Material | Jason Bridges: Add (5) #5 rebar 20’ length grade 60 to all elevations for the Avalon model Add (30) rod chairs 12” 2 bar to all elevations for Avalon model Crews are taking materials from jobs not passed plumbing and using them to finish preps. | 08/05/21 | 08/10/21 | ||||
| Complete | 08/02/21 | Brian Dinker | Minto | NDLTM 1908 Latitudes | Villa 9 | B | Masonry Steel Changes | Brian Dinker: Down rods are not correct on take off. Please remove 13’ down rods and 8’ down rods. Need to bring 9’ down rods to a total of 105 Need to add (6) 10’1” for columns. | 08/02/21 | 08/02/21 | ||||
| Complete | 08/02/21 | Steven Gilbert | Richmond | ROFLK 187 Forest Lake | F913/Pearl | L | Adding 1 6'-" Header | 08/02/21 | 08/02/21 | |||||
| Complete | 07/22/21 | Luis Umpierre | Mattamy Homes | MOSL2 021 Solara | 6 Unit | (QEFFEQ) MD | MO-6-Unit (QEFFEQ) MD | (35) 2x8x14 PT for Ledgers | Luis Umpierre: Need these lumber for my ledgers. Not on the POs. (35)2”x 8”x 14’ PT | 07/22/21 | 07/22/21 | |||
| Complete | 07/22/21 | John Rathbun | Surrey Homes | SOSVL A06 Savannah Landing | F913/Pearl | A | RA-Pearl-F913-A & Cost Group | (1) 9'-4" Header & (1) 4'-5" WRF Sill | John Rathbun: The pearl A elevation is missing one 9-4 header that goes from entry column to the house on the front porch . Need to add one to the A elevation package for a new total of 1 . I have not built a B elevation and do not have access to the base plans to even see the B elevation. Also need a fill in P.O. Sent over to Lott’s for one 9-4 header that was short on the takeoff . and one 4-5 sill that was broken . Could not tell if it was broken on delivery or if the mason broke it . It was on the very bottom of the pile . I am heading to pick this up now . | 07/22/21 | 07/22/21 | |||
| Complete | 07/22/21 | John Rathbun | Surrey Homes | SOSVL A06 Savannah Landing | F913/Pearl | A | RA-Pearl-F913-A & Cost Group | #5 20' in Slab Pack | John R: Need to add 10 bars of #5 20’ to the pearl model A elevation Precast/masonry steel for a new total of 40 bars. This might also apply to a B elevation . Not sure yet as we have not built one yet and I can not see the base plans to see for myself. | 07/22/21 | 07/22/21 | |||
| Complete | 07/21/21 | John Rathbun | Surrey Homes | SOSVL A02 Savannah Landing | Sanctuary | B | SO-Sanctuary-B, & Cost Group | Masonry Changes | John Rathbun: Sanctuary model B elevation only masonry materials package change. Remove 288 regulars new total of 2399 Remove 50 half block new total of 174 Add 55 four high block new total of 71. Add 30 six high block new total of 30. Remove 50 bags of preblend new total of 163. | 07/21/21 | 07/23/21 | |||
| Complete | 07/21/21 | Steven Gilbert | Richmond | ROFLK 060 Forest Lake | F924/Ammolite | K | RA-F924-K*** | Adding 80 H8s | 07/21/21 | 07/21/21 | ||||
| Complete | 07/21/21 | Hermes | Bella Vista Building Group | BVSER 007 Serenity Reserve | Harmony | C | Harmony-C SR (1 Story) | 5/8 CDX & 7/16 Zip for Crickets | 07/21/21 | 07/21/21 | ||||
| Complete | 07/15/21 | John Rathbun | Surrey Homes | SOSVL B08 Savannah Landing | Harbor | A&B | SO-Harbor-A*** | Slab Prep Changes, Visqueen | John Rathbun: Slab prep package change Harbor model A&B elev. Remove one roll of 10x100 visqueen. New total of zero. Add one roll of 20x100 visqueen. New total of 2 rolls. Please update and release slab prep materials. Ran short on the last slab prep we did for this model. | 07/15/21 | 07/15/21 | |||
| Complete | 07/15/21 | Kyle Jolly | Minto | NDLTS 1723 Latitudes | 50-179-II | A | 50-179-II-A*** | Masonry Changes | 07/15/21 | 07/19/21 | ||||
| Complete | 07/13/21 | John Rathbun | Surrey Homes | SOSVL A13 Savannah Landing | Harbor | A | SO-Harbor-A*** | Slab Prep Changes, Dowels | John Rathbun: Slab prep material change Harbor model I need 20 1x4 dowels removed I need 20 1x5 dowels added We need 1x5 dowels at the garage curbs and columns. Not enough projection to achieve the correct lap. Please update and release P.O. | 07/13/21 | 07/13/21 | |||
| Review | 07/06/21 | Mike Boyce | David Weekly | VSPAV 088 Payne Park | 7758/7757 | B | DW-7758-7757-B (Titan) | Frame Package Change | Mike Boyce: Package Change & Fill-In Request: Short Framing, Possible Takeoff Error, Possible Plan Change? Fill-In ($13,600+): 250 2x8x10 SYP 128 2x6x14 SYP 88 2x8x12 SYP 16 2x8x14 SYP 10 2x6x12 PT 12 2x4x14 PT 25 1/2 x4x8 fire rated plywood Package Change Request: 2x8x10 SYP old:0 new:250 2x6x14 SYP old:109 new:329 2x8x12 SYP old:32 new:120 2x8x14 SYP old:5 new:21 2x6x12 PT old:0 new:10 2x4x14 PT old :12 new:24 1/2x4x8 fire rated plywood old:35 new:60 | 07/06/21 | ||||
| Complete | 07/01/21 | John Rathbun | Surrey Homes | SOSVL B11 Savannah Landing | Seascape | B | Spruce Changes | John Rathbun: Ceiling height jumps up at the front entry. They are using fascia materials to frame the entry walls . As for the 92 5/8 precuts. The estimate needs to be checked. I bet Plantz estimated this and the estimating template has an error. If there is no 8’ walls segmented on the interior walls page and it is showing on the calc sheet. It is an error. This will apply to A and B elevations Remove all 2x4 & 2x6x 92 5/8 Spruce precuts. Total of zero on each item Add 25 pieces of 2x6x14 spruce. new total of 51 Add 15 pieces of 2x4x12 spruce. New total of 115 | 07/01/21 | 07/07/21 | ||||
| Complete | 07/01/21 | Joe Baller | CC Homes | CCMA6 152 Maple Ridge | 55-G | 2 | CC-DEVCO-55-G2 (1 Story) | H2.5T | Joe Baller: 0 H2.5 in hardware package 30 H2.5 | 07/01/21 | 07/01/21 | |||
| Complete | 07/01/21 | Joe Baller | CC Homes | CCMA6 020 Maple Ridge | 55-F | 3 | CC-DEVCO-55-F3 (1 Story) | H2.5T | Joe Baller: 0 H2.5 in hardware package 30 H2.5 | 07/01/21 | 07/01/21 | |||
| Complete | 07/01/21 | Kyle Jolly | Minto | NDLTS 1676 Latitudes | 40-176-II | A | ND-LTS-40-176 II-A | Adding 45 Degree Block | Kyle Jolly: Masons run short 45° block on this house. Not enough 45° block. 112 total 45° block on this back Old 40 New 112 | 07/01/21 | 07/01/21 | |||
| Review | 07/01/21 | Mike Boyce | David Weekly | VSPAV 090 Payne Park | 7760/7760 | B | DW-7760-7760-A&B Angie's Est (3 Story 2x6) | 3rd Floor Frame Materials | Mike Boyce: Fill in/ Package change. 3rd floor framing material not on PO. 60. 2 x 8 x 12 SYP old 0 new 60 10. 2 x 8 x 14 SYP old 0 new 10. 80. 2 x 4 x 10 spruce. Old 0. New 80. | 07/01/21 | ||||
| Complete | 06/30/21 | Luis Umpierre | Mattamy Homes | MOWAT 021 Waterbrooke | 6 Unit, C-C-A-A-C-S | CR | Mattamy - C,C,A,A,C,S - CR | ABU44Z | Luis Umpierre: Need Tapcons for loggers & front door bucks Need buckets for 4x4post. (14) ABU44Z Simpson 4x4 post buckets (400) 1/4x 31/4 hex nut Tapcons (200) 1/4x 13/4 hex nut Tapcons ----------------------------------------------------------- Notes:(Adam) The Hardware PO on this job went to CM w/ Trekker Materials and Pricing and was accepted. The ABU44Z are missing from the HW package for sure (there are 14 posts in the frame pack). Not 100% sure about the tapcons. | 06/30/21 | 06/30/21 | |||
| Review | 06/29/21 | Luis Umpierre | Mattamy Homes | MOWAT 024 Waterbrooke | 6 Unit, C-C-A-A-C-C | MO-WAT 6-Unit (CCAACC) | Removing a lot of Frame | Luis Umpierre: A lot of material left over after completion of building. Please remove from frame drop 1 - 50 sheets of 4 x 8 x 15/32 OSB for 134 total, 200 PCs of 2 x 4 x 16 Southern yellow Pine for 450 total, 20 pieces of 1 x 2 x 12 PT for 776 total. Then add 30 sheets of fire rated plywood for 104 total to frame drop 1. Please remove from frame drop 2- 50 sheets of 15/32 OSB for 212 total, 200 pieces of 2 x 4 x 16 SYP for 450 total 50 pieces of 2 x 4 x 14 SYP for 286 total. Then add 30 sheets of fire rated plywood for 104 total to drop on Frame 1 | 06/29/21 | |||||
| Complete | 06/28/21 | Scott Bierd | Richmond | ROLKS 139 Lake Smart | F927/Slate | A | RA-Slate-F927-A*** | Short Pre-Blend | Scott Bierd: Four straight slate models I’ve needed 15 bags of preblended morter type S 80 lb bags. | 06/28/21 | 06/28/21 | |||
| Review | 06/28/21 | Mike Boyce | David Weekly | VSPAV 090 Payne Park | 7760/7760 | B | DW-7760-7760-A&B Angie's Est (3 Story 2x6) | Frame Package Change | Mike Boyce: Fill in Package change. Short ordered material some items not on PO Different print used for take off? 128. 2 x 6 x 10 SYP old 3 new 131 30. 2 x 4 x 14 SYP old 82 new 112 16. 2 x 12 x 14 SYP old 0 new 16 2. 2 x 6 x 16 PT borate old 0 new 2 4. 2 x 6 x 12 pt borate old 4 new 8 12. 2 x 8 x 14 pt old 2 new 14 35. 1/2” x 4 x 8 fire rated plywood old 0 new 28 | 06/28/21 | ||||
| Complete | 06/25/21 | John Rathbun | Surrey Homes | SOSVL B14 Savannah Landing | F913/Pearl | A | SO-Pearl-A | Change Ply Clips | John Rathbun: I need plyclips changed from 7/16 to 5/8 on all models out here. Pearl, Harbor, cove, sanctuary, and the seascape model. All elevations | 06/25/21 | 06/28/21 | |||
| Complete | 06/24/21 | Scott Bierd | Richmond | RORVS 019-07 Riverstone | F914/Moonstone | D | RA-Moonstone-F914-D*** | Missing Ply Clips | Scott Bierd: Fill in and package change: There is no plywood clips on the PO. 2 boxes 7/16 of plywood clips. | 06/24/21 | 06/24/21 | |||
| Complete | 06/24/21 | Scott Bierd | Richmond | RORVS 002-10 Riverstone | F924/Ammolite | C | RA-Ammolite-F924-C *** | Hardware | Scott Bierd: Fill in and package change: 30 wedge anchors 40 2”x2”x1/2” washers, we already have 10 on the takeoff, need to add 30 10 HTS20 twist straps 8 MSTAM36” flat strap Wood to masonry 25 MTS12 twist strap 10 LSTA 36” Flat strap, we already have 58 on takeoff only need 10 50 H3 truss strap 40 sp1 wall strap 100 SP2 wall strap Need 2 boxes of plywood clips ,these are already on takeoff, but they have been used on several other houses. | 06/24/21 | 06/24/21 | |||
| Complete | 06/22/21 | Carlos Garcia | Richmond | ROSPC 095 Spring Creek | F927/Slate | H | RA-Slate-F927-A A3/O8 | Removing Misc. Frame | Carlos Garcia: Need to remove approximately: (-12) 1x2x? Furring Strips (-2) 2x8x14' PT (-1) 2x6x12' PT (-2) 2x6x16' Spruce (-40) 2x4x?' Yellow Pine | 06/22/21 | 06/22/21 | |||
| Review | 06/22/21 | Carlos Garcia | Richmond | ROSPC 078 Spring Creek | FC11/Ruby | G | RA-Ruby-FC11-G*** | Removing 7/16 OSB | Carlos Garcia: Approximately 45 sheets left over and this house is completed. I believe it may just be this elevation G that I am not sure we have seen before or me at least. Note: Currently, (124) Sheets of 7/16" OSB in the FC11/Ruby G Templates. | 06/22/21 | ||||
| Complete | 06/22/21 | Carlos Garcia | Richmond | ROSPC 098 Spring Creek | FC11/Ruby | J | RA-Ruby-FC11-J*** | (+25) 2x4x14 Spruce | Carlos Garcia: Please add 25 pieces of 2 x 4 x 14‘ spruce to the takeoff. This is requested by the framer who confirmed the overages on the first two package changes today. Verified by Framer working at home that he needs more 14 foot 2 x 4 for interior framing Note: Currently (49) in the package. | 06/22/21 | 06/22/21 | |||
| Complete | 06/18/21 | John Rathbun | Surrey Homes | SOSVL A05 Savannah Landings | Harbor | A | SO-Harbor-A + Cost Groups | Slab Prep Package Change | John Rathbun: This will apply to the A and B elevation. remove 16” 3 bar chairs. Change Bar ties from 6 “ to 8” Remove all corner bars. | 06/18/21 | 06/18/21 | |||
| Review | 06/17/21 | Steven Gilbert | Richmond | RPASQ 048 Arlington Square | FC11/Ruby | C | RA-Ruby-FC11-C (Metal Interior) *** | Need studs for door jams | Steven Gilbert: Need wood studs for door jams. And buck for garage doors. (40) 2x4x108” - For Door Jams. (2) 2x8x8’ PT - For Office Top of Block for Door | 06/17/21 | ||||
| Complete | 06/17/21 | Steven Gilbert | Richmond | RPASQ 048 Arlington Square | FC11/Ruby | C | RA-Ruby-FC11-C (Metal Interior) *** | 16" Katz too short. Need 24" | Steven Gilbert: Need 24” Katz not 16” Katz please create p.o. For 20 to be delivered to lot 48. (20) Katz-24” 25 gauge) add (20) Katz-16” (25 gauge) remove | 06/17/21 | 06/18/21 | |||
| Review | 06/15/21 | Mike Boyce | David Weekly | VSPAV 078 Payne Park | 7760/7759 | B | DW-7759-7760-A (3 Story 2x4) | 2 x 6 x 10 SYP | Mike Boyce: After framing partial 2 floor exterior walls realized short 2 x 6 x 10 SYP. Noticed on BT the schedule of events is only layed out for two story unit. Package Change & Fill-In: (148) 2 x 6 x 10 SYP. (72) Sub floor adhesive 28 oz. old 0 new 72 No sub floor glue on PO. Short 2 x 6 x 10 SYP for exterior structural framing. | 06/15/21 | ||||
| Complete | 06/09/21 | Carlos Garcia | Richmond | RORVS 013-10 Riverstone | F927/Slate | J | RA-Slate-F927-J | Removing Materials | Carlos Garcia: Extra materials. Adjust the following: Hardware: Delete all 1/4x3-3/4 Tapcons for 0 total 1/4x3-1/4 change from 26 to 100 2x2 washers change from 10 to 12 HGA10KT change from 2 to 1 HUC412 change from 2 to 0 add 10 pcs mts12 for valley blocking and remove meta12 from 2 to 0 this is all base takeoff Lumber: delete 34 pcs 1x2 from 178 to 144 total from base Options: 2x2 square washers from 3car from 10 to 12 Delete all 4 meta12 from 3rd car to 0 delete 1 box of plywood clips from 3rd car to 0 | 06/09/21 | 06/10/21 | |||
| Complete | 06/08/21 | Joe Baller | CC Homes | CCMA6 140 Maple Ridge | 55-R | 1 | CC-DEVCO-55-R1 (1 Story) *** | HUC210-2 | Joe Baller: Fill-In & Package Change: Need 2 huc 210-2 added to hardware package. | 06/08/21 | 06/08/21 | |||
| Complete | 06/08/21 | Joe Baller | CC Homes | CCMA6 009 Maple Ridge | 55-D | 2 | CC-DEVCO-55-D2 (2 Story) *** | HUC210-2 | Joe Baller: Fill-In & Package Change: Need 1 huc 210-2 for porch header. Design flaw CC homes. | 06/08/21 | 06/08/21 | |||
| Complete | 06/07/21 | Brian Dinker | Minto | NDLTS 1681 Latitudes | 40-176-II | B | NDLTS - 40-176-II-B *** | No 45 Degree Block | Brian Dinker: Best block fill in order/ package change. No 45 degree block. Need (200) 45 degree block. Old (0) new (112) for package change on this lot. | 06/07/21 | 06/08/21 | |||
| Complete | 06/07/21 | Joe Baller | CC Homes | CCMA6 137 Maple Ridge | 55-F | 1 | CC-DEVCO-55-F1 (1 Story) | Need H2.5T Clips | Joe Baller: No h2.5 in hardware package. Need 25. | 06/07/21 | 06/07/21 | |||
| Complete | 06/07/21 | Joe Baller | CC Homes | CCMA6 027 Maple Ridge | 55-G | 1 | CC-DEVCO-55-G1 (1 Story) | Need H2.5T Clips | Joe Baller: No h2.5 in hardware package. Need 25. | 06/07/21 | 06/07/21 | |||
| Complete | 06/07/21 | Brian Dinker | Minto | NDLTS 1681 Latitudes | 40-176-II | B | NDLTS - 40-176-II-A *** | 45 Degree Block | Adam Sowers: 45 Degree Block Total should be 80 on each 40-176 Elevation/Template/CostGroup | 06/07/21 | 06/08/21 | |||
| Complete | 06/07/21 | Brian Dinker | Minto | NDLTS 1681 Latitudes | 40-176-II | B | NDLTS - 40-176-A *** | 45 Degree Block | Adam Sowers: 45 Degree Block Total should be 80 on each 40-176 Elevation/Template/CostGroup | 06/07/21 | 06/08/21 | |||
| Complete | 06/04/21 | Steven Gilbert | Richmond | ROFOR 040 Forest Gate | F937/Pine | B | RA-F937-Pine-B | Missing LVLs | Adam Sowers: I had a request come in from Steven on this lot for (3) 9.25 x 10’ LVLs that he said are missing and sent me a detail photo where it is calling them out. | 06/04/21 | OK | |||
| Complete | 05/27/21 | Angela A. | Dream Finders | DOFER 238 Fernanda | Poinciana | A | DF-Poinciana (All) | Option / Selection | Adam Sowers: Angela found a PO on this job that has an option removing the wrong sized header (not in the base). The option was removing a 9'-4" header but there is no 9'-4" header in the base. It needs to be removing (1) 7'-6" instead. The PO has already been accepted so I am waiting to hear back from the field if the materials have been delivered or not to determine how to adjust the PO to make the correction. I will be updating the selection/option (DF-9080SGD) to replace thew 9'-4" with the 7'-6" and change the name to: DF-Poinciana-9080SGD. | 05/27/21 | NA | 05/27/21 | ||
| Complete | 05/27/21 | Joe Baller | CC Homes | CCMA6 137 Maple Ridge | 55-F | 1 | CC-DEVCO-55-F1 (1 Story) | Hardware | Joe Baller: Not enough borate lumber in package for garage door bucks. 1 16’ 2x6 borate (Materials sent but Change not made) 2 10’ 2x6 borate (Materials sent but Change not made) 2 Huc 210-2 (Change made +2) 1 box 1/4 x 3 1/4 tapcons (Change made +1) Package Change made to all 55-F1 Templates | 05/27/21 | 05/27/21 | |||
| N/A - Closed | 05/24/21 | Bill H. | Walters Construction | WCWAL 1702 Custom | Custom | Custom | N/A | Frame & Hardware | Bill H: Materials that are short and needed to finish framing: (30) 2X4X14 Spruce (12) 2X6X12 Pt (10) 2X8X10Pt (100) 1/2”X7” Red Heads with Square Washers (30) MTS12 (20) MTS16 | 05/24/21 | ||||
| N/A - Closed | 05/24/21 | Bill H. | Walters Construction | WCWAL 826 Edwards | Custom | Custom | N/A | Frame & Hardware | Bill H: Framing and Hardware needed to finish framing: (12) 2X6X12 Pt (10) 2X8X10Pt (100) 1/2”X7” Red Heads with Square Washers (30) MTS12 (20) MTS16 | 05/24/21 | ||||
| Review | 05/13/21 | Scott Bierd | Richmond | RORVS 010-10 Riverstone | F924/Ammolite | C | RA-Ammolite-F924-C | Hardware Changes | Scott Bierd: Fill in package change: 25 2”x2”x1/2” square washer 25 1/2” x7”. Anchor bolts 27 MTS12. Straps 12-HTS20 straps 10-MSTAM36 flat strap 2 DTT2Z Notes: Materials sent. I asked Scott if he knows if this is for the Base or Options releated and he said it's for the Base but there are 8 options on the job so Package Change needs review. | 05/13/21 | ||||
| N/A - Closed | 05/13/21 | Bill H. | Walters Construction | WCWAL 1702 Custom | Custom | Custom | N/A | 2x6 Post Bases | Bill H: I have four 6X6 Pt posts on the front porch and no post bases. I need 4–ABU66’s I need these sent over to CM ASAP. As I am swinging trusses now. (materials sent) | 05/13/21 | ||||
| Review | 05/12/21 | George Pyle | Surrey Homes | SOSVL A11 Savannah Landing | Sanctuary | A | SO-Sanctuary-A | Fascia & Studs | Adam Sowers: Materials requested / sent: (25) 2x6x14 (30) 2x4x12 | 05/12/21 | ||||
| Review | 05/10/21 | Joe Baller | CC Homes | CCMA6 153 Maple Ridge | 55-G | 3 | CC-DEVCO-55-G3 (1 Story) | No H2.5's in package | Adam Sowers: Need 25 H2.5 for valley trusses added to package | 05/10/21 | ||||
| Review | 05/10/21 | Kyle Jolly | Minto | NDLTS 1666 Latitudes | 40-178-II | B | NDLTS-40-178-II-B | Missing (1) 17'-4" Header | 05/10/21 | |||||
| Review | 05/10/21 | Ryan Corrigan | Richmond | RORVC 053 River Chase | Different RV Option | Jack Corrigan: This model has an RV garage with openings on both ends. I need the 2x8 bucks for the other side of the garage. (2) 2x8x16 pt (2) 2x8x12 pt | 05/10/21 | |||||||
| Pending | 05/06/21 | Kyle Jolly | Minto | NDLTS 1956 Latitudes | 40-176-II | A | NDLTS-40-176-II-A | Slab Concrete Over | Adam Sowers: This is a 176 A 2 model and this is the second time I’ve gone over on slab mud by this much. Po called for 53 yards. We poured 60. Gone over on slab mud twice on this model Would like to correct. Slab concrete Old 53yards New 59yards | 05/06/21 | ||||
| Pending | 05/06/21 | John Burkett | Mattamy Homes | MOMER 012 Meridian | 4 Unit | MAAC/CO | Fire Caulk for Inspection | Adam Sowers: No fire caulk in Job/POs for firewalls. Needed for inspection. John Burkett says that he can't go vertical without it. (25) tunes for caulk (Requested) (25) 11oz tubes (Sent) | 05/06/21 | OK | ||||
| Pending | 05/06/21 | Joey Ramos | Mattamy Homes | ? | ? | ? | ? | Anchors / J-Bolts | Adam Sowers: Adam on these jobs the 10” anchors (j bolts) do not work we need only 8” anchors Also the 3 bar chairs need doubled order if you use 1 chair the weight of the rebar will crush them so we have to double them up thanks. Joey said this applies to all Multi-Familys & Customs that he is on. He mentioned: Gramercy Farms(complete?), Tohoqua(complete?), and Meridian (only one left). | 05/06/21 | OK for Meridian | |||
| Review | 05/05/21 | Joey Ramos | David Weekly | VOLAP 002 Laureate Park | 4 Unit | N/A | VOLAP-4-Unit | Wedge/Anchor Bolts Swap | Adam Sowers: Guys need wedge anchors for the party walls. They sent. J bolts. But we are not wet setting them because of the difficulty when they are pouring the slab. 200 pcs of 1/2" red head wedge anchors. | 05/05/21 | ||||
| Complete | 05/05/21 | Joe Baller | CC Homes | CCMA6 036 Maple Ridge | 55-H | 3 | CC-DEVCO-55-H3 (2 Story) | Need more PT | Adam Sowers: Not enough borate lumber in package 8 14’ 2x4 borate 1 16’ 2x6 borate 2 10’ 2x6 borate No Old/New Total Counts included. We've had this same request for multiple models/elevations in this community for door bucks. | 05/05/21 | OK - by conversation with John R. | 05/12/21 | ||
| Review | 05/04/21 | John Burkett | Bella Vista Building Group | BVSOD 001 SODO House | 6 Unit | A-B-C-C-B-A | N/A | META 20 Straps | Adam Sowers: (149) Meta 20 straps on take off we need (200) more for new total of (349). | 05/04/21 | …. | |||
| Review | 05/03/21 | Joey Ramos | David Weekly | VOLAP 002 Laureate Park | 4 Unit | N/A | VOLAP-4-Unit | Frame Materials Short | Adam Sowers: (432) pcs of 2x6x10 southern yellow pine (80) pcs of 2x6x14 southern yellow pine (10)pcs. 2x6x10 PT No Old/New Total Counts submitted however materials were sent. No other details. | 05/03/21 | ||||
| Review | 04/27/21 | Brian Dinker | Minto | NDLTM 1910 Latitudes | Villa 7 | A | ND-Villa-7-A | Precast Changes | Adam Sowers: Screen lanai and sliding glass door changes. Need to check options. Screen lanai porches have been extended and sliding glass doors have been changed. Check options. Need 12’0 precast old (0) new (1) Need 13’4” precast old (2) new (3) Please remove 9’4” precast | 04/27/21 | ||||
Please add and additional 20 twist straps to the p.o. bringing the total to 50 per house moving forward. Also please create a fill in for this house for 20 more twist straps, and an additional 20 twist straps for 1296 as well.
We also need to change the total hurricane clip count to 250. I will need an additional (fill in) 150 for this house and 1296. For 1294 we need the total 250 because the original 100 were used at 1308.
*Update: Ross now says this is for all models/elevations.
----------------------------------------------------------------------
Package Change affects (3) Cost-Groups (Adam).
HDW.NDICP-1A (12"PARTY WALL).WHITECAP
H3: Old: 73, New: 250
HTS20: Old: 37, New: 50
HDW.NDICP-1B (12"PARTY WALL).WHITECAP
H3: Old: 150, New: 250
HTS20: Old: 37, New: 50
HDW.NDICP-1C (12"PARTY WALL).WHITECAP
H3: Old: 108, New: 250
HTS20: Old: 30, New: 50
----------------------------------------------------------------------
*Update: Ross says this is for all models/elevations.
*Update: Package Change Affected (11) Cost-Groups Total (AS).
HDW.NDICP-2A (12"PARTY WALL).WHITECAP
H3: Old: 50, New: 250
HTS20: Old: 49, New: 50
HDW.NDICP-2B (12"PARTY WALL).WHITECAP
H3: Old: 69, New: 250
HTS20: Old: 49, New: 50
HDW.NDICP-2C (12"PARTY WALL).WHITECAP
H3: Old: 36, New: 250
HTS20: Old: 65, New: 50
HDW.NDICP-3A (12"PARTY WALL).WHITECAP
H3: Old: 62, New: 250
HTS20: Old: 37, New: 50
HDW.NDICP-3B (12"PARTY WALL).WHITECAP
H3: Old: 60, New: 250
HTS20: Old: 37, New: 50
HDW.NDICP-3C (12"PARTY WALL).WHITECAP
H3: Old: 64, New: 250
HTS20: Old: 46, New: 50
HDW.NDICP-4A (12"PARTY WALL).WHITECAP
H3: Old: 61, New: 250
HTS20: Old: 49, New: 50
HDW.NDICP-4B(12"PARTY WALL).WHITECAP
H3: Old: 72, New: 250
HTS20: Old: 49, New: 50