History of Package Changes in BuilderTrend.

StatusRequestedByBuilderBT JobModelElevationAffectsShort DescriptionDetailsRev ReqReviewedByCompleted
Complete10/31/23Ross JohnsonMintoNDICP 1294 Isles of CollierALLALLHardware ***Adding H3's & HTS20's
Ross Johnson:
Please add and additional 20 twist straps to the p.o. bringing the total to 50 per house moving forward. Also please create a fill in for this house for 20 more twist straps, and an additional 20 twist straps for 1296 as well.

We also need to change the total hurricane clip count to 250. I will need an additional (fill in) 150 for this house and 1296. For 1294 we need the total 250 because the original 100 were used at 1308.

*Update: Ross now says this is for all models/elevations.
----------------------------------------------------------------------
Package Change affects (3) Cost-Groups (Adam).

HDW.NDICP-1A (12"PARTY WALL).WHITECAP
H3: Old: 73, New: 250
HTS20: Old: 37, New: 50

HDW.NDICP-1B (12"PARTY WALL).WHITECAP
H3: Old: 150, New: 250
HTS20: Old: 37, New: 50

HDW.NDICP-1C (12"PARTY WALL).WHITECAP
H3: Old: 108, New: 250
HTS20: Old: 30, New: 50
----------------------------------------------------------------------
*Update: Ross says this is for all models/elevations.
*Update: Package Change Affected (11) Cost-Groups Total (AS).

HDW.NDICP-2A (12"PARTY WALL).WHITECAP
H3: Old: 50, New: 250
HTS20: Old: 49, New: 50

HDW.NDICP-2B (12"PARTY WALL).WHITECAP
H3: Old: 69, New: 250
HTS20: Old: 49, New: 50

HDW.NDICP-2C (12"PARTY WALL).WHITECAP
H3: Old: 36, New: 250
HTS20: Old: 65, New: 50

HDW.NDICP-3A (12"PARTY WALL).WHITECAP
H3: Old: 62, New: 250
HTS20: Old: 37, New: 50

HDW.NDICP-3B (12"PARTY WALL).WHITECAP
H3: Old: 60, New: 250
HTS20: Old: 37, New: 50

HDW.NDICP-3C (12"PARTY WALL).WHITECAP
H3: Old: 64, New: 250
HTS20: Old: 46, New: 50

HDW.NDICP-4A (12"PARTY WALL).WHITECAP
H3: Old: 61, New: 250
HTS20: Old: 49, New: 50

HDW.NDICP-4B(12"PARTY WALL).WHITECAP
H3: Old: 72, New: 250
HTS20: Old: 49, New: 50
10/31/2310/31/23
Complete10/31/23Ross JohnsonMintoNDICP 1298 Isles of CollierCottage 2BHardware ***Remove All A34/A35
Ross Johnson:
Please remove all a34 framing anchors from future hardware p.o.'s

-----------------------------------------------------------------
Notes: * None of the CGs have A34s (must have already been removed). * Some of the CGs have A35s. Ross says to remove them (Adam).
-----------------------------------------------------------------

Package Change Affected (4) Cost-Groups (Adam).

HDW.NDICP-2A (12"PARTY WALL).WHITECAP
HDW.NDICP-4A (12"PARTY WALL).WHITECAP
A35: Old: 54, New: 0

HDW.NDICP-2B (12"PARTY WALL).WHITECAP
HDW.NDICP-4B(12"PARTY WALL).WHITECAP
A35: Old: 38, New: 0
10/31/2310/31/23
Complete10/31/23Jarrod RathbunMintoNDLTS 2952 Latitudes40-136AHardware ***Adding (1) HUC212-2 to each model/elevation
Jarrod Rathbun:
Package change for hardware/ fill in order - MINTO homes does not have a masonry to wood bucket where it needs to be per plan. We need one at the front entry here. Please order (15) LGUM210-2 buckets. And please make sure (1) is added to this model package for each lot moving forward.

Plans do not call for a bucket that NEEDS to be there.

-----------------------------------------------------------------------
* Notes - Kevin approved this package change onn 11/3 (AS)

* Notes - The bucket that's needed is not on the plans and it's needed because inspections are coming up and it enables Jarrod to attach on the wall without having to remove any other already built/attached items/materials. The item that's actually needed is the HUC210-2, but this will require additional work to remove materials already in place (Adam).

-----------------------------------------------------------------------

HDW.NDLTS40-136-A.WHITECAP
HDW.NDLTS40-136-B.WHITECAP
HUC212-2: Old: 0, New: 1

10/31/2311/03/23Kevin Bub11/06/23
Complete10/26/23Cyndi MulleeMintoNDLWS 370 WatersoundALLALLHardware ***Temporarily Removing All ABU66, SP4, HGA10
Cyndi Mullee:
Please remove the following hardware from takeoffs until further notice. All SP4, ABU66, HGA10.
------------------------------------------------------------------------

10/26/23 - Permission granted to run it (Adam)

* Permission/Under Review - Waiting on direction from Pete for how he'd like to handle this one (Adam)

------------------------------------------------------------------------

Affects (7 of 9) Cost-Groups.

HDW.NDLWS50-179-B.WHITECAP
ABU66: Old: 4, New: 0
HGA10KT: Old: 10, New: 0
SP4: Old: 46, New: 0

HDW.NDLWS50-179-II-A.WHITECAP
ABU66: Old: 4, New: 0
HGA10: Old: 1, New: 0
SP4: Old: 0, New: NA

HDW.NDLWS50-179-II-B.WHITECAP
ABU66: Old: 5, New: 0
HGA10: Old: 10, New: 0
SP4: Old: 4, New: 0

HDW.NDLWS50-181-A.WHITECAP
ABU66: Old: 7, New: 0
HGA10: Old: 1, New: 0
SP4: Old: 40, New:0

HDW.NDLWS50-181-B.WHITECAP
ABU66: Old: 6, New: 0
HGA10: Old: 4, New: 0
SP4: Old: 0, New: NA

HDW.NDLWS50-184-A.WHITECAP
ABU66: Old: 2, New: 0
HGA10: Old: 1, New: 0
SP4: Old: 0, New: NA

HDW.NDLWS50-184-B.WHITECAP
ABU66: Old: 2, New: 0
HGA10: Old: 7, New: 0
SP4: Old: 0, New: NA








10/26/2310/26/23
Complete10/20/23Dane JonesToll BrothersTBLPT 069 Laurel PointeMarsanneMOFrame ***Swapping LVL's in 1st Frame Drop
Dane Jones:
Wrong parallams on takeoff. Last fill in for parallams I did the size got changed. Framers already used the smaller ones in place of places that require (4)2x6 posts.

First lumber drop:
PO has (2) 5-1/4”x 5-1/4”x10’ parallams
Print calls for (2) 5-1/2”x7” parallams

NEED:
1) 5-1/2”x7”x12’
1) 5-1/2”x7”x10’

----------------------------------------------------------------------

FRMMAT-DROP1.TBLPT069.BFS
5.25 x 5.25 x 10' Parallams: Old: 2, New: 0
5.25 x 7 x 10' Parallams: Old: 0, New: 1
5.25 x 7 x 12' Parallams: Old: 0, New: 1
10/20/2310/20/23
Complete10/19/23Ross JohnsonMintoNDICP 1308 Isles of CollierCottage 2CFrame ***Removing 2x8's, Adding 2x4's, & 2x6's
Ross Johnson:
Carpenter has requested this change due to them cutting down 2x8’s for fascia backing instead of having the correct 2x6 size. Also not enough pt 2x4s on the current package. Moving forward we need to change the lumber package. We can erase the following 2x8’s:
(7) 2x8x8’ PT
(4) 2x8x10’ PT
(15) 2x8x16’ spruce #2
(2) 2x8x10’ YP
(3) 2x8x12’ YP

Please add to the framing PO:
2x6x14 - for fascia backing, they have been ripping down 2x8’s. 2x4x12 pt - for shear wall/ doors.
(45) 2x6x14 ?
(25) 2x4x12 PT

-----------------------------------------------------------------------
* Updated To-Do / Comment ****
after looking back through it, your numbers are correct. Not sure what I was looking at to get those mixed up but yes the quantities that you sent of those 2x8’s can all be removed. The only 2x8’s needed are (13) 2x8x12’ Pt and (2) 2x8x16 pt. All other 2x8’s can be removed -Ross

45) 2x6x14 PT*
(25) 2x4x12 PT
-----------------------------------------------------------------------
PO Quantities (NDICP 1308):
(7) 2x8x8’ PT ? ------------ 4 in PO (AS)
(4) 2x8x10’ PT ------------ 4 in PO (AS)
(15) 2x8x16’ spruce #2 ------------ 5 in PO (AS)
(2) 2x8x10’ YP ------------ 0 in PO (AS)
(3) 2x8x12’ YP ------------ 12 in PO (AS)
-----------------------------------------------------------------------

FRMMAT.NDICP-2C (12"PARTY WALL).84LUMBER
2x8x8’ PT: Old: 4, New: 0
2x8x10’ PT: Old: 4, New: 0
2x8x12’ PT: Old: 19, New: 13
2x8x16’ PT: Old: 4, New: 2
2x8x16’ spruce #2: Old: 5, New: 0
2x8x10’ SYP: N/A - Not in PO
2x8x12’ SYP: Old: 12, New: 0
2x4x12' PT: Old: 14, New: 39 (updated 10/24, AS)
2x6x14' PT: Old: 0, New: 45 (added 10/24, AS)
10/19/2310/24/23
Complete10/18/23Brian DinkerMintoNDLTM 3268 LatitudesVilla 12, Villa 12 IIA, BShaftwall ***Adding Fire Caulk
Brian Dinker:
No fire caulking on the denseglass package.
For this model. Need (10) 29 oz tubes.

-------------------------------------------------------------------

SHAFTWALL.NDLTM12-II-B/NDLTM12-II-B.INTERIOR/EXTERIOR
SHAFTWALL.NDLTM12-A/NDLTM12-II-A.INTERIOR/EXTERIOR
Fire Caulk (29oz Tube): Old: 0, New: 10
10/18/2310/18/23
Complete10/18/23Ross JohnsonMintoNDICP 1296 Isles of CollierAllAllHardware ***Removing all A34
Ross Johnson:
Please delete the 105 Simpson A34 framing angle bracket from all future hardware packages. None are needed.

-------------------------------------------------------------------
This package change affects 11 cost-groups (Adam)
-------------------------------------------------------------------
HDW.NDICP-1A (12"PARTY WALL).WHITECAP
HDW.NDICP-1C (12"PARTY WALL).WHITECAP
A34: Old: 105, New: 0

HDW.NDICP-1B (12"PARTY WALL).WHITECAP
A34: Old: 66, New: 0

HDW.NDICP-2A (12"PARTY WALL).WHITECAP
A34: Old: 30, New: 0

HDW.NDICP-2B (12"PARTY WALL).WHITECAP
A34: Old: 43, New: 0

HDW.NDICP-2C (12"PARTY WALL).WHITECAP
A34: Old: 141, New: 0

HDW.NDICP-3A (12"PARTY WALL).WHITECAP
A34: Old: 90, New: 0

HDW.NDICP-3B (12"PARTY WALL).WHITECAP
A34: Old: 69, New: 0

HDW.NDICP-3C (12"PARTY WALL).WHITECAP
A34: Old: 137, New: 0

HDW.NDICP-4A (12"PARTY WALL).WHITECAP
A34: Old: 45, New: 0

HDW.NDICP-4B(12"PARTY WALL).WHITECAP
A34: Old: 40, New: 0
10/18/2310/18/23
Complete10/17/23Ross JohnsonMintoNDICP 1310 Isles of CollierAllAllFrame ***Replacing 4x4 Posts with 2x4 and 1/2" CDX
Ross Johnson:
Per Minto USA, we are to change the 4x4 columns that we use for the porch column posts and install two 2x4's with a piece of 1/2" plywood sandwiched between the two. See photo for detail on materials.

-------------------------------------------------------------------------
Removing all 4x4 Posts and replacing each one with (2) 2x4x12 PT, and adding (1) sheet of 1/2" CDX (Should be enough for all columns per Sharon/Pete).

Package Change affected (14) Cost-Groups (AS).
-------------------------------------------------------------------------

FRMMAT.NDICP-1A (12"PARTY WALL).84LUMBER
FRMMAT.NDICP-1A (12"PARTY WALL).MARJAM
FRMMAT.NDICP-1B (12"PARTY WALL).84LUMBER
4x4x12 PT Posts: Old: 6, New: 0
2x4x12 PT: Old: 8, New: 20
1/2" CDX: Old: 0, New: 1

FRMMAT.NDICP-1C(12"PARTY WALL).84LUMBER
4x4x12 PT Posts: Old: 6, New: 0
2x4x12 PT: Old: 4, New: 16
1/2" CDX: Old: 0, New: 1

FRMMAT.NDICP-2A (12"PARTY WALL).84LUMBER
FRMMAT.NDICP-2A (12"PARTY WALL).MARJAM
FRMMAT.NDICP-2B (12"PARTY WALL).84LUMBER
4x4x12 PT Posts: Old: 5, New: 0
2x4x12 PT: Old: 6, New: 16
1/2" CDX: Old: 0, New: 1

FRMMAT.NDICP-2C (12"PARTY WALL).84LUMBER
4x4x12 PT Posts: Old: 5, New: 0
2x4x12 PT: Old: 4, New: 14
1/2" CDX: Old: 0, New: 1

FRMMAT.NDICP-3A/NDICP-3C (12"PARTY WALL).84LUMBER
4x4x12 PT Posts: Old: 3, New: 0
2x4x12 PT: Old: 2, New: 8
1/2" CDX: Old: 0, New: 1

FRMMAT.NDICP-3B (12"PARTY WALL).84LUMBER
FRMMAT.NDICP-3B (12"PARTY WALL).MARJAM
4x4x12 PT Posts: Old: 3, New: 0
2x4x12 PT: Old: 6, New: 12
1/2" CDX: Old: 0, New: 1

FRMMAT.NDICP-4A (12"PARTY WALL).84LUMBER
FRMMAT.NDICP-4A (12"PARTY WALL).MARJAM
FRMMAT.NDICP-4B(12"PARTY WALL).84LUMBER
4x4x12 PT Posts: Old: 8, New: 0
2x4x12 PT: Old: 8, New: 24
1/2" CDX: Old: 0, New: 1
10/17/2310/17/23
Complete10/03/23Cyndi MulleeMintoNDLWS 367 Watersound50-184A, BHardware ***Adding DTT2z and HTT5
Cyndi Mullee:
please add (2) DTT2z to future packages for this model. additionally this is the model that requires (8) HTT5 for the portal wall detail.

----------------------------------------------------------

HDW.NDLWS50-184-A.WHITECAP
HDW.NDLWS50-184-B.WHITECAP

DTT2Z: Old: 0, New: 2
HTT5: Old: 13, New: 21
10/03/2310/03/23
Complete09/29/23Bobby NellerMintoNDLTM 3270 LatitudesVilla 11A, BShaftwall Materials ***Adjusting Burn Clips
Bobby Neller:
Too many on the takeoff. Sending out too many burn clips on the villas like to remove 90. Old burn clips-190, New burn clips-100.

--------------------------------------------------------------------

SHAFTWALL.NDLTM11-A.INTERIOREXTERIOR
SHAFTWALL.NDLTM11-B.INTERIOREXTERIOR

Burn Clips: Old: 190, New: 100
09/29/2309/29/23
Complete09/29/23Pete/KevinMinto-All Single-FamiliesAllFrame ***Swapping 2x6x16 R/S Spruce to 2x8
Pete:
Adam - Please update the single family cost groups to swap out the 2x6 for 2x8 as well as making the changes at the job level.
-----------------------------------------------------------------------
Note: This Affects 78 Cost-Groups! (Adam)
Waiting on pricing from Marjam for the 2x8x16 R/S Spruce
-----------------------------------------------------------------------
FRMMAT.NDLTS40-136-A.84LUMBER
FRMMAT.NDLTS40-136-A.BFS
FRMMAT.NDLTS40-136-B.84LUMBER
FRMMAT.NDLTS40-136-B.BFS
FRMMAT.NDLTS40-136-A.MARJAM
FRMMAT.NDLTS40-136-B.MARJAM
2x6x16 R/S Spruce: Old: 24, New: 0
2x8x16 R/S Spruce: Old: 0, New: 24
--------------------------------------------------------
FRMMAT.NDLTS40-175-A.84LUMBER
FRMMAT.NDLTS40-175-A.BFS
FRMMAT.NDLTS40-175-B.84LUMBER
FRMMAT.NDLTS40-175-B.BFS
FRMMAT.NDLTS40-175-II-A.84LUMBER
FRMMAT.NDLTS40-175-II-A.BFS
FRMMAT.NDLTS40-175-II-B.84LUMBER
FRMMAT.NDLTS40-175-II-B.BFS
FRMMAT.NDLTS40-175-A.MARJAM
FRMMAT.NDLTS40-175-B.MARJAM
FRMMAT.NDLTS40-175-II-A.MARJAM
FRMMAT.NDLTS40-175-II-B.MARJAM
2x6x16 R/S Spruce: Old: 25, New: 0
2x8x16 R/S Spruce: Old: 0, New: 25
--------------------------------------------------------
FRMMAT.NDLTS40-176-A.84LUMBER
FRMMAT.NDLTS40-176-A.BFS
FRMMAT.NDLTS40-176-B.84LUMBER
FRMMAT.NDLTS40-176-B.BFS
FRMMAT.NDLTS40-176-II-A.84LUMBER
FRMMAT.NDLTS40-176-II-A.BFS
FRMMAT.NDLTS40-176-II-B.84LUMBER
FRMMAT.NDLTS40-176-II-B.BFS
FRMMAT.NDLTS40-176-A.MARJAM
FRMMAT.NDLTS40-176-B.MARJAM
FRMMAT.NDLTS40-176-II-A.MARJAM
FRMMAT.NDLTS40-176-II-B.MARJAM
2x6x16 R/S Spruce: Old: 22, New: 0
2x8x16 R/S Spruce: Old: 0, New: 22
--------------------------------------------------------
FRMMAT.NDLTS40-177-A.84LUMBER
FRMMAT.NDLTS40-177-A.BFS
FRMMAT.NDLTS40-177-B.84LUMBER
FRMMAT.NDLTS40-177-B.BFS
FRMMAT.NDLTS40-177-A.MARJAM
FRMMAT.NDLTS40-177-B.MARJAM
FRMMAT.NDLTS50-180-A.MARJAM
FRMMAT.NDLTS50-180-B.MARJAM
FRMMAT.NDLTS50-181-A.MARJAM
FRMMAT.NDLTS50-181-B.MARJAM
2x6x16 R/S Spruce: Old: 28, New: 0
2x8x16 R/S Spruce: Old: 0, New: 28
--------------------------------------------------------
FRMMAT.NDLTS40-178-A.84LUMBER
FRMMAT.NDLTS40-178-A.BFS
FRMMAT.NDLTS40-178-B.84LUMBER
FRMMAT.NDLTS40-178-B.BFS
FRMMAT.NDLTS40-178-II-A.84LUMBER
FRMMAT.NDLTS40-178-II-A.BFS
FRMMAT.NDLTS40-178-II-B.84LUMBER
FRMMAT.NDLTS40-178-II-B.BFS
FRMMAT.NDLTS50-179-A.84LUMBER
FRMMAT.NDLTS50-179-A.BFS
FRMMAT.NDLTS40-178-A.MARJAM
FRMMAT.NDLTS40-178-B.MARJAM
FRMMAT.NDLTS40-178-II-A.MARJAM
FRMMAT.NDLTS40-178-II-B.MARJAM
FRMMAT.NDLTS50-179-A.MARJAM
FRMMAT.NDLTS50-179-B.MARJAM
FRMMAT.NDLTS50-179-II-B.MARJAM
2x6x16 R/S Spruce: Old: 29, New: 0
2x8x16 R/S Spruce: Old: 0, New: 29
--------------------------------------------------------
FRMMAT.NDLTS50-179-II-A.MARJAM
2x6x16 R/S Spruce: Old: 35, New: 0
2x8x16 R/S Spruce: Old: 0, New: 35
--------------------------------------------------------
FRMMAT.NDLTS50-184-A.MARJAM
FRMMAT.NDLTS50-184-B.MARJAM
2x6x16 R/S Spruce: Old: 27, New: 0
2x8x16 R/S Spruce: Old: 0, New: 27
-----------------------------------------------------------------------


10/3/23 ---------------------
>All Marjam Cost-Groups completed

9/29/23 ---------------------
>Incomplete (Need Pricing from Vendor) ***
>All Marjam ***
09/29/2310/03/2310/03/23
Complete09/29/23Bobby NellerMintoNDLTM 3278 LatitudesVilla 11A, BHardware ***Remove All MSTA36
Bobby Neller:
MSTA36. Removed at one time prior. Inspectors are allowing wet set straps to accommodate.

Old/20 MSTA36, New/ 0

------------------------------------------------------------------

HDW.NDLTM11-A.WHITECAP
MSTA36: Old: 20, New: 0

HDW.NDLTM11-B.WHITECAP
MSTA36: Old: 41, New: 0
09/29/2309/29/23
Complete09/29/23Bobby NellerMintoNDLTC 3390 LatitudesALLALLHardware ***Adjusting 7/16 Panel Sheathing Clips
Bobby Neller:
Package change across the board. This takeoff has a total of three boxes with 250 in each box. I’m going to remove one box of 250 leaving two boxes of 500 please.

7/16 sheeting clips:
Old-3-boxes-750, New-2 boxes-500

-------------------------------------------------------------------

HDW.NDLTC2A.WHITECAP
HDW.NDLTC1C.WHITECAP
HDW.NDLTC1B.WHITECAP
HDW.NDLTC1A.WHITECAP
HDW.NDLTC2C.WHITECAP
HDW.NDLTC3A.WHITECAP
HDW.NDLTC3B.WHITECAP
HDW.NDLTC3C.WHITECAP
HDW.NDLTC4A.WHITECAP
HDW.NDLTC4B.WHITECAP
HDW.NDLTC4C.WHITECAP
PSCL716: Old: 3 (Boxes), New: 2 (Boxes)

HDW.NDLTC2B.WHITECAP
PSCL716: Old: 4 (Boxes), New: 3 (Boxes)
09/29/2309/29/23
Complete09/27/23Bobby NellerMintoNDLTC 3392 LatitudesALLALLShaftwall Materials ***Adjusting Quantities
Bobby Neller:
Good morning Adam, doing a package change on our C-track and H- track. I’d like to do this package change across-the-board to all cottages and elevations. On this H- track we’re basically removing all the 12 footers and adding six to the original 10 footers for a total of 16-10’.

C-track: Old-(31)-10’, New-(20)-10’
H-track: Old-(10)-10’, Old-(17)-12’, New-(16)-10’

----------------------------------------------------------------------------

SHAFTWALL.NDLTC3A/NDLTC3B/NDLTC3C.INTERIOR/EXTERIOR BUILDING SUPPLY
"C" Shaft Wall Track 10': Old: 31, New: 20
"H" Shaft Wall Stud 12': Old: 17, New: 0
"H" Shaft Wall Stud 10': Old: 10, New: 16

SHAFTWALL.NDLTC1A/NDLTC1B/NDLTC1C.INTERIOR/EXTERIOR BUILDING SUPPLY
"C" Shaft Wall Track 10': Old: 30, New: 20
"H" Shaft Wall Stud 12': Old: 17, New: 0
"H" Shaft Wall Stud 10': Old: 15, New: 22

SHAFTWALL.NDLTC2A/NDLTC2B/NDLTC2C.INTERIOR/EXTERIOR BUILDING SUPPLY
"C" Shaft Wall Track 10': Old: 26, New: 20
"H" Shaft Wall Stud 12': Old: 17, New: 0
"H" Shaft Wall Stud 10': Old: 6, New: 12

SHAFTWALL.NDLTC4A/NDLTC4B/NDLTC4C.INTERIOR/EXTERIOR BUILDING SUPPLY
"C" Shaft Wall Track 10': Old: 25, New: 20
"H" Shaft Wall Stud 12': Old: 17, New: 0
"H" Shaft Wall Stud 10': Old: 11, New: 17
09/27/2309/27/23
sent to Pete09/22/23Dane JonesToll BrothersTBLPT 069 Laurel PointeMarsanneMOMulti-Slide Door Option ***Adding Boxcar Block
Dane Jones:
Fill in/package change. Short on boxcar for the SGD wall. Wall dimensions are 22’x12’. Masonry materials Short on boxcar.
PO has 48 we need 138 -Dane Jones

90) 8”x12”x 16 Boxcar block

----------------------------------------------------------------

Sent to Pete for review before making any changes (Adam).

MASMAT.TBLPT069-MULTISLIDE.TITANORLANDO(ZONE1
09/22/23
Complete09/20/23Bryan HealyMattamy HomesMOSOL 005-03 Solara6-UnitDRCCRD/COSlab Prep ***Adding Red Tape
Bryan Healy:
Package Change.
Need to add 8 rolls of Red Tape to the next buildings.

X8 rolls of Red Tape.

-----------------------------------------------------

SLABPREP.MOSOL-DRCCRD(CO).LOTTSORLANDO

Visqueen Tape - Red Vinyl 2" x 60 yds:
Old: 0, New: 8
09/20/2309/20/23
Complete09/19/23Kyle JollyDart InterestsDIEVM 043 Evermore ResortPortal Entry-Masonry ***Adding Pre-Blend
Kyle Jolly:
Package change and fill in. Have been running short on mortar for these. Will need fill in for the following lots 43, 45, 47, 29, 30, 34.

(4 bags each lot). Total 24 bags

---------------------------------------------

MASMAT.DIEVM-PORTALENTRY.FLBESTBLOCKORLANDO
Pre-Blend: Old: 9, New: 13
09/19/2309/19/23
Complete09/14/23Adrian HartMintoNDLWS 355 Watersound30-197BFrame ***Removing LVLs
Adrian Hart:
Remove lvls from future purchase orders- see attachments. Not sure where these were intended to go?

------------------------------------------------------------------

FRMMAT.NDLWS30-197-B.MIDSOUTH

1.75 x 24 LVL 14': Old: 2, New: 0
1.75 x 7.25 LVL 10': Old: 2, New: 0
1.75 x 7.25 LVL 14': Old: 2, New: 0
1.75 x 7.25 LVL 16': Old: 2, New: 0

09/14/2309/14/23
Complete09/13/23Kyle JollyDart InterestsDIEVM 049 Evermore ResortPortal Entry-Frame ***Adding 2x12x8 PT for Door Bucks
Kyle Jolly:
Package change. We need to install doorbucks on every entry portal. Please change all po’s going forward.

(2) 2x12x8 PT

--------------------------------------------------------------------------

9/13/23 - Kyle says he needs 30 of them for now and to split between lots: 52 - 62, 43, 45, 30, 34 (Adam).

FRMMAT.DIEVM-PORTALENTRY.HAVEN
2x12x8 PT: Old: 0, New: 2
09/13/2309/13/23
Complete09/13/23Jason BridgesDream FindersDOTAL 096-02 TalichetAvalon IIBPrecast ***Adding (1) 8'-8" Lintel
Jason Bridges:
(1) 8-8 u shaped lintel

--------------------------------------------------------------

PCMS.DF-AVALON-II-B.LOTTSORLANDO
8'-8" Lintel: Old: 0, New: 1
09/13/2309/13/23
Complete09/12/23Kyle JollyDart InterestsDIEVM 043 Evermore ResortPortal Entry-Hardware ***Remove Grace Ice & Water Shield, Sikadur 52
Kyle Jolly:
Can we adjust future entry portal po's
The next 20 do not need ice and water shield or sikadur52.

-----------------------------------------------------------------

HDW.DIEVM-PORTALENTRY.WHITECAP

Grace Ice & Water Shield: Old: 1, New: 0
Sikadur 52 3gal: Old: 1, New: 0
09/12/2309/12/23
sent to bids09/07/23AnthonySobel CoOFPPR 01P Parkway Preserve3-UnitBDAPrecast/Masonry Steel ***#6, #7 Rebar 20', #3 Stirrups
Anthony Lopez:
Package change for rebar. D models have 3 tie beams
Fill in - need 2 #7 & #6 rebar at 20’ and 38 5x 11 stirrups.

---------------------------------------------------------------

9/7/23 - Sent to bids (Adam)
09/07/23
Complete08/22/23Sharon/PeteMinto---Housewrap ***Adding Button Caps
Sharon:
Pete needs you to add 1 bucket of button caps to all of the 1 story cost groups for Watersound.

HOUSEWRAP.NDLWS50-179-B//NDLWS50-179-II-A/NDLWS50-179-II-B/NDLWS50-181-A/NDLWS50-181-B/NDLWS50-184-A/NDLWS50-184-B.MIDSOUTH

We will also need to revise the housewrap po’s adding the caps. Below is what is scheduled to be delivered and when. All other lots have not been scheduled but will still need to be revised.
4126, 4127, 4108, 4107- DO NOT REVISE PO’S, FILL INS WERE DONE TO COVER THEM.

-----------------------------------------------------------------------------

HOUSEWRAP.NDLWS50-179-B//NDLWS50-179-II-A/NDLWS50-179-II-B/NDLWS50-181-A/NDLWS50-181-B/NDLWS50-184-A/NDLWS50-184-B.MIDSOUTH

Button Caps: Old: 0, New: 1
08/22/2308/22/23
Complete08/22/23Sharon/PeteMinto-AllAllQuickTie Materials ***Adding Epoxy
Sharon:
Please order (2) Quick Tie Epoxy w/1 Nozzle 28oz for the following lots: 4110, 4111, 4112, 4113, 4114, 4115, 4116, 4121, 4122, 4123, 4124, 4125 and 4515.
Cindy said there is not enough on the take off.
Pete said to do a package change for this. The take off only had 1 originally, we did a package change adding 3 more and Pete said to bump it again by 2 (so total of 6)

-------------------------------------------------------------------

Revising Package Change now to (5) total instead of 6.

QUICKTIE.NDLWS50-179-B.MIDSOUTH
>Quick Tie Epoxy w/1 Nozzle 28oz: Old: 6, New: 5

QUICKTIE.NDLWS50-179-II-A.MIDSOUTH
QUICKTIE.NDLWS50-179-II-B.MIDSOUTH
QUICKTIE.NDLWS50-181-A.MIDSOUTH
QUICKTIE.NDLWS50-181-B.MIDSOUTH
QUICKTIE.NDLWS50-181-B.WHITECAP
QUICKTIE.NDLWS50-184-A.MIDSOUTH
QUICKTIE.NDLWS50-184-A.WHITECAP
QUICKTIE.NDLWS50-184-B.MIDSOUTH
QUICKTIE.NDLWS50-184-B.WHITECAP
>Quick Tie Epoxy w/1 Nozzle 28oz: Old: 6, New: 5

-------------------------------------------------------------------

QUICKTIE.NDLWS50-179-B.MIDSOUTH
>Quick Tie Epoxy w/1 Nozzle 28oz: Old: 1, New: 6

QUICKTIE.NDLWS50-179-II-A.MIDSOUTH
QUICKTIE.NDLWS50-179-II-B.MIDSOUTH
QUICKTIE.NDLWS50-181-A.MIDSOUTH
QUICKTIE.NDLWS50-181-B.MIDSOUTH
QUICKTIE.NDLWS50-181-B.WHITECAP
QUICKTIE.NDLWS50-184-A.MIDSOUTH
QUICKTIE.NDLWS50-184-A.WHITECAP
QUICKTIE.NDLWS50-184-B.MIDSOUTH
QUICKTIE.NDLWS50-184-B.WHITECAP
>Quick Tie Epoxy w/1 Nozzle 28oz: Old: 4, New: 6

08/22/2308/22/2308/22/23
Complete08/21/23Jason BridgesDream FindersDOTAL 104-02 TalichetBiscayneCPrecast ***Adding Precast for Porch
Jason Bridges:
(1) 8-4 u shaped lintel
(2) 7-6 u shaped lintel
(2) 6-6 u shaped lintel

----------------------------------------------------------------

8/28/23 - All the precast the field is asking for are on the front porch. Those precast were not in the takeoff because the master plans for the model show wood posts and beams on the front porch -Chris Plantz

----------------------------------------------------------------

PCMS.DF-BISCAYNE-B/BISCAYNE-C.LOTTSORLANDO

6'-6" Lintel: Old: 0, New: 2
7'-6" Lintel: Old: 1, New: 3
8'-8" Lintel: Old: 0, New: 1
08/21/2308/28/23Chris Plantz08/28/23
Complete08/21/23Dane JonesMattamy HomesMOMER 049 Meridian5-UnitMCAACC/PRPrecast ***Adding & Removing Materials
Dane Jones:
Precast:
Add 7) 4’6” for a total of 12
Remove 4) 7’-6” for a total of 1

--------------------------------------------------------------------

PCMS.MOMER-MCACC(PR)/CCACM(PR).LOTTSORLANDO
4'-6" Lintels: Old: 5, New: 12
7'-6" Lintels: Old: 5, New: 1
08/21/2308/21/23
Complete08/21/23SharonMattamy HomesMOWAT 001-06 Waterbrooke6-UnitCCAACC/CRPrecast ***Changing Quantities
Sharon:
Please revise po’s and update cost groups on Waterbrooke 6, 4 and 3 to match the attached. (6 is scheduled to drop this week so need to be sure Lotts is notified via email so correct po gets delivered, the others have not been scheduled yet). Only update cost groups on Waterbrooke 5, 7 and 1 (these packages have already been delivered).

---------------------------------------------------------------------

PCMS.MOMER/MOWAT - CCAACC(CR).LOTTSORLANDO

1x9 Dowels: Old: 152, New: 148
HETA20: Old: 332, New: 330
08/21/2308/21/23
Complete08/21/23SharonMattamy HomesMOWAT 007-06 Waterbrooke4-UnitSCAC/CRPrecast ***Changing Quantities and Precast
Sharon:
Please revise po’s and update cost groups on Waterbrooke 6, 4 and 3 to match the attached. (6 is scheduled to drop this week so need to be sure Lotts is notified via email so correct po gets delivered, the others have not been scheduled yet). Only update cost groups on Waterbrooke 5, 7 and 1 (these packages have already been delivered).

---------------------------------------------------------------------

PCMS.MOMER/MOWAT - SCAC(CR)/CACS(CR).LOTTSORLANDO

1x9 Dowels: Old: 121, New: 111
#5 Rebar, 20': Old: 38, New: 41
HETA20: Old: 254, New: 252
3'-6" Lintel: Old: 1, New: 0
4'-6" Lintel: Old: 3, New: 1
5'-10" Lintel: Old: 1, New: 2
7'-6" Lintel: Old: 5, New: 6
2'-2.5' Sill: Old: 1, New: 0
3'-1" Sill: Old: 3, New: 1
4'-5" Sill: Old: 1, New: 2
6'-2" Sill: Old: 4, New: 5
08/21/2308/21/23
Complete08/21/23SharonMattamy HomesMOWAT 005-06 Waterbrooke6-UnitSCAACS/CRPrecast ***Changing Quantities and Precast
Sharon:
Please revise po’s and update cost groups on Waterbrooke 6, 4 and 3 to match the attached. (6 is scheduled to drop this week so need to be sure Lotts is notified via email so correct po gets delivered, the others have not been scheduled yet). Only update cost groups on Waterbrooke 5, 7 and 1 (these packages have already been delivered).

---------------------------------------------------------------------

PCMS.MO-SCAACS(CR).LOTTSORLANDO

1x9 Dowels: Old: 184, New: 168
#5 Rebar, 20': Old: 56, New: 62
3'-6" Lintel: Old: 2, New: 0
4'-6" Lintel: Old: 6, New: 2
5'-10" Lintel: Old: 0, New: 2
7'-6" Lintel: Old: 8, New: 10
2'-2.5' Sill: Old: 2, New: 0
3'-1" Sill: Old: 6, New: 2
4'-5" Sill: Old: 0, New: 2
6'-2" Sill: Old: 6, New: 8
08/21/2308/21/23
Complete08/21/23SharonMattamy HomesMOWAT 003-06 Waterbrooke4-UnitSCAS/COPrecast ***Changing Quantities and Precast
Sharon:
Please revise po’s and update cost groups on Waterbrooke 6, 4 and 3 to match the attached. (6 is scheduled to drop this week so need to be sure Lotts is notified via email so correct po gets delivered, the others have not been scheduled yet). Only update cost groups on Waterbrooke 5, 7 and 1 (these packages have already been delivered).

---------------------------------------------------------------------

PCMS.MOMER/MOWAT - SCAS(CO)/SACS(CO).LOTTSORLANDO

1x9 Dowels: Old: 137, New: 133
#5 Rebar, 20': Old: 39, New: 46
HETA20: Old: 276, New: 273
3'-6" Lintel: Old: 2, New: 0
4'-6" Lintel: Old: 6, New: 2
5'-10" Lintel: Old: 0, New: 6
2'-2.5' Sill: Old: 2, New: 0
3'-1" Sill: Old: 6, New: 2
4'-5" Sill: Old: 0, New: 6
08/21/2308/21/23
Complete08/21/23SharonMattamy HomesMOWAT 004-06 Waterbrooke6-UnitCCAACS/FTPrecast ***Changing Quantities and Precast
Sharon:
Please revise po’s and update cost groups on Waterbrooke 6, 4 and 3 to match the attached. (6 is scheduled to drop this week so need to be sure Lotts is notified via email so correct po gets delivered, the others have not been scheduled yet). Only update cost groups on Waterbrooke 5, 7 and 1 (these packages have already been delivered).

---------------------------------------------------------------------


PCMS.MOMER/MOWAT - CCAACS(FT)/SCAACC(FT).LOTTSORLANDO

1x9 Dowels: Old: 168, New: 174
#5 Rebar, 20': Old: 55, New: 57
HETA20: Old: 354, New: 348
3'-6" Lintel: Old: 1, New: 0
5'-10" Lintel: Old: 1, New: 8
7'-6" Lintel: Old: 7, New: 4
2'-2.5' Sill: Old: 1, New: 0
4'-5" Sill: Old: 1, New: 8
6'-2" Sill: Old: 6, New: 3
08/21/2308/21/23
Complete08/21/23SharonMattamy HomesMOWAT 006-06 Waterbrooke6-UnitSCAACC/COPrecast ***Changing Quantities and Precast
Sharon:
Please revise po’s and update cost groups on Waterbrooke 6, 4 and 3 to match the attached. (6 is scheduled to drop this week so need to be sure Lotts is notified via email so correct po gets delivered, the others have not been scheduled yet). Only update cost groups on Waterbrooke 5, 7 and 1 (these packages have already been delivered).

---------------------------------------------------------------------


PCMS.MOMER/MOWAT - SCAACC(CO)/CCAACS(CO).LOTTSORLANDO

1x9 Dowels: Old: 168, New: 172
#5 Rebar, 20': Old: 55, New: 57
HETA20: Old: 354, New: 348
3'-6" Lintel: Old: 1, New: 0
4'-6" Lintel: Old: 3, New: 1
5'-10" Lintel: Old: 1, New: 4
2'-2.5' Sill: Old: 1, New: 0
3'-1" Sill: Old: 3, New: 1
4'-5" Sill: Old: 1, New: 4
08/21/2308/21/23
sent to bids08/15/23Bryan HealyMattamy HomesMOWAT 005-06 Waterbrooke6-UnitSCAACS/CRPrecast ***Adding (2) 7'-6" Lintels, Removing (4) 4'-6" Lintels
Bryan Healy:
The pre-cast PO only has x8 7’-6” headers. It needs to have an additional 2 for the rear sliding glass doors. There are also x6 4’-6” headers and the building only requires 2.

--------------------------------------------------------------

Sent to bids for review 8/15/23 (Adam)


08/15/23
Complete08/14/23Dane JonesMattamy HomesMOMER 048 Meridian5-UnitCCACM/CRPrecast ***Adding (1) 7'-6" Lintel & (1) 6'-2" Sill
Dane Jones:
This elevation requires 6 total 6’-2” Sills. We only have 5 in the package. Precast PO. Needed 6) 7-6 headers and 6) 6’-2” sills. Package has 5 of each. I was able to find a 7’-6” header, just missing the sill now.

----------------------------------------------------------------


PCMS.MOMER-MCACC(CR)/CCACM(CR).LOTTSORLANDO

7'-6" Lintel: Old: 5, New: 6
6'-2" Sill: Old: New: 6
08/14/2308/14/23
Complete08/09/23White CapMintoAllAllHardware ***Swap H4 for H2.5A
Chris Booth:
Hey man, I’ve seen a couple PO’s come across with H4’s on them. They’ve been discontinued for a few years now. Should I put H2.5A as a replacement? I attached a discontinued list, and it has a closest replacement part option on it. Let me know please.

----------------------------------------------------------------

HDW.NDLWS50-179-B.WHITECAP
HDW.NDLWS50-179-II-B.WHITECAP
H4: Old: 20, New: 0
H2.5A: Old: 141, new: 161

HDW.NDLWS50-181-A.WHITECAP
HDW.NDLWS50-181-B.WHITECAP
H4: Old: 20, New: 0
H2.5A: Old: 144, new: 164
08/09/2308/09/23
Complete08/09/23White CapSobel Co3-UnitACBHardware ***Swap H4 for H2.5A
Chris Booth:
Hey man, I’ve seen a couple PO’s come across with H4’s on them. They’ve been discontinued for a few years now. Should I put H2.5A as a replacement? I attached a discontinued list, and it has a closest replacement part option on it. Let me know please.

----------------------------------------------------------------

HDW.OFPPR-ACB.WHITECAP

H4: Old: 20, New: 0
H2.5A: Old: 0, New: 20
08/09/2308/09/23
Complete08/08/23Cindy/John C.Minto-AllAllHardware ***Swap Wedge Anchors for Titen Bolts
Angie:
at the request of Cindy and John C. we must change the 1/2 x 8 Wedge Anchor for this Titen HD.

-------------------------------------------------

HDW.NDLWS50-179-B.WHITECAP
HDW.NDLWS50-179-II-A.WHITECAP
HDW.NDLWS50-179-II-B.WHITECAP
>WA1285: Old: 43, New: 0
>THD50800WH: Old: 0, New: 43

HDW.NDLWS50-181-A.WHITECAP
HDW.NDLWS50-181-B.WHITECAP
HDW.NDLWS50-184-A.WHITECAP
>WA1285: Old: 41, New: 0
>THD50800WH: Old: 0, New: 41

HDW.NDLWS50-184-B.WHITECAP
>WA1285: Old: 45, New: 0
>THD50800WH: Old: 0, New: 45

Waiting on pricing from White Cap (Adam)
08/08/2308/09/23
Complete08/07/23Cyndi MulleeMinto-50-181, 50-184A, BFrame ***2x4 and 2x6 Changes
Adam Sowers:
Pete made the following package changes:

-----------------------------------------------------------
I made the following changes to the packages for watersound if you could please capture that on the Package Change History Sheet. Thanks much -Pete

NDLWS 50-181-A
Frame Package
Removed All 2 x 6 x 104 5/8 Spruce Precuts (220)
Removed All 2 x 6 x 92 5/8 Spruce Precuts (18)
Added (270) 2 x 6 x 10’ Spruce #2 BTR
Increased 2 x 4 x 16 SYP from 125 to 175 (50)
Hardware Package
Added (10) HTS16


NDLWS 50-181-B
Frame Package
Increased 2 x 6 x 10 Spruce #2 & BTR from 170 to 270 (100)
Removed All 2 x 6 x 104 5/8 Spruce Precuts (50)
Removed All 2 x 6 x 92 5/8 Spruce Precuts (20)
Increased 2 x 4 x 16 SYP from 125 to 175 (50)
Hardware Package
Added (10) HTS16


NDLWS 50-184-A
Frame Package
Removed All 2 x 6 x 104 5/8 Spruce Precuts (174)
Removed All 2 x 6 x 92 5/8 Spruce Precuts (26)
Increased 2 x 6 x 10 Spruce #2 & BTR from 167 to 300 (133)
Increased 2 x 4 x 16 SYP from 156 to 175 (19)
Hardware Package
Added (10) HTS16


NDLWS 50-184-B
Frame Package
Increased 2 x 6 x 10 Spruce #2 & BTR from 165 to 300 (135)
Removed All 2 x 6 x 104 5/8 Spruce Precuts (81)
Removed All 2 x 6 x 92 5/8 Spruce Precuts (20)
Increased 2 x 4 x 16 SYP from 125 to 175 (50)
Hardware Package
Added (10) HTS16
08/07/2308/07/23
Complete08/04/23Cyndi MulleeMinto-50-184AFrame ***2x4 and 2x6 Changes
Adam Sowers:
Cyndi had a fill-in on 4125 for materials that were used on four different lots due to incorrect takeoffs. Angie reviewed everything and sent new totals.

FRMMAT.NDLWS50-184-A.MIDSOUTH

2x4x10 Spruce: Old: 11, New: 13
2x4x14 SYP: Old: 30, New: 13
2x4x14 Spruce: Old: 4, New: 5
2x4x16 SYP: Old: 125, New: 156
2x4x8 SYP: Old: 1, New: 2
2x4x92-5/8: Old: 36, New: 43
2x6x104-5/8: Old: 81, New: 174
2x6x12 SYP: Old: 4, New: 6
2x6x14 PT: Old: 28, New: 35
2x6x14 SYP: Old: 57, New: 72
2x6x14 Spruce: Old: 30, New: 38
2x6x16 Spruce: Old: 25, New: 39
2x6x8 SYP: Old: 3, New: 4
2x6x92-5/8: Old: 20, New: 26

08/04/23Angie08/04/23
Complete08/04/23Cyndi MulleeMinto-50-181BFrame ***2x4 and 2x6 Changes
Adam Sowers:
Cyndi had a fill-in on 4125 for materials that were used on four different lots due to incorrect takeoffs. Angie reviewed everything and sent new totals.

FRMMAT.NDLWS50-181-B.MIDSOUTH

2x4x10 Spruce: Old: 24, New: 28
2x4x14 PT: Old: 2, New: 3
2x4x14 SYP: Old: 30, New: 50
2x4x16 SYP: Old: 125, New: 157
2x4x92-5/8: Old: 28, New: 38
2x6x12 SYP: Old: 1, New: 8
2x6x14 PT: Old: 25, New: 34
2x6x14 SYP: Old: 51, New: 68
2x6x16 Spruce: Old: 25, New: 34
2x6x8 SYP: Old: 4, New: 5
2x6x92-5/8: Old: 18, New: 20
2x4x8 Spruce: Old: 8, New: 12
2x6x10 SYP: Old: 9, New: 13


FRMMAT.NDLWS50-181-B.BFS

2x4x8 Spruce: Old: 8, New: 14
2x4x10 Spruce: Old: 24, New: 28
2x4x14 PT: Old: 2, New: 3
2x4x14 SYP: Old: 30, New: 50
2x4x16 SYP: Old: 125, New: 157
2x4x92-5/8: Old: 28, New: 38
2x6x12 SYP: Old: 1, New: 8
2x6x14 PT: Old: 25, New: 34
2x6x14 SYP: Old: 51, New: 68
2x6x16 Spruce: Old: 25, New: 34
2x6x8 SYP: Old: 4, New: 5
2x6x92-5/8: Old: 18, New: 20
2x6x10 SYP: Old: 9, New: 13
2x8x14 SYP: Old: 4, New: 6
08/04/23Angie08/04/23
Complete08/04/23Cyndi MulleeMinto-AllAllHardwareRemove Tapcons, Add Anchor Bolts & SDS Screws
Cyndi Mullee:
5/8 x 12” anchor Bolt for all HTT5’s needed:
8 each lot and add to take off
4127, 4126, 4108, 4107

All models add to take off
Remove tapcons
Add 50- 1/4”x6” long SDS screws for SGD header

----------------------------------------------------------

HDW.NDLWS50-179-B.WHITECAP
HDW.NDLWS50-179-II-A.WHITECAP
HDW.NDLWS50-179-II-B.WHITECAP
HDW.NDLWS50-184-A.WHITECAP
HDW.NDLWS50-184-B.WHITECAP
>AB5812 Anchor Bolt: Old: 0, New: 8
>SDS25600 1/4 x 6" SDS Screws: Old: 0, New: 50
>TH14334 1/4" x 3 3/4" (Box 100): Old: 9, New: 0


HDW.NDLWS50-181-A.WHITECAP
HDW.NDLWS50-181-B.WHITECAP
>AB5812 Anchor Bolt: Old: 0, New: 8
>SDS25600 1/4 x 6" SDS Screws: Old: 0, New: 50
>TH14334 1/4" x 3 3/4" (Box 100): Old: 7, New: 0
08/04/2308/04/23
Complete08/02/23Jason BridgesDream FindersDOTAL 111-02 TalichetAvalon IIAPrecast ***Addiong (1) 8'-8" Lintel
Jason Bridges:
There is now a lintel over the front columns on Avalon model -Jason Bridges

(1) 8-8 u shaped lintel

------------------------------------------------------------

PCMS.DF-AVALON-A.LOTTSORLANDO
PCMS.DF-AVALON-B.LOTTSORLANDO
PCMS.DF-AVALON-C.LOTTSORLANDO
8'-8" Lintel: Old: 0, New: 1

08/02/2308/02/23
Complete08/01/23Sam RathbunBella Vista Building GroupBVRDG 008 Rivers Edge6-UnitABAABAHardware ***Adding Titen Bolts
Sam Rathbun:
We need these for the LGT4 on the end units.
This should only be added to the end unit takeoff.
4 for each unit. 8 total for the building.
They have these in Sanford, and I am going to be picking them up.

3/8 x 5” Titen Bolts x 8 total count.

---------------------------------------------------

HDW.BVRDG-ABAABA.WHITECAP
THD.7500HMG Titen: Old: 0, New: 8
08/01/2308/01/23
Complete07/31/23Sam RathbunBella Vista Building GroupBVRDG 008 Rivers Edge6-UnitABAABAHardware ***Swapping (6) 12" Threaded Ros for 24"
Sam Rathbun:
Longer All Thread Needed. Need 2’ All Thread. Going to need longer all thread to go through the floor system.

6 - 2’ x 5/8” Threaded Rod.

-------------------------------------------------------------

Swapping four to longer sizes per Sam (Adam)

HDW.BVRDG-ABAABA.WHITECAP
TR5812: Old: 20, New: 16
TR5824: Old: 0, New: 4

07/31/2308/01/23
Complete07/27/23Ross JohnsonSobel CoOFPPR 01A Parkway Preserve3-UnitACBHardware ***Adding Wedge Anchors & Tapcons
Ross Johnson:
Please add 12 3/4 x 6" wedge anchors and 100 1/4 x 3" tap cons to the hardware package. Also, please create a fill in for these items so I can pick them up today as they are needed to fly the roof this afternoon. These items are needed to bolt the red iron buckets to the wall and the garage ledger to the wall.

------------------------------------------------------------

HDW.OFPPR-ACB.WHITECAP
3/4 x 6 1/4 Wedge Anchors: Old: 24, New: No Change
1/4 x 3 Tapcons: Old: 0, New: 1

Note: It looks like the wedge anchors are in the cost-group but not in the PO on the job. Must have been updated alread (Adam).
07/27/2307/27/23
Complete07/26/23Ross JohnsonSobel CoOFPPR 01K Parkway Preserve3-UnitACBHardware ***Adding (50) U210 Hangers
Ross Johnson:
Please add 50 hu210 facemount brackets to this package making a total of 80. Also please create a fill in for the 50 I am requesting for the 1st and 2nd floor as 30 was only enough to partially complete the 1st floor. Need an additional 50 to complete truss hangers for entire house.

--------------------------------------------------------------------------

HDW.OFPPR-ACB.WHITECAP
U210: Old: 30, New: 80
07/26/2307/26/23
Complete07/24/23Bobby NellerRichmondROHSQ 009 Heritage SquareF924/AmmoliteCPrecast ***Adding 5'-10" and 4'-0" Sill
Bobby Neller:
Wasn’t on takeoff.

Package change:
5’10”-precast header-old-0, New-1
4’0”-flush mount sill- old- 0, New-1

Fill in- (PO request)
1-5’10” precast
1-4’0” flush sill

------------------------------------------------------------

PCMS.RA-Ammolite-F924-C.LOTTSORLANDO
5'-10" Lintel: Old: 0, New: 1
4'-0" Sill: Old: 0, New: 1
07/24/2307/25/23
Complete07/24/23Bobby NellerRichmondROHSQ 009 Heritage SquareF924/AmmoliteCSlab Prep, Precast ***Removing Corner Bars & Duro Wall
Bobby Neller:
Dura wall-Old-500 feet, New-0
30“ x 30“ rebar corners- old-9, New-0

----------------------------------------------

SLABPREP.RA-Ammolite-F924-C.WHITECAP
SLABPREP.RA-Ammolite-F924-C.LOTTSORLANDO
Corner Bars: Old: 46, New: 0

PCMS.RA-Ammolite-F924-C.LOTTSORLANDO
Corner Bars: Old: 9, New: 0
Duro Wall: Old: 3, New: 0
07/24/2307/24/23
Complete07/24/23Kyle JollyDart InterestsDIEVM 067 Evermore ResortPortal Entry-Hardware ***Adding Simpson Hardware
Kyle Jolly:
Please add these to every portal entry hardware po going forward.
Will need fill in for lot 67 as well as all hardware packages going forward adjusted.

(6) flat brackets (APVST610)
(200) black bolt heads (STN22-R24 - 1" Outdoor Accents Hex-Head Washer)
(4) t brackets (APVT6)
Black finish

-----------------------------------------------------------------

HDW.DIEVM-PORTALENTRY.WHITECAP
Simpson APVST610: Old: 0, New: 6
Simpson APVT6: Old: 0, New: 4
Outdoor Accents Hex-Head Washer: Old: 0, New: 9
07/24/2307/26/23
Complete07/21/23Cyndi MulleeMintoNDLWS 4108 WatersoundAllAllFrame ***Adding Materials
Cyndi Mullee
The lumber appears to have been used up in bracing and temporary scaffolding (framers have been asked to not use it for scaffolding). The 6x6post appears to have been stolen. We may want to change the take off to adjust for now. All models should have (1) or (2) 6x6 posts. I do not see any on 4107, 4127, 4126.

Package change:
Change all models facia (2x6x14’ spruce) to 30
Please add (20) 2x4x14’ SYP to all

----------------------------------------------------------------------

6x6 Posts for lots: 4107, 4126, 4127:
the model of these lots does not require it -Angie

---------------------------------------------------------------------

FRMMAT.NDLWS50-179-B.MIDSOUTH
FRMMAT.NDLWS50-179-II-B.MIDSOUTH
2x6x14 Spruce: Old: 31, New: 30
2x4x14 SYP: Old: 9, New: 29

FRMMAT.NDLWS50-179-II-A.MIDSOUTH
2x6x14 Spruce: Old: 30, New: No Change
2x4x14 SYP: Old: 10, New: 30

FRMMAT.NDLWS50-181-A.MIDSOUTH
FRMMAT.NDLWS50-181-B.BFS
FRMMAT.NDLWS50-181-B.MIDSOUTH
2x6x14 Spruce: Old: 25, New: 30
2x4x14 SYP: Old: 10, New: 30

FRMMAT.NDLWS50-184-A.MIDSOUTH
FRMMAT.NDLWS50-184-B.BFS
FRMMAT.NDLWS50-184-B.MIDSOUTH
2x6x14 Spruce: Old: 28, New: 30
2x4x14 SYP: Old: 10, New: 30
07/21/2307/21/23Angie07/21/23
Complete07/17/23OmarMintoNDICP 1318 Isles of CollierAllAllFrame ***Adding 2x6x16 Spruce for Fascia
Omar Hernandez:
Please order 15 pcs of 2x6x16 spruce #2
Needed to install facia. Needed for facia please add to all framing packages. Thank you.

------------------------------------------------------------------

FRMMAT.NDICP-2A (12"PARTY WALL).84LUMBER
FRMMAT.NDICP-2A (12"PARTY WALL).MARJAM
FRMMAT.NDICP-2B (12"PARTY WALL).84LUMBER
FRMMAT.NDICP-2C (12"PARTY WALL).84LUMBER
FRMMAT.NDICP-3A/NDICP-3C (12"PARTY WALL).84LUMBER
FRMMAT.NDICP-3B (12"PARTY WALL).84LUMBER
FRMMAT.NDICP-3B (12"PARTY WALL).MARJAM
2x6x16 Spruce: Old: 0, New: 15

FRMMAT.NDICP-1A (12"PARTY WALL).84LUMBER
FRMMAT.NDICP-1A (12"PARTY WALL).MARJAM
FRMMAT.NDICP-1B (12"PARTY WALL).84LUMBER
FRMMAT.NDICP-1C(12"PARTY WALL).84LUMBER
FRMMAT.NDICP-4A (12"PARTY WALL).84LUMBER
FRMMAT.NDICP-4A (12"PARTY WALL).MARJAM
2x6x16 Spruce: Old: 1, New: 15

07/17/2307/17/23
Complete07/05/23Chad BrewsterMarmer Contruction-AllAllFrame & Hardware ***Adjusting Quantities
Isa:
I am sending you the adjustment of materials as indicated by Chad.

You can get this at: S:\Estimating\Marmer Construction\Cypress Gardens Apartment\2023 - Takeoff & Proposal

------------------------------------------------------------------------------

TYPE 1 -------------------------
PCMS-DROP1.MACGA-TYPE1.LOTTSORLANDO
HETA20: Old: 0, New: 84

FRMMAT-DROP1.MACGA-TYPE1.HAVEN
2x8x16 PT: Old: 87, New: 76

HDW.MACGA-TYPE1.WHITECAP
1/2 Washers: Old: 420, New: 245
H3: Old: 436, New: 318
HCP2 Hip Corner Plate: Old: 46, New: 42
1/2" x 10" Wedge Anchor: Old: 215, New: 175

PCMS-DROP2.MACGA-TYPE1.LOTTSORLANDO
HETA20: Old: 0, New: 366

FRMMAT-DROP2.MACGA-TYPE1.HAVEN
2x8x16 PT: Old: 48, New: 0

HDW.MACGA-TYPE1.WHITECAP
1/2 Washers: Old: 245, New: 70
H3: Old: 318, New: 0
HCP2 Hip Corner Plate: Old: 42, New: 0
1/2" x 10" Wedge Anchor: Old: 175, New: 0
TYPE 1 -------------------------

TYPE 2 -------------------------
PCMS-DROP1.MACGA-TYPE2.LOTTSORLANDO
HETA20: Old: 0, New: 9

FRMMAT-DROP1.MACGA-TYPE2.HAVEN
2x8x16 PT: Old: 98, New: 96

HDW.MACGA-TYPE2.WHITECAP
1/2 Washers: Old: 393, New: 385
H3: Old: 410, New: 400
HCP2 Hip Corner Plate: NA
1/2" x 10" Wedge Anchor: Old: 208, New: 200

PCMS-DROP2.MACGA-TYPE2.LOTTSORLANDO
HETA20: Old: 0, New: 416

FRMMAT-DROP2.MACGA-TYPE2.HAVEN
2x8x16 PT: Old: 54, New: 0

HDW.MACGA-TYPE2.WHITECAP
1/2 Washers: Old: 385, New: 185
H3: Old: 400, New: 0
HCP2 Hip Corner Plate: Old: 43, New: 0
1/2" x 10" Wedge Anchor: Old: 200, New: 0
TYPE 2 -------------------------

TYPE 3 -------------------------
PCMS-DROP1.MACGA-TYPE3.LOTTSORLANDO
HETA20: Old: 0, New: 9

FRMMAT-DROP1.MACGA-TYPE3.HAVEN
2x8x16 PT: Old: 102, New: 100

HDW.MACGA-TYPE3.WHITECAP
1/2 Washers: Old: 475, New: 470
H3: Old: 454, New: 444
HCP2 Hip Corner Plate: NA
1/2" x 10" Wedge Anchor: Old: 225, New: 220

PCMS-DROP2.MACGA-TYPE3.LOTTSORLANDO
HETA20: Old: 0, New: 451

FRMMAT-DROP2.MACGA-TYPE3.HAVEN
2x8x16 PT: Old: 59, New: 0

HDW.MACGA-TYPE3.WHITECAP
1/2 Washers: Old: 470, New: 250
H3: Old: 444, New: 0
HCP2 Hip Corner Plate: Old: 52, New: 0
1/2" x 10" Wedge Anchor: Old: 220, New: 0
TYPE 3 -------------------------
07/05/23Isa07/05/23
Complete06/29/23Ross JohnsonSobel Co-AllAllMasonry Lift 1 ***Adding Four-Highs to All Models/Elevations
Ross Johnson:
Adam please add an additional cube of 8x4x16 half blocks on all 1st lift p.o.’s moving forward.

---------------------------------------------------------

Ross says 72 four-highs in a cube (Adam).

MASMAT-DROP1.OFPPR-ACB.PREFERREDLEE/COLLIER(OFPPR)
Four Highs: Old: 9, New: 81
Education Fee: Old: 4614, New: 4686

MASMAT-DROP1.OFPPR-ADB.PREFERREDLEE/COLLIER(OFPPR)
Four Highs: Old: 9, New: 81
Education Fee: Old: 4689, New: 4761

--

Revised: 7/11/23

MASMAT-DROP1.OFPPR-ACB.PREFERREDLEE/COLLIER(OFPPR)
Four Highs: Old: 81, New: 153
Education Fee: Old: 4686, New: 4758

MASMAT-DROP1.OFPPR-ADB.PREFERREDLEE/COLLIER(OFPPR)
Four Highs: Old: 81, New: 153
Education Fee: Old: 4761, New: 4833





06/29/2307/11/2306/29/23
Complete06/28/23Sam RathbunSurrey HomesSOFXH 051 Fox HammockCloverBAdjusting Multiple Cost-GroupsTrimming Excess Materials
Sam Rathbun:
Just trimming some materials from this takeoff.
For this model: Clover Elv B

20 Regular Block
15 Lintel Block
20 Bags of Preblend Mortar
10 sheets of 7/16 OSB

----------------------------------------------------------------

Note: Sam meant 15/32 OSB, not 7/16 (Adam)

MASMAT.SO-Clover-B.BESTBLOCKORLANDO
MASMAT.SO-Clover-B.TITANORLANDO(ZONE3)

Regulars: Old: 1911, New: 1891 (-20)
Lintel Block: Old: 191, New: 176 (-15)
Pre-Blend: Old: 150, New: 130 (-20)
--
FRMMAT.SO-Clover-B.BFS
15/32 OSB: Old: 122, New: 112


06/28/2306/28/23
Complete06/27/23Kyle JollyDart InterestsDIEVM 067 Evermore ResortPortal Entry-Pad Prep ***Removing (2) #4 Rebar, 20'
Kyle Jolly:
On future entry portals, please combine footing materials and Precast. I’ve requested Lotts to drop “precast” and asked them to remove the 20’ steel as we have left over from the footings.

From footings PO
Remove (2) #4 20’ bars

--------------------------------------------------------------

PADPREP.DIEVM-PORTALENTRY.LOTTSORLANDO
PCMS.DIEVM-PORTALENTRY.LOTTSORLANDO

Combining these two Cost-Groups per Kyle (Adam)
Removed the Precast/Masonry Steel PO from the template.

PADPREP.DIEVM-PORTALENTRY.LOTTSORLANDO
#4 Rebar, 20': Old: 12, New: 10
#5 Rebar, 20': Old: 4, New: 5
#5 Rebar, 1x8' 4" Dowels: Old: 0, New: 6
Lintel Screen: Old: 0, New: 1
06/27/2306/27/23
Complete06/23/23RossSobel CoOFPPR 01J Parkway Preserve3-UnitBDAPrecast, 2nd Lift ***Swapping (2) 3'-1" Sills w/ (1) 4'-6"
Ross Johnson:
Window sill replacement. I need three window sills from lotts to replace three broken ones -Ross

3’1"
4’6"
6’2"

------------------------------------------------------------------

Ross says that the (2) 3'-1"'s on the 2nd Lift PO are not needed and only (1) 4'-6" is needed there. He says the others were damaged and/or used somewhere else. We don't have 4'-6" in the catalog so I sent a 5'-0" Lintel instead (Adam)


PCMS-DROP2.OFPPR-ADB.LOTTSFTMYERS

3'-1" Sill: Old: 2, New: 0
5'-0" Sill: Old: 0, New: 1
06/23/2306/23/23
Complete06/22/23OmarMintoNDICP 1326 Isles of CollierCottage 2BFrame ***Adding Missing 2x6x14 Spruce
Omar:
Please order 15 pcs of 2x6x16 spruce #2
Needed to install facia. Needed as backing to the facia -Omar

15 pcs of 2x6x16 spruce #2

-----------------------------------------------------------------

For some reason the PO/Cost-Group only has (1) 2x6x14 Spruce but there are (36) in the takeoff. Will address Package Change after Fill-Ins (Adam).

FRMMAT.NDICP-2B (12"PARTY WALL).84LUMBER
2x6x14 Spruce: Old: 1, New: 36
06/22/2306/22/23
Complete06/22/23OmarMintoNDICP 1318 Isles of CollierCottage 2BFrame ***Removing 2x8 PT & swapping 2x4 Spruce for SYP
Omar:
Not all 2x8 are needed.

Please delete from the frame package:
-4 pcs of 2x8x8 pt borate,
-6 pcs of 2x6x12 pt borate.

Please switch the 32 pcs of 2x4x12 spruce
to 2x4x12 yellow pine.

Not all 2x8 are needed. The switch of the 2x4s is necessary because the borate 2xs are bowing and we’re having to go back and work on them.

--------------------------------------------------------------------

6/22/23 @ 4:47pm: ON HOLD FOR NOW (Adam)
>Omar says he didn't mean to assign the To-Do yet.
>Omar says he meant 2x8x12 PT not 2x6x12 PT

FRMMAT.NDICP-2B (12"PARTY WALL).84LUMBER

2x8x8 PT: Old: 4, New: 0
2x4x12 Spruce: Old: 32, New: 0
2x4x12 SYP: Old: 48, New: 80
2x8x12 PT: Old: 12, New: 6
06/22/2306/28/23
Complete06/22/23OmarMintoNDICP 1326 Isles of CollierCottage 1AFrame ***Adding Missing 2x6x14 Spruce
Omar:
Please order 15 pcs of 2x6x16 spruce #2
Needed to install facia. Needed as backing to the facia -Omar

15 pcs of 2x6x16 spruce #2

-----------------------------------------------------------------

For some reason the PO/Cost-Group only has (1) 2x6x14 Spruce but there are (36) in the takeoff. Will address Package Change after Fill-Ins (Adam).

FRMMAT.NDICP-1A (12"PARTY WALL).84LUMBER
2x6x14 Spruce: Old: 1, New: 40
06/22/2306/22/23
Complete06/21/23Sam RathbunSurrey HomesSOFXH 030 Fox HammockIrisAMasonry ***Removing some Regulars & Pre-Blend
Sam Rathbun:
Need to adjust this package down on a few items. Had some block and mortar left over. Not sure if this should apply to all elevations, could ask an estimator to look at how similar they all are, and make a judgement call from there.

-30 x regular block
-15 x mortar mix

-----------------------------------------------------------

MASMAT.SO-Iris-A/Iris-B.FLBESTBLOCKORLANDO
MASMAT.SO-Iris-A/Iris-B.TITANORLANDO
Regulars: Old: 1845, New: 1815
Pre-Blend: Old: 151, New: 136
06/21/2306/21/23
Complete06/20/23Kyle JollyDart InterestsDIEVM 067 Portal EntryPortal Entry-Concrete ***Switching to 3000 PSI and adding 2 Yards
Kyle Jolly:
These footings are poured in 2 lifts. The first being 16” and the second being 14”. Concrete being used per Brian with Dart is 3000PSI with fiber. I will need an additional concrete PO submitted.

The first lift should take 3 yards
The second lift will take 3 yards

--------------------------------------------------------------

Kyle says they will not need a pump for the footings (Adam)

2500 PSI: Old: 4 Yards, New: 0
3000 PSI: Old: 0, New: 6 Yards
+ Fiber + Fuel & Evironmental Fees
06/20/2306/20/23
Complete06/16/23Brian DinkerMintoNDLTM 2968 LatitudesAllAllMasonry ***Removing Block
Brian Dinker:
Old 8x8x12” block (60)
New amount is (30) for both elevations

Any villla with amount (75) 14” block
Make new amount of (45)
Both elevations

------------------------------------------------------------------
MASMAT.NDLTM12-A/NDLTM12-II-A.FLBESTBLOCKORLANDO
MASMAT.NDLTM12-A/NDLTM12-II-A.PREFERREDDAYTONA
12" Block: Old: 60, New: 30
14" Block: Old: 75, New: 45

MASMAT.NDLTM9-B.PREFERREDDAYTONA
MASMAT.NDLTM9-B.FLBESTBLOCKORLANDO
MASMAT.NDLTM9-A.PREFERREDDAYTONA
MASMAT.NDLTM9-A.FLBESTBLOCKORLANDO
12" Block: Old: 75, New: 30
14" Block: Old: 75, New: 45

MASMAT.NDLTM8-B.PREFERREDDAYTONA
MASMAT.NDLTM8-B.FLBESTBLOCKORLANDO
MASMAT.NDLTM8-A.PREFERREDDAYTONA
MASMAT.NDLTM8-A.FLBESTBLOCKORLANDO
12" Block: Old: 75, New: 30
14" Block: Old: 75, New: 45

MASMAT.NDLTM7-B/NDLTM7-II-B.PREFERREDDAYTONA
MASMAT.NDLTM7-B/NDLTM7-II-B.FLBESTBLOCKORLANDO
MASMAT.NDLTM7-A/NDLTM7-II-A.PREFERREDDAYTONA
MASMAT.NDLTM7-A/NDLTM7-II-A.FLBESTBLOCKORLANDO
12" Block: Old: 60, New: 30
14" Block: Old: 75, New: 45

MASMAT.NDLTM6-B.PREFERREDDAYTONA
MASMAT.NDLTM6-B.FLBESTBLOCKORLANDO
MASMAT.NDLTM6-A.PREFERREDDAYTONA
MASMAT.NDLTM6-A.FLBESTBLOCKORLANDO
12" Block: Old: 75, New: 30
14" Block: Old: 75, New: 45

MASMAT.NDLTM5-B.PREFERREDDAYTONA
MASMAT.NDLTM5-B.FLBESTBLOCKORLANDO
MASMAT.NDLTM5-A.PREFERREDDAYTONA
MASMAT.NDLTM5-A.FLBESTBLOCKORLANDO
12" Block: Old: 75, New: 30
14" Block: Old: 75, New: 45

MASMAT.NDLTM4-B/NDLTM4-II-B.PREFERREDDAYTONA
MASMAT.NDLTM4-B/NDLTM4-II-B.FLBESTBLOCKORLANDO
MASMAT.NDLTM4-A/NDLTM4-II-A.PREFERREDDAYTONA
MASMAT.NDLTM4-A/NDLTM4-II-A.FLBESTBLOCKORLANDO
12" Block: Old: 75, New: 30
14" Block: Old: 75, New: 45

MASMAT.NDLTM3-B.PREFERREDDAYTONA
MASMAT.NDLTM3-B.FLBESTBLOCKORLANDO
MASMAT.NDLTM3-A.PREFERREDDAYTONA
MASMAT.NDLTM3-A.FLBESTBLOCKORLANDO
12" Block: Old: 75, New: 30
14" Block: Old: 75, New: 45

MASMAT.NDLTM2-B.PREFERREDDAYTONA
MASMAT.NDLTM2-B.FLBESTBLOCKORLANDO
MASMAT.NDLTM2-A.PREFERREDDAYTONA
MASMAT.NDLTM2-A.FLBESTBLOCKORLANDO
12" Block: Old: 75, New: 30
14" Block: Old: 75, New: 45

MASMAT.NDLTM13-A/NDLTM13-B.PREFERREDDAYTONA
MASMAT.NDLTM13-A/NDLTM13-B.FLBESTBLOCKORLANDO
12" Block: Old: 75, New: 30
14" Block: Old: 75, New: 45

MASMAT.NDLTM10-B.PREFERREDDAYTONA
MASMAT.NDLTM10-B.FLBESTBLOCKORLANDO
MASMAT.NDLTM10-A.PREFERREDDAYTONA
MASMAT.NDLTM10-A.FLBESTBLOCKORLANDO
12" Block: Old: 75, New: 30
14" Block: Old: 75, New: 45
06/16/2306/16/23
Complete06/16/23Bobby NellerRichmondROEDH 032-02 Eden HillsF924/AmmoliteJMasonry ***Adding Regulars & Lintel Block
Bobby Neller:
Regulars 8 x 8 x 16: Old: 1468, New: 1684
Need three cubes of regulars.

Lintel block 8 x 8 x 16: Old: 150, New: 200

------------------------------------------------------------------

MASMAT.RA-F924-J.FLBESTBLOCKORLANDO
Regulars: Old: 1464, New: 1684
Lintel Block: Old: 150, New: 200

MASMAT.RA-F924-J.FLBESTBLOCKTAMPA
Regulars: Old: 1464, New: 1684
Lintel Block: Old: 150, New: 200

MASMAT.RA-F924-J.TITANORLANDO(ZONE3)
Regulars: Old: 1464, New: 1684
Lintel Block: Old: 150, New: 200

MASMAT.RA-F924-J.TITANORLANDO(ZONE4)
Regulars: Old: 1464, New: 1684
Lintel Block: Old: 150, New: 200
06/16/2306/16/23
Complete06/09/23Sam RathbunBella Vista Building GroupBVRDG 008 Rivers Edge6-UnitABAABAFrame ***Adding 2x4x108 5/8 Spruce
Sam Rathbun:
Need more studs for the first floor walls. Need 45 - 2x4x108 5/8”.

I would add 30 total to takeoff 6 units x 5 each.

------------------------------------------------------------------

FRMMAT-DROP1.BVRDG-ABAABA.BFS
2 x 4 x 108 5/8" Spruce: Old: 320, New: 350
06/09/2306/09/23
Complete06/06/23OmarMintoNDICP 1330 Isles of CollierCottage 4BHardware ***Adding Left Corner Column Cap
Omar:
Order 1 pc of ECCLLQ4F4=SDS2.5 LEFT CORNER COLUMN CAP. This unit requires three corner caps. Please order one corner to be picked up and add one corner to po. Thank you.


----------------------------------------------------------

HDW.NDICP-4B(12"PARTY WALL).WHITECAP

ECCLLQ444-SDS2.5 Left Corner Column Cap: Old: 2, New: 3
06/06/2306/06/23
Complete06/06/23Dane JonesToll BrothersTBLPT 077 Laurel PointeDolcettoMOCovered Balcony OptionSwapping to 3/4" T&G SYP CDX Treated
Adam Sowers:
Need PT tongue and groove subfloor materials for the master bedroom balcony -Dane

--------------------------------------------------------------------------

6/6/23 - We had a similar fill-in to this on lot 48 (same model/elevation). 3/4" Treated needed for the Covered Balcony Option/Selection instead of the 3/4" Advantech per Dane.

263353 - COVBAL@PRIMARY
FRMMAT-DROP1.TBLPT077.84LUMBER

--------------------------------------------------------------------------

FRMMAT-DROP1.TBLPT077-COVBAL.84LUMBER
3/4" x 4' x 8' CDX T&G Floor Sheathing: Old: 14, New: 0
3/4" x 4' x 8' T&G SYP CDX TREATED: Old: 0, New: 14

Update:
Swapped to 3/4" CDX Pressure Treated instead (Adam)
06/06/2306/06/23
Complete06/05/23OmarMintoNDICP 1324 Isles of CollierCottage 1ASlab Prep ***Adding Rod Chairs
Omar:
Needed to complete slab prep. Used some of this slab mat to complete two other slab. Please add one box to package.

---------------------------------------------------------------------------

SLABPREP.NDICP-1A (12"PARTY WALL).WHITECAP
SLABPREP.NDICP-1A (12"PARTY WALL).CASTCRETE

12" Rod Chairs: Old: 91 (each), New: 2 Boxes

06/05/2306/05/23
Complete06/01/23Sam RathbunBella Vista Building GroupBVRDG 008 Rivers Edge6-UnitABAABAFrame ***Adding 2x6x92 5/8 Spruce
Adam Sowers:
This to-do is primarily to adjust down the number of 2x6x92 5/8 SP studs that were on the fill in yesterday. There is no way they could need that many. Only need 100 more and need to add 50 to each building (2 & 8) takeoff.

----------------------------------------------------------

FRMMAT-DROP2.BVRDG-ABAABA.BFS

2x6x92-5/8 Spruce: Old: 430, New: 480
06/01/2306/01/23
Complete06/01/23Sam RathbunBella Vista Building GroupBVRDG 008 Rivers Edge6-UnitABAABAShaftwall Materials ***Adding DensGlass
Sam Rathbun:
DensGlass Package Change. DensGlass is short. Looks like we need roughly 40sheets per side of each wall. 40 x 10walls (2sides each) = 400 - 272 = 128 short per building. 256 total fill in for building 8. This is heavy but I’m not accounting for the strips they have to cut and use. Need H channel to go with this not sure how much yet. C channnel is fine I think.

--------------------------------------------------------------------------

6/1/23 - This was missed in the takeoff per Angie. Went over this with Kevin as well and will be changing the drops to 210 each (Adam).

SHAFTWALL-DROP1.BVRDG-ABAABA.INTERIOREXTERIOR
SHAFTWALL-DROP2.BVRDG-ABAABA.INTERIOREXTERIOR

DenGlass - 2x10x1: Old: 136, New: 210
06/01/23Angie06/01/23
Complete05/31/23Ross JohnsonSoebel CoOFPPR 01L Parkway Preserve3-UnitADBHardare ***Hardware Changes
Ross Johnsons:
REMOVE ALL
H4 hurricane tie (20)
PA28 Purlin Anchor (13)
Wedge Anchor 1/2" x 8 1/2" (36)

CHANGE QUANTITY
H10A Hurricane Tie (old:16 new:40)
HU410 Heavy Face Mount Hanger (old:2 new:4)
MSTA18 Medium Strap Tie (old:36 new:20)
MSTA24 Medium Strap Tie (old:27 new:20)
N58 Hex Nut 5/8" (old:10 new:30)
5/8" Panel Sheathing Clips (old:7 box new:5 box)
SPH6 Heavy Stud Plate Tie (old:60 new:160)
Sub Floor Adhesive (old:15 new:10)
Thermafiber 4"x24"x48" (old:3 new:1)
Wedge Anchor 1/2" x 7" (old:42 new:30)
Wedge Anchor 5/8" x 10" (old:120 new:130)
3"x3"x1/2" Square Washer 1/4" thick (old:42 new:30)
U210 Face Mount Hanger (old:30 new:70)

ADD
H2.5A hurricane clips (25)

-------------------------------------------------------------------------------

HDW.OFPPR-ADB.WHITECAP

H4: Old: 20, New: 0
PA28: Old: 13, New: 0
1/2 x 8-1/2 Wedge Anchor: Old: 36, New: 0
H10A: Old: 16, New: 40
HU410: Old: 2, New: 4
MSTA18: Old: 36, New: 20
MSTA24: Old: 27, New: 20
N58: Old: 10, New: 30
5/8" Panel Sheathing Clips: Old: 7, New: 5
SPH6: Old: 60, New: 160
Sub Floor Adhesive: Old: 15, New: 10
Thermafiber 4"x24"x48": Old: 3, New: 1
Wedge Anchor 1/2" x 7": Old: 42, New: 30
Wedge Anchor 5/8" x 10": Old: 120, New: 130
3"x3"x1/2" Square Washer: Old: 42, New: 30
U210: Old: 30, New: 70
H2.5A: Old: 0, New: 25

05/31/2305/31/23
Complete05/30/23Ross JohnsonSobel CoOFPPR 01I Parkway Preserve3-UnitACBFrame Materials ***Frame Changes
Ross Johnson:
Lumber Package changes. OFPPR01I-0008 Needs to be revised and this revision should go for all ACB/BCA unit mixes going forward.

Remove all:
2x12x16 #2 PT Borate (8)
2x12x20 #2 Southern Yellow Pine (3)
2x6x8 #2 PT Borate (10)
2x6x8 #2 Southern Yellow Pine (3)
2x8x8 #2 Southern Yellow Pine (6)
1x6x12 #2 PT Borate (66)
1x4x12 #2 PT Borate (87)

Change quantity:
2x4x14 #2 PT Borate (old:11 new:18)
2x6x10 #2 PT Borate (old:3 new:10)
2x6x10 #2 Southern Yellow Pine (old:30 new:50)
2x6x16 #2 PT Borate (old:2 new:5)
2x8x16 Rough Sawn Spruce (old:30 new:50)
5/8x4x8 cdx sheathing (old:220 new:230)
1x2x10 #2 PT Borate (old:557 new:80)

-----------------------------------------------------------

FRMMAT-DROP1.OFPPR-ACB.84LUMBER

2x12x16 PT: Old: 8, New: 0
2x12x20 SYP: Old: 3, New: 0
2x6x8 PT: Old: 10, New: 0
2x6x8 SYP: Old: 3, New: 0
2x8x8 SYP: Old: 6, New: 0
1x6x12 PT: Old: 0, New: 0
1x4x12 PT: Old: 0, New: 0

2x4x14 PT: Old: 11, New: 18
2x6x10 PT: Old: 3, New: 10
2x6x10 SYP: Old: 30, New: 50
2x6x16 PT: Old: 2, New: 5
2x8x16 RS Spruce: Old: 30, New: 50
5/8 CDX: Old: 224, New: 230
1x2x10 PT: Old: 0, New: 80
05/30/2305/30/23
Complete05/26/23OmarMintoNDICP 1328 Isles of CollierCottage 3AFrame Materials ***Swapping out 1x2 for 1x4
Omar:
Order 18 pcs of 1x4x16 pt to be deliver and add to framing package. Delete from package the 1x2x10 pt * not used on site.

---------------------------------------------------------------

FRMMAT.NDICP-3A/NDICP-3C (12"PARTY WALL).84LUMBER

1x2x10 PT: Old: 83, New: 0
1x4x16 PT: Old: 0, New: 18
05/26/2305/26/23
Complete05/24/23Ross JohnsonSobel CoOFPPR 01B Parkway Preserve3-UnitADBMasonry Steel & Hardware ***Adding Corner Bars & Epoxy
Ross Johnson:
Please create a white cap fill in for 3 tubes of epoxy and 8 corner bars for the tie beam company (top notch) on the second lift for building B.

We need to add these items to a p.o. For the second lift on all future homes moving forward.

-----------------------------------------------------------------------

PCMS-DROP2.OFPPR-ADB.LOTTSFTMYERS
#5, 30x30 Corner Bars: Old: 0, New: 8


HDW.OFPPR-ADB.WHITECAP
Epoxy, Set10: Old: 2, New: 5
05/24/2305/24/23
Complete05/19/23Sam RathbunBella Vista Building GroupBVRDG 002 Rivers Edge6-UnitABAABAFrame Drop 2 ***Adding 15/32" Fire Rated CDX
Sharon:
Sam says the take off must be short. please have this checked. this is the first building we have started in this community.

Angie:
Add only 20 sheets to the package, for the new building. Buildings 8 and 2 are covered with the 60-sheet fill that has already been made.

-------------------------------------------------------------

FRMMAT-DROP2.BVRDG-ABAABA.BFS

15/32 Fire Rated CDX: Old: 134, New: 154
05/19/2305/24/23Angie05/24/23
Complete05/18/23OmarMintoNDICP 1338 Isles of CollierCottage 4AHardware ***Adding (1) ECCLLQ444
Omar:
Building requires 3 corner caps. Please order for pick up and add one more corner cap to hardware po.

-----------------------------------------------------

HDW.NDICP-4A (12"PARTY WALL).WHITECAP
ECCLLQ444: Old: 2, New: 3
05/18/2305/18/23
Complete05/17/23Steven GilbertRichmondROSUT 070 Sutton PreserveF927/SlateBSlab Prep ***Swapping Visqueen
Steven Gilbert:
Please change package remove 10 x 100 and replace it with a 20 x 100. Need a total of two 20 x 100‘ rolls of plastic.

--------------------------------------------------------------

SLABPREP.RA-Slate-F927-B.LOTTSORLANDO

10mil Visqueen, 10 x 100: Old: 1, New: 0
10mil Visqueen, 20 x 100L Old: 1, New: 2
05/17/2305/17/23
Complete05/16/23OmarMintoNDICP 1334 Isles of CollierCottage 4A, BFrame Material ***Adding 2x6x14 Spruce
Omar:
Fill in 2x6. 35 pcs of 2x6x14 spruce. Needed for facia.
Don’t know why it was deleted.

-----------------------------------------------------------------------------

I can't find a record of a package change on the 2x6x14 Spruce but for some reason some of the Cottage 4-A Jobs/POs have it (#1370) and the other do not. It's in the takeoff for both the A & B but missing from cost-groups for some reason (Adam).


FRMMAT.NDICP-4A (12"PARTY WALL).84LUMBER
2x6x14 Spruce: Old: 0, New: 43

FRMMAT.NDICP-4A (12"PARTY WALL).MARJAM
No Changes. Note: This CG was correct.

FRMMAT.NDICP-4B(12"PARTY WALL).84LUMBER
2x6x14 Spruce: Old: 0, New: 39

05/16/2305/16/23
Complete05/15/23Jason BridgesRichmondROPAL 414 PalisadesF924/AmmoliteJHardware ***Adding VGT & Threaded Rod
Jason Bridges:
Please add fill in to package.
(2) vgt
(2) 5/8” threaded rod

--------------------------------------------------

HDW.RA-Ammolite-F924-J.WHITECAP

VGT: Old: 0, New: 2
5/8 x 12" Threaded Rod: Old: 0, New: 2
05/15/2305/15/23
Complete05/10/23Jeff RotertMintoNDLTS 3037 Latitudes50-179AMasonry ***Adding Column Block
Jeff Rotert:
Missing 12” x 12” column block on this model. Please get with estimating on this. This house is supposed to have column block and has none on the PO. Please correct this I need it expedited as Masons are in progress.

-----------------------------------------------------------------

Estimating Review:

5/10/23 - I assume we have built this model (50-179) before? There has never been 12" column block. in the takeoff to the best of my knowledge. However, if we want to start sending them some then he needs (28) 12"x8"x12" column block -Chris Plantz

-----------------------------------------------------------------

MASMAT.NDLTS50-179-A.FLBESTBLOCKORLANDO

12x8x12 Column Block: Old: 0, New: 28
05/10/2305/10/23Chris Plantz05/10/23
Complete05/10/23AngieSobel CoAllAllAllFrame ***Adding 5/8 CDX
Angie Rodriguez:
Adam can you include this in the package 2 sheets of 5/8 CDX only in each end units (4 sheets per building)

---------------------------------------------------------------------

FRMMAT-DROP1.OFPPR-ACB.84LUMBER
FRMMAT-DROP1.OFPPR-ADB.84LUMBER

5/8 CDX: Old: 220, New: 224
05/10/2305/10/23
Complete05/09/23Chad BrewsterMarmer ContructionAllAllAllMasonry, 1st Lift ***Swapping 9-Highs w/ Regulars
Chad Brewster:
All , please note that the builder was able to delete the 1-1/2” Recess around the perimeter of the buildings at Cypress Gardens. This does eliminate the need for and 9” high block that is on our takeoffs. Please delete all 9” high block from the future p.o.’s and replace that quantity with regulars. Thanks.

----------------------------------------------------------------

MASMAT-DROP1.MACGA-TYPE1.JAHNA
9-High Block: Old: 600, New: 0
Regulars: Old: 7637, New: 8237

MASMAT-DROP1.MACGA-TYPE2.JAHNA
9-High Block: Old: 522, New: 0
Regulars: Old: 7673, New: 8195

MASMAT-DROP1.MACGA-TYPE3.JAHNA
9-High Block: Old: 573, New: 0
Regulars: Old: 8070, New: 8643
05/09/2305/09/23
Complete05/02/23OmarMintoNDICP 1330 Isles of CollierCottage 4BSlab Prep ***Swapping Visqueen to 10 mil
Omar Hernandez:
In the Slab Prep Material please replace the visquuen 6mil poly 20 x 100 roll with Visqueen 10mil poly 20’x100’ roll.

------------------------------------------------------

SLABPREP.NDICP-4A (12"PARTY WALL).CASTCRETE
SLABPREP.NDICP-4A (12"PARTY WALL).WHITECAP
SLABPREP.NDICP-4B (12" PARTY WALL).WHITECAP
SLABPREP.NDICP-4B (12" PARTY WALL).CASTCRETE

SLABPREP.NDICP-3A/NDICP-3C (12"PARTY WALL).WHITECAP
SLABPREP.NDICP-3B (12"PARTY WALL).CASTCRETE
SLABPREP.NDICP-3B (12"PARTY WALL).LOTTSORLANDO
SLABPREP.NDICP-3B (12"PARTY WALL).WHITECAP

SLABPREP.NDICP-2A (12"PARTY WALL).WHITECAP
SLABPREP.NDICP-2B (12"PARTY WALL).CASTCRETE
SLABPREP.NDICP-2B (12"PARTY WALL).WHITECAP
SLABPREP.NDICP-2C (12"PARTY WALL).CASTCRETE
SLABPREP.NDICP-2C (12"PARTY WALL).WHITECAP

SLABPREP.NDICP-1A (12"PARTY WALL).CASTCRETE
SLABPREP.NDICP-1A (12"PARTY WALL).WHITECAP
SLABPREP.NDICP-1B (12"PARTY WALL).CASTCRETE
SLABPREP.NDICP-1B (12"PARTY WALL).WHITECAP
SLABPREP.NDICP-1C (12"PARTY WALL).CASTCRETE
SLABPREP.NDICP-1C (12"PARTY WALL).WHITECAP

6 mil, 20 x 100: Old: 2, New: 0
10 mil, 20 x 100: Old: 0, New: 2
05/02/2305/03/23
Complete04/27/23Bobby NellerRichmondROFCR 077 Forest CreekF936BHardware ***Reducing SP2 & Washers
Bobby Neller:
Package change removing additional hardware
SP2-old-99, New-50
2”x2”x1/2” Square washer-old-32, New-20

------------------------------------------------------

HDW.RA-Palm-F936-B.WHITECAP
SP2: Old: 99, New: 50
1/2 Washers: Old: 32, New: 20
04/27/2304/27/23
Complete04/26/23Cyndi MulleeMintoNDLTC 3108 LatitudesALLALLFrame ***Adding Gable Bracing
Cyndi Mullee:
Lumber package change to incorporate gable end bracing (all models) and added lumber for Aloha models (189).

Across all models, Please add:
(22) 2x4x14’ SYP
(12) 2x6x14 SYP

ALOHA MODEL (189) only please add:
(8) 2x12x12’ PT borate

-------------------------------------------------------------------
FRMMAT.NDLTC1A.84LUMBER
FRMMAT.NDLTC1A.BFS
FRMMAT.NDLTC1A.MARJAM
FRMMAT.NDLTC1C.84LUMBER
FRMMAT.NDLTC1C.BFS
FRMMAT.NDLTC1C.MARJAM
2x4x14 SYP: Old: 273, New: 295
2x6x14 SYP: Old: 2, New: 14
2x12x12 PT: Old: 0, New: 8

FRMMAT.NDLTC1B.84LUMBER
FRMMAT.NDLTC1B.BFS
FRMMAT.NDLTC1B.MARJAM
2x4x14 SYP: Old: 250, New: 272
2x6x14 SYP: Old: 2, New: 14
2x12x12 PT: Old: 0, New: 8

FRMMAT.NDLTC2A.84LUMBER
FRMMAT.NDLTC2A.BFS
FRMMAT.NDLTC2A.MARJAM
FRMMAT.NDLTC2B.84LUMBER
FRMMAT.NDLTC2B.BFS
FRMMAT.NDLTC2B.MARJAM
FRMMAT.NDLTC2C.84LUMBER
FRMMAT.NDLTC2C.MARJAM
2x4x14 SYP: Old: 274, New: 296
2x6x14 SYP: Old: 3, New: 15

FRMMAT.NDLTC3A.84LUMBER
FRMMAT.NDLTC3A.BFS
FRMMAT.NDLTC3A.MARJAM
FRMMAT.NDLTC3B.84LUMBER
FRMMAT.NDLTC3B.BFS
FRMMAT.NDLTC3B.MARJAM
FRMMAT.NDLTC3C.84LUMBER
FRMMAT.NDLTC3C.BFS
FRMMAT.NDLTC3C.MARJAM
2x4x14 SYP: Old: 273, New: 295
2x6x14 SYP: Old: 3, New: 15
2x12x12 PT: Old: 0, New: 8

FRMMAT.NDLTC4A.84LUMBER
FRMMAT.NDLTC4A.BFS
FRMMAT.NDLTC4A.MARJAM
FRMMAT.NDLTC4B.84LUMBER
FRMMAT.NDLTC4B.BFS
FRMMAT.NDLTC4B.MARJAM
2x4x14 SYP: Old: 279, New: 301
2x6x14 SYP: Old: 2, New: 14

FRMMAT.NDLTC4C.84LUMBER
FRMMAT.NDLTC4C.BFS
FRMMAT.NDLTC4C.MARJAM
2x4x14 SYP: Old: 270, New: 292
2x6x14 SYP: Old: 2, New: 14
04/26/2304/27/23
Complete04/24/23Jeff RotertMintoNDLTS 3039 Latitudes50-179-IIBMasonry ***Removing 90 Regulars
Jeff Rotert:
Please remove (90) regular block from this model.

----------------------------------------------------------------

MASMAT.NDLTS50-179-II-B.FLBESTBLOCKORLANDO

Regulars: Old: 2462, New: 2372
04/24/2304/24/23
Complete04/18/23Cyndi MulleeMintoNDLTC 3110 LatitudesALLALLMasonry ***Removing Four & Six High Block
Cyndi Mullee:
Masonry Block package change- all models/elevations.
Remove all Four & Six High Block.

Revise PO’s on: 3110, 3114, 3154, 3150.

-------------------------------------------------------------------

MASMAT.NDLTC1A.FLBESTBLOCKORLANDO
MASMAT.NDLTC1A.PREFERREDDAYTONA
MASMAT.NDLTC1B.FLBESTBLOCKORLANDO
MASMAT.NDLTC1B.PREFERREDDAYTONA
MASMAT.NDLTC1C.FLBESTBLOCKORLANDO
MASMAT.NDLTC1C.PREFERREDDAYTONA
MASMAT.NDLTC2A.FLBESTBLOCKORLANDO
MASMAT.NDLTC2A.PREFERREDDAYTONA
MASMAT.NDLTC2B.FLBESTBLOCKORLANDO
MASMAT.NDLTC2B.PREFERREDDAYTONA
MASMAT.NDLTC2C.FLBESTBLOCKORLANDO
MASMAT.NDLTC2C.PREFERREDDAYTONA
MASMAT.NDLTC3A.FLBESTBLOCKORLANDO
MASMAT.NDLTC3A.PREFERREDDAYTONA
MASMAT.NDLTC3B.FLBESTBLOCKORLANDO
MASMAT.NDLTC3B.PREFERREDDAYTONA
MASMAT.NDLTC3C.FLBESTBLOCKORLANDO
MASMAT.NDLTC3C.PREFERREDDAYTONA
MASMAT.NDLTC4A.FLBESTBLOCKORLANDO
MASMAT.NDLTC4A.PREFERREDDAYTONA
MASMAT.NDLTC4B.FLBESTBLOCKORLANDO
MASMAT.NDLTC4B.PREFERREDDAYTONA
MASMAT.NDLTC4C.FLBESTBLOCKORLANDO
MASMAT.NDLTC4C.PREFERREDDAYTONA

8x4x16: Old: 24, New: 0
8x6x16: Old: 40, New: 0
04/18/2304/18/23
Complete04/17/23Steven GilbertRichmondROFLK 037 Forest LakeF926/EmeraldKPrecast ***Swapping Lintels & Sills
Steven Gilbert:
Precast and sill for front window is incorrect.
Remove (1) 4’6” precast
Remove (1) 3’1” sill
Add (1) 5’10” precast
Add (1) 4’0” sill

------------------------------------------------------------------------

PCMS.RA-Emerald-F926-A/F926-K.LOTTSORLANDO

4'-6" Lintel: Old: 3, New: 2
5'-10" Lintel: Old: 2, New: 3
3'-1" Sill: Old: 2, New: 3
4'-0" Sill: Old: 2, New: 3
04/17/2304/17/23
Complete04/14/23Jeff RotertMintoNDLTS 3041 Latitudes50-184AMasonry***Removing Regulars
Jeff Rotert:
Remove (90) regular block from this model

------------------------------------------------------------

MASMAT.NDLTS50-184-A.FLBESTBLOCKORLANDO
Regulars: Old: 2028, New: 1938
04/14/2304/14/23
Complete04/13/23Sam RathbunSurrey HomesSOFXH 039 Fox HammockAzaleaAMasonry***, Lintel ConcreteReducing Pre-Blend & Lintel Concrete
Sam Rathbun:
This house needs the takeoff adjusted down by 20 bags of pre blend.

This lintel pour only needed 8 yds even with the rear patio option. The base Azalea should only need 9 yds on the very safe side.

---------------------------------------------------------------

MASMAT.SO-AZALEA-A.BESTBLOCKORLANDO
MASMAT.SO-AZALEA-A.TITANORLANDO
Pre-Blend: Old: 136, New: 116

LINCON.SO-AZALEA-A.TITANORLANDO
LINCON.SO-AZALEA-A.TITANBREVARD
LINCON.SO-AZALEA-A.PREFERREDORLANDO
Lintel Concrete: Old: 10 yds, New: 9 yds
04/13/2304/13/23
Complete04/12/23Ryan CorriganDart InterestsDIEVM 010 Evermore Resort10-BedroomTheaterFrame ***Swapping 8x8x10 to 12' Post
Ryan Corrigan:
Package change:
Please change all 8x8PT posts to 12’ instead of 10’ on all 10 bedroom houses left.

--------------------------------------------------------------

FRMMAT-DROP2.DIEVM-10BR-NONE.HAVEN
FRMMAT-DROP2.DIEVM-10BR-THEATRE.HAVEN

8x8x10' Post: Old: 2, New: 0
8x8x12' Post: Old: 0, New: 2
04/12/2304/12/23
Complete04/11/23Ross JohnsonSobel Co-3-UnitACB, ADB, BDAHardware ***Adding 5/8 Wedge Anchors & Washers
Sharon:
Ross Johnson is needing to order 50 5/8x5” wedge anchors and 50 2X2 square washers that would go with the wedge anchors. He is saying ¼” but I do not believe they make a square washer this size. I think where he sees this on the plans refers to the opening of the hole. Ross can confirm but I believe he will need 5/8x2x2 sq washers.

He is needing this same order for bldg. D, E and F and says this needs to be added to the packages.

I would add them to the hardware po’s on G, H, J these have not been scheduled or delivered yet.

---------------------------------------------------------------------------

HDW.OFPPR-ACB.WHITECAP
HDW.OFPPR-ADB.WHITECAP

5/8x5 Wedge Anchors: Old: 0, New: 50
5/8x2x2 Washers: Old: 130, New: 180
04/11/2304/11/23
Complete04/05/23Jeff RotertMintoNDLTS 2761 Latitudes40-177A, BMasonry ***Removing 90 Regulars
Jeff Rotert:
Please remove 90 regular block from this model.

------------------------------------------------------------------

MASMAT.NDLTS40-177-B.FLBESTBLOCKORLANDO

Regulars: Old: 1764, New: 1674

MASMAT.NDLTS40-177-A.FLBESTBLOCKORLANDO

Regulars: Old: 1854, New: 1764
04/05/2304/05/23
Complete04/05/23David PurvisDart Interests-10 -Bedroom, 11-BedroomALLHardware ***Revising Package
David Purvis:
Good afternoon here is updated hardware packs for 10 and 11 bedrooms. Please make them the same for both. This is for only the highlighted materials.

Totals
hga10kt new total of 6
Sp1 new total of 25
Sp2 new total of 25
Sp4 new total of 200
Sp6 new total of 100
Tapcon 1/4”x2 3/4” new total of 2 boxes
Tapcon 1/4x 3 1/4” new total of 4 boxes
Tapcon 1/4x 4” new total of 4 boxes
Tapcon 1/4x5” new total of 9 boxes
3x3x 3/4 square washer new total of 200
2x2 3/4 washers: Old: 185, New: 0
3/4”x10” wedge anchor new total of 200
#8 x 2 1/2” wstd212s new total of 3 boxes
Dtc new total of 4 boxes

-----------------------------------------------------------------------------

HDW.DIEVM-10BR-NONE.WHITECAP
HGA10KT: Old: 4, New: 6
SP1: Old: 77, New: 25
SP2: Old: 77, New: 25
SP4: Old: 18, New: 200
SP6: Old: 29, New: 100
Tapcons 1/4 x 2 3/4: Old: 0, New: 2
Tapcons 1/4 x 3 1/4: Matches, No Change
Tapcons 1/4 x 4: Old: 6, New: 4
Tapcons 1/4 x 5: Old: 0, New: 9
3/4 x 3 x 3 Washers: Old: 0, New: 200
3/4 x 2 x 2 Washers: Old: 185, New: 0
3/4 x 10 Wedge Anchors: Old: 185, New: 200
#8 x 2 1/2" WSTD212: Old: 0, New: 3
#8 x 2 1/2 Wood Screws: Old: 3, New: 0
DTC Clips: Old: 0, New: 400

HDW.DIEVM-10BR-THEATRE.WHITECAP
HGA10KT: Old: 4, New: 6
SP1: Old: 77, New: 25
SP2: Old: 77, New: 25
SP4: Old: 18, New: 200
SP6: Old: 29, New: 100
Tapcons 1/4 x 2 3/4: Old: 1, New: 2
Tapcons 1/4 x 3 1/4: Matches, No Change
Tapcons 1/4 x 4: Old: 6, New: 4
Tapcons 1/4 x 5: Old: 0, New: 9
3/4 x 3 x 3 Washers: Old: 0, New: 200
3/4 x 2 x 2 Washers: Old: 185, New: 0
3/4 x 10 Wedge Anchors: Old: 185, New: 200
#8 x 2 1/2" WSTD212: Old: , New: 3
#8 x 2 1/2 Wood Screws: Old: 3, New: 0
DTC Clips: Old: 0, New: 400

HDW.DIEVM-11BR-CORNER.WHITECAP
HGA10KT: Old: 3, New: 6
SP1: Old: 101, New: 25
SP2: Old: 101, New: 25
SP4: Old: 12, New: 200
SP6: Old: 33, New: 100
Tapcons 1/4 x 2 3/4: Old: 1, New: 2
Tapcons 1/4 x 3 1/4: Old: 2, New: 4
Tapcons 1/4 x 4: Old: 9, New: 4
Tapcons 1/4 x 5: Old: 0, New: 9
3/4 x 3 x 3 Washers: Old: 0, New: 200
3/4 x 2 x 2 Washers: Old: 165, New: 0
3/4 x 10 Wedge Anchors: Old: 165, New: 200
#8 x 2 1/2" WSTD212: Old: 0, New: 3
#8 x 2 1/2 Wood Screws: Old: 3, New: 0
DTC Clips: Old: 0, New: 400

HDW.DIEVM-11BR-NONE/11BR-THEATRE.WHITECAP
HGA10KT: Old: 3, New: 6
SP1: Old: 101, New: 25
SP2: Old: 101, New: 25
SP4: Old: 6, New: 200
SP6: Old: 36, New: 100
Tapcons 1/4 x 2 3/4: Old: 1, New: 2
Tapcons 1/4 x 3 1/4: Old: 2, New: 4
Tapcons 1/4 x 4: Old: 9, New: 4
Tapcons 1/4 x 5: Old: 0, New: 9
3/4 x 3 x 3 Washers: Old: 0, New: 200
3/4 x 2 x 2 Washers: Old: 165, New: 0
3/4 x 10 Wedge Anchors: Old: 165, New: 200
#8 x 2 1/2" WSTD212: Old: 0, New: 3
#8 x 2 1/2 Wood Screws: Old: 3, New: 0
DTC Clips: Old: 0, New: 400
04/05/2304/05/23
Complete04/05/23Jeff SubbertDart InterestsDIEVM 004 Evermore ResortALLALLPrecast/Masonry Steel, Drop 2 ***Adding HETA20s Back
Jeff Subbert:
At one point in time we were heavy on HETA20 straps, and I requested them to be taken off of Po’s. At this time I am requesting all lots concrete second lift precast PO’s to once again have the straps on the takeoff I think you.

---------------------------------------------------------

PCMS-DROP2.DIEVM-9BR-CORNER.LOTTSORLANDO
PCMS-DROP2.DIEVM-9BR-CORNER/THEATRE.LOTTSORLANDO
PCMS-DROP2.DIEVM-9BR-NONE.LOTTSORLANDO
HETA20: Old: 0, New: 142

PCMS-DROP2.DIEVM-8BR-NONE.LOTTSORLANDO
HETA20: Old: 0, New: 102

PCMS-DROP2.DIEVM-8BR-CORNER.LOTTSORLANDO
HETA20: Old: 0, New: 104

PCMS-DROP2.DIEVM-7BR-THEATRE.LOTTSORLANDO
PCMS-DROP2.DIEVM-7BR-NONE.LOTTSORLANDO
HETA20: Old: 0, New: 117

PCMS-DROP2.DIEVM-5BR-NONE.LOTTSORLANDO
HETA20: Old: 0, New: 125

PCMS-DROP2.DIEVM-11BR-THEATRE.LOTTSORLANDO
PCMS-DROP2.DIEVM-11BR-NONE.LOTTSORLANDO
PCMS-DROP2.DIEVM-11BR-CORNER.LOTTSORLANDO
PCMS-DROP2.DIEVM-11BR-B.LOTTSORLANDO
HETA20: Old: 0, New: 156

PCMS-DROP2.DIEVM-10BR-THEATRE.LOTTSORLANDO
PCMS-DROP2.DIEVM-10BR-NONE.LOTTSORLANDO
HETA20: Old: 0, New: 146
04/05/2304/05/23
Complete04/04/23John RathbunDart InterestsDIEVM 060 Evermore Resort11-BedroomCornerFrame Drop 2 ***Revising Package
John Rathbun:
Per Dave after todays meeting with all the framers we need to send the following as a fill in /package change .

Package change - please add 50 2x6x10 SYP to frame drop two for a new total of 106 on the 11 BR homes.

Please remove 50 2x6x10 spruce frame frame drop two for a new total of 387 on the 11 BR homes.

Please send 50 2x4x14 SYP
Please send 50 2x6x10 SYP

Please send this same fill in for lot 60,61,62. Thank you

----------------------------------------------------------------------

FRMMAT-DROP2.DIEVM-11BR-CORNER.HAVEN

2x6x10 SYP: Old: 56, New: 106
2x6x10 Spruce: Old: 447, New: 397
04/04/2304/04/23
Complete04/04/23Kyle JollyDart InterestsDIEVM 056 Evermore Resort5-BedroomNoneHardware ***Adding #10 x 5" Wood Screws
Kyle Jolly:
Needed for detail that was overlooked.

Needed for 5’s and 7’s: 56, 43, 9, 47.

#10x5” exterior wood screws (1000)

Split between those 4 lots

------------------------------------------------------------

HDW.DIEVM-5BR-NONE.WHITECAP
#10 x 5" Screws: Old: 0, New: 250

HDW.DIEVM-7BR-NONE/7BR-THEATRE.WHITECAP
#10 x 5" Screws: Old: 0, New: 250
04/04/2304/04/23
Complete04/03/23Ryan CorriganDart InterestsDIEVM 065 Evermore Resort10-BedroomNoneFrame Drop 2 ***Revising Package
Ryan Corrigan:
Please make this package change for any lot that the second lift has not been delivered.

Add
(50) 2x6x10 SYP
(50) 2x4x10 SYP
Remove
(50) 2x6x10 Spruce

---------------------------------------------------------------------------

FRMMAT-DROP2.DIEVM-10BR-NONE.HAVEN

2x4x10 SYP: Old: 0, New: 50
2x6x10 SYP: Old: 137, New: 187
2x6x10 Spruce: Old: 318, New: 268
04/03/2304/03/23
Complete03/31/23John RathbunDart InterestsDIEVM 052 Evermore Resort11-BedroomNone, TheaterFrame Drop 2 ***Revising Package
John Rathbun:
Per Dave after todays meeting with all the framers we need to send the following as a fill in /package change .

Package change - please add 50 2x6x10 SYP to frame drop two for a new total of 106 on the 11 BR homes.

Please remove 50 2x6x10 spruce frame frame drop two for a new total of 387 on the 11 BR homes.

Please send 50 2x4x14 SYP
Please send 50 2x6x10 SYP

------------------------------------------------------------------

FRMMAT-DROP2.DIEVM-11BR-NONE/11BR-THEATRE.HAVEN

2x6x10 SYP: Old: 56, New: 106
2x6x10 Spruce: Old: 437, New: 387


03/31/2303/31/23
Complete03/31/23John RathbunDart InterestsDIEVM 050 Evermore Resort10-BedroomTheaterFrame Drop 2 ***Revising Package
John Rathbun:
Per Dave after todays meeting with all the framers we need to send the following as a fill in /package change .

Package change - please add 50 2x6x10 SYP to frame drop two for a new total of 187 on the 10 BR homes.

Please remove 50 2x6x10 spruce frame frame drop two for a new total of 268 on the 10 BR homes.

Please send 50 2x4x14 SYP
Please send 50 2x6x10 SYP

----------------------------------------------------------------------------------

FRMMAT-DROP2.DIEVM-10BR-THEATRE.HAVEN

2x4x10 SYP: Old: 0, New: 50
2x6x10 SYP: Old: 137, New: 187
2x6x10 Spruce: Old: 318, New: 268
03/31/2303/31/23
Complete03/28/23Larry SimsSobel CoOFPPR 01G Parkway Preserve3-UnitBDAFrame ***Removing Materials
Larry Sims:
Package change for ADB model and release to vendor. Change package to remove lumber for door and window bucks remove excess material.

Delete
557) 1 x 2 x 10 PT
87) 1 x 4 x 12 PT
66) 1 x 6 x 12 PT
160) 2 x 4 x 14 Spruce
155) 2 x 4 x 16 SYP
20) 2 x 6 x14 SYP
9) 2 x 6 x 8 PT
17) 2 x 8 x 14 SYP
30) 5/8 x 4 x 8 CDX Sheathing

--

6) 2 x 12 x 12’ SYP
8) 2 x 12 x 16’ PT
3) 2 x 12 x 16’ SYP
3) 2 x 12 x 20’ SYP
3) 2 x 12 x 8’ SYP
12) 2 x 4 x 10 SYP
17) 2 x 4 x 14’ PT
59) 2 x 4 x 14’ SYP
32) 2 x 4 x 14 Spruce
25) 2 x 4 x 16 PT
200) 2 x 4 x 16’ SYP
3) 2 x 6 x 10’ PT
64) 2 x 6 x 10’ SYP
17) 2 x 6 x 14’ SYP
8) 2 x 6 x 16’ PT
10) 2 x 6 x 8 PT
20) 2 x 8 x 14’ SYP
16) 2 x 8 x 16’ PT
6) 2 x 8 x 8’ SYP
48) 23/32 x 4 x 8 OSB T&G EDGE GREEN FLOORING
64) 5/8 x 4 x 8 CDX Fire Rated Sheathing
220) 5/8 x 4 x 8 CDX Sheathing
1) Housewrap DuPont Tyvek 9 x 100
30) 2 x 8 x 16 Rough Sawn Spruce Primed

------------------------------------------------------------------------

FRMMAT-DROP1.OFPPR-ADB.84LUMBER

1x2x10 PT: Old: 557, New: 0
1x4x12 PT: Old: 87, New: 0
1x6x12 PT: Old: 66, New: 0
2x4x14 Spruce: Old: 192, New: 32
2x4x16 SYP: Old: 355, New: 200
2x6x14 SYP: Old: 37, New: 17
2x6x8 PT: Old: 19, New: 10
2x8x14 SYP: Old: 37, New: 20
5/8 CDX: Old: 30, New: 0

Notes: Moved 5/8 CDX from 2nd Drop to 1st Drop and deleted the 2nd Drop Cost-Group (Adam).

03/28/2303/28/23
Complete03/27/23Larry SimsSobel CoOFPPR 01D Parkway Preserve3-UnitACBFrame ***Removing Materials
Larry Sims:
Need to change package to reflect that we are not doing window bucking or furring. This change will apply to all ACB buildings package should be:

0) 1 x 2 x 10 #2 pt
0) 1 x 4 x 12 # 2 PT
0) 1 x 6 x 12 #2 PT
6) 2 x 12 x 12’ #2 Syp
8) 2 x 12 x 16 #2 PT
3) 2 x 12 x 20 #2 SYP
12) 2 x 4 x 10 #2 SYP
11) 2 x 4 x 14 #2 PT
59) 2 x 4 x 14 #2 SYP
32) 2 x 4 x 14 spruce
20) 2 x 4 x 16 #2 PT
200) 2 x 4 x 16 #2 SYP
3) 2 x 6 x 10 #2 PT
30) 2 x 6 x 10 #2 SYP
10) 2 x 6 x 14 #2 SYP
2) 2 x 6 16 #2 PT
10) 2 x 6 x 8 #2 PT
3) 2 x 6 x 8 #2 SYP
10) 2 x 8 x 10 #2 PT
20) 2 x 8 x 14 #2 SYP
10) 2 x 8 x 16 #2 PT
6) 2 x 8 x 8 #2 SYP
41) 23/32 x 4 x 8 OSB T&G EDGE GREEN FLOORING
64) 5/8 x 4 x 8 CDX Fire Rated Sheathing
220) 5/8 x 4 x 8 CDX Sheathing
1) Housewrap DuPont Tyvvek 9 x 100
30) 2 x 8 x 16 Rough Sawn Spruce primed

--------------------------------------------------------------------------

FRMMAT-DROP1.OFPPR-ACB.84LUMBER

1x2x10 PT: Old: 552, New: 0
1x4x12 PT: Old: 85, New: 0
1x6x12 PT: Old: 63, New: 0
2x4x14 PT: Old: 17, New: 11
2x4x14 Spruce: Old: 192, New: 32
2x4x16 SYP: Old: 355, New: 200
2x6x14 SYP: Old: 30, New: 10
2x6x8 PT: Old: 19, New: 10
2x8x14 SYP: Old: 37, New: 20
2x8x16 PT: Old: 16, New: 10
5/8 CDX: Old: 14, New: 220

--------------------------------------------------------------------------

Larry wanted the CDX at the same time as everything else so removing 2nd Drop Materials - Moved to 1st Drop (Adam).

FRMMAT-DROP2.OFPPR-ACB.84LUMBER

5/8 CDX: Old: 220, New: 0
03/27/2303/27/23
Complete03/21/23Bobby NellerMintoNDLTM 3042 LatitudesVilla 9AMasonry Steel ***Swapping 1x13 for 1x9 Dowels
Bobby Neller:
1x13 dowels-old-16, New-0
1x9 dowels-old-87, New-103

----------------------------------------------------

PCMS.NDLTM9-A.CASTCRETE

1x13 Dowels: Old: 16, New: 0
1x9 Dowels: Old: 87, New 103
03/21/2303/22/23
Complete03/17/23Jeff SubbertDart InterestsDIEVM 024 Evermore Resort8-BedroomNoneHardware ***Adding HUC212-3
Jeff Subbert:
Instead of me, doing it to do for every eight bedroom, this goes for all eight bedrooms, PO only shows two, but I need four
4) HUC212-3

--------------------------------------------------------------

HDW.DIEVM-8BR-NONE/8BR-CORNER.WHITECAP

HUC212-3: Old: 2, New: 4
03/17/2303/17/23
Complete03/15/23Jeff SubbertDart InterestsDIEVM 006 Evermore Resort8-BedroomNoneHardware ***Swapping ABU44 w/ ABU66
Jeff Subbert:
On my framing hardware PO‘s calls for 4, ABU44s. I’m not sure where these are supposed to go but the blueprint I’m reading does not show 4 x 4 bases. But it does car for 4 ABU66 on the front, but for some reason they are not on the PO takeoff.

------------------------------------------------------

HDW.DIEVM-8BR-NONE/8BR-CORNER.WHITECAP

ABU44: Old: 4, New: 0
ABU66: Old: 0, New: 4
ABU88: Old: 3, New: 0
ABU88Z: Old: 0, New: 3
03/15/2303/15/23
Complete03/14/23Larry SimsSobel CoOFPPR 01C Parkway Preserve3-UnitADB, ACBHardware ***Adding 3/4" Wedge Anchors for Red Iron
Larry Sims:
3/4” wedge anchors called for in plan are not in the po. Need 24) 3/4” x 7” wedge anchors for fabricated red iron floor joist buckets. 24) 3/4” x 7” wedge anchors ( exact length of the wedge anchor is not specified but they are going into a 7 5/8” wall so anything between 6” and 8” will work.

------------------------------------------------------------------

HDW.OFPPR-ADB.WHITECAP
HDW.OFPPR-ACB.WHITECAP

3/4"x 6-1/4" Wedge Anchors: Old: 0, New: 24
03/14/2303/14/23
Complete03/08/23Bobby NellerMintoNDLTM 3050 LatitudesVilla 11AShaftwall ***Reducing Quantities
Bobby Neller:
Removing 20 H track for a new total of 42 and removing 10 C track for new total of 30. Requesting a package change Interior Exterior‘s

H track-12’ old-62, New-42.
C track-10’ old-40, New-30.

---------------------------------------------------------

SHAFTWALL.NDLTM11-A.INTERIOREXTERIOR
SHAFTWALL.NDLTM11-B.INTERIOREXTERIOR

H track-12’ old-62, New-42.
C track-10’ old-40, New-30.
03/08/2303/08/23
Complete03/07/23Dane JonesMattamy HomesMOMER 035 Meridian5-UnitCCACC/PRPrecast, Frame, Hardware ***Revising Precast, Adding 6x6 Posts
Dane Jones:
Precast:
Need: 7) 4’-6” U Lintel, have 5 need 12
Remove: 4) 7’-6” U Lintel, have 5 need 1

Lumber:
Need: 16) 6x6x10’ PT, Have 0

Hardware;
Remove: 4) ABU66 post base, have 20 need 16.

-----------------------------------------------------------------

PCMS.MOMER035.LOTTSORLANDO
4'-6" Lintels: Old: 5, New: 12.
7'-6" Lintels: Old: 5, New: 1.

FRMMAT-DROP1.MOMER035.HAVEN
6x6x10 PT Posts: Old: 0, New: 16

HDW.MOMER035.WHITECAP
ABU66: Old: 20, New: 16
03/07/2303/07/23
Complete03/07/23Rick HigginsMinto-ALLALLPrecast ***Removing Duro Wall
Rick Higgins:
Isle of collier please credit back 7 bundles of 8” durawall and do not ship anymore to that neighborhood they don’t use it even though it’s on po todd is bringing it back now --

--------------------------------------------------------

PCMS.NDICP-1A (12"PARTY WALL).CASTCRETE
PCMS.NDICP-1A (12"PARTY WALL).LOTTSORLANDO
PCMS.NDICP-1B (12"PARTY WALL).CASTCRETE
PCMS.NDICP-1B (12"PARTY WALL).LOTTSORLANDO
PCMS.NDICP-1C (12"PARTY WALL).CASTCRETE
PCMS.NDICP-1C (12"PARTY WALL).LOTTSORLANDO
PCMS.NDICP-2A (12"PARTY WALL).CASTCRETE
PCMS.NDICP-2A (12"PARTY WALL).LOTTSORLANDO
PCMS.NDICP-2B (12"PARTY WALL).CASTCRETE
PCMS.NDICP-2B (12"PARTY WALL).LOTTSORLANDO
PCMS.NDICP-2C (12"PARTY WALL).CASTCRETE
PCMS.NDICP-2C (12"PARTY WALL).LOTTSORLANDO
PCMS.NDICP-3B (12"PARTY WALL).CASTCRETE
PCMS.NDICP-3B (12"PARTY WALL).LOTTSORLANDO
PCMS.NDICP-4A (12"PARTY WALL).CASTCRETE
PCMS.NDICP-4A (12"PARTY WALL).LOTTSORLANDO
PCMS.NDICP-4B (12"PARTY WALL).CASTCRETE
PCMS.NDICP-4B (12"PARTY WALL).LOTTSORLANDO

Duro Wall: Old: 6, New: 0
03/07/2303/07/23
Complete03/02/23Adrian HartDart InterestsDIGFL 0D1 Garden Flats6-Unit-Hardware ***Swapping HTS20 for HTSM20
Adrian Hart:
Fill-In/Package Change. Please revise po digflod1-0029rev. Adjust po delete hts20 and replace with htsm 20.

-------------------------------------------------------------

HDW.DIGFL-0D1.WHITECAP

HTS20: Old: 12, New: 0
HTSM20: Old: 0, New: 12
03/02/2303/02/23
Complete03/01/23Bobby NellerMintoNDLTM 3052 LatitudesVilla 7II-BShaftwall ***Adding DensGlass
Bobby Neller:
Package change needs to be read 77 pieces going to be needing a fill in order for eight additional pieces as well please. Only 69 pieces of Shaftwall on this takeoff the number needs to be 77.
Old-69, New-77-2’x10’x1”

---------------------------------------------------------------

SHAFTWALL.NDLTM7-B/NDLTM7-II-B.INTERIOR/EXTERIOR BUILDING SUPPLY
DensGlass 2x10x1: Old: 69, New: 77

SHAFTWALL.NDLTM7-B/NDLTM7-II-B.ALLIED
DensGlass 2x10x1: Old: 74, New: 77
03/01/2303/01/23
Sent to Bids03/01/23Kyle JollyDart InterestsDIEVM 058 Evermore Resort10-BedroomTheaterFrame ***Adding 5/8 OSB
Kyle Jolly:
Package change and fill in. Please add to all 10BR lots and fill in to this lot only. Needed for all 10BR’s. (+40sheets) 5/8 OSB plywood.

Add to future packages and fill in to this lot.

----------------------------------------------------------------
03/01/23
Sent to Bids03/01/23Kyle JollyDart InterestsDIEVM 055 Evermore Resort11-BedroomBFrame *** Patio Roofs2x4 & 2x8 for Perlins on Patios
Kyle Jolly:
We need to add PT 2x4’s to the packages on houses that get corrugated metal roofs on patios as they take 2x4 purlins.

Fill-In: These were taken from here to finish patio roofs on other lots. Materials use to finish patios on other lots.
2x4x16PT (68)
2x8x16PT (70)

Kyle says that Dart has sent a chart on which lots have patios with this kind of roof and that it’s not per model or plan.

-----------------------------------------------------------------------

03/01/23
Sent to Bids02/22/23Kyle JollyDart InterestsDIEVM 057 Evermore Resort10-BedroomNoneFrame Drop 2 ***Interiors and Stair Window Details
Kyle Jolly:
Fill in and package change. Please add to 2nd lumber drop on all 10BR’s moving forward. Needed for interiors and stair window details. Please fill in for this lot and add to upcoming 10BR drop 2.

100 pcs of 2x6x10 syp
30 pcs of 2x8x10 syp
1 pcs of 8x8x12 pt post

Note: There are 10 lots where the 2nd Drop Frame Material PO has not yet been loaded/released.

-----------------------------------------------------------------------

FRMMAT-DROP2.DIEVM-10BR-NONE.HAVEN
02/22/23
Sent to Bids02/22/23Kyle JollyDart InterestsDIEVM 056 Evermore Resort5-Bedroom, 7-BedroomAllHardware ***Hardware for Patios
Adam Sowers:
Needed to finish patios. This is for 5 and 7 BR lots.
For: 56, 51, 67, 12, 43, 30, 34, 39, 9 and 47

(100) LSSJ210RZ
(100) LSSJ210LZ

-----------------------------------------------------------------

Kyle wants to add (10) of each item above to the 5 and 7 bedroom packages (Adam).
02/22/23
Complete02/21/23Bobby NellerMintoNDLTM 2676 LatitudesVilla 11AShaftwall ***Adding 12' Densglass Back
Bobby Neller:
Need additional shaft liner added to the takeoff the number is roughly 75.

2’x12’x1”-old-50, New-70
Adding 20. For a total of 70-12’

--------------------------------------------------------

We had a package change on 1/19/2023 from Bobby reducing the DensGlass. Now we're adding it back. Not going back and forth on this one anymore (Adam).

SHAFTWALL.NDLTM11-A.INTERIOREXTERIOR

12' DensGlass: Old: 50, New: 70




02/21/2302/21/23
Complete02/21/23Omar HernandezMintoNDICP 1424 Isles of CollierCottage 1BSlab Prep Material ***Adjusting Rod Chairs
Omar Hernandez:
Please delete the 33 pcs of Rod Chairs 16” - 3 bar
Please add to the slab hardware package 1 box of Rod Chairs 12” - 2 bars. The 16” Rod chairs are not used. And we’re always short 12” Rod chairs. Thank you

----------------------------------------------------------------------------

SLABPREP.NDICP-1B (12"PARTY WALL).WHITECAP
SLABPREP.NDICP-1B (12"PARTY WALL).CASTCRETE

3-Bar Chairs: Old: 23, New: 0
2-Bar Chairs: Old: 91, New: 200
(switched to 2 boxes instead of 'each')
02/21/2302/21/23
Declined02/17/23Larry SimsSobel CoOFPPR 01C (ADB) Parkway Preserve3-UnitADBPrecast ***Adding (1) 17'-4" Lintel
Larry Sims:
Fill-In / Package Change. Missing 17-4 lintel. Package needs to be changed on ADB model to have 3) 17-4 lintels instead of 2 and issue a po to Lott’s concrete to deliver one more here.

1) 17-4 x 8 precast lintel

---------------------------------------------------------------------

PCMS-DROP1.OFPPR-ADB.LOTTSFTMYERS

2/20/23: Package Change Declined.

2/20/23: Larry: They used the 17-4 lintel on the right side lanai. You are right a 15-4 lintel will have 6” bearing on that spot which is good. I don’t know what they did with the 15-4 lintel that was supposed to be used there. I took over this job while this was in progress not sure if it was broken or cut I will dig into this package and see what happened but I will need a 17-4 lintel for the middle lanai.

2/20/23: Angie: @sharonheim1 @adamsowers1
according to the plans, I only need (2) 17-4
(1)for the garage door and (1) for the lanai,
unless they change the Beam B-2 that is on the SGD for a precast to. I have attached the email I sent to Larry to confirm the info.
02/17/2302/17/23Angie02/20/23
Sent to Bids02/16/23Kyle JollyDart InterestsDIEVM 026 Evermore Resort8-BedroomNoneFrame ***Short 1/2" OSB & Zip
Kyle Jolly:
Fill in and package change. Running short consistently on this model. Running short on 8BR models.

(60) 1/2”OSB
(30) 1/2ZIP

--------------------------------------------------------------

02/16/23
Complete02/15/23Ted MozzottMarmer ContructionMACSA 006 Casa San Alfonso4-BedroomSTDFrame ***Adjusting Package
Ted Mozzott:
Need to fix package one more time please add to existing package for lot 6/7/8/9/10/11/12 all four bedrooms.

Short materials for the next lots 6/7/8/9/10/11/12 four bedrooms please add to existing package list .please add to this list pic above and we should be good thank you Ted.

Need 36- 1x4x12 ft #2 pt borate
100- 1x2x8ft pt borate
10 - 1x6x12 ft pt borate
4 - sheets of cdx 5/8 plywood

----------------------------------------------------------

Angie: @sharonheim1 This material is the one corresponding to the furring, in our initial proposal we are not including the furring, the builder wanted it for Chad, I'm not sure if he already did the EWO for that reason.

I will send an email to @adamsowers1 that this must be included in the package, what must be found out is where this is going to be charged if through an EWO or we must send a proposal.

------------------------------------------------------------

FRMMAT.MACSA-4BR.HAVEN

1x2x8 PT: Old: 120, New Total: 220
1x4x12 PT: Old: 0, New Total: 36
1x6x12 PT: Old: 20, New Total: 30
5/8 CDX: Old: 60, New: 64
02/15/2302/16/23Angie02/16/23
Sent to Bids02/15/23Jeff SubbertDart InterestsDIEVM 026 Evermore Resort8-BedroomNoneFrame ***Removing Materials
Jeff Subbert:
Every eight bedroom we are heavy (160) 2 x 6 x 10 spruce. Lot 26 extra bunk lot 31 extra bunk lot, 45 extra bunk. It’s up to you guys what you wanna do we can either pick three bunks up a bunk equals 160) 2 x 6’s, or take off of next house and use on site in Lou of ordering anymore.

------------------------------------------------------------------
02/15/23
Declined02/15/23Larry SimsSobel CoOFPPR 01F (ADB) Parkway PreserveADB-Masonry ***Adding 9-Highs
Larry Sims:
Need 210 ) 9” high foundation block to account for 1 1/2” block recess called for on this building to achieve 9’ beam height and avoid issues at party walls

-------------------------------------------------------------

(Latest) Sharon: @angierodriguez61 @adamsowers1 per John her will get with Mark. we are not doing 9's. he said they figured out a way to use 4 highs.

Angie: @sharonheim1 at takeoff we have them as regular, you can add 210 9" and remove 210 regular

Sharon: @angierodriguez61 once this is checked please let us know. Mark spoke to larry and agrees 9's should have been included in the take off due to a recess.
02/15/2302/16/23Angie02/16/23
Complete02/15/23John RathbunSurrey HomesSOFXH 016 Fox HammockVioletA, BFrame ***Adding (2) Sheets of 3/4 PT
John Rathbun:
Please add two sheets of 3/4 PT plywood to the Violet model .
A and B elevations.
This is for the A/c stand and a tub deck .
New total of two sheets .
Need a fill in P.O. For two sheets of 3/4 PT plywood .

-------------------------------------------------------------------------

FRMMAT.SO-VIOLET-A.BFS
FRMMAT.SO-VIOLET-B.BFS
3/5 CDX PT: Old: 0, New: 2
02/15/2302/15/23
Complete02/13/23Bobby NellerMintoNDLTM 3052 LatitudesVilla 7II-BPrecast ***Removing (1) 4'-6" Lintel
Bobby Neller:
we have one extra header on this takeoff
4‘6“ precast header
Old-7, New-6

-----------------------------------------------------------

PCMS.NDLTM7-II-A/NDLTM7-II-B.CASTCRETE

4'-6" Lintel: Old: 7, New: 6
02/13/2302/14/23
Complete02/13/23Bobby NellerMintoNDLTM 2614 LatitudesVilla 9BMasonry ***Reducing Half Block
Bobby Neller:
Removing (70) 8 x 8 x 8 half block
Old-237, New-167

Need to add more nine highs to the takeoff
Old-191, New-220

-----------------------------------------------------

MASMAT.NDLTM9-B.FLBESTBLOCKORLANDO
MASMAT.NDLTM9-B.PREFERREDDAYTONA

Half Block: Old: 237, New: 167
9-Highs: Old: 191, New: 220



02/13/2302/14/23
Complete02/13/23Ryan CorriganRichmondROSVB 021 Silver BasinF927/SlateAllPrecast/Masonry Steel ***Adding (2) 1x9 Dowels
Ryan Corrigan:
Fill in order/ package change. Please add this change to lot 22 and 26 as well in separate PO’s. (2) 1’x9’ down rods for a total of 48.

-----------------------------------------------------

PCMS.RA-Slate-F927-A.LOTTSORLANDO
PCMS.RA-Slate-F927-B.LOTTSORLANDO
PCMS.RA-Slate-F927-C.LOTTSORLANDO

1x9 Dowels: Old: 46, New: 48
02/13/2302/14/23
Complete02/10/23HermesDart InterestsDIEVM 019 Evermore Resort9-BedroomCorner/TheaterHardware ***Adding LTT19 & H3
Hermes:
I only have two and I need 8 LTT 19in total
8 pcs LTT 19
500 pcs H3

--------------------------------------------------------------

HDW.DIEVM-9BR-CORNER/9BR-THEATRE.WHITECAP

LTT19: Old: 0, New: 19
H3: Old: 252, New: 500
02/10/2302/10/23
Complete02/10/23Omar HernandezMintoNDICP 1422 Isles of CollierCottage 2ASlab Prep***Adding 1 Box of 12" Rod Chairs
Omar Hernandez:
Needed to finish prepping slab so I need to pick one up today. We are always short. Would you add a box to the package please.

1 box of rod chair 12”-2bar (each)

------------------------------------------------------

12" Rod Chairs: Old: 176, New: 276
02/10/2302/10/23
Sent to Bids02/10/23Jeff SubbertDart InterestsDIEVM 029 Evermore Resort9-BedroomCornerFrame ***2x4, 2x6n 2x8 SYP02/10/23
Complete02/09/23Jeff SubbertDart InterestsDIEVM 052 Evermore Resort11-BedroomNone2nd Lift - Precast/Masonry SteelAdding Anchor Bolts
Jeff Subbert:
I need to start getting 10 inch by half-inch J bolts on precast packages second lift. All houses

50) bolts

-------------------------------------------------------------------------

PCMS-DROP2.DIEVM-10BR-NONE.LOTTSORLANDO
PCMS-DROP2.DIEVM-10BR-THEATRE.LOTTSORLANDO
PCMS-DROP2.DIEVM-11BR-B.LOTTSORLANDO
PCMS-DROP2.DIEVM-11BR-CORNER.LOTTSORLANDO
PCMS-DROP2.DIEVM-11BR-NONE.LOTTSORLANDO

AB1210: Old: 0, New: 50

PCMS-DROP2.DIEVM-5BR-NONE.LOTTSORLANDO
AB1210: Old: 15, New: 50

PCMS-DROP2.DIEVM-7BR-NONE.LOTTSORLANDO
PCMS-DROP2.DIEVM-7BR-THEATRE.LOTTSORLANDO
AB1210: Old: 30, New: 50

PCMS-DROP2.DIEVM-9BR-CORNER.LOTTSORLANDO
PCMS-DROP2.DIEVM-9BR-CORNER/THEATRE.LOTTSORLANDO
PCMS-DROP2.DIEVM-9BR-NONE.LOTTSORLANDO
AB1210: Old: 40, New: 50
02/09/2302/10/23
Complete02/09/23OmarMintoNDICP 1430 Isles of CollierCottage 2AHardware ***Removing SP2's - Too Many in Boneyard
Omar Hernandez:
Delete sp2 from hardware package. I have hundreds of SP-2 in my bone yard. When I need to add it back on I will do so then. Thank you

------------------------------------------------------------------

HDW.NDICP-1A (12"PARTY WALL).WHITECAP
SP2: Old: 23, New: 0

HDW.NDICP-1B (12"PARTY WALL).WHITECAP
SP2: Old: 32, New: 0

HDW.NDICP-1C (12"PARTY WALL).WHITECAP
SP2: Old: 44, New: 0

HDW.NDICP-2A (12"PARTY WALL).WHITECAP
SP2: Old: 16, New: 0

HDW.NDICP-2B (12"PARTY WALL).WHITECAP
SP2: Old: 31, New: 0

HDW.NDICP-2C (12"PARTY WALL).WHITECAP
SP2: Old: 33, New: 0

HDW.NDICP-3B (12"PARTY WALL).WHITECAP
SP2: Old: 40, New: 0

HDW.NDICP-4A (12"PARTY WALL).WHITECAP
SP2: Old: 23, New: 0

HDW.NDICP-4B(12"PARTY WALL).WHITECAP
SP2: Old: 23, New: 0
02/09/2302/10/23
Complete02/09/23Adrian HartDart InterestsDIGFL 0C1 Garden Flats12-Unit, 10-Unit-Hardware ***Adjusting Hardware
Adrian Hart:
1) 28-HTSM20 needed per detail. S511 Regular hts we’re delivered and not suitable for wood to concrete connections.
2) 12 mgt needed inleau of column caps
3)12- 5/8x 7 1/2” anchor wedge bolts
4) 2 220z Simpson epoxy tubes

---------------------------------------------------------

HDW.DIGFL-0C1/0C2/0C3.WHITECAP
HTS20: Old: 28, New: 0
HTSM20: Old: 0, New: 28
5/8 x 8/-1/2 Wedge Anchors: Old: 0, New: 12
SET22 Epoxy: Old: 0, New: 2
MGT: No Change. Cost-Group doesn't match the amount on the PO from 0C1 - Change must have already been made.

---------------------------------------------------------

HDW.DIGFL-0B1.WHITECAP
HTS20: Old: 24, New: 0
HTSM20: Old: 0, New: 24
02/09/2302/09/23
Complete02/08/23Bobby NellerMintoNDLTM 3054 LatitudesVilla 9AFrame ***Adjusting 2x8 PT
Bobby Neller:
Removing extra 2 x 8 PT
2x8x10-old-4, New-0
2x8x12-old-1, New-0
2x8x8-old 4, New -8 -all borate

---------------------------------------------------

FRMMAT.NDLTM9-A.84LUMBER
FRMMAT.NDLTM9-A.BFS
FRMMAT.NDLTM9-A.MARJAM

2x8x8 PT: Old: 4, New: 8
2x8x10 PT: Old: 4, New: 0
2x8x12 PT: Old: 1, New: 0
02/08/2302/08/23
Complete02/08/23Dane JonesToll BrothersTBLPT 037 Laurel PointeALLALLPrecast ***Adding Bar Ties
Dane Jones:
Need one bundle of 6” bar ties on every future precast PO for all of laurel pointe. Including this lot.

-------------------------------------------------------------

PCMS.TBLPT008.LOTTSORLANDO
PCMS.TBLPT009.LOTTSORLANDO
PCMS.TBLPT010.LOTTSORLANDO
PCMS.TBLPT013.LOTTSORLANDO
PCMS.TBLPT018.LOTTSORLANDO
PCMS.TBLPT037.LOTTSORLANDO
PCMS.TBLPT048.LOTTSORLANDO
PCMS.TBLPT053.LOTTSORLANDO
PCMS.TBLPT054.LOTTSORLANDO
PCMS.TBLPT055.LOTTSORLANDO
PCMS.TBLPT058.LOTTSORLANDO

6" Bar Ties: Old: 0, New: 1
02/08/2302/08/23
Complete02/06/23Bobby NellerMintoNDLTM 3048 LatitudesVilla 11BPrecast ***Removing (1) 8'-8" Lintel
Bobby Neller:
This job only requires 2/8‘8“ Precast headersl not three.

Old-3-8’8”-precast headersl
New-2-8’8”-precast headersl

---------------------------------------------------------------------

PCMS.NDLTM11-B.CASTCRETE
8'-8" Lintel: Old: 3, New:
02/06/2302/06/23
Complete02/03/23Bobby NellerMintoNDLTM 2672 LatitudesALL VillasAllFrame Materials ***Plant Shelves
Bobby Neller:
Initially we were getting three-quarter inch plywood sent out for plant shelves typically two pieces. In some cases some of the models only require one piece. These are the models that require only one sheet
2670/69
Villa 12
171 B 2- only one sheet required 4x8x 3/4” CDX

2671/72
Villa 12
171 A 2-only one sheet required

2673/74
Villa 4
171-B-only one sheet required

2689/90
Villa 7
171 A 2-only one sheet required
All other villas require two sheets.(4x8x3/4”)-plywood

------------------------------------------------------------------------------

FRMMAT.NDLTM12-B/NDLTM12-II-B.84LUMBER
FRMMAT.NDLTM12-B/NDLTM12-II-B.BFS
No Change, Already has 1 sheet.

FRMMAT.NDLTM12-A/NDLTM12-II-A.84LUMBER
FRMMAT.NDLTM12-A/NDLTM12-II-A.BFS
FRMMAT.NDLTM12-A/NDLTM12-II-A.MARJAM
3/4 CDX: Old: 2, New: 1

FRMMAT.NDLTM4-A/NDLTM4-II-A.84LUMBER
FRMMAT.NDLTM4-A/NDLTM4-II-A.BFS
FRMMAT.NDLTM4-A/NDLTM4-II-A.MARJAM
FRMMAT.NDLTM4-B/NDLTM4-II-B.84LUMBER
FRMMAT.NDLTM4-B/NDLTM4-II-B.BFS
FRMMAT.NDLTM4-B/NDLTM4-II-B.MARJAM
3/4 CDX: Old: 0, New: 1

FRMMAT.NDLTM7-A/NDLTM7-II-A.84LUMBER
FRMMAT.NDLTM7-A/NDLTM7-II-A.BFS
FRMMAT.NDLTM7-A/NDLTM7-II-A.MARJAM
FRMMAT.NDLTM7-B/NDLTM7-II-B.84LUMBER
FRMMAT.NDLTM7-B/NDLTM7-II-B.BFS
FRMMAT.NDLTM7-B/NDLTM7-II-B.MARJAM
3/4 CDX: Old: 0, New: 1

All Other Models/Elevations Require 2 Sheets of 3/4 CDX.
All Except: 12, 7, & 4.

-------------------------------------------------------------------------------

FRMMAT.NDLTM10-A.84LUMBER
FRMMAT.NDLTM10-A.BFS
FRMMAT.NDLTM10-A.MARJAM
FRMMAT.NDLTM10-B.84LUMBER
FRMMAT.NDLTM10-B.BFS
FRMMAT.NDLTM10-B.MARJAM
FRMMAT.NDLTM11-A.84LUMBER
FRMMAT.NDLTM11-A.BFS
FRMMAT.NDLTM11-A.MARJAM
FRMMAT.NDLTM11-B.84LUMBER
FRMMAT.NDLTM11-B.BFS
FRMMAT.NDLTM11-B.MARJAM
FRMMAT.NDLTM13-A.84LUMBER
FRMMAT.NDLTM13-A.BFS
FRMMAT.NDLTM13-A.MARJAM
FRMMAT.NDLTM13-B.84LUMBER
FRMMAT.NDLTM13-B.BFS
FRMMAT.NDLTM13-B.MARJAM
FRMMAT.NDLTM2-A.84LUMBER
FRMMAT.NDLTM2-A.BFS
FRMMAT.NDLTM2-A.MARJAM
FRMMAT.NDLTM2-B.84LUMBER
FRMMAT.NDLTM2-B.BFS
FRMMAT.NDLTM2-B.MARJAM
FRMMAT.NDLTM3-A.84LUMBER
FRMMAT.NDLTM3-A.BFS
FRMMAT.NDLTM3-A.MARJAM
FRMMAT.NDLTM3-B.84LUMBER
FRMMAT.NDLTM3-B.BFS
FRMMAT.NDLTM3-B.MARJAM
FRMMAT.NDLTM5-A.84LUMBER
FRMMAT.NDLTM5-A.BFS
FRMMAT.NDLTM5-A.MARJAM
FRMMAT.NDLTM5-B.84LUMBER
FRMMAT.NDLTM5-B.BFS
FRMMAT.NDLTM5-B.MARJAM
FRMMAT.NDLTM6-A.84LUMBER
FRMMAT.NDLTM6-A.BFS
FRMMAT.NDLTM6-A.MARJAM
FRMMAT.NDLTM6-B.84LUMBER
FRMMAT.NDLTM6-B.BFS
FRMMAT.NDLTM6-B.MARJAM
FRMMAT.NDLTM8-A.84LUMBER
FRMMAT.NDLTM8-A.BFS
FRMMAT.NDLTM8-A.MARJAM
FRMMAT.NDLTM8-B.84LUMBER
FRMMAT.NDLTM8-B.BFS
FRMMAT.NDLTM8-B.MARJAM
FRMMAT.NDLTM9-A.84LUMBER
FRMMAT.NDLTM9-A.BFS
FRMMAT.NDLTM9-A.MARJAM
FRMMAT.NDLTM9-B.84LUMBER
FRMMAT.NDLTM9-B.BFS
FRMMAT.NDLTM9-B.MARJAM
3/4 CDX: Old: 0, New: 2
02/03/2302/08/23
Complete02/02/23Bobby NellerMintoNDLTM 2670 LatitudesVilla 12A, B, II-A, II-BShaftwall Materials ***Removing DensGlass
Adam Sowers:
Shaft liner-old-95, New-75
H track-old-57, New-37
Burn clips-old-500, New-100

The 20 extra sheets I have left from this one are the ones I’m going to remove from lot 2700 that we’ve revised once already. For a total of zero shaft liner going to 2700.

-------------------------------------------------------

SHAFTWALL.NDLTM12-A/NDLTM12-II-A.INTERIOR/EXTERIOR
DensGlass: Old: 95, New: 75

SHAFTWALL.NDLTM12-B/NDLTM12-II-A.INTERIOR/EXTERIOR
DensGlass: Old: 80, New: 75

SHAFTWALL.NDLTM12-II-B/NDLTM12-II-B.INTERIOR/EXTERIOR
DensGlass: Old: 95, New: 75
H Studs 10': Old: 57, New: 37
Burn Clips (Box 500): Old: 1, New: 0
Burn Clips (Box 100): Old: 0, New: 1
02/02/2302/02/23
Complete02/01/23Steven GilbertRichmondROSUT 089 Sutton PreserveF956/ZincBHardware ***Adding HUS26
Steven Gilbert:
2nd house missing HUS26s
Need total of 21 on package need fill in also for this lot.

-------------------------------------------------------

HDW.RA-F956-B.WHITECAP

HUS26: Old: 0, New: 21
02/01/2302/01/23
Complete01/30/23Steven GilbertRichmondROEDH 039-02 Eden HillsF924/AmmoliteJFrame ***Swapping SYP w/ Spruce
Steven Gilbert:
Need SYP swapped for spruce. Need bundle of SYP swapped for spruce.

(230) 2x4x92 5/8” need to be spruce.

SYP will bow and cause issues later to exterior or interior’s walls.

---------------------------------------------------------------

FRMMAT.RA-Ammolite-F924-J.84LUMBER
FRMMAT.RA-Ammolite-F924-J.BFS
FRMMAT.RA-Ammolite-F924-J.HAVEN
FRMMAT.RA-Ammolite-F924-J.MARJAM

2x4x92 5/8 SYP: Old: 230, New: 0
2x4x92 5/8 Spruce: Old: 206, New: 436
01/30/2301/30/23
Complete01/27/23Jeff SubbertDart InterestsDIEVM 034 Evermore Resort7-BedroomNoneFrame Materials ***Reducing 1x2, 2x6x10 spruce
Jeff Subbert:
Remove material from PO
25) 2 x 6 x 10 spruce
50) 1 x 2 x 10 pt

--------------------------------------------

There's one more lot where the 2nd Drop Frame PO hasn't been released and Jeff would like to remove some materials.

FRMMAT-DROP2(SHINGLE).DIEVM-7BR-NONE/7BR-THEATRE.HAVEN
1x2x10 PT: Old: 202, New: 192
2x6x10 Spruce: Old: 198, New: 148
01/27/2302/03/23
Complete01/27/23Bobby NellerMintoNDLTM 2680 LatitudesVilla 11AFrame ***Removing Materials
Bobby Neller:
All this material is sitting in unit 2679 and can be picked up and credited.

2x8x10 borate-old-9 new 6
2x8x12 borate -old-2. New 0
2x8x14 borate old-3. New 0
2x12x8 borate-old-3. New 0

----------------------------------------------------------

FRMMAT.NDLTM11-A.84LUMBER
FRMMAT.NDLTM11-A.BFS
FRMMAT.NDLTM11-A.MARJAM

2x8x10 PT: Old: 9, New: 6
2x8x12 PT: Old: 2, New: 0
2x8x14 PT: Old: 3, New: 0
2x12x8 PT: Old: 3, New: 0
01/27/2301/27/23
Complete01/27/23Kyle JollyDart InterestsDIEVM 069 Evermore Resort8-BedroomNoneHardware***Adding HW for ECC98s
Kyle Jolly:
ECC98 did not come with hardware to install it. This is needed on each 8BR .

(4) 3/4x12” all threads
(8) 2x2x3/4 square washers
(8) 3/4 nuts
(4) 3/4”x3.5” wood lag bolts

------------------------------------------------

HDW.DIEVM-8BR-NONE/8BR-CORNER.WHITECAP

TR3412 Threaded Rod 3/4"x12": Old: 0, New: 4
2x2x3/4 washers: Old: 0, New: 8
N34: Old: 0, New: 8
01/27/2301/27/23
Complete01/24/23Ted MozzottMarmer ContructionMACSA 017 Casa San Alfonso4-BRSTDFrame ***Revising Package
Adam Sowers:
Ted sent in a package change via email for the 4-Bedrooms. Adding to the log.


FRMMAT.MACSA-4BR.HAVEN

1x2x10 PT: Old: 64, New: 20
1x6x12 PT: Old: 0, New: 20
2x4x14 PT: Old: 0, New: 15
2x4x16 PT: Old: 15, New: 0
2x6x16 PT: Old: 0, New: 1

2x4x14 SYP: Old: 0, New: 25
2x6x10 SYP: Old: 0, New: 8
2x6x12 SY: Old: 10, New: 0
2x6x14 SYP: Old: 0, New: 10

5/8 CDX: Old: 70, New: 60

1x2x8 PT: NA-Matches
2x4x16 SYP: NA-Matches
2x4x8 SYP: NA-Matches
2x6x16 Spruce: NA-Matches

Will be revising POs for lots: 3-12
01/24/2301/24/23
Complete01/24/23Jeff RotertMintoNDLTS 2864 Lastitudes40-176-IIBPrecast ***Removing (1) Recess 4'-6" Lintel
Jeff Rotert:

Totals needed: (1) 4-6 precast recessed door header, take has (2) on it. Please remove (1).


-----------------------------------------------------------

PCMS.NDLTS40-175-II-B.LOTTS
PCMS.NDLTS40-175-II-B.CASTCRETE

Recess 4'-6" Lintel: Old: 2, New: 1
01/24/2301/24/23
Complete01/23/23Omar HernandezSobel CoOFPPR 01C (ADB) Parkway PreserveALLALLPrecast - 1st LiftAdding Corner Bars
Omar Hernandez:
Would you please order for delivery and add to the Precast/Masonry Steel-1st package
35 pcs of #5 30 x30 corner bars.
Thank you

------------------------------------------------------------------

PCMS-DROP1.OFPPR-ADB.LOTTSFTMYERS
PCMS-DROP1.OFPPR-ACB.LOTTSFTMYERS

#5 30"x30" Corner Bars: Old: 0, New: 35
01/23/2301/23/23
Complete01/20/23Omar HernandezSobel CoOFPPR 01C (ADB) Parkway PreserveALLALLSlab Prep ***Adding Corner Bars
Omar Hernandez:
Would you please order 50 pcs of 3x3 #5 corner bars to the slab package. There’s none in the package.

-----------------------------------------------------------------------------

Omar want's to add 50 to the slab prep packages.

SLABPREP.OFPPR-ADB.WHITECAP
SLABPREP.OFPPR-ACB.WHITECAP

#5 30"x30" Corner Bars: Old: 0, New: 50
01/20/2301/20/23
Complete01/19/23Bobby NellerMintoNDLTM 2680 LatitudesVilla 11AShaftwall Materials - DensglassReducing Quantity
Bobby Neller:
We’ve got an extra 30 sheets of den‘s glass on this job that need to be removed from the takeoff.

2’x12’x1”-old-80, New-50

----------------------------------------------------------

SHAFTWALL.NDLTM11-A.INTERIOREXTERIOR

DensGlass Ultra Shaftliner 2' x 12' x 1":
Old: 80, New: 50

Inititally made the package change to both elevations but then reversed the package change on the "B" after speaking with Bobby (he wanted to hold off on that one for now).
01/19/2301/19/23
Complete01/18/23Bobby NellerMintoNDLTM 2670 LatitudesVilla 12B, II-BFrame ***Missing 15/32 CDX
Adam Sowers:
Bobby said the packages are short on 15/32 CDX. It looks like when the 12 B and 12 II-B were combined the CDX count was lost / changed to only 1 sheet. Bobby says it should be 19 sheets. The Takeoff for the Villa 12 B has only 1 sheet. The Takeoff for the Villa 12 II-B has 14 sheets.

FRMMAT.NDLTM12-B/NDLTM12-II-B.84LUMBER
FRMMAT.NDLTM12-B/NDLTM12-II-B.BFS

15/32 CDX: Old: 1, New: 14
1/2 Fire Rated CDX: Old: 62, New: 0
15/32 Fire Rated CDX: Old: 0, New: 62
01/18/2301/18/23
Complete01/17/23Omar HernandezSoebel CoOFPPR 01E Parkway PreserveALLALLSlab Prep ***Swapping 3-Bar Chairs w/ WPB Chairs
Omar Hernandez:
Would you please change on the Slab Prep Material package the 6 boxes of Rod Chair 16” - 3 bar to Chair 16” WPB 3bar. Footers schedule specified one bar on top two bars on the bottom requiring WPB chairs.

----------------------------------------------------------------------------

Materials are out for delivery today. Sending Return/Credit POs on Lots: 01E & 01F and following with package changes on both models/elevations.

SLABPREP.OFPPR-ACB.WHITECAP
Rod Chairs - 16" - 3 Bar (Box - 100): Old: 6, New: 0
Rod Chairs - WPB 16": Old: 0, New: 6
Besser Brick: Old: 0, New: 100

SLABPREP.OFPPR-ADB.WHITECAP
Rod Chairs - 16" - 3 Bar (Box - 100): Old: 6, New: 0
Rod Chairs - WPB 16": Old: 0, New: 6
Besser Brick: Old: 0, New: 100
01/17/2301/17/23
Sent for Review01/12/23Carlos GarciaDart InterestsDIGFL 0B1 Garden Flats10 Unit-Hardware ***Adding SDS Screws
Carlos Garcia:
Package change and fill in probably for each building. SDS screws are needed per detail, see attachment -Carlos

1/4 x 4-1/2 SDS (1900) pcs
1/4 x 3-1/2 SDS (300) pcs

-----------------------------------------------------------------

Waiting to hear back from Carlos on this one. Sharon is going to have Angie check to see if it was missed, we didn't have the detail, or something changed (Adam)
01/12/23
Complete01/12/23Bobby NellerMintoNDLTM 2684 LatitudesVilla 12II-AFrame ***Swapping 2x6x8 w/ 10'
Bobby Neller:
This is a fill in order/package change these two by eights are 2 feet too short for my garage door bucks need to be a minimum of 10 feet. 84 lumber is going to pick up these eight footers and credit us however I need to do the package change and fill in order to replace with 10 footers.

Old-2x6x8-borate-8
New-2x6x10-borate

--------------------------------------------------------------------------

It looks like I completed a similar package change for all models/elevations in LTS. Found in this log under the same PCDetails (col) for 'Swapping 2x6x8 w/ 10'.

FRMMAT.NDLTM12-A/NDLTM12-II-A.84LUMBER
FRMMAT.NDLTM12-A/NDLTM12-II-A.BFS
FRMMAT.NDLTM12-A/NDLTM12-II-A.MARJAM

2x6x8 PT: Old: 8, New: 0
2x6x10 PT: Old: 0, New: 8
01/12/2301/12/23
Complete01/11/23Jason BridgesRichmondROSVB 020 Silver BasinF926/EmeraldALLFrame ***Swapping 2) LVLs for 2x12x22
Jason Bridges:
Please remove (2)1.75x11.25 LVL 24’
Please add (2) 2x12x22’ for all emerald elevations. Plans have changed for the back porch beam.
---------------------------------------------------------
FRMMAT.RA-Emerald-F926-A.BFS
FRMMAT.RA-Emerald-F926-A.84LUMBER
FRMMAT.RA-Emerald-F926-A.HAVEN
FRMMAT.RA-Emerald-F926-A.MARJAM
FRMMAT.RA-Emerald-F926-B.84LUMBER
FRMMAT.RA-Emerald-F926-B.BFS
FRMMAT.RA-Emerald-F926-B.HAVEN
FRMMAT.RA-Emerald-F926-B.MARJAM
FRMMAT.RA-Emerald-F926-C.84LUMBER
FRMMAT.RA-Emerald-F926-C.BFS
FRMMAT.RA-Emerald-F926-C.HAVEN
FRMMAT.RA-Emerald-F926-C.MARJAM
FRMMAT.RA-Emerald-F926-G.84LUMBER
FRMMAT.RA-Emerald-F926-G.BFS
FRMMAT.RA-Emerald-F926-G.HAVEN
FRMMAT.RA-Emerald-F926-G.MARJAM
FRMMAT.RA-EMERALD-F926-H.84LUMBER
FRMMAT.RA-EMERALD-F926-H.BFS
FRMMAT.RA-EMERALD-F926-H.HAVEN
FRMMAT.RA-EMERALD-F926-H.MARJAM
FRMMAT.RA-Emerald-F926-J.84LUMBER
FRMMAT.RA-Emerald-F926-J.BFS
FRMMAT.RA-Emerald-F926-J.HAVEN
FRMMAT.RA-Emerald-F926-J.MARJAM
FRMMAT.RA-Emerald-F926-K.84LUMBER
FRMMAT.RA-Emerald-F926-K.BFS
FRMMAT.RA-Emerald-F926-K.HAVEN
FRMMAT.RA-Emerald-F926-K.MARJAM
FRMMAT.RA-Emerald-F926-L.84LUMBER
FRMMAT.RA-Emerald-F926-L.BFS
FRMMAT.RA-Emerald-F926-L.HAVEN
FRMMAT.RA-Emerald-F926-L.MARJAM
FRMMAT.RA-Emerald-F926-M.84LUMBER
FRMMAT.RA-Emerald-F926-M.BFS
FRMMAT.RA-Emerald-F926-M.HAVEN
FRMMAT.RA-Emerald-F926-M.MARJAM

1.75x11.25 LVL 24’: Old: 2, New: 0
2x12x22 SYP: Old: 0, New: 2
01/11/2301/11/23
Declined01/11/23Jeff SubbertDart InterestsDIEVM 031 Evermore ResortALLALLSlab Pre, Precast ***Missing Bar Ties
Jeff Subbert:
We are not getting any tie wires coming out with second left precast. Therefore I am going to order a bulk order unless you guys want to split it up for house don’t matter to me.

I am in need of (8) rolls of 6” tie wire

---------------------------------------------------------------------

No Bar Ties in Slab Prep or Precast POs/CGs.
Sent to Bids because this is going to be a community-wide package change (Adam).

Package Change Declined because all buildings are in the ground already and if we get awarded another phase we'll resestimate per Kevin.
01/11/23
Complete01/10/23Jason BridgesDream FindersDOTAL 074 TalichetAvalon IIAPrecast***Adding (1) 17'-4" Lintel
Jason Bridges:
There should be (2) 17-4 lintels on all Avalon models. We are missing 1 and the other is damaged

(2) 17-4 u-shaped lintels

----------------------------------------------------

Note: None of the Avalon's have more than (1) 17'-4" Lintel and zero fill-ins for them. I let Sharon know about this one and she is going to add to the board for estimating to review (Adam)

1/25/23 - Angie Rodriguez: in the specific plans of the lot it shows that it must be precast lintel @sharonheim1

1/11/23 - Chris Plantz: @sharonheim1 The master plans that the estimates were based on show (2) 1.75" x 12" LVL at the rear lanai. I attached a picture of it.
The lot specific plans for lot 74 show a lintel at the rear lanai. Master plan Lanai Beam.png

----------------------------------------------------

PCMS.DF-AVALON-A.LOTTSORLANDO
PCMS.DF-AVALON-B.LOTTSORLANDO
PCMS.DF-AVALON-C.LOTTSORLANDO
17'-4": Old: 1, New: 2

----------------------------------------------------

3/7/2023 - Revised:
Made the same changes to all of the Avalon-II Cost-Groups (Adam).

PCMS.DF-AVALON-II-A.LOTTSORLANDO
PCMS.DF-AVALON-II-B.LOTTSORLANDO
PCMS.DF-AVALON-II-C.LOTTSORLANDO
17'-4": Old: 1, New: 2
01/10/2303/07/23Chris, Angie03/07/23
Complete01/10/23Jack CorriganSteel XSXAVP 480 OakX-1460-Masonry ***Removing 90 Regulars
Jack Corrigan:
For steel x model X-1460 remove 90 regular block from future POs.

-----------------------------------------

MASMAT.SX-X1460.JAHNA

Regulars: Old: 1771, New: 1681
01/10/2301/10/23
Complete01/06/23Cyndi MulleeMintoNDLTC 3096 LatitudesCottage 2AShaftwall MaterialsReducing H Studs
Cyndi Mullee:

Current: (27) “H” shaft wall stud 12’
New: (17) “H” shaft wall stud 12’

Across all cottage models

-----------------------------------------------------------

SHAFTWALL.NDLTC1A/NDLTC1B/NDLTC1C.INTERIOR/EXTERIOR BUILDING SUPPLY
12' H Stud: Old: 20, New: 17

SHAFTWALL.NDLTC3A/NDLTC3B/NDLTC3C.INTERIOR/EXTERIOR BUILDING SUPPLY
12' H Stud: Old: 30, New: 17

SHAFTWALL.NDLTC2A/NDLTC2B/NDLTC2C.INTERIOR/EXTERIOR BUILDING SUPPLY
12' H Stud: Old: 27, New: 17

SHAFTWALL.NDLTC4A/NDLTC4B/NDLTC4C.INTERIOR/EXTERIOR BUILDING SUPPLY
12' H Stud: Old: 17, New: 17

01/06/2301/06/23
Complete01/05/23Bobby NellerMintoNDLTM 2688 LatitudesVilla 5AFrame & ShaftwallRemoving Materials
Bobby Neller:
2 x 8 x 8 southern yellow pine removing six pieces from the takeoff.
Old-20
New-14

Removing 10 pieces of C track from our shaft wall.
Old-35
New-25

---------------------------------------------------------

FRMMAT.NDLTM5-A.84LUMBER
FRMMAT.NDLTM5-A.BFS
FRMMAT.NDLTM5-A.MARJAM
2x8x8 SYP: Old: 20, New: 14


SHAFTWALL.NDLTM5-A.INTERIOR/EXTERIOR BUILDING SUPPLY
C-Track: Old: 35, New: 25
01/05/2301/05/23
Complete12/20/22Adrian HartDart InterestsDIGFL 0B1 Garden Flats10-Unit3rd Lift, Precast/Masonry SteelRemoving Materials
Adrian Hart:
See highlighted screen shot. These materials are not needed. This applies to all further buildings.

Remove:
#7 Rebar, 1x5 Dowels
#7 Rebar, 20'
#8 Rebar, 1x7'-8"
13'-4" Lintels

-----------------------------------------------------------------

PCMS-DROP3.DIGFL-0B1

# 7 Rebar - 1' x 5' Dowels: Old: 202, New: 0
# 7 Rebar - 20' Length: Old: 74, New: 0
# 8 Rebar - 1' x 7' 8" Dowels: Old: 80, New: 0
13'-4" Lintels: Old: 4, New: 0
12/20/2212/20/22
Complete12/20/22Steven GilbertRichmondROEDH 205-02 Eden HillsF923JFRMMAT.RA-F923-J.HAVENAdding 23/32 OSB T&G Edge Gold
Steven Gilbert:
Missing T&G from frame package. Missing TNG from frame package please create a fill-in order for Haven.

---------------------------------------------------------

Per Sam this should have 61 sheets (Adam)

FRMMAT.RA-F923-J.HAVEN

23/32 OSB T&G Edge Gold:
Old: 0, New: 61
12/20/2212/20/22
Complete12/14/22Bobby NellerMintoNDLTM 0274 LatitudesVilla 13BPrecastSwapping 10'-6" Lintels for 8'-8" Lintels
Bobby Neller:
Not exactly sure what happened here. Should only be (1)- 10 foot six and I’ve got two extras. There should be (2)-8’ 8” I don’t have any. I will be able to use the extra 10 foot sixes in Lou of the 8 foot eights on this particular job

10’6”precast: Old-3, New-1
8’8”precast: Old-0, New-2

-------------------------------------------------------------------------

PCMS.NDLTM13-B.CASTCRETE (doesn't exist)

PCMS.NDLTM13-A/NDLTM13-B.CASTCRETE
10'-6" Lintel: Old: 3, New: 1
8'-8" Lintel: Old: 0, New: 2


12/14/2212/14/22
12/14/22Jeff SubbertDart InterestsDIEVM 069 Evermore Resort8-BedroomCornerVariousVarious
Jeff Subbert:
There are some issues that we need to address with the lumber take offs.

1) I’ve checked all lumber PO’s and cannot find a 5 1/4” x 7” 1.8 PSL post.

2) per second drop PO I am seeing 7/16 OSB. This needs to be changed to 5/ 8 OSB or 19/32 osb.

4) we are always running short on 2x8x16 pt. We are using this material on all truss tails and under the out lookers on gable ends and drip edges.

3) a total of 4) 5/8 wedge Anchors.

12/14/22
Waiting on Review12/12/22Kyle JollyDart InterestsDIEVM 043 Evermore Resort7-BedroomNoneFrame ***Swapping 7/16 OSB for 5/8 OSB
Kyle:
EWO has been made and sent into DART awaiting approval. Roof is metal and requires 5/8 OSB

------------------------------------------------------------

Sharon sent an email to everyone to confirm what we're doing on this. Will update as needed.

FRMMAT-DROP2.DIEVM-7BR-NONE.HAVEN

7/16 OSB:
5/8 OSB:
12/12/22
Complete12/11/22Steven GilbertRichmondROHSQ 012 Heritage SquareF924/AmmoliteCFrame ***Adding 2x10x12 SYP
Steven Gilbert:
Please fix p.o.s and send fill in for 2x10s for window headers 2nd floor. Need 21 feet total so send me (2) 2x10x12’ also add to package for window headers.

----------------------------------------------------------------------

FRMMAT.RA-Ammolite-F924-C.HAVEN
FRMMAT.RA-Ammolite-F924-C.84LUMBER
FRMMAT.RA-Ammolite-F924-C.BFS
FRMMAT.RA-Ammolite-F924-C.MARJAM

2x10x12 SYP: Old: 0, New: 2

12/11/2212/20/22
Complete12/07/22Bobby NellerMintoNDLTM 2810 LatitudesVilla 11BFrame ***Removing Materials
Bobby Neller:
2x8x8 SYP old-30, New-25-remove five
2x6x10 SYP old-14, New 2-remove 12
2x12x8 borate -old-3, New-0
2x6x12 SYP-old -2, New-0
2x6x14 SYP -old-2, New-0

Like to remove five sheets of 15/32 CD X from this takeoff
Old-20, New-15

--------------------------------------------------------------

FRMMAT.NDLTM11-B.84LUMBER
FRMMAT.NDLTM11-B.BFS
FRMMAT.NDLTM11-B.MARJAM

2x12x8 PT: Old: 3, New: 0
2x6x10 SYP: Old: 14 , New: 2
2x6x12 SYP: Old: 2, New: 0
2x6x14 SYP: Old: 2, New: 0
2x8x8 SYP: Old: 30, New: 25
15/32 CDX: Old: 20, New: 15
12/07/2212/07/22
Complete12/07/22Jeff SubbertDart InterestsDIEVM 019 Evermore Resort9-BedroomCorner/Theater2nd Lift - Precast/Masonry SteelChanging 2nd Lift
Jeff Subbert:
Here’s a list of headers and windowsills that I will need for this specific nine bedroom C elevation with theater room.

Headers
3)3’6”
4) 4’6”
5) 5’4”
4) 8’

Sills ( Wind flush)
3)27”
1) 35”
1) 39”

--------------------------------------------------------------------------------

PCMS-DROP2.DIEVM-9BR-CORNER/THEATRE.LOTTSORLANDO

3’-6” Lintel: Old: 0, New: 3
4'-0" Lintel: Old: 3, New: 0
4’-6” Lintel: Old: 8, New: 4
4'-8" Lintel: Old: 1, New: 0
5’-4” Lintel: Old: 0, New: 5
8’-0" Lintel: Old: 0, New: 4
2'-2.5" Sill: Old: 0, New: 3
3'-1" Sill: Old: 4, New: 2
12/07/2212/07/22
Complete12/07/22Jeff SubbertDart InterestsDIEVM 014 Evermore Resort9-BedroomNone2nd Lift - Precast/Masonry SteelChanging 2nd Lift
Jeff Subbert:
Here’s a list of header sizes and sales sizes that we will need for a nine bedroom non-elevation.
Headers
1) 3’6”
4) 4’6”
5) 5’4”
1) 7’8”
3) 8’
Sills
1) 27”
2) 39”
1) 71”

---------------------------------------------------------------------------

PCMS-DROP2.DIEVM-9BR-A.LOTTSORLANDO (doesn't exist)
PCMS-DROP2.DIEVM-9BR-NONE.LOTTSORLANDO

3’-6” Lintel: Old: , New:
4'-0" Lintel: Old: 1, New: 0
4’-6” Lintel: Old: 1, New: 4
4'-8" Lintel: Old: 1, New: 0
5’-4” Lintel: Old: 7, New: 5
7’-6” Lintel: Old: 1, New: 1 (no change)
8’-0" Lintel: Old: 3, New: 3 (no change)

2'-2.5" Sill: Old: 0, New: 1
3'-1" Sill: Old: 1, New: 2
4'-0" Sill: Old: 2, New: 0
6'-0" Sill: Old: 1, New: 1 (no change)
12/07/2212/07/22
Complete12/07/22Jeff SubbertDart InterestsDIEVM 069 Evermore Resort8-BedroomCorner2nd Lift - Precast/Masonry SteelChanging 2nd Lift
Jeff Subbert:
This is what I’m finding for an eight bedroom corner as far as headers and sills go. I do not have any second lift PO generated to compare and contrast.

8 bedroom, corner
3) 3’6”
7) 4’6”
3) 5’4”
3) 8’

Sills
3) 27” windflush sills

--------------------------------------------------

PCMS-DROP2.DIEVM-8BR-CORNER.LOTTSORLANDO

3'-6" Lintel: Old: 0, New: 3
4'-0" Lintel: Old: 4, New: 0
4'-6" Lintel: Old: 7, New: 7 (No Change)
5'-4" Lintel: Old: 0, New: 3
7'-6" Lintel: Old: 1, New: 0
8'-0" Lintel: Old: 4, New: 3
2'-2.5" Sill: Old: 0, New: 3
3'-1" Sill: Old: 1, New: 0
12/07/2212/07/22
Complete12/07/22SharonMarmer ContructionMACSA 020 Casa San Alfonso4-BedroomSTDMasonry ***Swapping Column Block for Regulars
Sharon Heim:
Ted says they are not using the 12x8x12 column block that are on the po’s.

It appears that the 4 bedroom is the only one I see that has 12x8x12 column block on the po’s

Please delete the 24 12x8x12 column block and replace with 40 8x8x16 reg block

--------------------------------------------------

MASMAT.MACSA-4BR.JAHNA

12x8x12 Column Block: Old: 24, New: 0
Regulars: Old: 954, New: 978
12/07/2212/07/22
Complete12/06/22Jeff SubbertDart InterestsDIEVM 045 Evermore Resort8-BedroomNone2nd Lift - Precast/Masonry SteelChanging 2nd Lift
Jeff Subbert:
Lot 45 is an eight bedroom none elevation.
Here are the headers on this model.

3) 8’
5) 3’6”
3) 5’4”
1) 4’6”

Sills
5) 27” wind flush

---------------------------------------------

PCMS-DROP2.DIEVM-8BR-NONE.LOTTSORLANDO

3'-6" Lintel: Old: 6, New: 5
4'-6" Lintel: Old: 3, New: 1
7'-6" Lintel: Old: 3, New: 0
8'-0" Lintel: Old: 0, New: 3
2'-2.5" Sill: Old: 0, New: 5
3'-1" Sill: Old: 1, New: 0
6'-2" Sill: Old: 1, New: 0
12/06/2212/06/22
Sent to Bids12/05/22Dane JonesToll BrothersTBLPT 009 Laurel PointeBarberaMOPrecast ***Adding Lintel & Sill
Dane Jones:
+1) 10’ 6 U Lintel package change (this is at the front door, entry way)
+1) 8’ hi dri sill- fill in, extra window on the revised drawings – We don’t have anything over 6’-2”. Dane says a 3’-1” will work.

--------------------------------------------------------------------

Sent to bids for review (Adam)
12/05/22
Complete11/28/22Joey RamosRichmondROSPN 093-05 Southern PinesF913/PearlMFrame ***Adding 2x10x12 SYP
Joey Ramos:
Plans changed so we have to put the correct header in place. Was told by area manager David to make these changes.

(3) 2x10 yellow pine. 12’

--------------------------------------------------------------

FRMMAT.RA-Pearl-F913-M.HAVEN
FRMMAT.RA-Pearl-F913-M.BFS
FRMMAT.RA-Pearl-F913-M.84LUMBER
FRMMAT.RA-Pearl-F913-M.MARJAM
2x10x12 SYP: Old: 0, New: 3
11/28/2211/28/22
Complete11/28/22Jeff SubbertDart InterestsDIEVM 043 Evermore Resort7-BedroomNonePrecast, 2nd Lift ***Swapping (1) 14' for 15'-4" Lintel
Jeff Subbert:
Instead of a 14 footer I need a 15’4” header, all 7 bedrooms.

---------------------------------------------------------------

Jeff said this only applies to the 2nd Lift.


PCMS-DROP2.DIEVM-7BR-NONE.LOTTSORLANDO

14' Lintel: Old: 1, New: 0
15'-4" Lintel: Old: 0, New: 1
11/28/2211/28/22
Complete11/28/22Joey RamosRichmondROSPN 028-05 Southern PinesF914/MoonstoneLFrame ***Adding 2x10x12 SYP
Joey Ramos:
Plans changed so we have to put the correct header in place. Was told by area manager David to make these changes.

(3) 2x10 yellow pine. 12’

--------------------------------------------------------------

FRMMAT.RA-Moonstone-F914-L.HAVEN
FRMMAT.RA-Moonstone-F914-L.MARJAM
FRMMAT.RA-Moonstone-F914-L.BFS
FRMMAT.RA-Moonstone-F914-L.84LUMBER
2x10x12 SYP: Old: 0, New: 3
11/28/2211/28/22
Complete11/23/22John RathbunSurrey HomesSOFXH 049 Fox HammockCloverBPrecast ***Removing Lintel Adding Sill
John Rathbun:

Clover model B elevation Precast package change / fill in.
Please remove one of the 2-2.5 sills for a new total of one .
Please add one 4-0 sill for a new total of one.

---------------------------------------------------------------------

PCMS.SO-Clover-B.LOTTSORLANDO
2-2.5 Sill: Old: 2, New: 1
4'-0" Sill: Old: 0, New: 1
11/23/2211/23/22
Complete11/21/22Steven GilbertRichmondROHSQ 012 Heritage SquareF924/AmmoliteCPrecast ***Precast Package Change
Steven Gilbert:
Remove (2) 10’6” precast need only 1
Remove (3) 4’5” sills need only 2
Add (1) 7’6” precast need one
Add (1) 6’2” sills need only 1

------------------------------------------------------------

PCMS.RA-Ammolite-F924-C.LOTTS

10'-6" Lintel: Old: 3, New: 1
7'-6" Lintel: Old: 0, New: 1
4'-5" Sill: Old: 6, New: 2
6'-2" Sill: Old: 0, New: 1

11/21/2211/21/22
Complete11/21/22Kyle JollyDart InterestsDIEVM 067 Evermore Resort5-BedroomNonePCMS-DROP2.DIEVM-5BR-NONEAdding Anchor Bolts
Kyle Jolly:
Plans call for anchor bolts 4’ on center.
Anchor bolts needed for truss hold down.
All 5br need these added.
(15) 1/2x10” anchor bolts

----------------------------------------------------------

PCMS-DROP2.DIEVM-5BR-NONE.LOTTSORLANDO
AB1210: Old: 0, New: 15
11/21/2211/21/22
Complete11/07/22Bobby NellerMintoNDLTM 2756 LatitudesALLALLMasonry ***Remove 50 Regulars
Bobby Neller:
Requesting 50 regulars come off of all of the Villa take offs please.
-------------------------------------------------------------------------------------
Bobby says they keep having to pay best block or someone else to move them down. Doesn't affect pre-blend (Adam).

MASMAT.NDLTM2-A.FLBESTBLOCKORLANDO
MASMAT.NDLTM2-A.PREFERREDDAYTONA
MASMAT.NDLTM2-B.FLBESTBLOCKORLANDO
MASMAT.NDLTM2-B.PREFERREDDAYTONA
Regulars: Old: 1983, New: 1933

MASMAT.NDLTM3-A.FLBESTBLOCKORLANDO
MASMAT.NDLTM3-A.PREFERREDDAYTONA
MASMAT.NDLTM3-B.FLBESTBLOCKORLANDO
MASMAT.NDLTM3-B.PREFERREDDAYTONA
Regulars: Old: 2110, New: 2060

MASMAT.NDLTM4-A/NDLTM4-II-A.FLBESTBLOCKORLANDO
MASMAT.NDLTM4-A/NDLTM4-II-A.PREFERREDDAYTONA
MASMAT.NDLTM4-B/NDLTM4-II-B.FLBESTBLOCKORLANDO
MASMAT.NDLTM4-B/NDLTM4-II-B.PREFERREDDAYTONA
Regulars: Old: 2200, New: 2150

MASMAT.NDLTM5-A.FLBESTBLOCKORLANDO
MASMAT.NDLTM5-A.PREFERREDDAYTONA
MASMAT.NDLTM5-B.FLBESTBLOCKORLANDO
MASMAT.NDLTM5-B.PREFERREDDAYTONA
Regulars: Old: 2099, New: 2049

MASMAT.NDLTM6-A.FLBESTBLOCKORLANDO
MASMAT.NDLTM6-A.PREFERREDDAYTONA
MASMAT.NDLTM6-B.FLBESTBLOCKORLANDO
MASMAT.NDLTM6-B.PREFERREDDAYTONA
Regulars: Old: 1991, New: 1941

MASMAT.NDLTM7-A/NDLTM7-II-A.FLBESTBLOCKORLANDO
MASMAT.NDLTM7-A/NDLTM7-II-A.PREFERREDDAYTONA
Regulars: Old: 2113, New: 2063

MASMAT.NDLTM7-B/NDLTM7-II-B.FLBESTBLOCKORLANDO
MASMAT.NDLTM7-B/NDLTM7-II-B.PREFERREDDAYTONA
Regulars: Old: 2148, New: 2098

MASMAT.NDLTM8-A.FLBESTBLOCKORLANDO
MASMAT.NDLTM8-A.PREFERREDDAYTONA
MASMAT.NDLTM8-B.FLBESTBLOCKORLANDO
MASMAT.NDLTM8-B.PREFERREDDAYTONA
Regulars: Old: 1941, New: 1891

MASMAT.NDLTM9-A.FLBESTBLOCKORLANDO
MASMAT.NDLTM9-A.PREFERREDDAYTONA
Regulars: Old: 2070, New: 2020

MASMAT.NDLTM9-B.FLBESTBLOCKORLANDO
MASMAT.NDLTM9-B.PREFERREDDAYTONA
Regulars: Old: 2192, New: 2142

MASMAT.NDLTM10-A.FLBESTBLOCKORLANDO
MASMAT.NDLTM10-A.PREFERREDDAYTONA
Regulars: Old: 1957, New: 1907

MASMAT.NDLTM10-B.FLBESTBLOCKORLANDO
MASMAT.NDLTM10-B.PREFERREDDAYTONA
Regulars: Old: 1967, New: 1917

MASMAT.NDLTM11-A.FLBESTBLOCKORLANDO
Regulars: Old: 2250, New: 2200

MASMAT.NDLTM11-B.FLBESTBLOCKORLANDO
Regulars: Old: 2168, New: 2018

MASMAT.NDLTM12-A/NDLTM12-II-A.FLBESTBLOCKORLANDO
MASMAT.NDLTM12-A/NDLTM12-II-A.PREFERREDDAYTONA
MASMAT.NDLTM12-B/NDLTM12-II-B.FLBESTBLOCKORLANDO
MASMAT.NDLTM12-B/NDLTM12-II-B.PREFERREDDAYTONA
Regulars: Old: 2089, New: 2039

MASMAT.NDLTM13-B.FLBESTBLOCKORLANDO
MASMAT.NDLTM13-B.PREFERREDDAYTONA
Regulars: Old: 1953, New: 1903
11/07/2211/08/22
Complete11/07/22Jarrod RathbunMintoNDLTS 2399 Latitudes50-179-II, 40-175-IIBHardware ***Adding (1) HTT4
Jarrod Rathbun:

LMD 40-175 (lot 2904/2909) need (1) HTT4 a piece

LMD 50-179 (lots 2399/2393/2411/2423/2417/2451/2446) need (1) HTT4 per lot

------------------------------------------------------------------

There is (1) HTT4 on the 40-175 and 50-179 but not on the II's for some reason (takeoffs and jobs). Jarrod says they are needed and should be in the II packages.

HDW.NDLTS40-175-II-A.WHITECAP
HDW.NDLTS40-175-II-B.WHITECAP
HDW.NDLTS50-179-II-A.WHITECAP
HDW.NDLTS50-179-II-B.WHITECAP
HTT4: Old: 0, New: 1

11/07/2211/07/22
Complete11/03/22Dane JonesToll BrothersTBLPT 008 Laurel PointeDolcettoMOSlab Prep ***Adding 1 Roll of Visqueen
Dane Jones:
This model requires three total rolls of plastic for the slab pack
Previous amount-2
New total-3

-------------------------------------------------------------

SLABPREP.TBLPT008.WHITECAP
Visqueen: Old: 2, New: 3
11/03/2211/03/22
Complete11/03/22Adrian HartDart InterestsDIGFL 0C3 Garden Flats12-UnitPrecast, 2nd Lift ***Changing #7 Dowels
Adrian Hart:

Change 1x11’10” #7 dowels to 11’8”straight cut
Change 17’8” straight #7 to 14’ straight #7
Delete 12” durowall.
Add 40-20’ #5 rebar

Please revise po 0016 on c3 and d1
Do the same to building d1

-------------------------------------------------------------

PCMS-DROP2.DIGFL-0C1/0C2/0C3.LOTTSORLANDO
#7 - Dowel: 1x11'10: Old: 279
#7 - Dowel: 17'4 straight: Old: 537
#7 - Dowel: 1x11'8: New: 279
#7 - Dowel: 14' straight: New: 537
11/03/2211/03/22
Sent to Bids11/02/22Adrian HartDart InterestsDIGFL 0C1 Garden Flats12-UnitPrecast, 2nd Lift ***Adding (6) 12" Wide Lintels, 8'
Adrian Hart:
6- 12” wide x8’ long precast needed for second lift. Please apply this to all further buildings. C1, c2, c3 d1.

------------------------------------------------------

Sending to bids (Adam)
11/02/22
Complete11/02/22Larry SimsSobel CoOFVMR 004 Villa Mar6-UnitType 2Masonry, 1st Lift ***Adding 12" Block
Larry Sims:
PO # OFVMR004-0003 needs 8 x 12 x 16 3/4 block added to po and release to preferred materials.

85) 12 x 8 x 12 column block
70) 12 x 8 x 16 box car
434) 8 x 6 x 16 6 highs
7200) 8 x 8 x 16 regular
144) 8 x 8 x 16 lintel block
389) 8 x 8 x 8 half block
60) 8 x 4 x 16 half high
60) 8 x 12 x 16 3/4 block
140) 80 pound bag masonry
19) yards builders sand

---------------------------------------------------------

MASMAT-DROP1.OFVMR-TYPE2.PREFERREDNAPLES (OFVMR)
12" Block: Old: 0, New: 60
11/02/2211/02/22
Complete11/01/22Bryan HealyMattamy HomesMOSLL 003 Soleil6-UnitTCFFCVHDW.MOSLL-TCFFCV(FT).WHITECAPAdding (4) LUC26-2
Bryan Healy:

Every building needs 4 of the LUC26-2 for the overhangs on the side entries.

All POs for framing hardware.

X4 HUC26-2

-----------------------------------------------------------

HDW.MOSLL-TCFFCV(FT).WHITECAP
HDW.MOSLL-TCFFFV(CR).WHITECAP
HDW.MOSLL-VCFFCT(CR).WHITECAP
HDW.MOSLL-VCFFCT(MO).WHITECAP
LUS26: Old: 0, New: 4
LUS26-2: Old: 0, New: 4
11/01/2211/01/22
Sent to Bids10/31/22OmarSobel CoOFPP 01B Parkway Preserve3-UnitADBPrecast ***Package Change Request / Review
Omar Hernandez:
Would you please correct the 1st lift Lotts PO to reflect the following lintels and sills

2pcs 17’4”
1pc 15’2”
1pc. 12’6”
1pc 12’
3pcs. 9’4”
8 pcs 7’6”
3pcs . 4’8”
8 pcs. 4’6”.
1pc. 3’6”.

Sills
5pcs. 74” wind resistant flush sill
7pcs 37”wind resistant flush sill
1pc. 26.5” wind resistant flush sill

----------------------------------------------------------------

Sent to bids (Adam)
10/31/22
Sent to Bids10/31/22OmarSobel CoOFPP 01D Parkway Preserve3-UnitACBPrecast ***Package Change Request / Review
Omar Hernandez:
Would you please correct the 1st lift Lotts PO to reflect the following lintels and sills
1pcs 17’4”
1pc. 15’2”
1pc. 12’6”
2pcs 12’
2pcs . 9’4”
8 pcs 7’6”
3pcs . 4’8”
8 pcs. 4’6”.
1pc. 3’6”.

Sills
5pcs. 74” wind resistant flush sill
7pcs 37”wind resistant flush sill
1pc. 26.5” wind resistant flush sill

----------------------------------------------------------

Sent to bids (Adam)
10/31/22
Complete10/28/22David PurvisToll BrothersTBLPT Laurel PointeBarberaPBFrame Drop 1 & 2 ***Removing Materials
David Purvis:

Please adjust the following on the lumber package.

Delete
1x6x12 pt (1st drop) 24-10= new quantity of 14
2x6x10’ syp (2nd drop) 305-100= new quantity of 205
-----------------------------------------------------------------------

FRMMAT-DROP1.TBLPT053.84LUMBER
1x6x12 PT: Old: 24, New: 14

FRMMAT-DROP2.TBLPT053.84LUMBER
2x6x10 SYP: Old: 305, New: 205
10/28/2210/28/22
Complete10/25/22Brian DinkerMintoNDLTS 2474 LatitudesALLALLFrame ***Swapping 2x6x8 w/ 10'
Brian Dinker:
8’ are ending up short . Frames are requesting 10’. Please change 2x6 PT for garage door bucks from 8’ to 10’ for all single family. Models. Please.
--------------------------------------------------------
All Models / Elevations.
Swapping 2x6x8' with 2x6x10 (Adam).

FRMMAT.NDLTS40-136-A.84LUMBER
FRMMAT.NDLTS40-136-A.BFS
FRMMAT.NDLTS40-136-A.MARJAM
FRMMAT.NDLTS40-136-B.84LUMBER
FRMMAT.NDLTS40-136-B.BFS
FRMMAT.NDLTS40-136-B.MARJAM
FRMMAT.NDLTS40-175-A.84LUMBER
FRMMAT.NDLTS40-175-A.BFS
FRMMAT.NDLTS40-175-A.MARJAM
FRMMAT.NDLTS40-175-B.84LUMBER
FRMMAT.NDLTS40-175-B.BFS
FRMMAT.NDLTS40-175-B.MARJAM
FRMMAT.NDLTS40-175-II-B.84LUMBER
FRMMAT.NDLTS40-175-II-B.BFS
FRMMAT.NDLTS40-175-II-B.MARJAM
FRMMAT.NDLTS40-177-A.84LUMBER
FRMMAT.NDLTS40-177-A.BFS
FRMMAT.NDLTS40-177-A.MARJAM
FRMMAT.NDLTS40-177-B.84LUMBER
FRMMAT.NDLTS40-177-B.BFS
FRMMAT.NDLTS40-177-B.MARJAM
FRMMAT.NDLTS40-178-A.84LUMBER
FRMMAT.NDLTS40-178-A.BFS
FRMMAT.NDLTS40-178-A.MARJAM
FRMMAT.NDLTS40-178-B.84LUMBER
FRMMAT.NDLTS40-178-B.BFS
FRMMAT.NDLTS40-178-B.MARJAM
FRMMAT.NDLTS40-178-II-A.84LUMBER
FRMMAT.NDLTS40-178-II-A.BFS
FRMMAT.NDLTS40-178-II-A.MARJAM
FRMMAT.NDLTS40-178-II-B.84LUMBER
FRMMAT.NDLTS40-178-II-B.BFS
FRMMAT.NDLTS40-178-II-B.MARJAM
FRMMAT.NDLTS50-184-A.84LUMBER
FRMMAT.NDLTS50-184-A.BFS
FRMMAT.NDLTS50-184-A.MARJAM
FRMMAT.NDLTS50-184-B.84LUMBER
FRMMAT.NDLTS50-184-B.BFS
FRMMAT.NDLTS50-184-B.MARJAM
2x6x8 PT: Old: 3

FRMMAT.NDLTS40-176-A.84LUMBER
FRMMAT.NDLTS40-176-A.BFS
FRMMAT.NDLTS40-176-A.MARJAM
FRMMAT.NDLTS40-176-B.BFS
FRMMAT.NDLTS40-176-B.MARJAM
FRMMAT.NDLTS40-176-II-A.84LUMBER
FRMMAT.NDLTS40-176-II-A.BFS
FRMMAT.NDLTS40-176-II-A.MARJAM
FRMMAT.NDLTS40-176-II-B.84LUMBER
FRMMAT.NDLTS40-176-II-B.BFS
FRMMAT.NDLTS40-176-II-B.MARJAM
2x6x8 PT: Old: 5

FRMMAT.NDLTS50-179-A.84LUMBER
FRMMAT.NDLTS50-179-A.BFS
FRMMAT.NDLTS50-179-A.MARJAM
FRMMAT.NDLTS50-179-B.84LUMBER
FRMMAT.NDLTS50-179-B.MARJAM
FRMMAT.NDLTS50-179-II-A.84LUMBER
FRMMAT.NDLTS50-179-II-A.BFS
FRMMAT.NDLTS50-179-II-A.MARJAM
FRMMAT.NDLTS50-179-II-B.84LUMBER
FRMMAT.NDLTS50-179-II-B.BFS
FRMMAT.NDLTS50-179-II-B.MARJAM
2x6x8 PT: Old: 6

FRMMAT.NDLTS50-180-A.84LUMBER
FRMMAT.NDLTS50-180-A.BFS
FRMMAT.NDLTS50-180-A.MARJAM
FRMMAT.NDLTS50-180-B.84LUMBER
FRMMAT.NDLTS50-180-B.BFS
FRMMAT.NDLTS50-180-B.MARJAM
2x6x8 PT: Old: 10. 2x6x10 New: 12

FRMMAT.NDLTS50-181-A.84LUMBER
FRMMAT.NDLTS50-181-A.BFS
FRMMAT.NDLTS50-181-A.MARJAM
FRMMAT.NDLTS50-181-B.84LUMBER
FRMMAT.NDLTS50-181-B.BFS
FRMMAT.NDLTS50-181-B.MARJAM
2x6x8 PT: Old: 1
10/25/2210/31/22
Complete10/25/22Adrian HartDart InterestsDIGFL 0C1 Garden FlatsALLALL2nd Lift - Precast/Masonry SteelRemoving 12" Durowall
Adrian Hart:
Please remove all 12” ladder joint from all second floor pos.
We have plenty on site to complete work.

------------------------------------------------------------

Revised: 10/25/22 (AS)

FILLIN-PCMS-DROP2.DIGFL-0B1.LOTTSORLANDO
Duro Wall - 12": Old: 1, New: 0

PCMS-DROP2.DIGFL-0B1.LOTTSORLANDO
PCMS-DROP2.DIGFL-0C1/0C2/0C3.LOTTSORLANDO
Duro Wall - 12": Old: 3, New: 0

PCMS-DROP2.DIGFL-0D1.LOTTSORLANDO
Duro Wall - 12": Old: 2, New: 0
10/25/2210/25/22
Complete10/21/22Jeff SubbertDart InterestsDIEVM 027 Evermore Resort10-BedroomNonePrecast ***Package Change Request / Review
Jeff Subbert:
These are the headers that we need to build this house:

8) 3’6”
5) 4’6”
4) 5’10”
2) 9’4”
1) 14’
1) 17’4”
1) 19’4”
3) 4’6” recess

-------------------------------------------------------------------------------

Sending to bids (Adam)

-------------------------------------------------------------------------------

So we are all clear this will be the 2nd package change that pertains to precast on this lot. Bryan Healey did the first request on 7/26 which was completed -Sharon

Making Package Change (Adam)

PCMS-DROP1.DIEVM-10BR-NONE.LOTTSORLANDO
4’6”: Old: 1, New: 5
5’10”: Old: 8, New: 4
10/21/2210/26/2210/26/22
Sent to Bids10/21/22Jeff SubbertDart InterestsDIEVM 007 Evermore Resort9-BedroomNonePrecast ***Package Change Request / Review
Jeff Subbert:
These are the headers that we need for a nine bedroom, none Option.

4) 3’6”
4) 4’6”
1) 5’10”
3) 7’6”
1) 9’4”
2)10’6”
1) 12’0”
1) 13’4”
1) 15’4”
1) 21’4”
2) 4’6” recess

------------------------------------------------------------------

Sent to bids for review (Adam).
10/21/22
Sent to Bids10/21/22Jeff SubbertDart InterestsDIEVM 008 Evermore Resort8-BedroomNonePrecast ***Package Change Request / Review
Jeff Subbert:
These are the headers we need to build an eight bedroom option none

4) 3’6”
7) 4’6”
1) 7’6
5) 9’4”
1) 13’4”
1) 17’4”
2) 4’6” resses

---------------------------------------------------------

Sent to bids for review (Adam)
10/21/22
Sent to Bids10/21/22Jeff SubbertDart InterestsDIEVM 067 Evermore Resort5-BedroomNonePrecast ***Package Change Request / Review
Jeff Subbert:
This is the five bedroom option B elevation

6) 3’6”
3) 4’6”
5) 5’10”
1) 7’6”
1) 10’6”
1) 14’0”

----------------------------------------------------------

Sending to bids for review (Adam).
10/21/22
Sent to Bids10/21/22Jeff SubbertDart InterestsDIEVM 038 Evermore Resort11-BedroomNonePrecast ***Package Change Request / Review
Jeff Subbert:
This is an 11 bedroom, Option none.

10) 3’6”
2) 5’4”
2) 9’4”
1) 10’6”
1) 11’4”
2) 14’0”
1) 17’4”
1) 19’ 4”
2) 4’6” resses

----------------------------------------------------------

Sending to bids for review (Adam).
10/21/22
Complete10/21/22Cyndi MulleeMintoNDLTC 3090 LatitudesALLALLShaftwall Materials - DensglassAdding Densglass
Cyndi Mullee:

Package change for all cottage models
Please add 8 pieces of Densglass Ultra Shaftliner 2’x10’x1”

-----------------------------------------------------------------

Sent to bids for review (Adam)

Kevin approved this package change.

SHAFTWALL.NDLTC1A/NDLTC1B/NDLTC1C.INTERIOR/EXTERIOR BUILDING SUPPLY
Densglass: Old: 32, New: 40

SHAFTWALL.NDLTC2A/NDLTC2B/NDLTC2C.INTERIOR/EXTERIOR BUILDING SUPPLY
Densglass: Old: 35, New: 43

SHAFTWALL.NDLTC3A/NDLTC3B/NDLTC3C.INTERIOR/EXTERIOR BUILDING SUPPLY
Densglass: Old: 32, New: 40

SHAFTWALL.NDLTC4A/NDLTC4B/NDLTC4C.INTERIOR/EXTERIOR BUILDING SUPPLY
Densglass: Old: 35, New: 43
10/21/2210/21/2210/21/22
Complete10/21/22Adrian HartDart InterestsDIGFL 0C1 Garden Flats12-UnitSlab Prep Level 2 ***Removing Mesh Ups, Wire Mesh, & Chairs
Adrian Hart:
Please delete wire mesh,meshup chairs and rod chairs from all flats 2nd floor slab pos. We are using commercial fiber in leau of welded wire.

Package change 2nd floor slab c1-00132, c2-0016.

--------------------------------------------------------------

SLABPREP-LEVEL2.DIGFL-0C1/0C2/0C3.LOTTSORLANDO
16" Rod Chairs: Old: 12, New: 0
Wire Mesh Chairs: Old: 1536, New: 0
Welded Wire Mesh Fabric Sheets: Old: 94, New: 0

SLABPREP-LEVEL2.DIGFL-0B1.LOTTSORLANDO
16" Rod Chairs: Old: 10, New: 0
Wire Mesh Chairs: Old: 1274, New: 0
Welded Wire Mesh Fabric Sheets: Old: 79, New: 0

SLABPREP-LEVEL2.DIGFL-0D1.LOTTSORLANDO
16" Rod Chairs: Old: 6, New: 0
Wire Mesh Chairs: Old: 786, New: 0
Welded Wire Mesh Fabric Sheets: Old: 49, New: 0
10/21/2210/21/22
Complete10/19/22Bryan HealyMattamy HomesMOSLL 003 SoleilTCFFCVFTHardware ***Adding (1) MSTA49
Bryan Healy:
The plans require 2 of the MSTA49 strap tie.
One for each end unit.

--------------------------------------------------------------

Not sending to bids because the item is less than $10 and he's only adding one of them.

HDW.MOSLL-TCFFCV(FT).WHITECAP
MSTA49: Old: 1, New: 2
10/19/2210/19/22
Declined/No Change10/19/22Cyndi MulleeMintoNDLTC 3088 LatitudesCottage 4BFrame***Adding 2x6x12' SYP
Cyndi Mullee:
Please add to existing package (12) 2x6x12’ southern yellow pine for the Gable ends and bracing that call for 2x6 in detail.

Current package (17) 2x6x12’ southern yellow pine
Change package to (29) 2x6x12’ southern yellow pine

Fill in needed for current/in progress builds:
3076
3078
3080
3082
3084
3086
3088
3090
3124
3126
3128
3130

Sending to bids for review (Adam)

---------------------------------------------------

10/19/22 - Chris Plantz: I don't see anything changed in the gable detail. There is only one gable detail in the plans.The 2x6 diagonals shown in the detail are standard on all gables. The vertical piece that appears to be 2x6 isn't actually specified as such in the detail and plainly states. "By Truss Company" for that member.
My question again is, why are they just now asking for this? We have been building these cottages for some time now.


---------------------------------------------------

10/27/22 - Package Change Declined.
10/19/2210/27/22Chris Plantz
Complete10/18/22Steven GilbertRichmondROHSQ 019 Heritage SquareF924/AmmoliteAFrame ***Changed to 2x10's
Steven Gilbert:
Requesting a package change for this model/elevation. The garage door bucks and window headers changed to 2x10’s on the plans.

----------------------------------------------------------
Sent to bids (Adam)

Chris Plantz:
On the Richmond model F924 elevation "A" make the following change for these frame headers:

(-1) 2" x 6" x 8'0" SYP
(-1) 2" x 6" x 14'0" SYP
(+4) 2" x 10" x 8'0" SYP

----------------------------------------------------------

FRMMAT.RA-Ammolite-F924-A.84LUMBER
FRMMAT.RA-Ammolite-F924-A.BFS
FRMMAT.RA-Ammolite-F924-A.HAVEN
FRMMAT.RA-Ammolite-F924-A.MARJAM

2x6x8 SYP: Old: 10, New: 9
2x6x12 SYP: Old: 19, New: 18
2x10x8 SYP: Old: 0, New: 4
10/18/2210/18/22Chris Plantz10/18/22
Complete10/12/22Jeff SubbertDart InterestsDIEVM 069 Evermore Resort8-BedroomCornerMasonry Steel ***Adding more #5 16' Dowels
Jeff Subbert:

PO calls for 75) 16’ straights,
but I am in need of 83 per eight bedroom.

----------------------------------------------------------

Sent to bids for review (Adam).

PCMS-DROP1.DIEVM-8BR-C.LOTTSORLANDO
changed to:
PCMS-DROP1.DIEVM-8BR-CORNER.LOTTSORLANDO

#5 Rebar Dowel - 16' 0": Old: 75, New: 83
10/12/2210/19/22Angie10/19/22
Sent to Bids10/12/22Jeff SubbertDart InterestsDIEVM 033 Evermore Resort11-BedroomBMasonry Steel ***Adding more #5 16' Dowels
Jeff Subbert:

PO calls for 112) 16’ straights,
but I am actually in need of 125 per 11 bedroom

----------------------------------------------------------

Sent to bids for review (Adam).
10/12/22
Sent to Bids10/12/22Jeff SubbertDart InterestsDIEVM 019 Evermore Resort9-BedroomCorner/TheaterMasonry Steel ***Adding more #5 16' Dowels
Jeff Subbert:

We are in need of 110) 16’ straights,
po calls for 49

----------------------------------------------------------

Sent to bids for review (Adam).
10/12/22
Complete10/12/22Jeff SubbertDart InterestsDIEVM 021 Evermore Resort10-BedroomNoneMasonry Steel ***Adding more #5 16' Dowels
Jeff Subbert:

We are in need of 105) 16’ straights,
PO calls for 73.
----------------------------------------------------------

Sent to bids for review (Adam).

----------------------------------------------------------

PCMS-DROP1.DIEVM-10BR-A.LOTTSORLANDO
changed to:
PCMS-DROP1.DIEVM-10BR-NONE.LOTTSORLANDO

#5 Rebar Dowel - 16': Old: 73, New: 105
10/12/2210/19/22Angie10/19/22
Sent to Bids10/12/22Jeff SubbertDart InterestsDIEVM 067 Evermore Resort5-BedroomNoneMasonry Steel ***Adding more #5 16' Dowels
Jeff Subbert:

I am in need of 103) 16’ straights,
PO calls for 45.
----------------------------------------------------------

Sent to bids for review (Adam).
10/12/22
Complete10/11/22Dane JonesToll BrothersTBLPT 018 Laurel PointeBarberaMOPrecast ***Adding (1) 9'-4" Lintel
Dane Jones:

Precast PO is short 1) 9’-4” U Lintel.
Need 4 total for this model.

Locations: single car garage, garage window, 8’ SGD and the secondary lintel at the front door.

------------------------------------------------------------

Sent to Isa for review (Adam)

Isa: According to the takeoff and the list of materials there is the following:

(3) 9'-4" lintels: (1) SGD / (1) Single Garage door / (1) for secondary header on front door.
(1) 10'-6" header for garage window. If a 9'-4" lintel works on this window, you can change it.

------------------------------------------------------------

TBLPT018.LOTTSORLANDO

9'-4": Old: 2, New: 3
10'-6" Lintel: Old: 3, New: 2


10/11/22Isa10/11/22
Complete10/04/22John RathbunSurrey HomesSOSVL 019-A Savannah LandingPearlAHardware ***Adding 5/8 Nuts
John Rathbun:

I need 35 5/8 x2x2 square washers and 35 5/8 nuts .These where delivered and are now gone frame the garage on this home . The nuts are not on the P.O. And will be a package change . Total of 35 needed .

-----------------------------------------------------

HDW.RA-PEARL-F913-A.WHITECAP

5/8 Nuts: Old: 0, New: 35
5/8 Washers: Old: 0, New: 35
10/04/2210/04/22
Complete10/04/22John RathbunSurrey HomesSOFXH 032 Fox HammockVioletA & BHardware *** Adding more SPH4
John Rathbun:
Need to change this quantity again after another recount .I need a total of 200 SPH4 on the Violet model . Need to pick up another 40 of these to finish the frame -John Rathbun

--------------------------------------------

HDW.SO-VIOLET-A.WHITECAP
HDW.SO-VIOLET-B.WHITECAP

SPH4: Old: 173, New: 200
10/04/2210/04/22
Complete09/21/22Bobby NellerMintoNDLTM 2918 LatitudesVilla 11A & BPrecast ***Adding 4'-0" Sills
Bobby Neller:
Should be a total of 4-4’foot high and dry windowsills on this takeoff.
Package change:
Old-0, New-4

-------------------------------------------------------------------------

9/22/22 - Chris Plantz reviewed.

Chris Plantz:

After talking to Adam it appears we have made a sill change at the fields request on other villas with the same window group. To keep things similar I told Adam to make the following changes to Villa 11 sills. I emailed this to Adam as well so he had a means of tracking the change.

(-2) 3'1" sills
(-4) 2'2.5" sills
(+4) 4'0" sills

--------------------------------------------------------------------------

PCMS.NDLTM11-A.CASTCRETE

2'-2.5": Old: 10, New: 6
3'-1": Old: 8, New: 6
4'-0": Old: 0, New: 4

PCMS.NDLTM11-B.CASTCRETE

2'-2.5": Old: 10, New: 6
3'-1": Old: 10, New: 6
4'-0": Old: 0, New: 4
09/21/2209/22/22Chris Plantz09/22/22
Complete09/19/22Larry SimsSobel CoOFVMR 008 Villa Mar4-UnitType 1FRMMAT.OFVMR-TYPE1.RAYMONDFrame Package Change
Larry Sims:
Package needs to be changed and released to vendor package should be as follows:
80) 1 x 2 x 10’ #2 PT
10) 1 x 4 x 12’ #2 PT
80) 1 x 4 x 14’ #2 SYP
40) 2 x 4 x 14’ #2 PT
175) 2 x 4 x 16’ #2 SYP
30) 2 x 6 x 14’ #2 PT
30) 2 x 6 x 14’ #2 SYP
52) 2 x 6 x 16’ rough sawn spruce primed
14) 2 x 6 x 8’ #2 PT
40) 5/8 x 4’ x 8’ CDX Fire rated sheathing
260) 5/8 x 4’ x 8’ CDX sheathing
------------------------------------------------------------
9/20/22 - Went over this with Pete and running the package change (Adam)

FRMMAT.OFVMR-TYPE1.RAYMOND
New Cost-Group: $18,415.46
80) 1 x 2 x 10’ #2 PT
10) 1 x 4 x 12’ #2 PT
80) 1 x 4 x 14’ #2 SYP
40) 2 x 4 x 14’ #2 PT
175) 2 x 4 x 16’ #2 SYP
30) 2 x 6 x 14’ #2 PT
30) 2 x 6 x 14’ #2 SYP
52) 2 x 6 x 16’ rough sawn spruce primed
14) 2 x 6 x 8’ #2 PT
40) 5/8 x 4’ x 8’ CDX Fire rated sheathing
260) 5/8 x 4’ x 8’ CDX sheathing

Old Cost-Group: $27,878.87
1650) 1 x 2 x 10’ #2 PT
200) 1 x 4 x 12’ #2 PT
158) 1 x 6 x 12’ #2 PT
6) 2 x 4 x 14’ #2 PT
140) 2 x 4 x 14’ Spruce
12) 2 x 4 x 16’ #2 PT
250) 2 x 4 x 16’ #2 SYP
8) 2 x 6 x 14’ #2 PT
30) 2 x 6 x 14’ #2 SYP
46) 2 x 6 x 16’ rough sawn spruce primed
14) 2 x 6 x 8’ #2 PT
16) 2 x 8 x 10’ #2 PT
8) 2 x 8 x 14’ #2 PT
6) ¾ x 4 x 8 CDX Sheathing
30) 5/8 x 4’ x 8’ CDX Fire rated sheathing
260) 5/8 x 4’ x 8’ CDX sheathing
09/19/2209/20/22
Complete09/16/22Chris PlantzMintoNDLTS 2902 Latitudes40-176-IIALLPrecast ***Base Precast & MBATH
Adam Sowers:
Chris Plantz had to estimate an Option for Susan on this lot and re-ran the estimate for base precast as well. After comparing to the current Cost-Group I noticed differences so adding to the log and making the changes.

-----------------------------------------------------------------------------------
Chris Plantz: Susan has a "Minto / NDLTS 2902 / 40-176 II" on the books. She needed an estimate for the optional master bath on it.

Since we both know it's coming eventually I went ahead and did the precast only takeoffs for the model.

S:\Estimating\Minto\Latitude Margaritaville DAYTONA\Single Family\Precast Takeoffs - 6-24-2022\40-176 II

This gives the field the 8" of bearing at each end of the lintels as they've been requesting. They should have no reason
to deviate from it, but they probably will. 🙂

------------------------------------------------------------------------------------

PCMS.NDLTS40-176-II-A.LOTTS
PCMS.NDLTS40-176-II-B.LOTTS
6'-6" Lintel: Old: 1, New: 0
7'-6" Lintel: Old: 2, New: 3
09/16/2209/16/22Chris Plantz09/16/22
Under Review09/14/22Dane JonesToll BrothersTBLPT 018 Laurel PointeBarberaMOSGD Precast ***Swapping (1) 17'-4" w/ 12" Wide 17'-4"
Dane Jones:
We need a 12” wide 17’6” lintel for the back SGD.
-------------------------------------------------------------

We had this same problem on lot #013 (Barbera/FH)..
I revised the original precast order to remove (1) 8" 17'-4" Lintel and sent the 12" wide 17'-4" Lintel separately.

Sending to bids for review.

-----------------------------------------------------------------------------

9/16/22 - Lots of emails back and forth on this yesterday.
Last email was from Isa w/ takeoff for what this should require. Following up w/ Pete today on how we're going to run this package change (Adam).

Isa: This wall is 10'-8" high / 22'-8" long ((3'-4" x 2) + 16').
According to the specifications in the S200 drawing, to make this wall 12" wide, it is required:

(70) 12"x8"x16" Boxcar Block
(56) 12"x8"x16" Lintel Block
(1) Pre-Cast 12" U Lintel - 17'-4"

-----------------------------------------------------------------------------




09/14/2209/15/22Isa
Complete09/13/22Bryan HealyMattamy HomesMOSLL 002 Soleil6-UnitTCFFCVFrame ***Adding 1/2 Fire Rated CDX
Bryan Healy:
Fill in for lumber and hardware.
Framers say that they need additional material.

X60 2x6 16' southern yellow pine
X1 Bunk CDX 1/2 fire rated (72 sheets)
X150 nuts 1/2
X150 washers 1/2
X30 MSTAM36
X30 MSTA36

----------------------------------------------------------------

9/14/22 - Carlos said Pete is running this package change (Adam).

9/14/22 - The CDX was missed in the takeoff and will be part of an incoming package change per Carlos, confirmed w/ Angie. We'll be removing OSB for whatever CDX is added. Adding this to the Package Change Log (Adam)

09/13/22Angie09/14/22
Complete09/12/22Steven GilbertRichmondROHSQ 019 Heritage SquareF924/AmmoliteAPrecast ***Package Change Request
Steven Gilbert:
Remove (6) 4’5” sills
Remove (3) 10’6” precast
Add (2) 7’6” precast
Add (2) 6’2” sills

PO Revised/Re-Relased. Sent to bids (Adam)

---------------------------------------------------------------

9/13/22 - Revised by Chris Plantz

Base elevation A
(1) 3'6" lintel
(3) 7'6" lintel
(1) 13'4" lintel
(1) 17'4" lintel
(1) 4'6" recessed (3'0" Door)
(1) 2'-2.5" sill
(3) 6'2" sill

Updated Cost-Groups:
PCMS.RA-Ammolite-F924-A.LOTTS

Removed (3) 10'-6" Lintels & (6) 4'-5" Sills.
Added: (3) 7'-6" Lintels & (3) 6'-2" Sills.
09/12/2209/13/22Chris Plantz09/13/22
Sent to Bids09/07/22Larry SimsSobel CoOFVMR 007 Villa Mar8-UnitType 4MASMAT-DROP2.OFVMR-TYPE4PCR - 2nd Drop Masonry
Larry Sims:
We have 592) 8 x 6 x 16 6 highs in the second lift masonry order and no 8 x 4 x 16 half high. Need to do a package change also need a fill in to get the half highs.

There should be:
92) 8 x 6 x 16 6 high
500) 8 x 4 x 16 half highs

---------------------------------------------------------------------

The job matches the takeoff in the BuilderTrend Templates folder. There is a previous package change on this from March. The PO had the 92) six highs so I sent a fill-in for the 500) four-highs.

Sent to bids for review (AS)
09/07/22
Sent to Bids09/01/22Larry SimsSobel CoOFVMR 009 Villa Mar4-UnitType 1FRMMAT.OFVMR-TYPE1.RAYMONDPackage Change Request
Larry Sims:
Roof lumber package changes and release to vendor.
Larry says the the totals should be the following..

Frame Totals Should be as follows:
80) 1 x 2 x 10’ #2 PT
10) 1 x 4 x 12’ #2 PT
80) 1 x 4 x 14’ #2 SYP
40) 2 x 4 x 14’ #2 PT
175) 2 x 4 x 16’ #2 SYP
30) 2 x 6 x 14’ #2 PT
30) 2 x 6 x 14’ #2 SYP
52) 2 x 6 x 16’ rough sawn spruce primed
14) 2 x 6 x 8’ #2 PT
40) 5/8 x 4’ x 8’ CDX Fire rated sheathing
260) 5/8 x 4’ x 8’ CDX sheathing

Hardware Totals should be as follows:
100) H3 hurricane clip
6) box HETA 20 heavy truss anchor
1) box 3” hilti pin with washer
20) HTU 210
6) LGT3 SDS2.5
100) LSTA 18 flat straps 20 gage 18”
20) SP4 top plate anchor
1) SUL210 45 degree 8” high bucket - left
1) SUR210 45 degree 8” high bucket - right
1) tar paper 6”
4) box TH 14214 Tapcon hex head 1/4 x 2 1/4”
8) USP HU28
40) wedge anchor 3/8 x 5”

----------------------------------------------------------------------------------

Sending to bids for review (Adam)

FRMMAT.OFVMR-TYPE1.RAYMOND
09/01/22
Complete08/31/22Lotts ConcreteMintoNDLTS 2387 Latitudes50-179BOption Related - GSD Precast ***Swapping out 6" High 4'-6"
Adam Sowers:
I received an email from Mary at Lotts asking me to get with Jeff to review the POs on two lots: 2387 & 2388 because they both had 6" 4'-6" Lintels in them and we're missing Recess 4'6" (3'0 dr) Lintels.

We have been making package changes recently with a lot of these models/elevations. Plantz has been reviewing them and I've been updating them. It looks like I missed one of the Recess Lintels on one of the recent package changes and the other missing lintels were due to an incorrect Option on each job. Since Platnz has been reviewing each model/elevation and options I've been creating new options on the A Elevation Templates. X-Options brought in so that's why they were missing.

I've updated the X-Options now so we shouldn't run into this problem anymore.

Updated Selections from X-OPTIONS - Minto:
X-RMV GSD-4280-30291-Lotts
X-RMV GSD-4280-30291-Cast

Swapped out (1) 6" High 4'-6" w/ (1) Recess 4'6" (3'0 dr) Lintel
08/31/2208/31/22
Complete08/31/22Jeff RotertMintoNDLTS 2520 Latitudes40-136APrecast ***Package Review / Change
Jeff Rotert:
Totals need: (7) 7-6, (0) 5-10, (5) 4-6.

Please run this by estimating, as I haven’t built this model out here yet. This is the first house in the new, phase 7. Precast has not been delivered yet.

Sent to bids (Adam)

------------------------------------------------------------

Reviewed by Chris Plantz on 9/6/22

Combined the A & B Cost-Groups (AS)
>Precast Pacakge was correct. Option was wrong.

Added MBATH Option to the 40-136-A Template (Adam)
08/31/2209/06/22Chris Plantz09/06/22
Complete08/29/22David PurvisBella Vista Building GroupBVSLS 008 Sand Lake Station9-UnitType APrecast ***Adding 11'-4" Lintels
David Purvis:
Need (8) 11’4” precast 8” headers, building requires 17 total only 9 on po

------------------------------------------------

PCMS-DROP1.BVSLS-TYPEA-9UNIT.LOTTSORLANDO

11'-4" Lintel: Old: 7, New: 17
7'-6" Lintel: Old: 0, New: 9
08/29/2208/29/22
Complete08/25/22NAMinto-Villa 12ALLHardware ***Adjustments
Adam Sowers:

Revised Cost-Groups for the Villa 12 and matched them to the takeoffs.

Combined the A, II-A, & II-B.
The 12-B is separate since the takeoff was different.

(Adam)
08/25/2208/25/22
Complete08/25/22David PurvisBella Vista Building GroupBVSLS 007 Sand Lake Station8-UnitType BPrecast ***Adding (8) 7'-6" Lintels
Adam Sowers:

David requested a Fill-In for (8) 7'-6" Lintels.
It looks like they were in Angie's takeoff but didn't make it to the compiled takeoff. They are for the Sliding Glass Doors.

Sent the 8 and now adding to the cost-group.

-----------------------------------------------------------------------

PCMS-DROP1.BVSLS-TYPEB-8UNIT.LOTTSORLANDO

7'-6" Lintel: Old: 0, New: 8
08/25/2208/25/22
Complete08/23/22Jeff RotertMintoNDLTS 2388 Latitudes50-180APrecast *** Package Review / Change
Jeff Rotert:

Please have estimating look at this to double check me. This is the first model like this for me out here.

Totals needed: (1) 9-4, (6) 7-6, (0) 6-6
Takeoff totals: (3) 9-4, (3) 7-6, (1) 6-6

---------------------------------------------------------------------------

Job matches the takeoff but I don’t think this model has been reviewed since the package matches the takeoff from 2017.

PO Revised. Sent to bids for review (Adam).

---------------------------------------------------------------------------

Cost-Groups revised per Chris Plants' Revised Takeoff:
PCMS.NDLTS50-180-A.CASTCRETE
PCMS.NDLTS50-180-A.LOTTS

Deleted the 50-180-B Cost-Groups and changed the A to A&B (Adam)
08/23/2208/24/22
Complete08/23/22Jeff SubbertDart InterestsDIEVM 040 Evermore ResortALLALLPrecast ***Adding Bar Ties
Jeff Subbert:

Evermore every lot I need wire ties, 1000 extra per lot. At this time I need 13 rolls of 1000, 8 inch wire ties

---------------------------------------------------

There's only 1 bundle in the job. Jeff says to add 1 bundle of 8" to the precast pacakge (Adam).

PCMS-DROP1.DIEVM-10BR-NONE.LOTTSORLANDO
PCMS-DROP1.DIEVM-10BR-THEATRE.LOTTSORLANDO
PCMS-DROP1.DIEVM-11BR-B.LOTTSORLANDO
PCMS-DROP1.DIEVM-11BR-CORNER.LOTTSORLANDO
PCMS-DROP1.DIEVM-11BR-NONE.LOTTSORLANDO
PCMS-DROP1.DIEVM-11BR-THEATRE.LOTTSORLANDO
PCMS-DROP1.DIEVM-5BR-NONE.LOTTSORLANDO
PCMS-DROP1.DIEVM-7BR-NONE.LOTTSORLANDO
PCMS-DROP1.DIEVM-7BR-THEATRE.LOTTSORLANDO
PCMS-DROP1.DIEVM-8BR-CORNER.LOTTSORLANDO
PCMS-DROP1.DIEVM-8BR-NONE.LOTTSORLANDO
PCMS-DROP1.DIEVM-9BR-CORNER/THEATRE.LOTTSORLANDO
PCMS-DROP1.DIEVM-9BR-NONE.LOTTSORLANDO

8" Bar Ties: Old: 0, New: 1
08/23/2208/23/22
Complete08/18/22Josh CountsMintoNDICP 1394 Isles of CollierCottage 2BMasonry ***Adding Pre-Blend
Adam Sowers:

Josh is ordering 224 bags of pre-blend and after looking at the job and takeoff I realized that we're short.

Only 103 bags of PB in the takeoff & job.
3,538 Total Block
/ 15 = 236 bags of preblend.


MASMAT.NDICP-2B (12"PARTY WALL).FLBESTBLOCKFT.MYERS
MASMAT.NDICP-2B (12"PARTY WALL).PREFERREDNAPLES(NDICP)
Pre-Blend: Old: 103, New: 236
08/18/2208/18/22
Complete08/15/22Jonathan HimesDart InterestsDIEVM 010 Evermore Resort10-BedroomTheaterHardware *** Adding #14 x 3" Screws
Jonathan Himes:
Lumber to truss connection. Framers need more of these screws. Bryan Nealy indicated a package change has already been completed. Please add this tot he package change.

(1000) 14x3” self tapping screws

-------------------------------------------------------

I spoke with Jonathan about this and he said to add 1,000 of these just to the 10besrooms for now (Adam)

HDW.DIEVM-10BR-THEATRE.WHITECAP
HDW.DIEVM-10BR-NONE.WHITECAP

#14 x 3” Hex Head Tek Screws:
Old: 0, New: 1000
08/15/2208/15/22
Complete08/12/22Jeff SubbertDart InterestsDIEVM 050 Evermore Resort10-BedroomTheater1st lift Masonry SteelAdding #3 Rebar 5x29 Stirrups
Jeff Subbert:
Only (67) #3 Rebar - Stirrups 5” x 29” are being ordered per lot. I have been advised that (80) is needed per house for the package change. As of now, (240) is needed to finish up the lots that the cast in place is currently being installed.

----------------------------------------------------

Split between lots 35, 50, & 59.
Sending to bids for review (Adam)

-----------------------------------------------------

PCMS-DROP1.DIEVM-10BR-THEATRE.LOTTSORLANDO
# 3 Rebar - Stirrups 5" x 29": Old: 67, New: 80


PCMS-DROP1.DIEVM-10BR-NONE.LOTTSORLANDO
# 3 Rebar - Stirrups 5" x 29": Old: 64, New: 80
08/12/2208/16/22
Complete08/09/22Bobby NellerMintoNDLTM 2460 LatitudesVilla 11AFrame ***Adding & Removing Materials
Bobby Neller:
Would like to void out old PO and re-issue a new one to accommodate changes please/
15/32-OSB-new-170. Old-217
2x8x8 SYP-new-30. Old-37
2x8x12 PT- new-2. Old-17
2x6x1085/8-new-0. Old-14
2x6x14 spruce- new-0 old-31
2x6x92 5/8- New-0. Old-4
2x4x12 PT- New-10. Old 33
15/32-CDX-new-20. Old-0
2x10x10 SYP new-2. Old-0
2x10x10 PT-new-4. Old-0
--------------------------------------------------------------
Since we're removing more than we're adding I'm running with Bobby's requested changes (Adam).

FRMMAT.NDLTM11-A.BFS --------------------------
FRMMAT.NDLTM11-A.MARJAM --------------------------
-- Revised ------
15/32 OSB: Old: 217, New: 170
2x4x12 PT: Old: 33, New: 10
2x6x14 spruce: Old: 31, New: 0
2x6x92 5/8 SYP Precuts: Old: 4, New: 0
2x6x108 5/8 SYP Precuts: Old: 14, New: 0
2x8x12 PT: Old: 17, New: 2
2x8x8 SYP: Old: 37, New: 30
-- New ------
15/32-CDX: Old: 0, New: 20
2x10x10 SYP: Old: 0, New: 2
2x10x10 PT: Old: 0, New: 4

FRMMAT.NDLTM11-A.84LUMBER --------------------------
-- Revised ------
15/32 OSB: Old: 217, New: 170
2x4x12 PT: Old: 33, New: 10
2x6x14 spruce: Old: 31, New: 0
2x6x92 5/8 SYP Precuts: Old: 4, New: 0
2x6x108 5/8 SYP Precuts: Old: 0, New: 0
2x8x12 PT: Old: 17, New: 2
2x8x8 SYP: Old: 37, New: 30
-- New ------
15/32-CDX: Old: 0, New: 20
2x10x10 SYP: Old: 0, New: 2
2x10x10 PT: Old: 0, New: 4

---------------------------------------------------------------------

8/22/22 - Package Change should have been made to the A & B per Bobby/Brian (Adam)

15/32-OSB-new-170. Old-217
2x8x8 SYP-new-30. Old-37
2x8x12 PT- new-2. Old-17
2x6x1085/8-new-0. Old-14
2x6x14 spruce- new-0 old-31
2x6x92 5/8- New-0. Old-4
2x4x12 PT- New-10. Old 33
15/32-CDX-new-20. Old-0
2x10x10 SYP new-2. Old-0
2x10x10 PT-new-4. Old-0


FRMMAT.NDLTM11-B.84LUMBER
-- Revised ------
15/32 OSB: Old: 195, New: 170
2x4x12 PT: Old: 10, New: N/A
2x6x14 spruce: Old: 0, New: N/A
2x6x92 5/8 SYP Precuts: Old: 0, New: N/A
2x6x108 5/8 SYP Precuts: Old: 0, New: N/A
2x8x12 PT: Old: 4, New: 2
2x8x8 SYP: Old: 32, New: 30
-- New ------
15/32-CDX: Old: 0, New: 20
2x10x10 SYP: Old: 0, New: 2
2x10x10 PT: Old: 0, New: 4

FRMMAT.NDLTM11-B.BFS
-- Revised ------
15/32 OSB: Old: 195, New: 170
2x4x12 PT: Old: 10, New: N/A
2x6x14 spruce: Old: 0, New: N/A
2x6x92 5/8 SYP Precuts: Old: 0, New: N/A
2x6x108 5/8 SYP Precuts: Old: 0, New: N/A
2x8x12 PT: Old: 4, New: 2
2x8x8 SYP: Old: 32, New: 30
-- New ------
15/32-CDX: Old: 0, New: 20
2x10x10 SYP: Old: 0, New: 2
2x10x10 PT: Old: 0, New: 4

FRMMAT.NDLTM11-B.MARJAM
-- Revised ------
15/32 OSB: Old: 195, New: 170
2x4x12 PT: Old: 10, New: N/A
2x6x14 spruce: Old: 0, New: N/A
2x6x92 5/8 SYP Precuts: Old: 0, New: N/A
2x6x108 5/8 SYP Precuts: Old: 0, New: N/A
2x8x12 PT: Old: 4, New: 2
2x8x8 SYP: Old: 32, New: 30
-- New ------
15/32-CDX: Old: 0, New: 20
2x10x10 SYP: Old: 0, New: 2
2x10x10 PT: Old: 0, New: 4
08/09/2208/09/22
Complete08/09/22Bryan HealyDart InterestsDIEVM 016 Evermore Resort11-BedroomTheaterHardware ***Adding #8 Screws
Bryan Healy:
Need an additional 600 screws for each lot
#8x1 1/2” self drilling screws

--------------------------------------------

HDW.DIEVM-11BR-THEATRE.WHITECAP
#8 x 1-1/2" Flat Head Phillips Tek Screw (Box 100): Old: 40, New: 46
08/09/2208/09/22
Review08/08/22Dane JonesMattamy HomesMOMER 031 Meridian6-UnitMCAACC/PRSlab Prep & Precast ***Slab Prep & Precast
Dane Jones:

192 dowels(need 29 more) original count-163
3 bundles of rod ties(remove 3) OC-6
12 boxes of chairs(remove 3) OC-15

--

2) 7’-6” Lintel/ OC-6
12) 4’-6” lintel/ OC-5
12) 3’-1” sills/ OC-5
2) 6’-2” sills/ OC-6
1 roll of bar ties

---------------------------------------------------------------

POs revised and Fill-Ins sent.
Sent to bids for review.
08/08/22
NA - Cancelled08/05/22Skip DoyleMintoNDICP 1390 Isles of CollierALLALLPrecast/Masonry Steel ***Swapping Lintel Screen & Duro Wall
Skip Doyle:
Exchange 1 roll of of 6” lintel screen for 1 roll of 10”
Exchange 1 bundle of 8” durowall for 1 bundle of 12”

----------------------------------------------------

Sending price request for 10" Lintel Screen (Adam)
08/05/22
Review08/05/22Adrian HartDart InterestsDIGFL 0B1 Garden Flats10 UnitCIP Form Hardware ***Adding Black Drill Ties
Adrian Hart:

18” Drill ties needed for 18” columns
Black drill tie 18”x21/4”
$85 per bundle of 50
500 needed

----------------------------------------------------------------

Waiting on Adrian to confirm package change on this building after he sees how the fill-in works out (Adam)
08/05/22
Complete08/05/22John RathbunSurrey HomesSOFXH 056 Fox HammockVioletBHardware ***Removing LSTA24 & DSP Clips
John Rathbun:

Please remove all LSTA24 (128)
and replace with 70 LSTA42

Please remove all DSP clips total of zero

Please send a fill in P.O. For the following items.
50 - SPH4
12 - LSTA42
50 - 6” SDS screws

---------------------------------------------------------------

White Cap doesn't have LSTA in 42" so John asked to supplement the CS18 Coil Strap instead (Adam)


HDW.SO-VIOLET-B.WHITECAP

LSTA24: Old: 128, New: 0
DSP Stud Plate Tie: Old: 18, New: 0
CS18 Coil Strap: Old: 0, New: 1
08/05/2208/05/22
Review08/03/22Kyle JollyEncoreECRUN 006 SpectrumNo ElevatorFrame Drop 3 ***Adding 2x8 for Eyebrows
Kyle Jolly:

2x8 eyebrows - Encore told me they added this to our buildings going forward. Please verify on the portal.

Please also adjust packages for future buildings to include this on the 3rd lumber drop.
(8) 2x8x14PT

I need the following fill-in made to the following buildings: 6-47-46-7-18-31

----------------------------------------------------------


08/03/22
Complete08/02/22Dane JonesToll BrothersTBLPT 040 Laurel PointDolcettoMOSlab Prep ***Adding Corner Bars
Dane Jones:

I need 48 pieces of #5 30”x30” corner bars as stated in the foundation notes and on page S401 detail 2. These are for each building corner(3each) and doubled for T walls(6each)

-------------------------------------------------------
8/4 - Package Change Approved by Estimating.

The change of package can be done by including (49) 30"x30" corner bars. Although it is specified in the foundation notes and the detail is in the plans, I did not include them because the detail is not call out in the foundation plan -Isa

SLABPREP.TBLPT040.WHITECAP
#5 30x30 Corner Bars: Old: 0, New: 48

--------------------------------------------------------
8/17/22:
SLABPREP.TBLPT040.WHITECAP:
#5 30x30 Corner Bars: Old: 48, New: 49

SLABPREP.TBLPT054.WHITECAP
#5 30x30 Corner Bars: Old: 51, New: 54

SLABPREP.TBLPT053.WHITECAP
#5 30x30 Corner Bars: Old: 37, New: 54



08/02/2208/04/22Isa08/05/22
Complete08/02/22Dane JonesToll BrothersTBLPT 054 Laurel PointCorbeilMOSlab Prep ***Adding Corner Bars
Dane Jones:

I need 51 pieces of #5 30”x30” corner bars as stated in the foundation notes and on page S401 detail 2.
Also short 3 dowels.

-----------------------------------------------------

Isa reviewed the package change request on the lot 40 and it was approved so moving forward with adding these as well (Adam)

-----------------------------------------------------

SLABPREP.TBLPT054.WHITECAP

#5 30x30 Corner Bars: Old: 0, New: 51
08/02/2208/04/22Isa08/05/22
Complete07/20/22Larry SimsSobel CoOFVMR 005 Villa Mar6-UnitType 3PrecastPrecast Package Change
Larry Sims:
Change 2) 4-0 x 8” to 4-6 x 8”,
castcrete does not carry 4-0 lintels anymore.

Change 10-0 x 12” lintel to 10-6 x 12”,
it only comes in that size.

Change 60” flush sills to 54”,
which are correct for the opening

---------------------------------------------------------

PRECAST-DROP1.OFVMR-TYPE3.CASTCRETE

PO revised/re-released. The 12" 10' lintels were already correct. Sending to bids for review (Adam)

8/18/22 - Completed (Adam)

07/20/2208/18/22
Review07/18/22Jonathan HimesBella Vista Building GroupBVSLS 008 Sand Lake Station9-UnitType APrecastPrecast Package Change
Jonathan Himes:
Please update Bldg 6 with this same change.

9 Unit
Original Order.
(7) Pre-cast 8” lintel 11’-4”
(0) Pre-cast 8” lintel 7’-6”

New P.O.
(9) Pre-cast 8” lintel 11’-4”
(9) Pre-cast 8” lintel 7’-6”

-------------------------------------------------------------------

PO revised and re-released. Sending this to bids for package change review (Adam)
07/18/22
Complete07/14/22Bobby NellerMintoNDLTM 2536 LatitudesVilla 11AFrame ***Adding 2x6x16 R/S Spruce
Adam Sowers:
Can't find the entry for this but was on the Trello board so adding for history of change.

Chris said to proceed w/ the fields request.

--------------------------------------------------

FRMMAT.NDLTM11-A.MARJAM
FRMMAT.NDLTM11-A.BFS
FRMMAT.NDLTM11-A.84LUMBER

2x6x16 R/S Spruce: Old: 12. New: 29
07/14/2207/19/22Chris Plantz07/19/22
Complete07/13/22Adrian HartDart InterestsDIGFL 0C2 Garden Flats12-UnitPrecast ***Swapping (4) 7'-6" w/ 8'-0" Lintels
Adrian Hart:

4- 7’6” lintels on po do not allow for 8”bearing on both sides of6’5” block openings. Need to swap these out for 8’ u lintels. Digfloc1-0008 this is for c1 as well.

------------------------------------------------------

sending to bids (Adam)

7/26/22 - Angie reviewed this and Pete completed the change (Adam)

------------------------------------------------------

9/15/22 - It doesn't look like this package change was completed so revisiting.

Per Adrian: (6) of the 7'-6" Lintels should be 8'-0"'s.

I created a Return/Credit PO for the 7'-6" Lintels and a fill-in for the 8'-0" Lintels (Adam)


PCMS-DROP1.DIGFL-0C1/0C2/0C3.LOTTSORLANDO

7'-6" Lintels: Old: 17, New: 11
8'-0" Lintels: Old: 0, New: 6
07/13/2207/26/22
Complete07/12/22Jonathan HimesBella Vista Building GroupBVSLS 009 Sand Lake Station6-UnitType CPCMS-DROP1.BVSLS-TYPEC-6UNITSwapping Stirrups
Jonathan Himes:

Old: (58) 8”x17” stir-ups
New: (58) 5”x17” Stir-ups.

Pleas change this on Bldg 9, 8, 7 & 6

-----------------------------------------------------

#010 - 6-Unit / Type C
#009 - 6-Unit / Type C
#008 - 9-Unit / Type A

No POs Yet:
#007 - 8-Unit / Type B (No Cost Group Yet)
#006 - 9-Unit / Type A

Updated:
PCMS-DROP1.BVSLS-TYPEC-6UNIT.LOTTSORLANDO
PCMS-DROP1.BVSLS-TYPEA-9UNIT.LOTTSORLANDO
07/12/2207/12/22
Complete07/11/22Bryan HealyDart InterestsDIEVM 027 Evermore Resort10-BedroomNo ElevatorPCMS-DROP1.DIEVM-10BR-ASwap (4) 4'-6" w/ 5'-10"
Bryan Healy:

5’4” precast header x4 each. 4’6” header doesn’t meet the 8” overlap per plans with the revised window openings.

-------------------------------------------------------------

Already created Return/Credit POs for the (4) 4'-6" Lintels and sent fill-ins for the 5'-10"'s.

Sent to Bids for Package Change Approval -Adam

---------------------------------------------------------------

Sam spoker with Joe Matthews and this is coming from the Engineer, not the inspector so he said go ahead with the package change.


PCMS-DROP1.DIEVM-10BR-A.LOTTSORLANDO

4'-6": Old: 9, New: 5
5'-10": Old: 0, New: 4
07/11/2207/11/22Sam Rathbun07/11/22
Review07/07/22Dane JonesMattamy HomesMOMER 030 Meridian6-UnitCCACCM/COPCMS.MOMER030.LOTTSORLANDOPrecast Package Change/Review
Dane Jones:
I tried to schedule a drop date today, Mary with lotts said she could not view the job at all. It says released, but building 30 doesn’t come up on her end.

Please revise precast to reflect:

+1) 7’ 6” lintel /new total= 7
+1) 6’ 2” sill /new total= 7
+1) 3’ 6” lintel /new total=1
+1) 2’ 2.5” sill /new total=1
-3) 4’ 6” lintel /new total=2
-3) 3’ 1” sill /new total=2
+1) roll of bar ties

----------------------------------------------------------------------

PO Revised/re-released.
Sent to bids for review (Adam)

PCMS.MOMER030.LOTTSORLANDO

PO says it used the above Cost-Group but it doesn't exist in the BuilderTrend for some reason (AS)
07/07/22
Review06/29/22Larry SimsSobel CoOFVMR 013 Villa Mar (Type 4)8-UnitType 4Frame ***Frame for Roof
Larry Sims:

Need to add to package and send po for material needed to complete roof type 4 building

35) sheets 5/8 x 4 x 8 fire rated CDX
35) sheets 5/8 x 4 x 8 CDX plywood
10) 2 x 4 x 14 PT

------------------------------------------------------------------

Sent to bids for review (Adam)
06/29/22
Complete06/29/22John RathbunSurrey HomesSOFXH 053 Fox HammockVioletA & BHardware***Adding SPH4
John Rathbun:

Please add 50 SPH4 to the Violet model for a new total of 173. I will need a fill in P.O. For 50 of the SPH4.

----------------------------------------------------------

Updated:

HDW.SO-VIOLET-A.WHITECAP
HDW.SO-VIOLET-B.WHITECAP
06/29/2206/29/22
Complete06/28/22Chris PlantzRichmondNA50-181Precast ***Precast Package Review Changes
Adam Sowers:

Chris Plantz is re-estimating all of these as well as the options since we've been having so many issues out here. I'm running with the revised takeoffs that he has been leaving on the S Drive.

All of the revised takeoffs that he's putting together are located:

S/Estimating/Minto/Latitudes Margarita Daytona/Single Family/Precast Takeoffs - 6-24-2022/

I'm uploading the PDF of the new package to each Cost-Group and combining Cost-Groups where Chris has said the new pacakge applies to all elevations.

Also creating / updating all of the options he is re-estimating as well (Adam)

------------------------------------------------------------------------------------

Combined A & B.

Updated:
PCMS.NDLTS.50-181-A/50-181-B.CASTCRETE
PCMS.NDLTS.50-181-A/50-181-B.LOTTS
06/28/22Chris Plantz07/05/22
Complete06/28/22Chris PlantzRichmondNA50-184Precast ***Precast Package Review Changes
Adam Sowers:

Chris Plantz is re-estimating all of these as well as the options since we've been having so many issues out here. I'm running with the revised takeoffs that he has been leaving on the S Drive.

All of the revised takeoffs that he's putting together are located:

S/Estimating/Minto/Latitudes Margarita Daytona/Single Family/Precast Takeoffs - 6-24-2022/

I'm uploading the PDF of the new package to each Cost-Group and combining Cost-Groups where Chris has said the new pacakge applies to all elevations.

Also creating / updating all of the options he is re-estimating as well (Adam)

-------------------------------------------------------------------------------

Combined A & B

Updated:
PCMS.NDLTS.50-184-A/50-184-B.CASTCRETE
PCMS.NDLTS.50-184-A/50-184-B.LOTTS

-------------------------------------------------------------------------------

7/5/22 - Revised both cost-groups again per Chris Plantz revised takeoff (Adam)
06/28/22Chris Plantz07/05/22
Complete06/28/22Chris PlantzRichmondNA40-178-IIPrecast ***Precast Package Review Changes
Adam Sowers:

Chris Plantz is re-estimating all of these as well as the options since we've been having so many issues out here. I'm running with the revised takeoffs that he has been leaving on the S Drive.

All of the revised takeoffs that he's putting together are located:

S/Estimating/Minto/Latitudes Margarita Daytona/Single Family/Precast Takeoffs - 6-24-2022/

I'm uploading the PDF of the new package to each Cost-Group and combining Cost-Groups where Chris has said the new pacakge applies to all elevations.

Also creating / updating all of the options he is re-estimating as well (Adam)

---------------------------------------------------------------------------------

Combined A & B

Updated:
PCMS.NDLTS.40-178-II-A/40-178-II-B.CASTCRETE
PCMS.NDLTS.40-178-II-A/40-178-II-B.LOTTS
06/28/22Chris Plantz07/05/22
Complete06/28/22Chris PlantzRichmondNA40-177Precast ***Precast Package Review Changes
Adam Sowers:

Chris Plantz is re-estimating all of these as well as the options since we've been having so many issues out here. I'm running with the revised takeoffs that he has been leaving on the S Drive.

All of the revised takeoffs that he's putting together are located:

S/Estimating/Minto/Latitudes Margarita Daytona/Single Family/Precast Takeoffs - 6-24-2022/

I'm uploading the PDF of the new package to each Cost-Group and combining Cost-Groups where Chris has said the new pacakge applies to all elevations.

Also creating / updating all of the options he is re-estimating as well (Adam)

--------------------------------------------------------------------------------

Combined A & B

Updated:
PCMS.NDLTS.40-177-A/40-177-B.CASTCRETE
PCMS.NDLTS.40-177-A/40-177-B.LOTTS
06/28/22Chris Plantz07/05/22
Complete06/24/22Chris PlantzRichmondNA50-179A & BPrecast ***Precast Package Review Changes
Adam Sowers:

Chris Plantz is re-estimating all of these as well as the options since we've been having so many issues out here. I'm running with the revised takeoffs that he has been leaving on the S Drive.

All of the revised takeoffs that he's putting together are located:

S/Estimating/Minto/Latitudes Margarita Daytona/Single Family/Precast Takeoffs - 6-24-2022/

I'm uploading the PDF of the new package to each Cost-Group and combining Cost-Groups where Chris has said the new pacakge applies to all elevations.

Also creating / updating all of the options he is re-estimating as well (Adam)
06/24/22Chris Plantz06/24/22
Complete06/24/22Chris PlantzRichmondNA50-179-IIA & BPrecast ***Precast Package Review Changes
Adam Sowers:

Chris Plantz is re-estimating all of these as well as the options since we've been having so many issues out here. I'm running with the revised takeoffs that he has been leaving on the S Drive.

All of the revised takeoffs that he's putting together are located:

S/Estimating/Minto/Latitudes Margarita Daytona/Single Family/Precast Takeoffs - 6-24-2022/

I'm uploading the PDF of the new package to each Cost-Group and combining Cost-Groups where Chris has said the new pacakge applies to all elevations.

Also creating / updating all of the options he is re-estimating as well (Adam)
06/24/22Chris Plantz06/24/22
Review06/21/22Jeff RotertMintoNDLTS 2474 Latitudes50-179-IIBPrecast Package Review/Change
Jeff Rotert:

Remove (1) 8-8
Add (1) 5-10, (1) 8-0

-----------------------------------------

sent to bids for review (Adam)
06/21/22
Complete06/20/22Steven GilbertRichmondROHSQ 034 Heritage SquareF913/PearlFPCMS.RA-PEARL-F913-F.LOTTSORLANDOMissing (1) 4'-6" Lintel06/20/2206/20/22
Complete06/15/22John RathbunSobel CoSOSVL 005-C Savannah LandingPearlBPrecast ***Precast Package Change
John Rathbun:

Please update the following precast on
The Pearl model B elevation only template .
Add two 9’-4” headers (one for the garage and one for the front porch ) new total of two 9’-4” headers .

Remove one 7’-6” header and one 6’-2” sill (this is the front window change from an A to a B elevation ) new total of One 7’-6” header and one 6’-2” sill.

Please add three 2’-2.5” sills for the front three windows for a new total of 9 needed on the B elevation.

I will need a P.O. For two 9’-4” and three 2’-2.5” sills
And one 7’-6” six inch tall header sent over to Lotts.

-----------------------------------------------------------

PCMS.SO-Pearl-B.LOTTSORLANDO

7'-6" Lintel: Old: 2, New: 1
9'-4" Lintel: Old: 0, New: 2
2'-2.5' Sill: Old: 6, New: 9
6'-2" Sill: Old: 2, New: 1
06/15/2206/15/22
Declined/No Change06/15/22Scott DeasonDream FindersDOSHV 044 South HavenMulberryAPrecast ***Precast Package Review/Change
Scott Deason:

Need lotts to pick up and credit us for 2 lintels at 4’-6”
Need 1- 74”sill

--------------------------------------------------

8/29/22 - @adamsowers1 and @petepallis1 Pete/Adam I don't know whom handled that back when it came in , but we should not be changing this package according to this request. This package was correct, It should NOT be changed -Sam Rathbun

Package Change Request Closed/Declined (Adam)
06/15/2208/29/22Sam Rathbun08/29/22
No Changes06/15/22Scott DeasonDream FindersDOSHV 041 South HavenAuburndaleAPrecast ***Precast Package Review/Change
Adam Sowers:

Scott is requesting to return Lintels & Sills that were not on the original PO. He's also requesting a Package Change.

Sent to bids (Adam)

----------------------------------------

Closing this one out with No Changes to the Package. It seems there was a bit of confusion from Scott because he was trying to return some headers and sills that weren't even in the package on this job.

Chris Plantz has reviewed this package and doesn't see any necessary changes.

Windows in plans used for original estimates match windows in plans for lot 41 South Haven. Current precast package is exactly what I would send. I don't know what Scott wants to change. See attached GCC_SH 41 Precast Review 6-23-22.png
Looks exactly right to me. -Chris Plantz
06/15/2206/23/22Chris Plantz06/23/22
Review06/14/22Joe MatthewsDart InterestsDIEVM 015 Evermore Resort10 BedroomAHardware *** Clips for Trusses
Joe Matthews:
Need estimating to add these clips to take off every house is diff takes 8 clips per truss (sp/rcac225/97-r55

----------------------------------------------------------

Sent to bids (Adam)
06/14/22
Complete06/14/22Brian DinkerMintoNDLTM 2342 LatitudesVilla 2 IIBPrecast ***Precast Package Review
Brian Dinker:
We need to void this PO out re submit correct package with changes. We will let castcrete know there will be a new po for this lot. Package is not here yet.

Precast. Old. New
4’6”. 6. 9
5’4”. 3. 2
8’8”. 1. 3
9’4”. 3. 2
12’0”. 2. 1
14’8”. 0. 1
Sills
3’1”. 4. 7
4’0”. 2 4
1’7”. 1. 0
6’2”. 3. 2

----------------------------------------------------

PCMS.NDLTM2-II-A/NDLTM2-II-B.CASTCRETE

7/5/2022 - Updated per Chris Plantz review and attached the image to the Cost-Group (Adam)
06/14/2207/05/22Chris Plantz
Review06/13/22Cyndi MulleeMintoNDLTC 2200 LatitudesCottage-3BFrame ***2x12x10 SYP for Eyebrow
Cyndi Mullee:
Need asap. Fill in for lots 2200; 2246; and 2240. Will do Package change for all cottage 3 -Cyndi Mullee

Need (18) 2’x12’x10’

------------------------------------

Cyndi says Cottage 3 has an Eyebrow over the front-door and they make the whole thing with the 2x12's. She says there isn't enough in the package.

FRMMAT.NDLTC3B.MARJAM
06/13/22
Complete06/13/22Bobby NellerMintoNDLTM 2546 LatitudesVilla 11BFrame ***15/32 CDX for Bird Box?
Bobby Neller:
Requesting a PO for CD X plywood 4x8- 15/32 that didn’t make the takeoff -Bobby Neller
Old-0
New-20

-----------------------------------------------------------

I made a package change to this model/elevation in May per Brian Dinker. Not sure how we're all of the sudden needing these if they weren't in the package before. Bobby says they are needed for a bird box on top. Adding to the Package Change log and Sharon is adding to the Trello Board (Adam)

7/14/22 - Figured out that the package change was made on the B elevation but not the A. Updating the A CGs now (Adam)


FRMMAT.NDLTM11-A.84LUMBER
FRMMAT.NDLTM11-A.BFS
FRMMAT.NDLTM11-A.MARJAM

15/32 Fire Rated CDX: Old: 41, New: 56
06/13/2207/14/22
Review06/09/22Cyndi MulleeMintoNDLTC 2258 LatitudesCottage 2BHardware ***Caulking for Door Bucks
Cyndi Mullee:

Clear silicone caulking 10oz. Not on any cottage take off -Cyndi Mullee

12 tubes

---------------------------------------------

Cyndi says that this is in our scope of work but for some reason isn't in any of the Cottages. She said that someone was walking by the bucking yesterday and noticed that there wasn't any caulking but we have it in the Single Families. Sending here for now and she's going to determine how much each Cottage needs (Adam)
06/09/22
Complete06/07/22Jeff RotertMintoNDLTS 2482 Latitudes50-179BPrecast ***Precast Package Review/Change
Jeff Rotert:
There are multiple discrepancies identified. Please have estimating review and make all necessary changes.

-------------------------------------------

Sent to bids for review (Adam)

PCMS.NDLTS50-179-B.CASTCRETE
PCMS.NDLTS50-179-B.LOTTS

4'-6": Old: 10, New: 9
5'-4": Old: 1, New: 2
8'-0": Old: 0, New: 1
9'-4": Old: 2, New: 1
10'-6": Old: 0, New: 1
3'-1" HiDri: Old: 12, New: 11
4'-0" HiDri: Old: 1, New: 2

-------------------------------------------------

All Elevations are the same for Pre-Cast so combining the Cost-Groups (Adam)

New Cost-Groups (Combined)

PCMS.NDLTS.50-179-A/50-179-B.CASTCRETE
PCMS.NDLTS.50-179-A/50-179-B.LOTTS
06/07/2206/07/22Chris Plantz06/07/22
Review06/07/22Larry SimsSobel CoOFVMR 013 Villa Mar (Type 4)8-UnitType 4Frame ***Frame Package Review/Change
Larry Sims:

Roof lumber package change.
Material on po should be as follows:

120) 1 x 2 x 10’ #2 PT Borate
14) 1 x 4 x 12’ #2 PT Borate
110) 1 x 4 x 14’ #2 SYP
55) 2 x 4 x 14’ #2 PT Borate
470) 2 x 4 x 16’ #2 SYP
24) 2 x 6 x 10’ #2 PT Borate
46) 2 x 6 x 14’ #2 PT Borate
60) 2 x 6 x 14’ #2 SYP
64) 2 x 6 x 16’ rough sawn spruce primed
78) 5/8 x 4 x 8 CDX Fire rated sheathing
350) 5/8 x 4 x 8 CDX Sheathing

----------------------------------------------

PO has already been revised/re-released per Larry's request. Sent to bids for PC Review -Adam
06/07/22
Complete06/06/22Jeff RotertMintoNDLTS 2485 Latitudes50-181A & BPrecast ***Precast Package Review/Change
Jeff Rotert:

Please have estimating review this and make necessary corrections. Precast not delivered yet

--------------------------------------------------

Chris Plantz review the package and submitted a new takeoff for this.

Updated Cost-Groups:

PCMS.NDLTS50-181-A.CASTCRETE
PCMS.NDLTS50-181-A.LOTTS
PCMS.NDLTS50-181-B.CASTCRETE
PCMS.NDLTS50-181-B.LOTTS

17'-4": Old: 2, New: 3
15'-4": Old: 1, New: 0
10'-6: Old: 1, New: 2
7'-6": Old: 5, New: 4
3'-1" HiDri: Old: 10, New: 8
4'-0" HiDri: Old: 0, New: 1
06/06/2206/07/22Chris Plantz06/07/22
Complete06/03/22Cyndi MulleeMintoNDLTC 2264 LatitudesAllAllSlab Prep ***Removing Welded Wire Mesh
Cyndi Mullee:

Across the board, all models
Remove 1 piece welded fabric flat sheet 6”x6” 10/10 - 8x20’ sheet

Old- 25
New- 24

---------------------------------------------

All Cost-Groups updated. Not all of them had the same amount of Welded Wire Mesh but they all only have 24 now (Adam)
06/03/2206/03/22
Complete06/03/22David PurvisRichmondNAF927/SlateJHardware ***Adding H2.5A
David Purvis:

Can we please review the take-off for the F927 hardware takeoff as the “J” elevation is consistently missing (45) h2.5 clips for the front gables.

Please review other elevation that have gables. Not certain how many total elevations have gables.

----------------------------------------------------

HDW.RA-Slate-F927-J.WHITECAP

I added 45 H2.5A's to the Cost-Group (Adam)
06/03/2206/03/22
Complete05/26/22Brian DinkerMintoNDLTM 2546 LatitudesVilla 11A & BFrame ***Multiple Cost-Codes/Groups
Adam Sowers:

This initially came in via email in January but it slipped through the cracks since it wasn't a To-Do. Brian submitted photos of handwritten notes on a Material Package but the photos are extremely hard to read.

-------------------------------------

FRMMAT.NDLTM11-B.84LUMBER
FRMMAT.NDLTM11-B.BFS
FRMMAT.NDLTM11-B.MARJAM

15/32 CDX Fire Rated: Old: 44, New: 56
15/32 OSB Sheathing: Old: 215, New: 195
2x4x12 PT: Old: 33, New: 10
2x6x92 5/8 SYP: Old: 4, New: 0
2x8x10 PT: Old: 9, New: 0
2x8x12 PT: Old: 19, New: 4
2x8x14 PT: Old: 3, New: 0
2x8x14 SYP: Old: 10, New: 5
2x8x8 SYP: Old: 37, New: 32
2x6x14 Spruce -->Changed to 2x6x16 R/S Spruce. Old: 31, New: 31
2x4x108 5/8 SYP: Old: , New: 0 (Not in CG)
2x4x92 5/8 SYP: Old: , New: 0 (Not in CG)
2x6x108 5/8 SYP: Old: , New: 0 (Not in CG)


SLABPREP.NDLTM11-B.CASTCRETE
Wire Mesh Chairs: Old: 462, New: 200

LINCON.NDLTM11-A.ARGOSLATITUDES
Yards: Old: 27, New: 19

HDW.NDLTM11-A.WHITECAP
MSTA36: Old: 40, New: 20
SP2: Old: 90, New: 70
05/26/2205/26/22
Complete05/25/22HermesBella Vista Building GroupBVSOD 003 SODO House2-UnitDDHardware ***Adding H10A-2
Hermes:

I need 60 pieces H10A-2for the double trusses on the roof . 60 pcs H10A-2

-------------------------------------------------------

HDW.BVSOD-DD.WHITECAP

H10A-2: Old: 48, New: 60

05/25/2205/25/22
Review05/24/22Dane JonesMattamy HomesMOMER 023 Meridian5-UnitCACAC/?Precast ***Swapping Lintels & Sills
Dane Jones:
This building has three units- the Catalina and the Catalina II model that call for two separate 3’0 windows each. Not twin 3’0 -Dane Jones

Will need to return
3) 7’-6” U Lintels
3) 6’-2” sills

Order
6)4’-6” U Lintels
6)3’-1” sills

------------------------------------------------------------

PCMS.MOMER023.LOTTSORLANDO

Sent to bids. Waiting on Review/Approval (Adam)
05/24/22
Complete05/24/22Brian DinkerMintoNDLTM 2580 LatitudesVilla 12AMASMAT.NDLTM12-A/NDLTM12-II-AAdding Pre-Blend
Brian Dinker:

Need to add 50 bags of mortar to take off.
Old 246 new 296.
Need a fill in order of 84 bags.

------------------------------------------------------------

MASMAT.NDLTM12-A/NDLTM12-II-A.FLBESTBLOCKORLANDO
MASMAT.NDLTM12-A/NDLTM12-II-A.PREFERREDDAYTONA

Pre-Blend: Old: 260, New: 296


05/24/2205/24/22
Complete05/23/22Johnny VargasRichmondROEDH 093 Eden HillsF924/AmmoliteKHDW.RA-Ammolite-F924-KWedge Anchors, LUS28, MSTAM36
Johnny Vargas:

These items were NOT in the original take off list please add these items to all future homes make a change order for all Ammolite homes.

30 pieces of 1/2x7 inch wedge - all anchor Simpson.
12 pieces of LUS28 joist hangers.
5 pieces of MSTAM36.

---------------------------------------------------------
HDW.RA-Ammolite-F924-K.CONSTRUCTIONMATERIALS

WA127: Old: 0, New: 30
LUS28: Old: 0, New: 12
MSTAM36: Old: 0, New: 5
05/23/2205/23/22
Complete05/23/22Carlos GarciaRichmondROEDH 074 Eden HillsF924/AmmoliteLHDW. RA-Ammolite-F924-L.WHITECAPHardware Changes
Carlos Garcia:

After deleting or adjusting the items per the edited take off in the attachments please add the following that are not in the takeoff at all

2 pieces Simpson DTT2Z,
25 pieces of MTS 12,
10 pieces MSTAM 36,
5 pcs MSTA 36 flat straps,
35 pieces SP1,
70 pieces SP2
20 pieces of SP4,
40 each 1/4x1-3/4” hex head tap cons,
25 pieces 1/2x8’” wedge anchors.
----------------------------------------------------------------
There's an image that Carlos attached to this To-Do with revisions and the above additions as well.

HDW. RA-Ammolite-F924-L.CONSTRUCTIONMATERIALS

Revised Items:
H8: Old: 94, New: 60
HTS20: Old: 10, New: 13
HUC28-2: Old: 4, New: 2
LSTA12: Old: 14, New: 0
LSTA18: Old: 12, New: 0
LSTA36: Old: 58, New: 0
Tapcons 14334: Old: 48, New: 0

New Items:
2 pieces Simpson DTT2Z,
25 pieces of MTS 12,
10 pieces MSTAM 36,
5 pcs MSTA 36 flat straps,
35 pieces SP1,
70 pieces SP2
20 pieces of SP4,
40 each 1/4x1-3/4” hex head tap cons,
25 pieces 1/2x8’” wedge anchors,
05/23/2205/23/22
Complete05/23/22Carlos GarciaRichmondROEDH 093 Eden HillsF924/AmmoliteKHDW.RA-Ammolite-F924-KHardware Changes
Carlos Garcia:

After deleting or adjusting the items per the edited take off in the attachments please add the following that are not in the takeoff at all

two pieces of DTT2Z,
13 pieces of HTS 20,
25 pieces of MTS 12,
5 pieces MSTA36 inch flat straps,
10 pieces of MSTAM 36
35 pcs SP1,
70 pcs SP2,
20 pieces SP4,
40 pieces of 1/4x1-3/4 tap cons hex head,
25 pieces of 1/2“ x 8“ wedge anchors,
37 pieces of 3“ x 3“ by half inch square washers,
----------------------------------------------------------------
There's an image that Carlos attached to this To-Do with revisions and the above additions as well.

HDW.RA-Ammolite-F924-K.CONSTRUCTIONMATERIALS

New Items:
25 pieces of 1/2“ x 8“ wedge anchors,
37 pieces of 3“ x 3“ by half inch square washers,
two pieces of DTT2Z,
13 pieces of HTS 20,
25 pieces of MTS 12,
40 pieces of 1/4x1-3/4 tap cons hex head,
5 pieces MSTA36 inch flat straps,
35 pcs SP1,
70 pcs SP2,
20 pieces SP4,
10 pieces of MSTAM 36
05/23/2205/23/22
Complete05/23/22HermesBella Vista Building GroupBVSOD 003 SODO House2-UnitDDFRMMAT-DROP3.BVSOD-DD.BFSAdding (6) LVL's
Hermes:

Missing lvl for the openings of the third level, see plan check detail H5 -Hermes

6) 1.75 x14” x 14’

------------------------------------------------------------------

Went over this with Angie and she said this was good to send / to add to the package and that there was a problem with the formulas in the takeoff.

FRMMAT-DROP3.BVSOD-DD.BFS

1.75 x14” x 14’: Old: 0, New: 6
05/23/2205/23/22
Complete05/20/22Dane JonesMattamy HomesMOMER 023 Meridian5-UnitCACAC/PRSLABPREP.MO-CACAC(CO).WHITECAPMove Bar Ties to Precast
Dane Jones:

Please remove 2 rolls of bar ties from the slab pack
Old total-5
New total-3

Please add those two rolls to precast delivery on all future buildings

-------------------------------------------

SLABPREP.MO-CACAC(CO).WHITECAP
6" Bar Ties: Old: 5, New: 3

PCMS.MO-CACAC(CO).LOTTSORLANDO
6" Bar Ties: Old: 0, New: 2
05/20/2205/20/22
Complete05/20/22Dane JonesMattamy HomesMOMER 023 Meridian5-UnitCACAC/PRMASMAT.MO-CACAC(CO)Adding 2-Hour Regulars
Dane Jones:

Add 100 more 8x8x16 regular 2 hour fire block

Old total- 4,225
New total- 4,325

----------------------------------------------

MASMAT.MO-CACAC(CO).FLBESTBLOCKORLANDO

8" x 8" x 16" Regular 2 Hour:
Old: 4225, New: 4325
05/20/2205/20/22
No Cost-Groups05/20/22Dane JonesMattamy HomesMOMER 026 Meridian6-UnitCCACCM/CO?Adding 2-Hour Regulars
Danes Jones:

Add 100 more 8x8x16 regular 2 hour fire block

Old total- 4,876
New total- 4,976

--------------------------------------------------

Can't find a CG for this. The one used in this job does not exist in the catalog.

Petes updating the compiler
05/20/22
Complete05/20/22Skip DoyleMintoNDICP 1362 Isles of CollierALLALLMultipleMany Changes
Skip Doyle:

Delete the following on all lots:
84 Lumber - 1 x 2 furring strips

Whitecap & Lotts slab packs & precast - delete bar ties, replace with rolled tie wire.

Whitecap hardware - TR 58 threaded rod, N58 hex nut, Set 10 epoxy tie kits, AB 128 anchor bolts, SS312 sill seal

Add to each model
Sanibel
84 Lumber - 1” x 4” x 16’ PT (10)
Whitecap hardware - 1/2” x 7” wedge anchor (35), 1/2” 2” x 2” square washer (35), 5/8” x 6” wedge anchor (12), 5/8” 2” x 2” square washer (12)

Useppa
84 Lumber - 1” x 4” x 16’ PT (10)
Whitecap hardware - 1/2” x 7” wedge anchor (25), 1/2” 2” x 2” square washer (25), 5/8” x 6” wedge anchor ( 12), 5/8” 2” x 2” square washer (12)

Captiva
84 Lumber - 1” - 4” x 16’ PT (10)
Whitecap hardware - 1/2” x 7” wedge anchor (35), 1/2” 2” x 2” square washer, 5/8” x 6” wedge anchor (12), 5/8” 2” x 2” square washer.

Marco
84 Lumber - 1” x 4” x 16’ PT (6)
Whitecap hardware - 1/2” x 7” wedge anchor (60), 1/2” 2” x 2” square washer (60), 5/8” x 6” wedge anchor (12), 5/8” 2” x 2” square washer.

-------------------------------------------------------------------------------

Pete is running the additions. I removed/ updated the following:

SLABPREP.NDICP-1B (12"PARTY WALL).CASTCRETE
SLABPREP.NDICP-1B (12"PARTY WALL).WHITECAP
SLABPREP.NDICP-2B (12"PARTY WALL).CASTCRETE
SLABPREP.NDICP-2B (12"PARTY WALL).WHITECAP
SLABPREP.NDICP-3B (12"PARTY WALL).CASTCRETE
SLABPREP.NDICP-3B (12"PARTY WALL).LOTTS
SLABPREP.NDICP-3B (12"PARTY WALL).WHITECAP
SLABPREP.NDICP-4A (12"PARTY WALL).CASTCRETE
SLABPREP.NDICP-4A (12"PARTY WALL).WHITECAP
SLABPREP.NDICP-4B (12" PARTY WALL).CASTCRETE
SLABPREP.NDICP-4B (12" PARTY WALL).WHITECAP

PCMS.NDICP-1B (12"PARTY WALL).CASTCRETE
PCMS.NDICP-1B (12"PARTY WALL).LOTTSORLANDO
PCMS.NDICP-2B (12"PARTY WALL).CASTCRETE
PCMS.NDICP-2B (12"PARTY WALL).LOTTSORLANDO
PCMS.NDICP-3B (12"PARTY WALL).CASTCRETE
PCMS.NDICP-3B (12"PARTY WALL).LOTTSORLANDO
PCMS.NDICP-4A (12"PARTY WALL).CASTCRETE
PCMS.NDICP-4A (12"PARTY WALL).LOTTSORLANDO
PCMS.NDICP-4B (12"PARTY WALL).CASTCRETE
PCMS.NDICP-4B (12"PARTY WALL).LOTTSORLANDO

FRMMAT.NDICP-1B (12"PARTY WALL).84LUMBER
1x2x10 PT: Old: 49, New: 0

FRMMAT.NDICP-2B (12"PARTY WALL).84LUMBER
1x2x10 PT: Old: 104, New: 0

FRMMAT.NDICP-3B (12"PARTY WALL).84LUMBER
1x2x10 PT: Old: 45, New: 0

FRMMAT.NDICP-4A (12"PARTY WALL).84LUMBER
1x2x10 PT: Old: 116, New: 0

FRMMAT.NDICP-4B(12"PARTY WALL).84LUMBER
1x2x10 PT: Old: 108, New: 0

HDW.NDICP-1B (12"PARTY WALL).WHITECAP
HDW.NDICP-2B (12"PARTY WALL).WHITECAP
HDW.NDICP-3B (12"PARTY WALL).WHITECAP
HDW.NDICP-4A (12"PARTY WALL).WHITECAP
HDW.NDICP-4B(12"PARTY WALL).WHITECAP

05/20/2205/20/22
Complete05/18/22Larry SimsSobel CoOFVMR 003 Villa Mar (Type 2)6-UnitType 2PRECAST-DROP1.OFVMR-TYPE2.CASTCRETESwap (2) 12" 11'-4" w/ 13'-4"
Larry Sims:

11-4 x 12” lintels do not work on type 2 building need to be 13-4 x 12” lintels.

Need to order 2) 13-4 x 12” lintels for building 3 to replace 11-4 lintels delivered.

-------------------------------------------

PRECAST-DROP1.OFVMR-TYPE2.CASTCRETE

Pre Cast 12" U Lintel - 11'-4": Old: 2, New: 0
Pre Cast 12" U Lintel - 13'-4": Old: 0, New: 2

05/18/2205/18/22
Complete05/17/22John RathbunSurrey HomesSOFXH 012 Fox HammockCloverALANAI OptionSwap 13'-4" for 14'-0"
John Rathbun:

Clover model lanai option package change.
Please remove the single 13- 4 header and replace this with a 14’ -0” header on the Clover model lanai option .

Plans show that the headers are mitered in the corners due to the lack of bearing area available on the top of a 12x12 column .

------------------------------------------------

LANAI Option on the Clover A Template:

Swapped (1) 13'-4" for (1) 14'-0" Lintel.
05/17/22
Review05/16/22HermesBella Vista Building GroupBVSOD 003 SODO House2-UnitDDHDW.BVSOD-DD.WHITECAPTSP & SP6
Hermes:

24 pcs Simpson TSP Stud Plate Tie - G90 Galvanized

80 pcs Simpson Sp6

----------------------------------------------

Job matches the takeoff. Sending to Angie for review before making the changes.


HDW.BVSOD-DD.WHITECAP

TSP: Old: 0, New:
SP6: Old: 0, New:
05/16/22Angie05/17/22
Complete05/16/22John RathbunSurrey HomesSOFXH 054 Fox HammockVioletA & BSiding ***Removing (33) 8" Lap Siding
John Rathbun:

Please remove 33 pieces of the 8” lap siding .
Old total of 103 pieces .
New total of 70 pieces.
We will need to pull back and fix P.Os on the following lots .
23
27
53
55
56
59

-----------------------------------------------------

SIDINGMAT.SO-VIOLET-A/VIOLET-B.BFS

Hardiplank Lap Siding Smooth - 9 1/4 - 8" Exp
Old: 103, New: 70
05/16/2205/16/22
Complete05/16/22David PurvisRichmondROPAL 458 PalisadesFC10/AzureALLMasonry ***Removing Pre-Blend
David Purvis:

Need to adjust package for preblend mortar type “S”

Need a NEW total of 124 previously was 139.

Needs to be across all elevations.

---------------------------------------------

MASMAT.RA-Azure-FC10-J.TITANORLANDO
MASMAT.RA-Azure-FC10-J.FLBESTBLOCKORLANDO
Pre-Blend: Old: 140, New: 124

MASMAT.RA-Azure-FC10-A.FLBESTBLOCKORLANDO
MASMAT.RA-Azure-FC10-A.FLBESTBLOCKTAMPA
MASMAT.RA-Azure-FC10-A.MCMASTERORLANDO
MASMAT.RA-Azure-FC10-A.TITANORLANDO
MASMAT.RA-Azure-FC10-B.FLBESTBLOCKORLANDO
MASMAT.RA-Azure-FC10-B.FLBESTBLOCKTAMPA
MASMAT.RA-Azure-FC10-B.MCMASTERORLANDO
MASMAT.RA-Azure-FC10-B.TITANORLANDO
MASMAT.RA-Azure-FC10-C.A1BLOCK
MASMAT.RA-Azure-FC10-C.FLBESTBLOCKORLANDO
MASMAT.RA-Azure-FC10-C.FLBESTBLOCKTAMPA
MASMAT.RA-Azure-FC10-C.MCMASTERORLANDO
MASMAT.RA-Azure-FC10-C.TITANORLANDO
MASMAT.RA-Azure-FC10-G.FLBESTBLOCKORLANDO
MASMAT.RA-Azure-FC10-G.TITANORLANDO
Pre-Blend: Old: 135, New: 124

MASMAT.RA-Azure-FC10-H.FLBESTBLOCKORLANDO
MASMAT.RA-Azure-FC10-H.TITANORLANDO
Pre-Blend: Old: 138, New: 124

MASMAT.RA-Azure-FC10-K.FLBESTBLOCKORLANDO
MASMAT.RA-Azure-FC10-K.FLBESTBLOCKTAMPA
MASMAT.RA-Azure-FC10-K.MCMASTERZONE2
MASMAT.RA-Azure-FC10-K.TITANORLANDO
Pre-Blend: Old: 122, New: 124

MASMAT.RA-Azure-FC10-L.TITANORLANDO
Pre-Blend: Old: 141, New: 124

MASMAT.RA-Azure-FC10-M.FLBESTBLOCKTAMPA
MASMAT.RA-Azure-FC10-M.MCMASTERORLANDO
MASMAT.RA-Azure-FC10-M.TITANORLANDO
Pre-Blend: Old: 144, New: 124
05/16/2205/16/22
Complete05/13/22Mike CooperRichmondROPAL 463 PalisadesF913/PearlHFRMMAT.RA-F913-H.84LUMBER2x6x10 PT
Adam Sowers:

2x6x12 PT in the takeoff on the S Drive but not in this job/PO/Cost Group.

FRMMAT.RA-F913-H.84LUMBER

2x6x12 PT: Old: 0, New: 2
05/13/2205/13/22
Review05/12/22Kyle JollyEncoreECRUN 030 Spectrum??FRMMAT-DROP1.ECRUN-NOELEVATOR.BFS2x4 & 2x6 SYP
Kyle Jolly:

Framers ran short of the following materials for first drop, they took from building 19 to finish bearing walls.

Please adjust first drop on all future buildings including 19, 6 and 47 and reorder the materials to here and 19

2x4x10SYP (100)
2x6x10SYP (120)

------------------------------------------------------------

FRMMAT-DROP1.ECRUN-NOELEVATOR.BFS

5/12/22 - Both jobs (30 & 19) match what's in the takeoff. Sent to bids for review (Adam)

Old:
2x4x10' SYP:
2x6x10' SYP:

New:
2x4x10' SYP:
2x6x10' SYP:
05/12/22
Complete05/11/22Ross HollandWalters ConstructionWCWAL 815 CustomCustomCustomFooter Prep ***Swapped Rod Chairs to 'each'
Adam Sowers:

Ross sent an email and noticed the Footer Prep PO had 144 Boxes of 3-Bar Chairs (100 per Box) instead of 'Each'.

FOOTERPREP.WCWAL817.WHITECAP

Removed the 144 Boxes (3-bar chairs).
Added 144 'each'.
Updated Taxes
05/11/2205/11/22
Confirm/Review05/11/22Mike CooperRichmondROPAL 421 PalisadesF927/SlateJMasonry ******
Mike Cooper:

I have a full cube of block left and 3 pieces of 20’ #5 bar after block work

------------------------------------------------------

Mike says he thinks it's 90 Block per cube.

05/11/22
Confirm/Review05/11/22Mike CooperRichmondROPAL 478 PalisadesFC10/AzureGMasonry ****** Preblend
Mike Cooper:

Need to remove 4 bags of mortar from this model PO. We have 7 extra bags of mortar after completion of blockwork.

----------------------------------------
05/11/22
Complete05/10/22Jeff RotertMintoNDLTS 2380 Latitudes40-177B***Precast Review Needed
Jeff Rotert:

Precast takeoff wrong- send to estimating to correct. Too many discrepancies. Please have estimating revise and resend to the vendor with the correct takeoff

Precast has NOT been delivered yet

----------------------------------------------------

Sam reviewed the package and sent me a new one. Jeff said he didn't have a chance to review what Sam sent and just to go ahead with the changes.

PCMS.NDLTS40-177-B.LOTTS
PCMS.NDLTS40-177-B.CASTCRETE

Old Package
3'-6": 2 New: -2
4'-6": 6 New: +1
5'-10": 1 New: +1
7'-6": 2 No Change
10'-6": 3 New: -1
12'-0": 1 New: +1
13'-4": 2 No Change
17'-4": 1 No Change
Recess 4'-6": 1 No Change
2'-2.5" HiDri: 2 New: -2
3'-1" HiDri: 8 New: -2
4'-0" HiDri: 1 New: +1
5'-0" HiDri: 2 New: -2
6'-2" HiDri: 2 New: -1
4'-5" HiDri: 0 New: +1

New Package:
4'-6": 7
5-10": 2
7'-6": 2
10'-6": 2
12'-0": 2
13'-4": 2
17'-4": 1
Recess 4'-6": 1
3'-1" HiDri: 6
4'-0" HiDri: 2
4'-5" HiDri: 1
6'-2" HiDri: 1
05/10/2205/10/22Sam05/10/22
Complete05/10/22HermesBella Vista Building GroupBVSOD 003 SODO House2-UnitDDFRMMAT-DROP1.BVSOD-DD.BFSAdding Parallams
Hermes:

Missing posts..
4 pcs 3.5” x 5.25” x10’ PL 1.8 E FB 2400 psi
4 pcs 3.5”x 7” x 10’ PL 1.8 E FB 2400 psi
8 pcs 5.25” x 5.25”x 10’ PL 1.8 E FB 2400 psi

---------------------------------------------------------

Went over this with Angie and they're in her takeoff just didn't make it into the Cost-Groups.

Old: 0, 0, 0

New:
(4) 3.5 x 5.25 x 10' Parallam
(4) 3.5 x 7 x 10' Parallam
(8) 5.25 x 5.25 x 10' Parallam
05/10/2205/10/22Angie05/10/22
Complete05/10/22Steven GilbertDream FindersDODFM 036 Deerfield ManorMulberryAMasonry ***Add 12" Block
Steven Gilbert:

Package change missing 12” block.
Need (75) 12” block added to takeoffs for front columns.

-----------------------------------------------

There are no 12" Block in this job but there is 12" Block in the takeoff that I found on the S Drive so I'm going to move forward with what's in the takeoff.

MASMAT.8'PLATE-DF-MULBERRY-A.MCMASTERORLANDO
MASMAT.8'PLATE-DF-MULBERRY-A.MCMASTERORLANDO(ZONE2)

12" Block: Old: 0, New: 75

Note: These packages (between vendors) don't seem to match. Some have 12" & 14" Block, this one didn't. Also, we don't have 14" Block from McMaster in the catalog.

----------------------------------------------

MASMAT.8'PLATE-DF-MULBERRY-A.FLBESTBLOCKORLANDO

12" Block: Old: 20, New: 75
14" Block: Old: 30, New: 50
05/10/2205/10/22
Complete05/06/22Brian DinkerMintoNDLTM 2322 LatitudesVilla 12ASlab Prep, Slab Prep,Masonry, Lintel, Shaftwall, Frame
Adam Sowers:

Brian turned this package change in person, written notes over the material package.

-----------------------------------------------------------------------
SLABPREP.NDLTM12-A/NDLTM12-II-A.CASTCRETE

16" Rod Chairs: Changed to 12" 2 Bar. Old: 4, New: 2 Boxes
Wire Mesh Chairs: Old: 538, New: 400
-----------------------------------------------------------------------
MASMAT.NDLTM12-A/NDLTM12-II-A.FLBESTBLOCKORLANDO
MASMAT.NDLTM12-A/NDLTM12-II-A.PREFERREDDAYTONA

8x8x12: Old: 0, New: 60
8x8x14: Old: 0, New: 75
Pre-Blend: Old: 246, New: 260
-----------------------------------------------------------------------
LINCON.NDLTM12-A/NDLTM12-II-A.ARGOSLATITUDES

Old: 22 Yards, New: 20 Yards
-----------------------------------------------------------------------
SHAFTWALL.NDLTM12-A/NDLTM12-II-A.INTERIOR/EXTERIOR

H Shaft Wall Stud 10': Old: 57, New: 40
DensGlass - 2x10x1: Old: 115, New: 95
Burn Clips: Old: 500, New: 100
-----------------------------------------------------------------------
FRMMAT.NDLTM12-A/NDLTM12-II-A.84LUMBER
FRMMAT.NDLTM12-A/NDLTM12-II-A.BFS
FRMMAT.NDLTM12-A/NDLTM12-II-A.MARJAM

1x4x12 PT: Old: 23, New: 0
1x6x12 PT: Old: 9, New: 0
1/2" OSB: Old: 47, New: 60
2x4x14 PT: Old: 17, New: 10
2x4x14 Spruce: Old: 120, New: 30
3/4" CDX: Old: 14, New: 2
7/16 OSB: Changed to 15/32 OSB: Quantitiy stayed the same.
05/06/2205/06/22
Complete05/05/22John RathbunSurrey HomesSOFXH 003 Fox HammockAzaleaA & BHardware ***Adding SPH4's
John Rathbun:

Hardware fill in / package change.

Please add 20 SPH4 to the azalea model A and B elevations. New total of 30.

Send a fill in for the 20 pieces to white cap please.

--------------------------------------

HDW.SO-AZALEA-A.WHITECAP
SPH4

Old: 10
New: 30

HDW.SO-AZALEA-B.WHITECAP
SPH4

Old: 0
New: 30
05/05/2205/05/22
Complete05/05/22Jeff RotertMintoNDLTS 2375 Latitudes40-178APrecast ***Adding (1) 7'-6" Lintel
Jeff Rotert:

Takeoff has (4) 7-6 precast on it and we need a total of (5) 7-6 precast. Please add (1).

Precast has not been delivered yet

--------------------------------------------------

Talked to Pete about this and we initially thought this was supposed to be a 40-178-II-A but that package doesn't match the takeoff because of recent package changes so we decided to just add (1) 7'-6" here.

PCMS.NDLTS40-178-A.LOTTS
Old: 4
New: 5

PCMS.NDLTS40-178-A.CASTCRETE
No change, this package was already correct.

Old: 5
New: no change.
05/05/2205/05/22
Complete05/02/22Bobby NellerMintoNDLTM 2330 LaittudesVilla 7II-AMASMAT.NDLTM7-A/NDLTM7-II-AAdding Pre-Blend
Bobby Neller:

Need additional motor added to the take off all villas have been taking six pallets
Old-223
New-252

-----------------------------------------------------

Sent the 42 bags of mortar that Bobby requested and emailed this package change request to bids for review / approval.

There are currently 223 bags of Pre-Blend in the Package, with a total of 3,844 Block.

3,844 / 15 = 185 (appears that the job should have enough Pre-Blend)

-----------------------------------------------------

I spoke to Mark about this and he got with Bobby. He said to go ahead and make this change to this package (VILLA 7 II-A). Bobby will keep an eye out and let us know if we need to scale back or not -Sharon Heim

---------------------------------------------------

MASMAT.NDLTM7-A/NDLTM7-II-A.FLBESTBLOCKORLANDO
MASMAT.NDLTM7-A/NDLTM7-II-A.PREFERREDDAYTONA

Old Count: 223
New Count: 252
05/02/2205/02/2205/02/22
Complete05/02/22Skip DoyleCNCCNCNC 001 Custom (Pine Key)Pine KeyStemwall Footer PrepRemoving Plastic Grade Stakes
Ship Doyle:

24” plastic grade stakes sent back, not needed. Same for all 4 lots.

--------------------------

FOOTERPREP.CNC-PINEKEY.WHITECAP
FOOTERPREP.CNC-BONITA.WHITECAP

Old Count: 25
New Count: 0
05/02/2205/02/22
Review04/29/22Carlos GarciaRichmondROASQ 016 Arlington SquareF913/PearlDPrecast PackageDoesn't match takeoff
Carlos Garcia:

Package change? Takeoff is missing the 13’4” lintel needed for the multi panel slider, Need to get a purchase order to Lotts as soon as possible as they will be on the lookout for it

---------------------------------------------------------

Sent this to bids for review since we already had a pacakge change this week on this job/model/elevation from Steven Gilbert. Waiting for review (Adam).


PCMS.RA-PEARL-F913-D.LOTTSORLANDO

Old Count Totals:
13'-4": 0

New Count Totals:
13'-4": ?
04/29/22
Complete04/26/22John RathbunSurrey HomesSOSVL 009-C Savannah LandingSanctuaryAPrecastAdding (1) 7'-6" Lintel
John Rathbun:

Precast Fill in / package change. Please add one 7-6 header for a new total of three to the sanctuary model elevation A only.
Need two for the windows on each side of the entry . And one more on the back left window . A total of three needed

---------------------------------------------------------------

PCMS.SO-Sanctuary-A.LOTTSORLANDO

Old Count Totals:
7'-6" Lintel: 2

New Count Totals:
7'-6" Lintel: 3
04/26/2204/26/22
Complete04/25/22Steven GilbertRichmondROASQ 016 Arlington SquareF913/PearlDPrecast PackageDoesn't match takeoff
Steven Gilbert:

Change precast package.
Remove Lotts precast to many:
(1) 7’6” precast
(1) 4’6” precast
(1) 6’2” sill
(1) 3’1” sill

---------------------------------------------------------

PCMS.RA-PEARL-F913-D.LOTTSORLANDO

Old Count Totals:
4'-6" Lintel: 2
7'-6" Lintel: 2
3'-1" Sill: 2
6'-2" Sill: 2

New Count Totals:
4'-6" Lintel: 1
7'-6" Lintel: 1
3'-1" Sill: 1
6'-2" Sill: 1
04/25/2204/25/22
Complete04/21/22Steven GilbertRichmondROFLK 042 Forest LakeF924/AmmoliteMPrecast PackageRemove AB1210's from Precast
Steven Gilbert:

Remove all 10” j bolts total=(18) from this precast package for this model.

--------------------------------------------------------

PCMS.RA-Ammolite-F924-M.LOTTS

Removing: AB1210 Anchor Bolt 1/2" x 10"

Old: 18, New: 0
04/21/2204/21/22
Complete04/21/22Steven GilbertRichmondROFLK 043 Forest LakeF926/EmeraldKHDW.RA-Emerald-F926-A/F926-KRemove AB1210's from HW
Steven Gilbert:

These are unusable at this stage of the house . Please remove all j bolts from hardware packs.
Remove (5) 10” j bolts

------------------------------------------------------

HDW.RA-Emerald-F926-A/F926-K.CONSTRUCTIONMATERIALS

AB1210 Anchor Bolts:

Old: 5. New: 0
04/21/2204/21/22
04/20/22HermesBella Vista Building GroupBVSOD 003 SODO House2-UnitDDPCMS.SODO07.CASTCRETESwapping #4 Dowels for #5
Hermes:

I have some wrong dowels in the Po that should be changed, it receives #4 1x9’8” but the plan marks them as #5 1x9’8” there are 8 pieces per building

--------------------------------------------------

PCMS.SODO07.CASTCRETE
NOTE: This Cost-Group no longer exists in BT so can't make the package change. Will do some investigating.

Old Totals:
# 4 Rebar - 1' X 9' 8" Dowels:
# 5 Rebar - 1' X 9' 8" Dowels

New Totals:
# 4 Rebar - 1' X 9' 8" Dowels:
# 5 Rebar - 1' X 9' 8" Dowels
04/20/22
Review04/18/22Steven GilbertRichmondROASQ 042 Arlington SquareFC11/RubyA (Metal)Frame***Missing 2x4 Spruce for Doors
Steven Gilbert:

Fill in missing 2x4s for door openings. Need (60) 2x4x108 5/8” spruce precuts.

-------------------------------------------------------

There are none in the Metal Frame versions of the FC11-A. Sent to bids for review (Adam)
04/18/22
Complete04/14/22Scott DeasonDart InterestsDIEVM 012 Evermore Resort5 BedroomASwapping (4) 4'-6" for (5) 5'-10"
Scott Deason:

5’-4” lintels were not on order list.

---------------------------------------------------

Scott says that there are too many 4'-6" Lintels in the 1st Lift Precast PO. He says that it should be 4 total 4'-6"'s and that he needs (5) 5'-4"'s to the package.

PCMS-DROP1.DIEVM-5BR-A.LOTTSORLANDO

Old Totals:
4'-6" Lintels: 8
5'-10" Lintels: 0

New Totals:
4'-6" Lintels: 4
5'-10" Lintels: 5
04/14/2204/14/22
Complete04/11/22Jeff RotertMintoNDLTS 2437 Latitudes40-178II-APrecast***Headers & Sills Package
Jeff Rotert:
Can you please have estimating check this there are quite a few discrepancies...
We need (2) 17-4, takeoff has (1), please add (1)
We can use the 14-8 for the 11’ lanai opening, but it’s a little big
We can use the 13-4 for the 10-8’ lanai opening, but it’s a little big
Takeoff has (2) 10-6, plans call for (1), please remove (1)
Takeoff has (4) 7-6, plans call for (3), please remove (1)
Takeoff has (4) 4-6, plans call for (6), please add (2)
Precast has not been delivered yet.

---------------------------------------------------------------

PCMS.NDLTS40-178-II-A.LOTTS

REVIEW: Chris Plantz: I compared lot specific plans to type "II" bay plans recv'd in January 2021 and all openings match. This is for model #40-178 II elev A only / Windows change by elevation and are different for model #40-178.

Old Package:
(2) 3' 6" precast lintel
(4) 4' 6" precast lintel
(1) 5' 10" precast lintel
(4) 7' 6" precast lintel
(2) 10' 6" precast lintel
(1) 13' 4" precast lintel
(1) 14' 8" precast lintel
(1) 17' 4" precast lintel
(1) 4' 6" Recess lintel (3'0" door)
(2) 2' 2-1/2" flush sill
(4) 3' 1" flush sill
(1) 4' 0" flush sill
(3) 6' 2" flush sill

---------------------------------------------------------------

4/12/22 - Chris Plantz reviewed this and verified that the package is incorrect.
Per CP the Package should be as follows:

New Package:
(2) 3' 6" precast lintel ::: (no change)
(6) 4' 6" precast lintel ::: (+2)
(1) 5' 4" precast lintel ::: (no change, 5'-10" substituted)
(3) 7' 6" precast lintel ::: (-1)
(1) 10' 6" precast lintel ::: (-1)
(2) 12' 0" precast lintel ::: (+2)
(0) 13' 4" precast lintel ::: (-1)
(0) 14' 8" precast lintel ::: (-1)
(2) 17' 4" precast lintel ::: (+1)
(1) 4' 6" Recess lintel (3'0" door) ::: (no change)
(2) 2' 2-1/2" flush sill ::: (no change)
(6) 3' 1" flush sill ::: (+2)
(1) 4' 0" flush sill ::: (no change)
(2) 6' 2" flush sill ::: (-1)


Cost Groups Updated:
PCMS.NDLTS40-178-II-A.LOTTS
PCMS.NDLTS40-178-II-A.CASTCRETE
04/11/2204/12/22Chris Plantz04/12/22
Hold04/06/22Carlos GarciaRichmondROEDH 070 Eden HillsF914/MoonstoneKFrame ***Swap SYP Precuts w/ Spruce
Carlos Garcia:

Subs are complaining that the pre-cuts are southern yellow pine, it makes them heavier and they tend to twist more. Why do we have southern yellow pine pre-cuts?

---------------------------------------------------------------------

Plans at Eden Hills call for SPF studs but SYP plates. Estimating template wasn't designed to mix lumber, either walls are SPF or SYP, not both. This meant a manual substitution on every elevation of every model so I was instructed to make bearing walls SYP, studs included. This was before John Corrigan was hired. We have sent SYP for bearing walls for years and this is the first I've heard about any issues -Chris Plantz

---------------------------------------------------------------------

Carlos says they need to be swapped out (Adam).

FRMMAT.RA-Moonstone-F914-K.HAVEN

Old Totals (SYP Precuts)
2x4x92 5/8 SYP: 211
2x4x108 5/8 SYP: 58
2x6x92 5/8 SYP: 10
2x6x108 5/8 SYP: 23

Old Totals (Spruce Precuts)
2x4x92 5/8 Spruce: 204
2x4x108 5/8 Spruce: 44
2x6x92 5/8 Spruce: 34
2x6x108 5/8 Spruce: 12

Carlos is going to double check on this before I make any changes (Adam).
04/06/22
Complete04/01/22Steven GilbertRichmondROFLK 039 Forest LakeF924/AmmoliteKHardwareMissing MTS12 & HTS20
Steven Gilbert:

Missing hardware on p.o. All mts12s and HTS20s.

4/1/22 - The takeoff I originally looked at didn't have these either but I found a revised Takeoff in the Estimating Folder on the S Drive that does have these items. Steven didn't know how many he needed so sending what's in this takeoff and will add to package change log (Adam).

-------------------------------------------------------

HDW.RA-Ammolite-F924-K.CONSTRUCTIONMATERIALS

Old Totals:
MTS12: 0
HTS20: 0

New Totals:
MTS12: 27
HTS20: 10
04/01/2204/01/22
Complete04/01/22John RathbunSurrey HomesSOSVL 007-A Savannah LandingHarborA & BHardwareAdd HSTM16 & Tapcons
John Rathbun:

Harbor model A and B elevations. Please add the following:

2 - HTSM16
One box of 1” x 1/4” hex head tapcons

-----------------------------------------

John said that he doesn't need an entire box of tapcons for this, and since that's how they send them he said he'll just order them as fill-ins.

HDW.SO-Harbor-A.CONSTRUCTIONMATERIALS
HDW.SO-Harbor-B.CONSTRUCTIONMATERIALS

HTSM16: Old: 0, New: 2
04/01/2204/01/22
Complete03/31/22Steven GilbertRichmondROFLK 048 Forest LakeF924/AmmoliteL***Remove Duro Wall
Steven Gilbert:

We have never used durowall in my area please remove from all orders.


PCMS. RA-Ammolite-F924-L.LOTTS
Old: 3, New: 0
03/31/2203/29/22
Review03/31/22Jack CorriganRichmondRORVC 049 River ChaseF928AOption?Missing 2x12x18 SYP (Sel?)
Jack Corrigan:

I’m missing all 2x12s for the back porch detail. I attached a picture of the detail -Jack Corrigan

Missing: (6) 2x12x8 syp
(4) 2x12x18 syp

For lot 49:
Model: Bronze
Elevation: A

3/31/22 - Job matches the takeoff but not sure about the options. Either missed option, needs to be updated, or change. Will forward to bids for review (Adam).

---------------------------------------------------------------


03/31/22
Review03/31/22Larry SimsSobel CoOFVMR 011 Villa Mar4-UnitType 1Precast Drop 1Missing (2) 13'-4"
Larry Sims:

There are 2) 13-4 x 8” lintels on the interior of the type 1 and type 2 building that where not included in the package. We will need to add them to the packages of both building types and I need to send a po to cast Crete for 2) 13-4 x 8” lintels to complete building 11 thanks.

2) 13-4 x 8” lintels

3/31/22 - Sending for now and will send to bids for package change review (Adam).

-------------------------------------------------
03/31/22
03/31/22Bobby NellerMintoNDLTM 2582 LatitudesVilla 7B***Adding META 20 Straps
Bobby Neller:

Been running short truss straps in the villas. I was wondering why, because I remember doing a package change for truss straps but it was in the cottages lol.
However we need to do one as well in the villas. Just got done counting all my Truss straps after pouring a Lentil. Took 310 straps. All villas are similar.

Package change:
Old-283
New-315

----------------------------------------------------

PCMS.NDLTM7-A/NDLTM7-B.CASTCRETE
PCMS.NDLTM7-II-A/NDLTM7-II-B.CASTCRETE
Old: 283, New: 315

03/31/22
Complete03/28/22Bobby NellerMintoNDLTM 2588 LatitudesVilla 9AAll Models/ElevationsRemove All Precut Studs
Bobby Neller:

Villa package change: Removing all precut studs across the board not necessary in the villas.

92 5/8- Spruce Pre-cuts: Old-35, New-0
104 5/8-Spruce Pre-cuts: Old-21, New-0

----------------------------------------

FRMMAT.NDLTM9-A.84LUMBER
FRMMAT.NDLTM9-A.BFS
FRMMAT.NDLTM9-A.MARJAM
FRMMAT.NDLTM9-B.84LUMBER
FRMMAT.NDLTM9-B.BFS
FRMMAT.NDLTM9-B.MARJAM
92 5/8 Old: 35, New: 0
104 5/8 Old:21 , New: 0

FRMMAT.NDLTM8-A.84LUMBER
FRMMAT.NDLTM8-A.BFS
FRMMAT.NDLTM8-A.MARJAM
FRMMAT.NDLTM8-B.84LUMBER
FRMMAT.NDLTM8-B.BFS
FRMMAT.NDLTM8-B.MARJAM
FRMMAT.NDLTM7-A/NDLTM7-II-A.84LUMBER
FRMMAT.NDLTM7-A/NDLTM7-II-A.BFS
FRMMAT.NDLTM7-A/NDLTM7-II-A.MARJAM
FRMMAT.NDLTM7-B/NDLTM7-II-B.84LUMBER
FRMMAT.NDLTM7-B/NDLTM7-II-B.BFS
FRMMAT.NDLTM7-B/NDLTM7-II-B.MARJAM
FRMMAT.NDLTM6-A.84LUMBER
FRMMAT.NDLTM6-A.BFS
FRMMAT.NDLTM6-A.MARJAM
FRMMAT.NDLTM6-B.84LUMBER
FRMMAT.NDLTM6-B.BFS
FRMMAT.NDLTM6-B.MARJAM
92 5/8 Old: 26, New: 0

FRMMAT.NDLTM5-A.84LUMBER
FRMMAT.NDLTM5-A.BFS
FRMMAT.NDLTM5-A.MARJAM
FRMMAT.NDLTM5-B.84LUMBER
FRMMAT.NDLTM5-B.BFS
FRMMAT.NDLTM5-B.MARJAM
92 5/8 Old: 36, New: 0
104 5/8 Old:21 , New: 0

FRMMAT.NDLTM4-A/NDLTM4-II-A.84LUMBER
FRMMAT.NDLTM4-A/NDLTM4-II-A.BFS
FRMMAT.NDLTM4-A/NDLTM4-II-A.MARJAM
FRMMAT.NDLTM4-B/NDLTM4-II-B.84LUMBER
FRMMAT.NDLTM4-B/NDLTM4-II-B.BFS
FRMMAT.NDLTM4-B/NDLTM4-II-B.MARJAM
92 5/8 Old: 26, New: 0

FRMMAT.NDLTM3-A.84LUMBER
FRMMAT.NDLTM3-A.BFS
FRMMAT.NDLTM3-A.MARJAM
FRMMAT.NDLTM3-B.84LUMBER
FRMMAT.NDLTM3-B.BFS
FRMMAT.NDLTM3-B.MARJAM
92 5/8 Old: 35, New: 0
104 5/8 Old:21 , New: 0

FRMMAT.NDLTM2-A.84LUMBER
FRMMAT.NDLTM2-A.BFS
FRMMAT.NDLTM2-A.MARJAM
FRMMAT.NDLTM2-B.84LUMBER
FRMMAT.NDLTM2-B.BFS
FRMMAT.NDLTM2-B.MARJAM
92 5/8 Old: 26, New: 0

FRMMAT.NDLTM10-A.84LUMBER
FRMMAT.NDLTM10-A.BFS
FRMMAT.NDLTM10-A.MARJAM
FRMMAT.NDLTM10-B.84LUMBER
FRMMAT.NDLTM10-B.BFS
FRMMAT.NDLTM10-B.MARJAM
92 5/8 Old: 26, New: 0

FRMMAT.NDLTM11-
* Has SYP Pre-cuts instead of Spruce Pre-cuts
FRMMAT.NDLTM11-A.84LUMBER
FRMMAT.NDLTM11-A.BFS
FRMMAT.NDLTM11-B.84LUMBER
FRMMAT.NDLTM11-B.BFS
92 5/8 Old: 41, New: 0
108 5/8 Old:14 , New: 0

FRMMAT.NDLTM12-A/NDLTM12-II-A.84LUMBER
FRMMAT.NDLTM12-A/NDLTM12-II-A.MARJAM
FRMMAT.NDLTM12-B/NDLTM12-II-A.84LUMBER
FRMMAT.NDLTM12-II-B/NDLTM12-II-B.84LUMBER
92 5/8 Old: 34, New: 0

FRMMAT.NDLTM13-B.84LUMBER
FRMMAT.NDLTM13-B.BFS
FRMMAT.NDLTM13-B.MARJAM
92 5/8 Old: 26, New: 0

03/28/2203/29/22
Complete03/25/22Jeff SubbertMattamy HomesMOWAT 028 Waterbrooke8-UnitCACAACAC/FTFRMMAT-DROP1.MO-CACAACAC(FT).84LUMBERRemoving 6x6 Posts
Adam Sowers:

Jeff Subbert asked about these saying he didn't think they were supposed to be in the package. Chris Plants reviewed and determined yes, they're not supposed to be in there. I created a Return/Credit PO for the Posts and now removing them from the Cost-Group.

---------------------------------------------------

FRMMAT-DROP1.MO-CACAACAC(FT).84LUMBER

Old: 6x6x8 PT: 16, New: 0
03/25/2203/28/22Chris Plantz03/28/22
Complete03/23/22Johnny VargasRichmondROLKS 003 Lake Smart (F927-B)F927/SlateB*** HardwareRemoving HGA10KT
Johnny Vargas:

Please take off HGA10KT Gable End Wall connector Simpson. For all future homes I have way to many of these connectors. Each house only needs one connector and every box comes with ten pieces. So please take this item off the take off list. Each box cost $98.80. I have and collected 12 boxes that I’ve found through my walk through that’s 120 houses I can do.

-----------------------------------------

HDW.RA-Slate-F927-B.CONSTRUCTIONMATERIALS
HDW.RA-Slate-F927-A.CONSTRUCTIONMATERIALS
HDW.RA-Slate-F927-C.CONSTRUCTIONMATERIALS
HDW.RA-Slate-F927-G.CONSTRUCTIONMATERIALS
Old: 2, New: 1

HDW.RA-SUNSTONE-F919-B.WHITECAP
Old: 2, New: 1

HDW.RA-Moonstone-F914-G.CONSTRUCTIONMATERIALS
HDW.RA-Moonstone-F914-H.WHITECAP
HDW.RA-MOONSTONE-F914-J.CONSTRUCTIONMATERIALS
Old: 2, New: 1

HDW.RA-F913-G/F913-H.WHITECAP
Old: 2, New: 1

HDW.RA-Onyx-F9C2-G.CONSTRUCTIONMATERIALS
Old: 2, New: 1
03/23/22
Complete03/21/22Bobby NellerMintoNDLTM 2570 LatitudesAll VillasAll***Removing H-Track
Bobby Neller:
H track package change interior exterior.
Like to remove 10 pieces of each track from the take off. Across-the-board!
Old-43
New-33
------------------------------------------------------------
SHAFTWALL.NDLTM9-A.ALLIED
Old Totals:
"H" Shaft Wall Stud 10': 43
New Totals:
"H" Shaft Wall Stud 10': 33

SHAFTWALL.NDLTM9-A.INTERIOR/EXTERIOR BUILDING SUPPLY
Old Totals:
"H" Shaft Wall Stud 10': 43
New Totals:
"H" Shaft Wall Stud 10': 33

Package Changes Made to the following Cost-Groups:

SHAFTWALL.NDLTM9-B.ALLIED
SHAFTWALL.NDLTM9-B.INTERIOR/EXTERIOR BUILDING SUPPLY

SHAFTWALL.NDLTM10-A.INTERIOR/EXTERIOR BUILDING SUPPLY

SHAFTWALL.NDLTM10-B.ALLIED
SHAFTWALL.NDLTM10-B.INTERIOR/EXTERIOR BUILDING SUPPLY

SHAFTWALL.NDLTM11-A.INTERIOREXTERIOR
SHAFTWALL.NDLTM11-B.INTERIOREXTERIOR
Old: 72, New: 62

SHAFTWALL.NDLTM13-B.ALLIED
SHAFTWALL.NDLTM13-B.INTERIOR/EXTERIOR BUILDING SUPPLY

SHAFTWALL.NDLTM2-A.ALLIED
SHAFTWALL.NDLTM2-A.INTERIOR/EXTERIOR BUILDING SUPPLY
Old: 41, New: 31

SHAFTWALL.NDLTM2-B.ALLIED
SHAFTWALL.NDLTM2-B.INTERIOR/EXTERIOR BUILDING SUPPLY
Old: 41, New: 31

SHAFTWALL.NDLTM3-A.ALLIED
SHAFTWALL.NDLTM3-A.INTERIOR/EXTERIOR BUILDING SUPPLY


SHAFTWALL.NDLTM3-B.ALLIED
SHAFTWALL.NDLTM3-B.INTERIOR/EXTERIOR BUILDING SUPPLY

SHAFTWALL.NDLTM4-A/NDLTM4-II-A.ALLIED
SHAFTWALL.NDLTM4-A/NDLTM4-II-A.INTERIOR/EXTERIOR
Old: 41, New: 31

SHAFTWALL.NDLTM4-B/NDLTM4-II-B.ALLIED
SHAFTWALL.NDLTM4-B/NDLTM4-II-B.INTERIOR/EXTERIOR
Old: 41, New: 31

SHAFTWALL.NDLTM5-A.ALLIED
SHAFTWALL.NDLTM5-A.INTERIOR/EXTERIOR BUILDING SUPPLY
Old: 41, New: 31

SHAFTWALL.NDLTM5-B.ALLIED
SHAFTWALL.NDLTM5-B.INTERIOR/EXTERIOR BUILDING SUPPLY
Old: 41, New: 31

SHAFTWALL.NDLTM6-A.ALLIED
SHAFTWALL.NDLTM6-A.INTERIOR/EXTERIOR BUILDING SUPPLY
Old: 41, New: 31

SHAFTWALL.NDLTM6-B.ALLIED
SHAFTWALL.NDLTM6-B.INTERIOR/EXTERIOR BUILDING SUPPLY
Old: 41, New: 31

SHAFTWALL.NDLTM7-A/NDLTM7-II-A.ALLIED
SHAFTWALL.NDLTM7-A/NDLTM7-II-A.INTERIOR/EXTERIOR
Old: 42, New: 32

SHAFTWALL.NDLTM7-B/NDLTM7-II-B.ALLIED
SHAFTWALL.NDLTM7-B/NDLTM7-II-B.INTERIOR/EXTERIOR BUILDING SUPPLY

SHAFTWALL.NDLTM8-A.ALLIED
SHAFTWALL.NDLTM8-A.INTERIOR/EXTERIOR BUILDING SUPPLY

SHAFTWALL.NDLTM8-B.ALLIED
SHAFTWALL.NDLTM8-B.INTERIOR/EXTERIOR BUILDING SUPPLY

03/21/2203/21/22
Complete03/21/22Bobby NellerMintoNDLTM 2566 LatitudesVilla 3A & B*** MasonryAdding Pre-Blend
Adam Sowers:

Bobby Neller called me about this. Not exactly sure why all of the sudden we're having problems with being short on Pre-Blend in this community but what's currently in the package here is incorrect.

There are only 227 bags of Pre-Blend and it should be at least 266 bags. Total Block = 3983 (Adam).

--------------------------------------

Old: 227, New: 266

MASMAT.NDLTM3-A.FLBESTBLOCKORLANDO
MASMAT.NDLTM3-A.PREFERREDDAYTONA
MASMAT.NDLTM3-B.FLBESTBLOCKORLANDO
MASMAT.NDLTM3-B.PREFERREDDAYTONA


03/21/2203/21/22
Complete03/17/22John RathbunSurrey HomesSOSVL 010-C Savannah LandingSanctuaryA & BHDW.SO-Sanctuary-A & BHardware Changes
John Rathbun:
Sanctuary model A&B elevations.

Please remove 35 / all 1/2”x8” hex bolts.
Please add 50 (1/4” x 4 1/4” SDS screws)
Alternate built up column nail pattern .
Please add 10 SPH6 for a new total of 124.
Please send the 10 SPH6 & the 50 SDS screws as a fill in

------------------------------------------------
HDW.SO-Sanctuary-A.CONSTRUCTIONMATERIALS

Old Totals:
HB127 Hex Bolt, 1/2" x 8": 35
SDS25412 Simpson 1/4" x 4 1/2" Wood Screw: 0
SPH6: 114

New Totals:
HB127 Hex Bolt, 1/2" x 8": 0
SDS25412 Simpson 1/4" x 4 1/2" Wood Screw: 50
SPH6: 124
-------------------------------------------------
HDW.SO-Sanctuary-B.CONSTRUCTIONMATERIALS

Old Totals:
HB127 Hex Bolt, 1/2" x 8": 45
SDS25412 Simpson 1/4" x 4 1/2" Wood Screw: 0
SPH6: 72

New Totals:
HB127 Hex Bolt, 1/2" x 8": 0
SDS25412 Simpson 1/4" x 4 1/2" Wood Screw: 50
SPH6: 82
03/17/2203/17/22
Complete03/11/22Scott DeasonDart InterestsDIEVM 010 Evermore Resort10 BedroomASlab PrepSwapping Visqueen to 10 mil
Adam Sowers:

Swapping all Visqueen to 10mil instead of 6mil in every Cost-Group. taxes updated as well (Adam)

SLABPREP.DIEVM-LOT10.LOTTSORLANDO
SLABPREP.DIEVM-LOT11.LOTTSORLANDO
SLABPREP.DIEVM-LOT12.LOTTSORLANDO
SLABPREP.DIEVM-LOT13.LOTTSORLANDO
SLABPREP.DIEVM-LOT14.LOTTSORLANDO
SLABPREP.DIEVM-LOT15.LOTTSORLANDO
SLABPREP.DIEVM-LOT16.LOTTSORLANDO
SLABPREP.DIEVM-LOT17.LOTTSORLANDO
SLABPREP.DIEVM-LOT18.LOTTSORLANDO
SLABPREP.DIEVM-LOT19.LOTTSORLANDO

03/11/2203/11/22
Complete03/11/22Bobby NellerMintoNDLTM 2590 LatitudesVilla 11BPCMS.NDLTM11-B.CASTCRETESwapping META12 for 20s
Adam Sowers:

Bobby said that the truss anchors in this are the incorrect sizes. It matches the takeoff on the S Drive but all of the other takeoffs that I looked at had META16 or bigger.


PCMS.NDLTM11-B.CASTCRETE

Old Totals:
META12: 300
META20: 7

New Totals:
META12: 0
META20: 300

Note: They were the same price. So, I just made the change and didn't forward to bids for review (Adam).
03/11/2203/11/22
Complete03/11/22Bobby NellerMintoNDLTM 2564 LatitudesALLALLHardwareRemoving 1 Box of Tapcons
Bobby Neller:

I’ve already removed 36 inch straps from all the take offs I need to remove one box of these hex head tap cons as well1-4”x1 3/4”

Old-two boxes
New-One box
------------------------------------------------
Old Count Totals:
TH14134 Tapcon 1/4" x 1 3/4" (box): 2

New Count Totals:
TH14134 Tapcon 1/4" x 1 3/4" (box):

HDW.NDLTM8-A.CONSTRUCTIONMATERIALS
HDW.NDLTM8-B.CONSTRUCTIONMATERIALS
Old Count: 2, New Count: 1

HDW.NDLTM10-A.CONSTRUCTIONMATERIALS
HDW.NDLTM10-B.CONSTRUCTIONMATERIALS
Old Count: 2, New Count: 1

HDW.NDLTM11-A.WHITECAP
HDW.NDLTM11-B.WHITECAP
TH14314: Old Count: 12, New Count: 1

HDW.NDLTM2-A.CONSTRUCTIONMATERIALS
HDW.NDLTM2-B.CONSTRUCTIONMATERIALS
Old Count: 2, New Count: 1

HDW.NDLTM3-A.CONSTRUCTIONMATERIALS
HDW.NDLTM3-B.CONSTRUCTIONMATERIALS
Old Count: 2, New Count: 1

HDW.NDLTM4-A/NDLTM4-II-A.WHITECAP
HDW.NDLTM4-B/NDLTM4-II-B.WHITECAP
Old Count: 2, New Count: 1

HDW.NDLTM5-A.CONSTRUCTIONMATERIALS
HDW.NDLTM5-B.CONSTRUCTIONMATERIALS
Old Count: 2, New Count: 1

HDW.NDLTM6-A.CONSTRUCTIONMATERIALS
HDW.NDLTM6-B.CONSTRUCTIONMATERIALS
Old Count: 2, New Count: 1

HDW.NDLTM7-A/NDLTM7-II-A.WHITECAP
HDW.NDLTM7-B/NDLTM7-II-B.WHITECAP
Old Count: 2, New Count: 1

HDW.NDLTM9-A.CONSTRUCTIONMATERIALS
HDW.NDLTM9-B.CONSTRUCTIONMATERIALS
Old Count: 2, New Count: 1
03/11/2203/11/22
Complete03/10/22Bobby NellerMintoiNDLTM 2590 LatitudesVilla 11BSLABPREP.NDLTM11-B.CASTCRETERemoving Corner Bars
Bobby Neller:

Like to remove all 30“ x 30“ corner bars total of 33

Old-72
New-0

Corner bars are being wasted out here we need to remove them from the package we weren’t receiving them to begin with but I think what we started doing takeoffs for down south is when I started seeing them in latitudes again.

------------------------------------------------------

I removed all Corner Bars from the following Cost-Groups:

SLABPREP.NDLTM11-A.CASTCRETE
SLABPREP.NDLTM11-B.CASTCRETE
03/10/2203/10/22
Complete03/10/22Bobby NellerMintoNDLTM 2564 LatitudesVilla 8BMASMAT.NDLTM8-B.FLBESTBLOCKORLANDOAdding Pre-Blend
Adam Sowers:

Bobby had a To-Do on this job for Pre-Blend w/ notes saying he thought the package was short. I ran the numbers and it appears to be short by about 40 bags of pre-blend so I'm adding it to the package.

MASMAT.NDLTM8-B.FLBESTBLOCKORLANDO
MASMAT.NDLTM8-B.PREFERREDDAYTONA

Old Totals:
Pre- Blend: 212

New Totals:
Pre-Blend: 252
03/10/2203/10/22
Review03/08/22Jeff RotertMintoNDLTS 2499 Latitudes40-179-IIBPCMS.NDLTS40-178-II-B.LOTTSORLANDOPrecast Changes
Jeff Rotert:

Please have estimating look at this. Takeoff vs prints in the field don’t match up.

Takeoff has (1) 17-4 and we need (2), please add (1)
Takeoff has (2) 10-6 and we need (1), please remove (1)
Takeoff has (4) 7-6 and we need (3), please remove (1)
Takeoff has (4) 4-6 and we need (6), please add (2)

Precast has not been delivered yet

----------------------------------------------------------------------

Sent to bids for review. Will update as necessary (Adam).
03/08/22
Complete03/03/22Bobby NellerMintoNDLTM 2598 LatitudesVilla 13B***Remove MSTAM 36
Bobby Neller:

I’d like to remove the following hardware from the take offs on all villas. No longer needed I’m wet setting straps.
MSTAM 36 strap tie
Old-40
New-0
-------------------------------------------
HDW.NDLTM13-B.CONSTRUCTIONMATERIALS

Old Totals:
MSTAM36: 40

New Totals:
MSTAM36: 0
-------------------------------------------
Removed ALL MSTAM36 from the following Cost-Groups:

Cost-Group: # Removed (Old Total)
HDW.NDLTM10-A.CONSTRUCTIONMATERIALS: 40
HDW.NDLTM10-B.CONSTRUCTIONMATERIALS: 40
HDW.NDLTM11-A.WHITECAP: 45
HDW.NDLTM11-B.WHITECAP: 45
HDW.NDLTM12-A/NDLTM12-II-A.WHITECAP: 30
HDW.NDLTM12-B/NDLTM12-II-B.WHITECAP: 30
HDW.NDLTM12-II-B/NDLTM12-II-B.WHITECAP: 30
HDW.NDLTM2-A.CONSTRUCTIONMATERIALS: 40
HDW.NDLTM2-B.CONSTRUCTIONMATERIALS: 40
HDW.NDLTM3-A.CONSTRUCTIONMATERIALS: 40
HDW.NDLTM3-B.CONSTRUCTIONMATERIALS: 40
HDW.NDLTM4-A/NDLTM4-II-A.WHITECAP: 20
HDW.NDLTM4-B/NDLTM4-II-B.WHITECAP: 40
HDW.NDLTM5-A.CONSTRUCTIONMATERIALS: 25
HDW.NDLTM5-B.CONSTRUCTIONMATERIALS: 25
HDW.NDLTM6-A.CONSTRUCTIONMATERIALS: 25
HDW.NDLTM6-B.CONSTRUCTIONMATERIALS: 25
HDW.NDLTM7-A/NDLTM7-II-A.WHITECAP: 20
HDW.NDLTM7-B/NDLTM7-II-B.WHITECAP: 20
HDW.NDLTM8-A.CONSTRUCTIONMATERIALS: 40
HDW.NDLTM8-B.CONSTRUCTIONMATERIALS: 40
HDW.NDLTM9-A.CONSTRUCTIONMATERIALS: 25
HDW.NDLTM9-B.CONSTRUCTIONMATERIALS: 25


03/03/2203/03/22
Complete03/01/22Adrian HartDart InterestsDIGFL 0B1 Garden Flats (10 Unit)10-Unit?FOOTERPREP.DIEVM-B1.LOTTSORLANDOFooter Pacakge Change
Adrian Hart:

Footer package change:

1) 45-Besser brick needed per unit.

2) Please delete3bar chair rods. The chair rods do not support the weight of rebar.

3) Also, 6” loop tie wire will not wrap #7 rebar properly. Please change to rolls of wire. I need this asap to maintain on schedule.

-----------------------------------------------------------------

Sent Fill-In for Besser Brick. Sent another PO to return 3-Bar Chairs and Bar Ties.


FOOTERPREP.DIEVM-B1.LOTTSORLANDO

Old Package Totals:
Besser Brick: 80
16", 3-Bar Rod Chairs (Box): 15
Bar Ties, 6": 5
Tie Wire #2: 0

New Package Totals:
Besser Brick: 450
16", 3-Bar Rod Chairs (Box): 0
Bar Ties, 6": 0
Tie Wire #2: 2

03/01/2203/01/22
Complete03/01/22Larry SimsSobel CoOFVMR 001 Villa Mar (Type 3)6-UnitType 3Adding LSTA18 & HHUS28-2
Larry Sims:

Hardware needed for roof. Needed to fly roof but not provided by truss company will need to be added to package.

100 LSTA 18 Flat straps
8 HHUS 28-2 Truss buckets

------------------------------------------------

There aren't Cost-Groups for this Job/Model/Elevation so making the package changes the old way on the template level.

OFVMR - 6 Unit - Type 3 - Unit C-D-E-F

Old Package Totals:
LSTA 18 Flat straps: 0
HHUS 28-2 Truss buckets: 0

New Package Totals:
LSTA 18 Flat straps: 100
HHUS 28-2 Truss buckets: 8
03/01/2203/01/22
Complete03/01/22Scott DeasonDart InterestsDIEVM 010 Evermore Resort10-BedroomA - TheaterFOOTERPREP.DIEVM-LOT10.LOTTSORLANDOAdding Grade Stakes
Scott Deason:

Need grade stakes in every footer for inspector. 2 lots per box (10 Boxes).

------------------------------------------------------------

After speaking w/ Scott this is what I determined:

1) 100 Grade Stakes per Box.
2) He need 18" Grade Stakes.
3) He only needs a total of 500 (50 per lot, 10 lots).

FOOTERPREP.DIEVM-LOT10.LOTTSORLANDO

Old Pacakge Totals:
18" Plastic Grade Stakes: 0

New Pacakge Totals:
18" Plastic Grade Stakes: 50

Added (50) 18" Grade Stakes to the following Cost-Groups:

FOOTERPREP.DIEVM-LOT10.LOTTSORLANDO
FOOTERPREP.DIEVM-LOT11.LOTTSORLANDO
FOOTERPREP.DIEVM-LOT12.LOTTSORLANDO
FOOTERPREP.DIEVM-LOT13.LOTTSORLANDO
FOOTERPREP.DIEVM-LOT14.LOTTSORLANDO
FOOTERPREP.DIEVM-LOT15.LOTTSORLANDO
FOOTERPREP.DIEVM-LOT16.LOTTSORLANDO
FOOTERPREP.DIEVM-LOT17.LOTTSORLANDO
FOOTERPREP.DIEVM-LOT18.LOTTSORLANDO
FOOTERPREP.DIEVM-LOT19.LOTTSORLANDO
03/01/2203/01/22
Complete02/25/22SharonRichmond*F913/PearlB3-CAR & COVP Options, RA-Pearl-F913-A ***Removing Sand & Mortar
Adam Sowers:

Sharon noticed Sand and Mortar on a job and it appeared to be coming from the 3CAR and COVP options. This started a complete review of the options in the templates and I found that nearly all of them have Sand and Mortar. Because there are so many I have to do these Template by Template to keep track of them.

-------------------------------------------------

Sand & Mortar swapped to Pre-Blend in the following Templates / Cost-Groups:

RA-Pearl-F913-B ***
1) F913-RA-3CAR (Argos,Marjam)
2) F913-RA-3CAR (HD,Argos,Marjam)
3) F913-RA-COVP (Argos, Haven)
4) F913-RA-COVP (Argos, Marjam)
5) F913-RA-COVP (Cemex, Haven)
6) F913-RA-COVP (HD, Argos, Marjam)
7) F913-RA-COVP (HD, Argos,BBO, Haven)
8) F913-RA-COVP (HD, Argos,BBT, Haven)
9) F913-RA-COVP (HD, Cemex, Haven)
10) F913-RA-COVP (HD, Maschmeyer, Haven)
11) F913-RA-COVP (Lotts, Argos,BBT, Haven)
12) F913-RA-COVP (Maschmeyer, Haven)
02/25/2203/01/22
Complete02/25/22SharonRichmondROPAL 388 PalisadesF913/PearlG3-CAR & COVP Options, RA-Pearl-F913-A ***Removing Sand & Mortar
Adam Sowers:

Sharon noticed that there was Sand and Mortar in the Masonry PO on this job. It's coming from the 3-CAR & COVP Options for the F913.

There are 11 Variations of the COVP/COVPX in just the F913-A Template.

I've updated the Masonry items in each 3-CAR & COVP/COVPX Option in the RA-Pearl-F913-A *** Template (Adam).
02/25/2202/25/22
Complete02/24/22Larry SimsSobel CoOFVMR 001 Villa Mar (Type 3)6-UnitType 3Old TemplateAdding 64 Wedge Anchors
Larry Sims:

Need to change roof hardware package to include 64) 3/8” x 5” wedge anchors to be used for LGT3 truss hold downs and send po to southern for bolts needed for building 2 we will pick them up.

64) 3/8” x 5” wedge anchors

-----------------------------------------------

OFVMR - 6 Unit - Type 3 - Unit C-D-E-F

We didn't have these in the catalog so I had to get a price from Southern. Added them to the catalog and sent the fill-in. Also added the (64) Wedge Anchors to the Template.

Note: The package change here was done "the old way", to the Template, not Cost-Group (Adam).


02/24/2202/24/22
Complete02/22/22John RathbunSurrey HomesSOFXH 054 Fox HammockVioletA***Precast Changes
John Rathbun:

Violet model precast package change.
Please remove one 5’-10” header and
add one 7’-6” header.
Please remove one 6’-6” header and
add one 8’-8” header.

-----------------------------------------------------

PCMS.SO-VIOLET-A.LOTTSORLANDO

Old Totals:
5'-10" Lintel: 1
6'-6" Lintel: 0
7'-6" Lintel: 3
8'-8" Lintel: 1

New Totals:
5'-10" Lintel: 0
6'-6" Lintel: 0
7'-6" Lintel: 4
8'-8" Lintel: 2

There was no 6'-6" Lintel in the package on this job. i let John know that all other changes were made. He said he's going to dig in and get back to me (Adam).

--------------------------------------------------

Per John (after digging in):
Remove (1) 8'-8", new total of (1).

Lotts sent different sized lintels than were in the package (Adam).
02/22/2202/22/22
Complete02/22/22Carlos GarciaRichmondROPAL 473 PalisadesF924/AmmoliteJHDW.RA-Ammolite-F924-JHardware, See Note
Carlos Garcia:

The attached hardware list as what is exactly needs to be for this lot model and elevation.
-------------------------------------------------------
Carlos submitted a photo on this to-do with handwritten notes for this pacakge change. Per Carlos, Totals should be as follows:
HUC212-2: 4
SP1: 35
SP2: 65
MASTAM36: 8
MASTA36: 6
HGA10KT: 1
WA1285: 30
Washers 1/2": 42
Hex Nut 1/2": 12
H2.5: 100
MTS12: 30
? Tapcons: 30 & 40

Note: I didn't inlcude items that already matched what was in the base for this model/elevation.
----------------------------------------------------------
HDW.RA-Ammolite-F924-J.CONSTRUCTIONMATERIALS

1) MTS12 is missing entirely from the package.
Should be 24, Adding 30 per Carlos

2) H2.5: Only have T's in the Job, T's & A's in the TOS.
Should be: A: 27, T: 62

3) Tapcons: Reduced both exisiting sizes to 1 box.
02/22/2203/03/22
Complete02/21/22John RathbunSurrey HomesSOFXH 054 Fox HammockVioletA***Swapping 2x12x16 w/ 18'
John Rathbun:

Violet model package change .
Please remove the three 2x12x16 syp and
add three 2x12x18 SYP.
Please send the 18 footers as a fill in .

---------------------------------------

FRMMAT.SO-VIOLET-A.BFS
FRMMAT.SO-VIOLET-B.BFS: 4/5/2022 (Adam)

Old Totals:
2x12x16 SYP: 3
2x12x18 SYP: 0

New Totals:
2x12x16 SYP: 0
2x12x18 SYP: 3
02/21/2204/05/22
Review02/21/22Jeff RotertMintoNDLTS 2494 Latitudes40-178-IIA***Precast Changes
Jeff Rotert:

Takeoff shows (4) 4-6,
we need (6), please add (2)

Takeoff shows (4) 7-6,
we need (3), please remove (1)

Takeoff shows (2) 10-6,
we need (1), please remove (1)

Takeoff shows (1) 17-4,
we need (2), please add (1)

Precast not delivered yet

--------------------------------------------

Spoke with Sam about this and sent him the details and he's going to check it out and get back to me (Adam).
02/21/22
Review02/21/22Steven GilbertRichmondROASQ 058 Arlington SquareF927/SlateB***Missing 2x4x108 5/8 Spruce for Door Frames
Steven Gilbert:

Missing lumber for doors not on p.o. -Steven Gilbert

(60) 2x4x108 5/8” spruce

-------------------------------------------------------------------

The job matches the takeoff that I found for this Model/Elevation. Steven said this is needed for the frame of all the doors, must be spruce.

I asked if this was for just this lot and he said that's what the framer's asked for and that it could be heavy and to just send whatever is in the takeoff but there isn't any in the takeoff (Adam).
02/21/22
Review02/16/22Kyle JollyEncoreECRUN 029 Spectrum??HDW-GENERAL.ECRUN-NOELEVATOR.WHITECAPAdding Threaded Rods
Adam Sowers:

Did not see on plans before as it was covered by stamp. W1/D3 detail shows 1/2” all thread on overhang. Will need these added to all future buildings.

1/2”x26” all thread
4 Per Building

---------------------------------------------------


02/16/22
Review Status?02/10/22Steven GilbertRichmondROFLK 031 Forest LakeF924/AmmoliteK***Short 2x4x14 & 2x4x92 5/8 Spruce
Steven Gilbert:

Fill in ammolite short please add to package and fill in. The ammolite has been short the whole time according to framers they have been able to pull from other houses to fix please fix package and send fill in.

(30) 2x4x14’ spruce add this amount to package
(40) 2x4x92 5/8 spruce add to package

------------------------------------------------------------

The job quantities match the takeoff I found on the S Drive for this. Sending the fill-in for now and sending the package change to estimating for review (Adam).

Old Totals:
2x4x14 Spruce: 75
2x4x92 5/8 Spruce: 284

New Totals:
2x4x14 Spruce: ?
2x4x92 5/8 Spruce: ?
02/10/22
Review Status?02/10/22Steven GilbertRichmondROFLK 080 Forest LakeF924/AmmoliteM***Short 2x4x14 & 2x4x92 5/8 Spruce
Steven Gilbert:

Fill in ammolite short please add to package and fill in. The ammolite has been short the whole time according to framers they have been able to pull from other houses to fix please fix package and send fill in.

(30) 2x4x14’ spruce add this amount to package
(40) 2x4x92 5/8 spruce add to package

------------------------------------------------------------

The job quantities match the takeoff I found on the S Drive for this. Sending the fill-in for now and sending the package change to estimating for review (Adam).

Old Totals:
2x4x14 Spruce: 96
2x4x92 5/8 Spruce: 204

New Totals:
2x4x14 Spruce: ?
2x4x92 5/8 Spruce: ?
02/10/22
Complete02/10/22Kyle JollyRichmondECRUN 020 Spectrum??***Adding 2x2x10 for Drip Edge
Kyle Jolly:

Drip edge fill in and package change.

I just went thru this building yesterday with Angie. I need to adjust the amount of 2x2’s for this building and order some extra here.

I was not ordering enough 2x2 drip edge for each building. This will be for the entire building.

(60) 2x2x10PT

+20 to takeoff for a total of 60 for future buildings

---------------------------------------

Called Pete about this one because I wasn't sure about the Models/Elevations/Cost-Groups for these job (Adam)
02/10/22
Review02/07/22Steven GilbertRichmondROASQ 012 Arlington SquareF913/PearlF***Short 2x4x92 5/8 Spruce
Steven Gilbert:

Fill in and package change material on p.o. On site short material for door openings. Fill in and package change short material for the door openings

Add (40) 2x4x92 5/8” spruce precuts

------------------------------------------------------

Job matches the takeoff I found on the S Drive (172).

Old Totals:
2x4x92 5/8 Spruce: 172

New Totals:
2x4x92 5/8 Spruce: ?

02/07/22
Review02/07/22Steven GilbertRichmondROASQ 013 Arlington SquareF9C3/CoralD***Short 2x4x92 5/8 Spruce
Steven Gilbert:

Short spruce studs all materials ordered accounted for. Need more for the door openings.

Lot 13 Arlington square need 40- 2x4x92 5/8.

------------------------------------------------------

Job matches the takeoff I found on the S Drive. Steven wants to add 40 to what's in the package, for a new total of 163.


Old Totals:
2x4x92 5/8 Spruce: 123

New Totals:
2x4x92 5/8 Spruce:

02/07/22
Complete02/04/22Steven GilbertRichmondROFLK 041 Forest LakeF924/AmmoliteL***Precast Changes
Steven Gilbert:

Remove sills to many on p.o.

2’2.5” sills remove (2) should be 3 total
4’0” sills remove (1) should be 1 total

-------------------------------------------------------

Note: Previous package change on 8/10/21 added (2) 2'-2.5" Sills. Now we're removing them.

PCMS. RA-Ammolite-F924-L.LOTTS

Old Totals:
2'-2.5" Sill: 3
4'-0" Sill: 1

New Totals:
2'-2.5" Sill: 1
4'-0" Sill: 1 (No Change)
02/04/2202/04/22
Review/Hold02/04/22Johnny VargasRichmondROLKS 053 Lake SmartF913/PearlDF913-RA-COVP (Lotts, Argos, McMaster, Haven)COVP Option - Precast Changes
Johnny Vargas:

1 piece of precast 8” U lintel - 13-04 was not in the original take off list. Please see attachment. -Johnny Vargas

1 piece of precast 8” U lintel - 13-04

--------------------------------------------------

Note: Package Changes on Options are going to be very difficult. This specific option, for example, isn't even in the F913-D Template. It's spread out amongst all of the other F913 Templates though. I checked a few and none appeared to have any Lintels in the COVP option so going to have estimating review and put on the Trello because making package changes on these is going to be a problem. We have the same option over and over in multiple templates w/ different vendors and potentialls different line-items.

*****************************

Johnny submitted a detail in this to-do showing a 13'4" needed for the COVP option on this job and there isn't one in the COVP option.

F913-RA-COVP (Lotts, Argos, McMaster, Haven)

Old Totals:
13'-4" Lintel: 0

New Totals:
13'-4" Lintel:
02/04/22
Complete02/01/22Scott DeasonRichmondROEDH 069 Eden HillsF913/PearlKWDWGREAT***Swapping Sills
Scott Deason:

The precast package has 2 sills at 26.5” but they need to be 3’-1” because the windows in the great room are 37-1/4” x 60-1/2”.


-------------------------------------------------------

The sills that he's mentioning are coming from the WDWGREAT Option.

F913-RA-WDWGREAT (Lotts)

Old Totals:
2'-2.5" WRF Sill: 2
3'-1" WRF Sill: 0

New Totals:
2'-2.5" WRF Sill: 0
3'-1" WRF Sill: 2
02/01/2202/01/22
Complete02/01/22Steven GilbertRichmondROFLK 035 Forest LakeF914/MoonstoneM***Removing AB1210's
Steven Gilbert:

Some reason we are getting 10” anchors with the precast please remove from all other orders.

--------------------------------------

PCMS.RA-Moonstone-F914-M.LOTTS

Old Package Totals:
AB1210: 44

New Package Totals:
AB1210: 0
02/01/2202/01/22
Complete02/01/22Jeff RotertMintoNDLTS 1786 Latitudes50-179-IIBAdding Sills Removed on 8/10/21Precast Changes
Jeff Rotert:

Takeoff shows (8) 3-1 HiDri sills and we need (11).
Please add (3)

House is blocked and missing these (3) sills needed to complete house

----------------------------------------------------

Note: Pacakge change on 8/10/21 from Kyle removed 2 of these Sills. Now we're adding them back?

PCMS.NDLTS50-179-II-B.CASTCRETE
PCMS.NDLTS50-179-II-B.LOTTS

Old Totals:
3'-1" HiDri Sill: 8

New Totals:
3'-1" HiDri Sill: 11
02/01/2202/01/22
Complete02/01/22John RathbunSurrey HomesSOFXH 058 Fox HammockIrisB***Adding 2x6x14 Spruce & 2x4x14 SYP
John Rathbun:

Iris model A & B elevations package change

2x6x14 spruce . add 6 for a new total of 28.

2x4x14 SYP add 16 for a new total of 100.

Please send the 6 and16 as a fill in please .

--------------------------------------------------------------

FRMMAT.SO-Iris-B.BFS

Old Package Totals:
2x6x14 Spruce: 22
2x4x14 SYP: 108

New Package Totals:
2x6x14 Spruce: 28
2x4x14 SYP: 132
02/01/2202/01/22
Review01/31/22Jeff RotertMintoNDLTS 1776 Latitudes50-181A***Precast Changes
Jeff Rotert:

Precast takeoff wrong.

Takeoff shows (0) 4-6 door header and we need (1), please add (1)
Takeoff shows (0) 9-8 (or next size bigger) header and we need (1), please add (1)

Precast has not been delivered yet

--------------------------------------------------

Leaving this open because it needs to be reviwed again (Adam).
01/31/22
Complete01/24/22Steven GilbertRichmondROFLK 076 Forest LakeF924/AmmoliteK***Precast Changes
Steven Gilbert:

Precast and sill deleted for some reason.

Add (1) 7’6” precast
Add (1) 6’2” sill

--------------------------------------------------------
Package Change was already complete but I don't see it in the log so leaving this here -Adam.
--------------------------------------------------------
PCMS.RA-Ammolite-F924-K.LOTTS

Old Package Totals:
7'-6" Lintel: 1
6'-2" Sill: 1

New Package Totals:
7'-6" Lintel: 2
6'-2" Sill: 2
01/24/22?
Complete01/24/22Jeff SubbertMattamy HomesMOSOL 024-2 Solara8-UnitQEFFFFEQ/COSHAFTWALL-DROP2.MOSOL-QEFFFFEQ(CO).INTERIOREXTERIORDensGlass Changes
Jeff Subbert:

After counting material I came up with that’s what I did 742 sheets of dens glass 66 for the bottom walls at 10’

And 40 sheets above ceiling at 12’. 280 sheets of 12’, and 462 sheets of 10’. This goes for building 25–2 as well

-------------------------------------------------

Old Cost-Group: SHAFTWALL-DROP1.MOSOL024.INTERIOREXTERIOR
New Cost-Group: SHAFTWALL-DROP2.MOSOL-QEFFFFEQ(CO).INTERIOREXTERIOR

The amounts on the estimates added up correctly for this building are:
420-10'0" sheets and 320-12'0" sheets -Chris Plantz

------------------------------------------------

Current Package Totals
2x10x1: 246
2x12x1: 180

New Package Totals
2x10x1: 420
2x12x1: 320

01/24/22Chris Plantz01/25/22
Complete01/24/22Brian DinkerMintoNDLTM 2604 LatitudesVilla 10APCMS.NDLTM10-A.CASTCRETEAdding Downrods
Brian Dinker:

9x1 down rods old 77 new 100
13x1 down rods old 15 new 8

Need fill in order for (23)9’x1’ down rods.

----------------------------------------------

PCMS.NDLTM10-A.CASTCRETE

Old Package Totals:
1x13 Dowels: 15
1x9 Dowels: 77

New Package Totals:
1x13 Dowels: 8
1x9 Dowels: 100
01/24/2201/24/22
Complete01/21/22Kyle JollyEncoreECRUN 020 Spectrum??***Adding 2x2x10 for Drip Edge
Kyle Jolly:

2x2 drip edge. Needed for drip edge. Not enough on po.

(40) 2x2x10 PT

----------------------------------------------------------

Proposal doesn't mention Drip Edge so not sure if this is included or excluded. There are 15 2x2x10 PT in this job on Frame Drop 3 but I don't see any in the takeoff that I found on the S Drive.

Old Package Totals:
2x2x10 PT:

New Package Totals:
2x2x10 PT:


Waiting to hear back from Sharon on what she thinks about this one. No changes made yet (Adam)
01/21/2202/11/22
Review01/20/22Brian DinkerRichmondNDLTM 2302 LatitudesVilla 5A***Precast Changes
Brian Dinker:

Precast is tight in length. Would like to change take off.

I would like to remove (2) 15’4” Precast headers
And add (2) 17’4” precast headers. I am getting barely making my bearing on 2 openings that are 14’8” wide.
I need a fill in order for (2) 17’4” precast.


15’4” precast old (3) new (1)
17’4” precast old (2) new (4)

---------------------------------------------------------------

Old Package Totals:
15'-4" Lintel: 3
17'-4" Lintel: 2

New Package Totals:
15'-4" Lintel:
17'-4" Lintel:

01/20/22
Complete01/19/22Steven GilbertRichmondROFLK 082 Forest LakeF924/AmmoliteM***Precast Changes
Steven Gilbert:

Precast wrong.

Remove (1) 5’10” precast
Add (1) 7’6” precast
Add (1) 6'-2" sill (added this over the phone)

---------------------------------------------------------------------------

PCMS.RA-Ammolite-F924-M.LOTTS

Old Package Totals:
5'-10" Lintel: 1
7'-6" Lintel: 1
6'-1" Sill: 1

New Package Totals:
5'-10" Lintel: 0
7'-6" Lintel: 2
6'-1" Sill: 2
01/19/2201/19/22
Review01/19/22Jeff RotertMintoNDLTS 1782 Latitudes50-184A***Precast Changes
Jeff Rotert:

Precast takeoff wrong.

Takeoff shows (1) 5-4 and we don’t need any, please remove
Takeoff shows (5) 4-6 and we need (6), please add (1)

Precast has Not been delivered yet to this lot.

--------------------------------------------------

I made the requested changes to the PO but didn't make any package changes here. Sending this to Estimating for review because I just did a package change on this model/elevation on 1/7/2022 for Jeff where he removed this 4'-6", now adding it back. Something is going on here (Adam).
01/19/22
Pete01/19/22Steven GilbertRichmondROASQ 004 Arlington SquareF9C1/AmethistC***Adding Katz
Steven Gilbert:

All metal packs need 100 Katz not 10 for all houses . According to the metal crew they need 100 Katz to complete install I’ve sent this in before please fix all takeoffs for the future

----------------------------------------------------------

I don't see any fill-ins for Kats (this many anyway). We had a package change where they went from 16" to 24" but nothing chaning the quantity (Adam).

----------------------------------------------------------

1/19/2022 - Waiting to confirm this w/ someone before changing the package here (Adam).

METALFRMMAT.RA-Amethyst-F9C1-A/B/C.INTERIOREXTERIOR

Old Package Total:
24" Katz: 7

New Package Total:
24" Katz: 100?
01/19/22
Complete01/18/22Dane JonesMattamy HomesMOMER 018 Meridian6-UnitMCAACM/CO*FRMMAT-DROP1.MOMER018.HAVENAdding 1x2x10 PT
Dane Jones:

Only receiving 50% of what is needed for 1x2x10. To complete the job we need 100 per unit.

Fill-In: 270) 1x2x10

---------------------------------------------------------------------

Confirmed with Angie that this was good to go. She said this is how much she originally had for the 1x2.


Old Package Totals:
1x2x10 PT: 330

New Package Totals:
1x2x10 PT: 600
01/18/22Angie01/19/22
Complete01/17/22Steven GilbertRichmondROFLK 078 Forest LakeF924/AmmoliteKPCMS.RA-Ammolite-F924-K.LOTTSPrecast Changes
Steven Gilbert:

Add precast and sill p.o. Incorrect. Takeoff error also I don’t think we need Durowall.

Add (1) 7’6” precast
Add (1) 6’2” sill
Remove durowall

----------------------------------------------------------

Old Package Totals:
7'-6" Lintel: 1
6'-2" Sill: 1
Duro Wall: 3

New Package Totals:
7'-6" Lintel: 2
6'-2" Sill: 2
Duro Wall: 0
01/17/2201/17/22
Complete01/17/22Steven GilbertRichmondROFLK 077 Forest LakeF926/EmeraldLPCMS.RA-Emerald-F926-L.LOTTSPrecast Changes
Steven Gilbert:

Change precast takeoff.

Remove (1) 3’6” precast
Remove (1) 2’2.5” sill

---------------------------------------------------------

Old Package Totals:
3'-6" Lintel: 1
2'-2.5" Sill: 1

New Package Totals:
3'-6" Lintel: 0
2'-2.5" Sill: 0
01/17/2201/17/22
Complete01/17/22John RathbunSurrey HomesSOFXH 061 Fox HammockCloverAAdding SPH4
John Rathbun:

Clover model package change / fill in.

Please add 30 SPH4 for a new total of 48 for both A and B elevations on the clover model . I am heading to pick up the 30 of these now.

------------------------------------------

HDW.SO-Clover-A.WHITECAP

Old Package Totals:
SPH4: 18

New Package Totals:
SPH4: 48


01/17/2201/17/22
Complete01/13/22Scott DeasonRichmondROMPT 019 Mattie PointeF913/PearlDSlab PrepRemoving 8 #5 20'
Scott Deason:

Please eliminate 8- #5’s 20’-0”
Package has 32 and there are 11 leftover

---------------------------------------------

SLABPREP.RA-PEARL-F913-D.HDSUPPLYORLANDO
SLABPREP.RA-PEARL-F913-D.LOTTSORLANDO

Old Package Total:
# 5 Rebar - 20' Length Grade 40: 32

New Package Total:
# 5 Rebar - 20' Length Grade 40: 24
01/13/2201/13/22
Complete01/13/22Nick CazaresMintoNDLTS 1758 Latitudes50-179APCMS.NDLTS50-179-APrecast Changes
Nick Cazares:

-PO calls for (10) 4’ 6” headers, plans call for (8). Need (2) 4’ 6” headers removed please

-PO calls for (1) 5’ 4” header, plans call for (2) 5’ 4” headers, need (1) more added to PO please.

-PO calls for (0) 8’ 0” header, plans call for (1) 8’ 0” header, need to add to PO please

-PO calls for (2) 9’ 4” headers, plans call for only (1) 9’ 4” header, need this added to PO

------------------------------------------------------------------

PCMS.NDLTS50-179-A.CASTCRETE
PCMS.NDLTS50-179-A.LOTTS

Old Package Totals:
4'-6" Lintel: 10
5'-4" Lintel: 1
8'-0" Lintel: 0
9'-4" Lintel: 2

New Package Totals:
4'-6" Lintel: 8
5'-4" Lintel: 2
8'-0" Lintel: 1
9'-4" Lintel: 1
01/13/2201/13/22
Complete01/12/22Jeff RotertMintoNDLTS 1757 Latitudes50-184BPCMS.NDLTS50-184-BPrecast Changes
Jeff Rotert:

Takeoff shows (0) 5-4, we need (1) please add
Takeoff shows (6) 4-6, we need (5), please remove (1)

Precast has not been delivered

----------------------------------------------------
PCMS.NDLTS50-184-B.CASTCRETE
PCMS.NDLTS50-184-B.LOTTS

Old Package Totals:
4'-6" Lintel: 6
5'-4" Lintel: 0

Old Package Totals:
4'-6" Lintel: 5
5'-4" Lintel: 1
01/12/2201/12/22
Review01/12/22Jeff RotertMintoNDLTS 1771 Latitudes50-181BPCMS.NDLTS50-181-BPrecast Changes
Jeff Rotert:

Precast takeoff wrong. Takeoff shows (0) and we need (1) 9-8 precast header for the back lanai per plan.

Precast has not been delivered yet.

----------------------------------------------------

We don't have a 9'-8" in the catalog and we've done multiple package changes on this model/elevation.

We removed (1) 11'-4" yesterday and now today short (1) 10'-6" so going to add this to the list for estimating to review.

Since I removed (1) 11'-4" yesterday I'm not sending the 10'-6" as a variance PO (Adam).
01/12/22
Review01/12/22Jeff RotertMintoNDLTS 1783 Latitudes50-181B***Precast Changes
Jeff Rotert:

Precast takeoff wrong

Takeoff (0) 9-8, we need (1) please add
Takeoff (8) 4-6, we need (7), please remove

----------------------------------------------------------

This conflicts with package changes made to the same model yesterday. Needs review (Adam)
01/12/22
Complete01/11/22Kyle JollyEncoreECRUN 048 SpectrumCustomCustomHDW-DROP1.ECSPC001.WHITECAPAdding Anchor Bolts & Washers
Kyle Jolly:

Detail 1/SD3 calls for 1/2” anchor bolts in all bearing walls
We did not receive any on take off. Will need to be added.

270 1/2” anchor bolts
270 2x2 square washers

------------------------------------------------

Note: WEDGE ANCHORS. Not Anchor Bolts.

ECSPC001
HDW-DROP1.ECSPC001.WHITECAP

Old Package Totals:
WA1285 Wedge Anchors: 170
WS22916 Washers: 170

New Package Totals:
WA1285 Wedge Anchors: 270
WS22916 Washers: 270
01/11/2201/11/22
Complete01/10/22Jeff SubbertMattamy HomesMOWAT 027 Waterbrooke8 UnitSACAACAC***Removing (2) 4'-6" Lintels
Jeff Subbert:

Take off calls for 3) 4’6” headers, when I only need 1) 4’ 6” header. Please adjust on takeoff for future thank you

----------------------------------------
PCMS.MOWAT27.LOTTSORLANDO

Old Package Totals:
4'-6" Lintel: 3

New Package Totals:
4'-6" Lintel: 1
01/10/2201/10/22
Complete01/10/22Nick CazaresMintoNDLTS 1752 Latitudes50-181B***Precast Changes
Nick Cazares:

Plans only call for (8) 4’ 6” headers, PO has (10) we need to remove (2) of these headers off the takeoff please.
Also plans call for (1) 5’ 4” header and PO has (0) on it and plans call for (0) 11’ 4” headers and the PO has (1)

Remove (2) 4’ 6” headers from PO
Add (1) 5’ 4” to PO
Remove (1) 11’ 4” from PO

-------------------------------------------

PCMS.NDLTS50-181-B.CASTCRETE
PCMS.NDLTS50-181-B.LOTTS

Looks like package change was already half-way done. The only thing I had to remove was the 11'-4". Everything else was already good.

Old Package Totals:
4'-6" Lintel: 8
5'-4" Lintel: 0
11'-4" Lintel: 1

New Package Totals:
11'-4" Lintel: 0
01/10/2201/10/22
Complete01/10/22Jeff RotertMintoNDLTS 1786 Latitudes50-179-IIB***Precast Changes
Jeff Rotert:

(2) 9-4 on takeoff, only need (1), please remove
(2) 5-4 on takeoff, only need (1), please remove
(7) 4-6 on take off, need (9) total, please add
(0) 7-8 door on takeoff, need (1), please add
(1) 13-4 on takeoff, need (0), please remove
(1) 6-8 door on takeoff, need (0), please remove

PRECAST PACK NOT DELIVERED YET

-----------------------------------------------------------------
PCMS.NDLTS50-179-II-B.CASTCRETE
PCMS.NDLTS50-179-II-B.LOTTS

Old Package Totals:
9'-4" Lintel: 2
5'-4" Lintel: 2
4'-6" Lintel: 8
13'-4" Lintel: 1
6'-8" Recess Lintel: 1
7'-6" Recess Lintel: 0

New Package Totals:
9'-4" Lintel: 1
5'-4" Lintel: 1
4'-6" Lintel: 9
13'-4" Lintel: 0
6'-8" Recess Lintel: 0
7'-6" Recess Lintel: 1
01/10/2201/10/22
Complete01/10/22Zane HeckMintoNDLTM 1840 LatitudesVilla 11AFrameAdding 2x6x16 R/S Spruce
Adam Sowers:

Zane submitted a To-Do saying that Rockafuerte took these from this job but they weren't in the package. Missing from the takeoff as well. He says he needs 12.

------------------------------------------------------
FRMMAT.NDLTM11-A.84LUMBER
FRMMAT.NDLTM11-A.BFS

Old Package Totals:
2x6x16 R/S Spruce: 0

Old Package Totals:
2x6x16 R/S Spruce: 12
01/10/2201/10/22
Complete01/07/22Mike Schlosser?EICHB Condo 002 Cape HarbourB1***Swapping Bar Ties w/ Tie Wire
Mike Schlosser:

Sudb contractor asked to wire rolls, instead of bar ties.

-------------------------------------------
*SLABPREP.EICHB1.LOTTS
*PCMS-DROP1.EICHB1.LOTTS
*PCMS-DROP2.EICHB1.LOTTS

Removing Bar Ties from the Pre-cast Cost-Groups.

Old Package Totals (SlabPrep, PCMS-Drop1&2)
8" Bar Ties: 3
Tie Wire #2 Roll: 0

New Package Totals (SlabPrep, PCMS-Drop1&2)
8" Bar Ties: 0
Tie Wire #2 Roll: 3
01/07/2201/07/22
Complete01/07/22Mike Schlosser?EICHB Condo 002 Cape HarbourB2***Swapping Bar Ties w/ Tie Wire
Mike Schlosser:

Sudb contractor asked to wire rolls, instead of bar ties.

-------------------------------------------
*SLABPREP.EICHB2.LOTTS
*PCMS-DROP1.EICHB2.LOTTS
*PCMS-DROP2.EICHB2.LOTTS

Removing Bar Ties from the Pre-cast Cost-Groups.

Old Package Totals (SlabPrep, PCMS-Drop1&2)
8" Bar Ties: 4
Tie Wire #2 Roll: 0

New Package Totals (SlabPrep, PCMS-Drop1&2)
8" Bar Ties: 0
Tie Wire #2 Roll: 4
01/07/2201/07/22
Complete01/07/22Nick CazaresMintoNDLTS 1753 Latitudes50-181A***Precast Changes
Adam Sowers:

Didn't have time to add this to the log yesterday when I completed this package change.

I ran a few of these yesterday and will have to go back though my emails and cost-groups to update.

----------------------------------------------
50-181-A (Precast Cost-Groups)

Note: We don't have a 5'-4" Lintel for Lotts Orlando in the catalog. I believe they may have discontued this size. I added (1) 5'-10" in lieu of the missing 5'-4" to the Lotts Cost-Group for this model/elevation (Adam).

(-2) 4'-6" Lintels
(+1) 5'-4" Lintels
(-1) 11'-4" Lintel

Old Package Totals:
4'-6" Lintels: 10
5'-4" Lintels: 0
11'-4" Lintels: 1

New Package Totals (Cast Crete):
4'-6" Lintels: 8
5'-4" Lintels: 1
11'-4" Lintels: 0

New Package Totals (Lotts):
4'-6" Lintels: 8
5'-10" Lintels: 1 (*in lieu of the 5'-4")
11'-4" Lintels: 0
01/07/2201/07/22
Complete01/07/22Jeff RotertMintoNDLTS 1788 Latitudes50-184A***Precast Changes
Jeff Rotert:

Takeoff has (6) 4-6 headers and we only need (5), please remove (1).

Takeoff has (0) 5-4 headers and we need (1), please add and ship


-----------------------------------------------------

PCMS.NDLTS50-184-A.CASTCRETE

Old Package Totals:
4'-6" Lintels: 6
5'-4" Lintels: 0

New Package Totals:
4'-6" Lintels: 5
5'-4" Lintels: 1


PCMS.NDLTS50-184-A.LOTTS

Old Package Totals:
4'-6" Lintels: 6
5'-4" Lintels: 0

New Package Totals:
4'-6" Lintels: 5
5'-10" Lintels: 1 (Added in lieu of the 5'-4")
01/07/2201/07/22
Complete01/07/22Jeff RotertMintoNDLTS 1787 Latitudes50-179-IIA***Precast Changes
Jeff Rotert:

Takeoff has (10) 4-6 and we only need (8), please remove (2)
Takeoff has (1) 8-8 and we need (2), please add one and ship

-----------------------------------------------------

PCMS.NDLTS50-179-II-A.CASTCRETE

Old Package Totals:
4'-6" Lintels: 9
8'-8" Lintels: 1

New Package Totals:
4'-6" Lintels: 8
8'-8" Lintels: 2

PCMS.NDLTS50-179-II-A.LOTTS

Old Package Totals:
4'-6" Lintels: 9
8'-8" Lintels: 1

New Package Totals:
4'-6" Lintels: 8
8'-8" Lintels: 2
01/07/2201/07/22
Complete01/06/22Jeff RotertMintoNDLTS X Latitudes50-181A***Precast Changes
Adam Sowers:

Didn't have time to add this to the log yesterday when I completed this package change.

I ran a few of these yesterday and will have to go back though my emails and cost-groups to update.

----------------------------------------------
50-181-A (Precast Cost-Groups)

Note: We don't have a 5'-4" Lintel for Lotts Orlando in the catalog. I believe they may have discontued this size. I added (1) 5'-10" in lieu of the missing 5'-4" to the Lotts Cost-Group for this model/elevation (Adam).

(-2) 4'-6" Lintels
(+1) 5'-4" Lintels
(-1) 11'-4" Lintel

Old Package Totals:
4'-6" Lintels: 10
5'-4" Lintels: 0
11'-4" Lintels: 1

New Package Totals (Cast Crete):
4'-6" Lintels: 8
5'-4" Lintels: 1
11'-4" Lintels: 0

New Package Totals (Lotts):
4'-6" Lintels: 8
5'-10" Lintels: 1 (*in lieu of the 5'-4")
11'-4" Lintels: 0
01/06/2201/07/22
on Hold01/05/22Jeff SubbertMattamy HomesMOSL2 027 Solara8-UnitQEFFFFEQ/MOAdding LVLs
Jeff Subbert:

LVL’s needed for headers that did not come or even is on takeoff. Please fix takeoff/PO accordingly so I do not have to do a to do fill-in on building 25–2 -Jeff Subbert

(2) 9 1/4 x 2 x 14’ LVL
(1) 9 1/4 x 2 x 8’ LVL

---------------------------------------------------------------------

1/5/2022 - Holding off on package change for now because Jeff is going to verify some things first.

The only LVLs that are in this job are:
(4) 1.75x9.25x8' LVLs, which matches the takeoff I found on the S drive. Pete has mentioned problems with estimating missing LVLs.

Old Totals:
1.75 x 9.25 x 8': 4
1.75 x 9.25 x 14': 0

New Totals:
1.75 x 9.25 x 8':
1.75 x 9.25 x 14':
01/05/22
Complete01/04/22Jeff RotertMintoNDLTS 1794 Latitudes50-179-IIAMASMAT.NDLTS50-179-II-A.FLBESTBLOCKORLANDOAdding Column & Boxcar Block
Jeff Rotert:

(24) 12”x8”x12” column block
(6) 12”x8”x16” boxcar

WHY ARE THESE STILL GETTING MISSED?

-------------------------------------------------------------------

Looks like a package change was made for this on another model, not on this one... So, addding it in now.

Old Count Totals:
12”x8”x12” column block: 0
12”x8”x16” boxcar: 0

New Count Totals:
12”x8”x12” column block: 24
12”x8”x16” boxcar: 6
01/04/2201/04/22
Complete12/30/21Nick CazaresMintoNDLTM 2610 LatitudesVilla 11BPCMS.NDLTM11-B.CASTCRETESwapping Flush Sills w/ HiDri's
Nick Cazares:

PO has Flush Sills. We don't use them out here, we use HiDris.

---------------------------------------------

Not sure how but the Cost-Group for the Villa 11-B has Flush sills. Swapping them all to HiDris (Adam)
12/30/2112/30/21
Complete12/28/21Steven GilbertRichmondROASQ 033 Arlington SquareF913/PearlDPCMS.RA-PEARL-F913-D.LOTTSORLANDOUpdating Precast
Steven Gilbert:

Fix precast on p.o. Wrong. Precast order is wrong.

Remove 13’4” precast
Add (2) 4’6” precast
Add (2) 3’1” sills

---------------------------------------------------

PO updated and re-released.
Ccost-Group updated.
12/28/2112/28/21
Complete12/28/21Kyle JollyEncoreECRUN 029 Spectrum******HDW-GENERAL.ECRUN-NOELEVATOR.WHITECAPAdding 5/8 Ply Clips
Kyle Jolly:

I don’t see plywood clips on take off
If they are in there remove all of them and replace with 5/8 clips. 2 boxes 5/8 plywood clips -Kyle Jolly

--------------------------------------------

Sent 2 boxes and added 2 boxes to the cost-group.
12/28/2112/28/21
Complete12/21/21SharonRichmondRORVC 050 River ChaseF914/Moonstone***ALL Options with Sand & Mortar (3CAR, COVP)***Remove Sand & Mortar, Add Pre-Blend
Adam Sowers:

Request came via email from Sharon about there being Sand and Mortar in the options on some of these jobs. Specifically, RORVC 050 River Chase.

After looking at all of the F914-F Templates there appear to be MANY incorrect options with sand and mortar instead of pre-belend.

I went through all of the new templates, marked *, and updated each option that I found sand and mortar.

We have TOO MANY variations of the same options w/ different vendors. This will make package changes extremely difficult / nerarly impossible. We have multiple variations of 3CARs, COVPs, with different variations of vendors as well.

I went through all ofi them and updated them where I saw sand or mortar and removed them both and added pre-blend. I added up all block and divided by 15 to get the # of PB Bags. I did not update taxes on them.
12/21/2112/21/21
Complete12/20/21Scott DeasonRichmondROMPT 013 Mattie PointeF9C1/AmethistCFRMMAT.RA-Amethyst-F9C1-C.HAVENRemoving (45) 2x4x108 Spruce Precuts
Scott Deason:

Please eliminate 45- 2x4x108-5/8” spruce precuts from this model.

-------------------------------------

Job Totals:
2x4x108 5/8 Spruce Precuts: 289

Cost-Group Totals:
2x4x108 5/8 Spruce Precuts: 289

New Cost-Group Totals:
2x4x108 5/8 Spruce Precuts: 244
12/20/21
Complete12/20/21Scott DeasonRichmondROMPT 008 Mattie PointeFC10/AzureBFRMMAT.RA-AZURE-FC10-B.HAVENRemoving (25) 2x4x14 SYP
Scott Deason:

Please eliminate 25 - 2x4x14 SYP. Had 40 leftover

-------------------------------------

Job Totals:
2x4x14 SYP: 120

Cost-Group Totals:
2x4x14 SYP: 108

New Cost-Group Totals:
2x4x14 SYP: 95


12/20/2112/20/21
Complete12/17/21Johnny VargasRichmondROLKS 049 Lake SmartF9C2/OnyxBF9C2-RA-COVPFixing Frame Materials
Johnny Vargas:

Missing 2x12x12 #2 Spruce for the back patio. Material arrived yesterday afternoon and I have my framer starting this morning I need this PO’s to be released as soon as possible so I could go and pick up the material as soon as possible.

+4 pieces of 2x12x12#2 Spruce.

------------------------------------------------------------------------------------------

After going over this with Chris Plantz and Johnny I've determined that a couple of things are going on here.

1) The COVP option was re-estimated on 11/29 but was never updated in BT.
2) Johnny needed 2x12x10 PT, not 2x12x12 spruce.

I had to make updates to each cost-group of materials in 3 different COVP Selections (multiple vendors). Too many changes to list them all so I'm only listing the frame changes:

Old COVP Frame Totals:
2 x 4 x 12' Spruce: 3
2 x 6 x 12' Spruce: 3
2 x 4 x 12' SYP: 3
2 x 4 x 16' SYP: 2
2 x 12 x 16' SYP: 2
7/16" x 4' x 8' OSB: 7

New COVP Frame Totals:
1 x 2 x 10 PT: 3
2 x 12 x 10 PT: 4
2 x 12 x 16 PT: 2
2 x 4 x 12 Spruce: 13
2 x 6 x 14 Spruce: 2
2 x 4 x 14 SYP: 10
7/16 OSB: 17

Updated:
F9C2-RA-COVP (HD, Titan, Lotts, Haven, CM)
F9C2-RA-COVP (Lot, Argos, Best, Haven)
F9C2-RA-COVP (Lot, Argos,MCM,Haven)
12/17/2112/17/21
Complete12/14/21Bobby NellerMinto***CottagesAllAll Cottages ***Adding Fire Rated CDX
Adam Sowers:

Adding 6 sheets of Fire Rated CDX to each Cottage.

1/2" CDX Fire Rated Counts: Old -- New
Cottage 1 - A: 56 -- 62
Cottage 1 - B: 56 -- 62
Cottage 1 - C: 56 -- 62

Cottage 2 - A: 68 -- 74
Cottage 2 - B: 68 -- 74
Cottage 2 - C: 68 -- 74

Cottage 3 - A: 62 -- 68
Cottage 3 - B: 62 -- 68
Cottage 3 - C: 62 -- 68

Cottage 4 - A: 56 -- 62
Cottage 4 - B: 56 -- 62
Cottage 4 - C: 56 -- 62

(Adam)
12/14/2112/14/21
Complete12/13/21Larry SimsSobel CoOFVMR 002 Villa Mar6 UnitType 3OFVMR - 6 Unit - Type 3 - Unit C-D-E-FAdding Garage Door Bucks
Larry Sims:

Garage door bucks not added to package.

12) 2 x 6 x 8 pt
6) 2 x 6 x 12 pt
Needs to be added to package for garage door bucks

-------------------------------------------------

Materials sent and added to the Template. No Cost-Groups for this one. (Adam)
12/13/2112/13/21
Complete12/13/21Larry SimsSobel CoOFVMR 002 Villa Mar6 UnitType 3OFVMR - 6 Unit - Type 3 - Unit C-D-E-FAdding CIP Deck Form Materials
Larry Sims:

Material needed to form deck and ribbon beams. Material needed to form cip deck:

50) 2 x 4 x 14 syp for deck and whalers
12) 2 x 6 x 12 syp for stairwells
40) 1 x 4 x 14 syp for recess
40) 4 x 8 x 3/4 form ply for deck and ribbon beam

-----------------------------------------------------

Went over this one with Sam as well and he said it's in the budget but needs to be broken out in the jobs. Since this 6-Unit, Type 3 isn't in BT the new way I am making the package changes to the template. Adding the materials to their own cost-group. (Adam)
12/13/2112/13/21
Complete12/13/21Larry SimsSobel CoOFVMR 002 Villa Mar6 UnitType 3OFVMR - 6 Unit - Type 3 - Unit C-D-E-FAdding 1x4x14 SYP
Larry Sims:

We need 1 x4x14 for bracing while flying trusses this should be added to the 6 unit building roof lumber pkg

40) 1 x 4 x 14 syp

---------------------------------------------

Went over this with Sam and he said to go ahead and send the materials and make the package change.

Note: There isn't a new template for this with Cost-Groups so I made the package change to the Template in BT (Adam).
12/13/2112/13/21
Complete12/13/21Dane JonesMattamy HomesMOMER 017 Meridian6 UnitMCAACM/PRFRMMAT-DROP1.MOMER17.HAVENAdding 1x2x10 PT
Dane Jones:

Each unit uses roughly 100 1x2x10 because of the ledger on the inside. 100 tapcons short for the strapping

300) 1x2x10
100) 1/4” x 2 3/4” tapcons

-----------------------------------------------------------

Materials sent. Went over this with Angie and she said she initially had 100 for each unit (600 total) for this so it was good to send.

Old Totals:
1x2x10: 300

New Totals:
1x2x10: 600
12/13/2112/13/21
Complete12/06/21Jonathan HimesToll BrothersTBWIP 001 WhippoorwillGrenacheMOFrame Drop 1 & 2 ***Changing LVLs
Jonathan Himes:

Original 1 Drop P.O.
(1) 1.75 x 7.25 LVL 14’

New 1st Drop P.O.
(1) 5-1/4” x 5-1/4” Parallam Post.

Original 2nd Drop P.O.
(2) 1.75 x 11.25 LVL 12’

New 2nd Drop P.O.
(0) 1.75 x 11.25 LVL 12’

Return:
(1) 1.75 x 7.25 LVL 14’
(2) 1.75 x 11.25 LVL 24’

--------------------------------------------------------

Package Changes:

Drop 1 Old Totals:
1.75 x 7.25 LVL 14’: 1
5-1/4” x 5-1/4” Parallam: 0

Drop 1 New Totals:
1.75 x 7.25 LVL 14’: 0
5-1/4” x 5-1/4” x 16' Parallam: 1

Drop 2 Old Totals:
1.75 x 11.25 LVL 12’: 2

Drop 2 New Totals: 0
12/06/2112/06/21
Complete12/02/21Jeff RotertMintoNDLTS 1802 Latitudes50-184B***Adding Column & Boxcar Block
Jeff Rotert:

(2) front columns need 12” block to build.

Please get with estimating to see how many is required for this product and expedite

------------------------------------------------------

The plans call for 8x12 columns but Jeff says that's not how they've been getting built in the field. He thinks they've been taking block from the villas or cottages.

Sam reviewed and approved. Sent the materials and now making the package change.

MASMAT.NDLTS50-184-B.FLBESTBLOCKORLANDO:
Old Count Totals:
12"x12" Block: 0
Boxcar Block: 0

New Count Totals:
12"x12" Block: 24
Boxcar Block: 6
12/02/2112/02/21
Complete11/30/21Jeff SubbertMattamy HomesMOWAT 030 Waterbrooke6-UnitCCCCCS/COFRMMAT-DROP1.MOWAT30Adding Furring Strips
Jeff Subbert:

Po It’s calling for 120 thereabouts one by twos furring strips for this building I’m going to need around 400 please go back to print to get the exact count keep in mind anything on a party wall gets double furring strips due to the two by ledger on top

-----------------------------------------------------

Job only has (120) 1x2x10 PT in Frame D-1.
Which matches the takeoff on S Drive.

Jeff says nowhere near enough and referenced lot 026 - Same situaiton and I sent an additional 350.

Old Total: 120
New Total: 450
>requested change to 470 but putting 450 for now and will update accordingly (Adam)
11/30/2111/30/21
Complete11/30/21Jeff SubbertMattamy HomesMOWAT 029 Waterbrooke4-UnitSAAC/COFRMMAT-DROP1.MOWAT29.84LUMBERAdding Furring Strips
Jeff Subbert:

1“ x 2“ furring strip needed roughly 200.
See notes in need of furring strips PO calls for 80 please go back to print keep in mind I’ll party walls are double due to two by ledger -Jeff Subbert

------------------------------------------------------

Sent 200.

FRMMAT-DROP1.MOWAT29.84LUMBER:

1x2x10 PT Totals:
Old Total: 80
New Total: 280

(Adam)
11/30/2111/30/21
Complete11/30/21Kyle JollyEncoreECRUN 048 SpectrumCustom48FRMMAT-DROP3.ECSPC001.BFSAdding 2x6x10 SYP to FD3
Kyle Jolly:


Package change and fill in. Needed for walls of third floor. Need to add this to 3rd lumber drop.

(+40) 2x6x10 Syp

-------------------------------------------------

Sent (40) 2x6x10 SYP (Fill-In)

FRMMAT-DROP3.ECSPC001.BFS:

2x6x10 SYP Counts:
Old Totals: 65
New Totals: 105

(Adam)
11/30/2111/30/21
Complete11/29/21Carlos GarciaRichmondROMPT 029 Mattie PointeF926/EmeraldCFRMMAT.RA-Emerald-F926-C.HAVENRemoving (36) 1x2
Carlos Garcia:

48 sticks left over, please take out 36-this should leave us with 164 PCs total.

----------------------------------------------

Old Totals:
1x2x10 PT: 200

New Totals:
1x2x10 PT: 163
11/29/2111/29/21
Complete11/23/21Dane JonesRichmondROSPN 065 Southern PinesF913/PearlMFRMMAT.RA-Pearl-F913-M.HAVENAdding missing lumber
Dane Jones:

Need more lumber to finish. PO is short on material -Dane Jones
60- 2x4x16 spruce
20- 2x4x16 syp
1- 2x12x16 syp
30- 1/4x 2 1/2” tapcon

------------------------------------------------

Determined that this is a data/entry error because the items are in the takeoff that I found on the S Drive but not in the job for some reason.

Takeoff on S Drive vs Job Total:
>2x4x14 spruce: 83 vs 0
>2x4x14 syp: 105 vs 71
>2x12x8 syp: 5 vs 0

Package Changes:
>2x4x14 spruce: changed from 0 to 83
>2x4x14 syp: changed from 71 to 105
>2x12x8 syp: changed from 0 to 5
11/23/2111/24/21
Complete11/19/21Carlos GarciaRichmondROFOR 012 Forest GateF935/HawthorneAHardware***Removing Sill Seal
Carlos Garcia:

Cannot believe I have to say this but please remove this from the takeoff, we do not use this ever we are at the end of the community and I am still seeing it.

-------------------------------------------

Quick check at the F935/Hawthorne Cost-Groups and they all appear to have Sill Seal. If they've submitted package changes for this previously it wasn't on this model.

Package Change:
Removed ALL Sill Seal from:

HDW.RA-Hawthorne-F935-A.CONSTRUCTIONMATERIALS

HDW.RA-Hawthorne-F935-B.CONSTRUCTIONMATERIALS

HDW.RA-Hawthorne-F935-C.CONSTRUCTIONMATERIALS

(Adam)
11/19/2111/19/21
Complete11/17/21Jonathan HimesToll BrothersTBLPT 033 Laurel PointMarsanne/FarmhousePCMS.TB-MARSANNE-FARMHOUSE.LOTTSORLANDOSwapping WR Sills for HiDris
Jonathan Himes:

Return and replace + Package change.

Package change
Original P.O.
(8) 3’-1” Wind resistant Flush Sills
(2) 4’-5” Wind resistant Flush Sills
(2) 5’-0” Wind resistant Flush Sills
(2) 6’-2” Wind Resistant Flush Sills

New P.O.
(8) 3’-1” 3 Step Flush Sills
(2) 4’-5” 3 Step Flush Sills
(2) 5’-0” 3 Step Flush Sills
(2) 6’-2” 3 Step Flush Sills

-------------------------------------

Swap complete on Cost-Group Adam)
11/17/2111/17/21
Complete11/17/21Zane HeckMintoNDLTS 1871 Latitudes50-179-IIBLINCON.NDLTS50-179-II-B.ARGOSLATITUDES, LINTELPUMP1st.NDLTS50-179-II-BReducing Lintel Concrete
Zane Heck:

Package change

1871 has a P.O for 19 yards. The only lintel out here that takes 19 is the villas. Just want to verify that this is correct or if it needs changed.

On the 50 series (3 car garage) we usually poor 13 yards. Just want to verify that 19 yards is correct for single families.

-----------------------------------------------------------------

Other Lots(same model/elevation):
1740, 1729, 1728, 1724

19 yards is what's in the takeoff for Lintel Concrete on the 50-179-II-A that I found in the Estimating folder. This job is a 50-179-II-B and I can't find the takeoff for that one.

Making the package change because all of the other above lots have poured less. Changing from 19 to 13 (Adam)

Updated Cost-Groups:
LINCON.NDLTS50-179-II-B.ARGOSLATITUDES
>Changed from 19 CY to 13 CY

LINTELPUMP1st.NDLTS50-179-II-B
>Changed from 9 CY to 3 CY (Over 10 Yards line-item)

11/17/2111/17/21
Complete11/16/21Jonathan HimesToll BrothersTBWIP 002 WhippoorwillCorbeilMOHDW.CORBEIL-MODERN.CONSTRUCTIONMATERIALSSwapping HUC212-2 to HUC212-3
Jonathan Himes:

Need to pick up the HUC212-2.
Deliver a HUC212-3.

Original P.O. : (0) HU212-2
New P.O. (1) HUC212-3

------------------------------------------------

Updated the Cost-Group. Removed (1) HUC212-2 and added (1) HUC212-3.
11/16/2111/16/21
Review11/16/21Brian DinkerMintoNDLTS 1863 Latitudes50-184BMissing Precast for Shower?
Brian Dinker:

Package change/ missing option shower window.

There’s an optional shower window we are missing the precast and sill on. I’ve notice this coming up a lot. We are missing the(1) 5’4” precast and 48” window sill. The (1) 4’6” precast and 3’1” window sill is removed for it.


Need 5’4” precast and 48” hi and dri sill

-------------------------------------------------------------

Sent the two items Brian was asking for. Sent to bids for review from estimatin (Adam)
11/16/21
Review11/16/21Jonathan HimesToll BrothersTBWIP 002 WhippoorwillCorbeilMOFRMMAT-DROP1.CORBEIL-MODERN.84LUMBERAdding Parallams
Jonathan Himes:

Original Package P.O.

(0) 3-1/2” x 3-1/2” x 10’ Parallam Post
(1) 3-1/2” x 5-1/4” x 10’ Parallam Post
(4) 5-1/4” x 5-1/4” x 10’ Parallam Post

New Package P.O.

(1) 3-1/2” x 3-1/2” x 10’ Parallam Post
(2) 3-1/2” x 5-1/4” x 10’ Parallam Post
(5) 5-1/4” x 5-1/4” x 10’ Parallam Post

Fill-In
(1) 3-1/2” x 3-1/2” x 10’ Parallam Post
(1) 3-1/2” x 5-1/4” x 10’ Parallam Post
(1) 5-1/4” x 5-1/4” x 10’ Parallam Post
(1) 2x12x12 SYP
(30) 2x4x16 SYP
(40) 2x4x16 White
( 30 ) 2x4x10 pt

-------------------------------------------------------

Materials sent. Added for review for now (Adam)
>Parallams Change
11/16/21
Review11/16/21Jeff SubbertMattamy HomesMOSL2 026 Solara4-UnitQFEQ/FTHDW.MOSL26.CONSTRUCTIONMATERIALSAdding MGT & HDU4
Jeff Subbert:

On the Set of structural plans in three places on the second floor calls for note 14 which cars for (1) MGT and (1) HDU4 for each specified point.

Jeff says he needs 3 of each.

--------------------------------------------------

Materials sent, no other changes made. Need to determine if this was estimated prior to having structurals or if the plans changed (Adam)
11/16/21
Complete11/11/21Jonathan HimesToll BrothersTBWIP 007 WhippoorwillCorbeilMOPCMS.CORBEIL-MODERN.LOTTSORLANDOWrong Sills, Swapping with HiDris
Jonathan Himes:

Package change. Need to return all. 2 step window sills delivered and replace with 3 step per detail in blue prints.

(2) 2.5 Wind Resistant Flush Sill
(2) 3’-1” Wind Resistant Flush Sill
(2) 4’-5” Wind Resistant Flush Sill
(2) 5’-0” Wind Resistant Flush Sill
(2) 6’-2” Wind Resistant Flush Sill


Please return and replace the Recess Door Headers below with 8” headers per plan.

(1) Pre Cast 8” U Recess Lintel 7’-6”
(1) Pre Cast 8” U Recess Lintel 4’-4”


-------------------------------------------------

Jonathan said they let it slide on all but 3 buildings. Swapping out all Wind Resistant Flush Sills with HiDris and replace 2 Recess Lintels with normal headers (Adam)

Removed (1) 7'-6" Recess Lintel.
Added (1) 7'-6" Header for a new total of: 3 (old: 2)
11/11/2111/11/21
Review11/11/21Josh CountsCC HomesCCMA6 059 Maple Ridge55-H1HardwareHUS26, HHUS46, HHUS26-2
Josh Counts:

Hardware was not delivered. Items not listed on PO.

(2)-HUS26
(34)-HHUS46
(4)-HHUS26-2

-------------------------------------------------------------

materials sent.
Sending to bids@ for review.
11/11/21
Complete11/11/21Jeff RotertMintoNDLTS 1863 Latitudes50-184BSLABPREP.NDLTS50-184-BAdding 1x4 Dowels
Jeff Rotert:

Fill-In & Package Change?
Need (17) 1x4 dowels for slab prep

----------------------------------------------

Jeff never submits old count new count totals when he submits these and rarely answers his phone.

Adding 17 dowels to the Slab Prep Material Cost-Group.

Old Cost-Group Totals:
1x4 Dowels: 85

New Cost-Group Totals:
1x4 Dowels: 99
11/11/2111/12/21
Complete11/11/21Jeff RotertMintoNDLTS 1860 Latitudes40-176ASLABPREP.NDLTS40-176-AAdding 1x4 Dowels
Jeff Rotert:

Fill-In & Package Change?
Need (16) 1x4 dowels for slab prep.

----------------------------------------------

Jeff never submits old count new count totals when he submits these and rarely answers his phone.

Adding 16 dowels to the Slab Prep Material Cost-Group.

Old Cost-Group Totals:
1x4 Dowels: 63

New Cost-Group Totals:
1x4 Dowels: 79
11/11/2111/11/21
Complete11/11/21Jeff RotertMintoNDLTS 1862 Latitudes50-184ASLABPREP.NDLTS50-184-AAdding 1x4 Dowels
Jeff Rotert:

Fill-In & Package Change?
Need (14) 1x4 dowels for slab prep

----------------------------------------------

Jeff never submits old count new count totals when he submits these and rarely answers his phone.

Adding 14 dowels to the Slab Prep Material Cost-Group.

Old Cost-Group Totals:
1x4 Dowels: 85

New Cost-Group Totals:
1x4 Dowels: 99
11/11/2111/11/21
Complete11/10/21John RathbunSurrey HomesSOSVL C08 Savannah LandingPearlBHDW.SO-Pearl-BAdding Hardware
John Rathbun:

Please make the following changes to the pearl model B elevation.

Add 30 MTS12 for a new total of 80
Add 50 SPH4 for a new total of 150
Add 2 LSTA36 for a new total of 2 .

---------------------------------------------------
Old Cost-Group Totals:
MTS12: 50
SPH4: 100
LSTA36: 0

New Cost-Group Totals:
MTS12: 80
SPH4: 150
LSTA36: 2
11/10/2111/10/21
11/10/21Zane HeckMintoNDLTS 1712 Latitudes40-175BPCMS.NDLTS40-175-BAdding 19'-4" Lintel
Zane Heck:

Need (1)19’ 4” precast header to finish house.

---------------------------------------------------

Confirmed with Sam that this job/pacakge is missing (1) 19'-4" Lintel, and has one too many 17'-4" Lintels.

Package Change:
Cast-Creete Cost-Group was already updated with these package changes.

Made the following changes to the Lotts Cost-Group:

Old Totals:
19'-4": 0
17'-4": 2

New Totals:
19'-4": 1
17'-4": 1
11/10/2111/10/21
Complete11/09/21John RathbunSurrey HomesSOSVL A08 Savannah LandingHarborAFRMMAT.SO-Harbor-A.BFSRemoving 25 sheets of OSB
John Rathbun:

Harbor model package change.

Please remove: 25 sheets of 5/8 4x8 OSB for a new total of 153.

---------------------------------------

Old Cost-Group Totals:
5/8x4x8 OSB: 178

New Cost-Group Totals:
5/8x4x8 OSB: 153
11/09/2111/09/21
Complete11/09/21Joey RamosMattamy HomesMOMER 020 Meridian5-UnitCACAC/PRMASMAT.MOMER20Adding Boxcar Block
Joey Ramos:

Guys cutting to much block. And we were paying them.

(16)pcs 12x8x16 per unit.
5 unit total (80) pcs


-------------------------------------------------------------------

There are currently no 12x8x16 Boxcar Block in this job, takeoff, or template/cost-groups.

Sent Fill-In for 80 pieces. Sending an email to Estimating for Package Change Review before making any changes.
(Adam)

Update: Angie said Yes for this elevation only.
Adding 80 Boxcar Block to the MOMER020 Masonry Cost-Group.

11/09/21per Angie11/09/21
Complete11/08/21Dane JonesRichmondROSPN 054 Sourthern PinesF936/PalmK3CAR OptionAdding 12" Block
Dane Jones:

Package change for ALL of the Palm 3 car garage models.

16 piece’s of 12” block needed for both sides of the 1 car garage.

3CAR Option Pacakge Totals:
12" Column Block: 0

New Totals:
12" Column Block: 16
11/08/2111/08/21
Complete11/05/2184 LumberToll BrothersTBLPT 033 Laurel PointMarsanne/FarmhouseTB-MARSANNE-FARMHOUSESwapping 5/8" Zip with CDX
Adam Sowers:

Got an email from Shawn @ 84 Lumber asking if the 5/8" Zip in the two Frame POs should be CDX like the other Toll Brothers jobs.

Job Information says Grenache - MO but Cost-Groups are Marsanne/Farmhouse.

Cost-Group & Option Updates:
Swapped out 139 sheets in Frame Drop 1.
Swapped out 68 sheets in Frame Drop 2.
Swapped out 19 in the EXTCOVP Option.
Swapped out 9 in the EXTMBR Option.
11/05/2111/05/21
Complete11/05/21Marcos ChicoRichmondROSPN 033 Southern PinesF936/PalmLALL Pine & Palm Elevations ***Add 45 degree Butterfly Block
Marcos Chico & Dane Jones:

Dane initially requested we add (25) 45 degree butterfly block to ALL Palm & Pine Elevations.

It looks like I added them to the F936 & F937 L's but none of the others. There is a note saying I was waiting to confirm something with Marcos but I can't remember exactly what that was.


F936/Palm (A,B,C,K) Cost-Group Totals:

45 Degree Butterfly Block:
Old Totals: 0
New Totals: 25

F937/Pine (A,B,K,M) Cost-Group Totals:
Old Totals: 0
New Totals: 25
11/05/2111/05/21
Complete11/03/21Dane JonesRichmondROSPN 043 Southern PinesF916/Ruby-IIKMASMAT.RA-Ruby-II-F916-K.TITANORLANDORemoving Pre-Blend
Dane Jones:

Please remove 15 bags of pre blended mortar for all ruby models.

---------------------------------------------------------------

Job / F916/Ruby-II K Totals:
Pre-Blend: 145 Bags

New Cost-Group Totals:
Pre-Blend: 130 Bags

Note: I only made this change on this model/elevation for now (Adam)
11/03/2111/03/21
Complete11/03/21Dane JonesRichmondROSPN 042 Southern PinesF927/SlateKMASMAT. RA-Slate-F927-KRemoving Pre-Blend
Dane Jones:

Package change for all slate models. Please remove 15 bags of pre blended mortar from the slate model PO.

---------------------------------------------------------------

Job Totals:
Pre-Blend: 147 Bags

New Cost-Group Totals:
Pre-Blend: 132 Bags

Note: I only made this change on this model/elevation for now (Adam)
11/03/2111/03/21
Complete11/02/21David PurvisRichmondROPAL 356 PalisadesF927/SlateGOption: 3CARMissing Block Labor
David Purvis:

Block masons saying they should be getting paid for 3CAR block labor. Nothing in the option on this job.

--------------------------------------------------------

Found a file in the estimating folder where it looks like things were re-calcuated on 10/14 for the 3CAR on this model for certain elevations.

I added a Block Labor line-item to each 3CAR option on the F927-A Template (where all the options are located).
11/02/2111/02/21
Complete10/29/21Steven GilbertRichmondROASQ 026 Arlington SquareF9C1/AmethistCFRMMAT.METALINTERIOR.RA-Amethyst-F9C1-A/B/C.HAVENRemoving Frame Materials
Steven Gilbert:

Lumber package change.
For metal stud house only.

To many studs and bottom and top plates

Remove (80) 2x4x108 5/8” spruce precuts
Remove (10) 2x4x14’ spruce
Remove All 2x4x14’ PT
Remove (25) 2x4x14’ SYP

--------------------------------------------------------

OLD Count Totals:
2x4x14’ PT: 29
2x4x108 5/8” spruce: 180
2x4x14’ spruce: 46
2x4x14’ SYP: 80

NEW Count Totals:
2x4x14’ PT: 0
2x4x108 5/8” spruce: 100
2x4x14’ spruce: 36
2x4x14’ SYP: 55
10/29/2110/29/21
Complete10/29/21Steven GilbertRichmondROASQ 025 Arlington SquareFC10/AzureAFRMMAT.METALINTERIOR.RA-AZURE-FC10-A.HAVENRemoving Frame Materials
Steven Gilbert:

To much lumber left over

Remove 36 1x2x10’ PT
Remove 25 2x4x14’ SYP
Remove 11 2x4x10’ SYP

----------------------------------------------------------

OLD Count Totals:
1x2x10’ PT: 167
2x4x14’ SYP: 96
2x4x10’ SYP: 31

NEW Count Totals:
1x2x10’ PT: 131
2x4x14’ SYP: 71
2x4x10’ SYP: 20
10/29/2110/29/21
Complete10/28/21John RathbunSurrey HomesSOSVL C08 Savannah LandingPearlBPCMS.SO-Pearl-B.LOTTSORLANDOPrecast Changes
John Rathbun:

Pearl model elevation B precast package change

Please remove three 2-2.5 sills for a new total of 6 from the pearl model B elevation only.
These are to small for the opening .
Please add three 37” sills for a new total of 9 to the pearl model B elevation only.

Sills to short For the rough opening

---------------------------------------------------------
PCMS.SO-Pearl-B.LOTTSORLANDO:

Old Count Totals:
2'-2.5" WR Sill: 9
3'-1" WR Sill: 6

New Count Totals:
2'-2.5" WR Sill: 6
3'-1" WR Sill: 9
10/28/2110/28/21
Complete10/27/21Steven GilbertRichmondROFLK 199 Forest LakeFC11/RubyMFRMMAT.RA-Ruby-FC11-M.HAVENMissing Top & Bottom Plate Lumber
Steven Gilbert:

The lumber was delivered with no tip or bottom plates for the wallls. Please create p.o. To get the bottom and top plates please.

----------------------------------------------------------------

I compared the job to the takeoff I found in the Estimating folder and the job appears to be missing a lot of lumber.

Here's what was missing from the Cost-Group:

2x4x12 PT: 27
2x6x12 PT: 3
2x4x8 Spruce: 4
2x4x14 Spruce: 57
2x6x16 Spruce: 2
2x8x8 SYP: 2

I sent the above as a Fill-In on ROFLK#199 and added all of the above materials to the Cost-Group in the BT Catalo (Adam)
10/27/2110/27/21
To-Do10/26/21Jonathan HimesToll BrothersTBWIP 005 WhippoorwillCorbeilFH***Adding 2 Parallams
Jonathan Himes:

Package Change
(2) 5-1/4”x 5-1/4” Parralam Post [ (3) on old PO, (5) on new PO ]

Package change
(1) HU212-2 [ 0= before change; 1= after]

--------------------------------------------------------------

There are (3) in the package on this job.
There are (3) in the Cost-Group.
Requested Package Change: +2

Update 9/27:
Added the HU212-2 to this packlage.
None of the other materials have any quantity in this Cost-Group. Need to reach out to Pete.

9/26:
NO CHANGES MADE.
Cost-Group in the Catalog has 0 quantity for every item for some reason. Going to contact Pete to see if he's working on this one or something.

10/26/21
Complete10/26/21Jeff SubbertMattamy HomesMOSL2 023 Solara4-UnitQEFQ/MOPCMS.MOSL23.LOTTSORLANDOAddind 1x9 Dowels
Adam Sowers:

PO is only con for 12 9 x 1 dowels for the main building? He only calls for (12) 9 x 1 dowels.

9 x 1 dowels for main building

--------------------------------------------------

The spreadsheet on the S Drive for this Unit Mix has (128) 1x9 Dowels. There are only 12 in the job and cost-group.

Sent materials as data entry error.
New Total for 1x9 Dowels: 128
10/26/2110/26/21
Complete10/21/21Jeff SubbertMattamy HomesMOWAT 026 Waterbrooke6 UnitSCAACS/COMOWAT26Adding furring and posts
Jeff Subbert:

Po calls for only (120) furring strips, I’ll party walls have a 2 x 8 ledger. Therefore I need double the furring strips to match the thickness of the 2 x. Need (350) more 1 x 2 x 10 pt
PO calls for (8)parallams but I also need (2)4 x 6 posts

350) 1 x 2 x 10 pt
2) 4 x 6 x10 posts

-----------------------------------------------------------

Job Totals:
1 x 2 x 10 pt: 120
4 x 6 x10 posts: 0

New Totals:
1 x 2 x 10 pt: 470
4 x 6 x10 posts: 2

10/21/2110/21/21
Complete10/20/21John RathbunSurrey HomesSOSVL A03 Savannah LandingHarborA***Hardware Changes
John Rathbun:

Please add 40 mts12 for a new total of 60.
I will be picking these up the 40 MTS12 tomorrow morning.
I also need 8 HUS26 .
This is a truss to truss connection that was not delivered with the truss pack.
We also need to remove sill seal And HETA20 from hardware on this template .
We do not use sill seal .
HETA20 are used at lintel pour.

-----------------------------------------------------

Cost-Group for Harbor-A updated (Adam)
10/20/2110/20/21
Complete10/19/21Johnny VargasRichmondRORVS 039-04 RiverstoneF924/AmmoliteB***Sub Floor Adhesive
Johnny Vargas:

Missing Sub Floor Adhesive.

--------------------------------------------------------------

(16) in TOS in the Estimating Folder but none in the Job/POs/Template. Sent this fill-in on a couple lots as a normal PO instead of a variance.

Added (16) SFA to the F924-B Cost-Group.
10/19/2110/19/21
Complete10/19/21Jonathan HimesToll BrothersTBWIP 006 WhippoorwillGrenacheMO***Adding 2x4x15 SYP & Spruce
Jonathan Himes:

Lumber fill-In and package change.
(50) 2x4x16’ SYP
(60) 2x4x16’ Spruce
(2) MSTC-28 flat strap

SYP is short for truss engineering and details for cross bracing, 45 degree bracing. Spruced is short for tray ceilings and interior walls.

------------------------------------------------------

Job Totals:
2x4x16 SYP:
>Drop 1: 55
>Drop 2: 35
2x4x16 Spruce:
>Drop 1: 0
>Drop 2: 0

Takeoff / Spreadsheet Totals:
2x4x16 SYP:
>Drop 1: 45
>Drop 2: 35
2x4x16 SYP:
>Drop 1: 55
>Drop 2: 35


Send the requested materials and sent down the line for review by estimating (Adam)
10/19/21per Chad10/19/21
Complete10/19/21Johnny VargasRichmondRORVS 021-10 RiverstoneF924/AmmoliteB & C***Adding (4) 2x6x10 PT
Johnny Vargas:

All my Ammolite style homes the take off list are being short with these material. I’ll be heading to the vendor to pick these items in an hour from now please make a pos for this one.

4 pieces of 2x6x10 pressure treated studs.

---------------------------------------------------

There is currently no 2x6x10 PT in this job/template. It has been requested/sent on multiple ammolite jobs.

Added 4 to the F924-B Cost-Group.

Other Lots with 2x6x10PT Fill-Ins:
RORVS:
>#025 - F924-C (Added 4 to Cost-Group)
>#023 - F914-F (No Change to Cost-Group)
10/19/2110/19/21
Complete10/18/21Nick CazaresMintoNSLTM 1828 LatitudesVilla 11A***Changing Sills to HiDris
Nick Cazares:

We do not get wind resistant flush sills, only Hi-Dri sills.
We only get Hi-Dri sills, no flush sills

-----------------------------------------------------------------

Sills swapped out on the job and updated the Cost-Groups (Adam).
10/18/2110/18/21
Complete10/14/21Jonathan HimesToll BrothersTBWIP 005 WhippoorwillCorbeilFH***Adding Sub-Floor Adhesive
Jonathan Himes:

Create P.O. and package change for this lot and model. Need to add sub floor adhesive as soon as possible. Matthew is getting a ticket ready for me now with 16 tubs matching Lot 6.

----------------------------

No SFA in the job.

There are 30 SFA in the spreadsheet under TOLL BROTHERS\TBWIP 005 - Template List Material for BT.xlsx

Sent 30. Adding 30 to Cost-Group (Adam).
10/14/2110/14/21
Complete10/14/21John RathbunSurrey HomesSOSVL A03 Savannah LandingHarborA & B***Adding SPH6
John Rathbun:

Please add 30 SPH6 to the Harbor model both Elevations
for a new total of 63 pieces .
I need a fill in of 50 pieces of SPH6 .
I will be picking this up from CM.


-------------------------------------------

SOSVL A03 SPH6 Totals:
SPH6: 36

New Total A & B: 63
10/14/2110/14/21
Complete10/13/21Adam SowersRichmondRORVS 027-04 RiverstoneF926/EmeraldAllAll (Old & New)TOO MANY Tapcons
Adam Sowers:

I noticed this HW PO had 48 BOXES of Tapcons.
Updated all of them to singles. Every single template for this model had boxes instead of singles.
10/13/2110/13/21
Complete10/13/21Adrian HartBella Vista Building GroupBVSOD 002 SODO House6-UnitABCCBABVSOD House / 6-Unit (ABCCBA)Switching Lintel to 4000 PSI
Adrian Hart:

Lintel Concrete Change:
We need to change po bvsod002-0009 from 3000psi to match beam concrete 4000psi. There is not really a good way to pour beams independently, everything should be poured at the same time with the same 4000 psi mix.

------------------------------------------------------

Original Lintel Concrete PO Voided. New PO issued.
10/13/2110/13/21
Complete10/13/21Jeff SubbertMattamy HomesMOWAT 026 Waterbrooke6-UnitSCCAAA/CO***Removing LVLs
Jeff Subbert:

Remove LVLs from all Waterbrooke jobs. They come with the truss packages now.

--------------------------------------

Removed LVLs from the following:

MOWAT26.84LUMBER: 6

Released a Material for Return/Credit PO on MOWAT 026 to return 5 LVLs per Jeff Subbert.
10/13/2110/13/21
Complete10/13/21Johnny VargasRichmondRORVS 039-04 RiverstoneF924/AmmoliteA & B***Removing Duro Wall
Johnny Vargas:

Ammolite style homes. Their not being used the material is being taken to the bone yard. Please have them taken back. It will be in lot #39-04 please change order on all Ammolite style homes. Regarding on both community Riverstone and Lake Smart. I will have all of them located on lot#39-04 for easy pickup. Thank you.

--------------------------------------------------------------

Material for Return / Credit: 9 Bundles

Old Package Total: 3
New Package Total: 0

Updated A & B Elevations.
10/13/2110/13/21
Complete10/12/21John RathbunSurrey HomesSOSVL A03 Savannah LandingHarborA & B***Removing 5 Yards
John Rathbun:

Harbor model package change A&B elevations.

Please remove 5 yards for a new total of 12 yards on the harbor model.

-------------------------------------------------
Current Lintel Concrete Totals
Harbor A: 17
Harbor-B: 17

New Lintel Concrete Totals
Harbor A: 12
Harbor-B: 12

Updated Line Pump Labor as well.
10/12/2110/12/21
Complete10/12/21Jeff SubbertMattamy HomesMOWAT 030 Waterbrooke6-UnitCCCCCS/CRRemove Duro Wall
Jeff Subbert:

Do not need dura wall. I do not see anywhere where I would need dura wall. I have no stack joints.

-------------------------------------------------

Current Totals in MOWAT030:
Duro Wall: 5 Bundles

Removed Duro Wall from all MOWAT Cost-Groups and Templates (Adam)
10/12/2110/13/21
Complete10/11/21Jason BridgesDream FindersROSPH 085 Park HillFC10/AzureB***Removing 12 2x4x14 SYP
Jason Bridges:


Please remove (12)2x4x14 syp from take off on azure “b” elevations

120-12=108 2x4x14 syp new total

---------------------------------------

Updated Cost-Groups for FC10-B.
10/11/2110/11/21
Complete10/11/21Jeff RotertMintoNDLTS 1732 Latitudes50-179-IIA***Adding 2x6x16 R/S Spruce
Jeff Rotert:

Need (6) 2x6x16 R/S Spruce added to the pacakge.

---------------------------------------------------------

Package has a total of (29) currently.
New Total: 35
10/11/2110/11/21
Complete10/11/21John BurkettMattamy HomesMOMER 014 Meridian4-UnitCAAC/CR***Adding 1x2x10 PT
John Burkett:

Previous package change for furring strips. Need 200 total please.
98 were on this PO.Did package changes on bldg 15-16.

------------------------------------------------

No BT Template for this Unit Mix. Made the package change to the Cost-Group (Frame Drop 1)
10/11/2110/11/21
Complete10/08/21Johnny VargasRichmondCommunityAllAll***Removing 1 Box of Ply Clips
Johnny Vargas:

Remove 1 Box of Ply Clips from all models/elevations that have 3 boxes. 2 boxes are enough.

---------------------------------------------------------------------

I removed 1 Box of Ply Clips from the following Model/Elevation Cost-Groups:

F927 A & B
FC10 A & B
F9C1 A
10/08/2110/08/21
Complete10/08/21Carlos GarciaRichmondROFLK 187 Forest LakeF913/PearlL***Hardware & Frame Changes
Carlos Garcia:


Please remove:
36 pcs 1 x 2 x 10 PT
2 pieces of 1 x 4 x 8 PT
1 piece of 1 x 6 x 12 PT
2 pieces of 2 x 4 x 14‘ Spruce
8 PCs 2x4x92-5/8 SYP

Hardware takeoff is completely jacked up these are the only items that I need listed below.

25 PCs 1/4“ x 6“ SDS wood screws
25 pieces of 1/4 x 3 1/4 inch hex head tap cons
32 pieces of 1/4x1-3/4 hex head tap cons
15 PCs of 1/2x6 inch wedge anchors
35 pieces of 2 x 2 by 1/2” square washer
100 pieces H2.5 or H8
35 pieces MTS 12
8 pieces HTS 20
8 PCs MSTM 36 straps
5 PCs MSTA36 straps
2 pieces HUC28-2
2 pieces of HUC212-2
40 SP1
80 SP2
two boxes of 15/32 plywood clips
Whatever subfloor adhesive was in original takeoff. This is all that’s needed

--------------------------------------------------------------------

ROFLK 187 Forest Lake Frame Totals:
1x2x10 PT: 131 ---------------- New total: 95
1x4x8 PT: 4 --------------------- New total: 2
1x6x12 PT: 3 ------------------- New total: 2
2x4x14 Spruce: 110 ---------- New total: 108
2x4x92 5/8 SYP: 28 -------- New total: 20

ROFLK 187 Forest Lake Hardware Package ($898.02):
H10A: 86
HB127: 9
HGA10KT: 1
HTS20: 9
HUC28-2: 4
LSTA24: 16
MSTA36: 1
MSTAM36: 10
MTS12: 5
N12: 9
PSCL716: 2
SP1: 49
SP2: 124
Sub Floor Adhesive: 14
TH 14234 (each): 80
TH 14314 (each): 26
TH 14334 (each): 48
WA1285: 18
WS22916: 49
10/08/2110/08/21
Complete10/08/21Adrian HartBella Vista Building GroupBVSOD 001 SODO House6-UnitABCCBABVSODO House / 6-Unit (ABCCBA)Adding Type C Densglass
Adrian Hart:

Drywall needed to cover channels of firewall. There is a good chance this was not on original bid set. From what I have gathered, the original submitted plans used a fire rated assembly u347 that was denied by the city. This assembly does not require channels/studs to be covered with drywall. In addition, we need to reach out to vendor for fastener requirements. If someone could provide me with a contact I would be more than happy to call. -Adrian

--------------------------------------------------------------------

This is in budget so not sending as a variance. Marcos got a price from Int/Ext for Type C Densglass for this

(70) 1/2" x 4' x 12' Type C Densglass

Added them to the Template (Adam)
10/08/2110/11/21
NA10/07/21Johnny VargasRichmondROLKS 033 Lake SmartF914/MoonstoneD***Removing Frame
Johnny Vargas:

Their is way to much lumber not being used and a stock pile is being created. Please remove these items from the take off. Only for Moonstone style homes. Thank you.

6 pieces of 2”x8”x10’ SYP
1 piece of 2”x6”x16’ Pressure treated.
1 piece of 2”x6”x14’ SYP
4pieces of 2”x4”x 8’ SYP
3 pieces of 2”x4”12’ SYP
3 pieces of 2”x6”x10’ SYP
2 pieces of 2”x6”x12’ Pressure treated
1 piece of 2”x8”x10’ Pressure treated

----------------------------------------------------------
Job Totals:
2x6x12 PT: 2
2x6x16 PT: NA
2x8x10 PT: 2
2x4x8 SYP: NA
2x4x12 SYP: 41
2x6x10 SYP: NA
2x6x14 SYP: NA
2x8x10 SYP: NA
10/07/2110/08/21
Complete10/07/21Johnny VargasRichmondRORVS 022-07 RiverstoneF927/SlateJ***Removing Frame
Johnny Vargas:

There is way no many lumber material not being used. Please change all take off regarding all (Slate style homes).

15 pieces of 2”x4”x14’ Southern yellow pine.
10 pieces of 7/6”x 4’x 8’ OSB Radiant Barrier Sheathing.
8 pieces of. 1”x2”x10’ PT Borate.

---------------------------------------------------------

Job Totals:
1x2x10 PT: 144
2x4x14 SYP: 108
7/16 OSB Radiant Barrier: 145

New Cost-Group Totals:
1x2x10 PT: 136
2x4x14 SYP: 93
7/16 OSB Radiant Barrier: 135
10/07/2110/07/21
Complete10/07/21Jeff RotertMintoNDLTS 1700 Latitudes40-176A***Adding Frame
Jeff Rotert:

Need
(4) 2x4x16 pt
(12) 2x4x16 syp

---------------------------------------------------------

Job Totals:

2x4x16 PT: 2
2x4x16 SYP: 43


New Totals:

2x4x16 PT: 6
2x4x16 SYP: 55
10/07/2110/07/21
Complete10/07/21Dane JonesRichmondROSPN 033 Southern PinesF936/PalmL***Adding Butterfly Block
Dane Jones:

Package change for ALL Palm and Pine models. Butterfly block needed for front doors. 25 total for each one.

Butterfly block is needed for entry doors to block correctly.

25 butterfly block for each.

---------------------------------------------------------
10/8/2021
>F936/Palm - L - Now has 25 Butterfly Block
>F937/Pine - L - Now has 25 Butterfly Block

10/7/2021
Added 25 Butterfly 45 Degree Block to the F936-L Cost-Group. Waiting to hear back from Marcos to confirm everything before making any other package changes to the other models.
10/07/2110/08/21
Review10/07/21Jonathan HimesToll BrothersTBWIP 002 WhippoorwillCorbeilMOAdding Boxcar Block
Jonathan Himes:

Missing 12”x8”x16” CMU for rear SGD.
Please expedite this ASAP. Need delivery no later than 10/11.

Missing the 12”x8”x16” block per Lot 5 fill in. Take off needs to be updated per this model.

(311) 12”x 8” x 16” Block.

------------------------------------------------------------------

None in the job or the takeoff. Waiting to hear back from Estimating about this (Adam).
10/07/21
Complete10/06/21Jeff RotertMintoNDLTS 1732 Latitudes50-179-IIA***Reducing Lintel Concrete
Jeff Rotert:

The current PO shows 19 yards for the lentil pour. However, it is supposed to be 13 yards. Please correct.

--------------------------------------

Package Change made to the Cost-Group (Adam)
10/06/2110/06/21
Complete10/05/21Kyle JollyMintoNDLTS 1874 Latitudes50-179-IIA***Reducing Slab Concrete
Kyle Jolly:

Concrete package change. Please change slab concrete for this model on this elevation.

Package reads 72 yards for slab
Only pour around 65-66.


---------------------------------------------

Changed Slab Concrete Cost-Group from 72 yards to 66 yards (Adam).
10/05/2110/05/21
Complete10/04/21John RathbunSurrey Homes*AllAll***Changing 7/16 OSB to 5/8 OSB10/04/2110/04/21
Complete10/04/21John RathbunSurrey HomesSOSVL B12 Savannah LandingCoveAll***Changing 7/16 OSB to 5/8 OSB
John Rathbun:

Cove model hardware package change A&B elevations.

remove sill seal from this model and all others. We do not use this.

remove anchor bolts.These are wet set in concrete and come with the precast package.

Add 40 SPH6 for a new total of 67 .
Plans show bearing wall studs at 16” centers and SPH6 top and bottom of every stud.

--------------------------------------------------

I only see an A (Elevation), No B.
Package Change complete.
(Adam)
10/04/2110/04/21
Complete10/04/21John BurkettMattamy HomesMOMER 020 Meridian5-UnitCACAC/PR***Adding 20 Dowels
John Burkett:

(20) dowels for new total = 147.
PO only has 127

------------------------------------------

Cost-Group for MOMER20 Updated
(Adam)
10/04/2110/04/21
Complete10/01/21Jeff SubbertMattamy HomesMOWAT 025 Waterbrooke6-UnitSCAACS/FTMO-WAT 6-Unit (SCAACS) - FTHUC410
Jeff Subbert:

A quantity of six ( HUC410 )’s are needed at every front porch. Po calls for 28. I need 36.

------------------------------------------------------------

There was no Template in BT for this so I turned the job into a Template and removed all the bills, schedule, to-dos, documents, etc - and made the package change to the HUC410s.
10/01/2110/01/21
Review09/30/21Marcos ChicoBella Vista Building GroupBVSOD 002 SODO House6-UnitABCCBAPrecast Changes
Marcos Chico:

Marcos is requesting to remove all of the precast headers (except two 4’4 recess lintels) because he says everything is cast in place.

>The only ones they need are the (2) Recess Lintels - 4'-4 (2'8 dr).

>Instead of the (6) 2'-2.5" Sills he needs 3' Sills.

-------------------------------------

Waiting on Review from Estimating
(Adam)
09/30/21
Complete09/30/21John BurkettBella Vista Building GroupBVSOD 001 SODO House6-UnitABCCBABVSOD House / 6-Unit (ABCCBA)Densglass
John Burkett:

Densglass for rippers in attic per Marcos.
(15) sheets densglass for new total of 235

---------------------------------------------------------

There are 3 Shaftwall Material Drops in this job. Each currently has 210 pieces of Densglass, for a total of: 630.

John Burkett is requesting to update the package to: 235 pieces of Densglass per Drop, for a total of: 705.
09/30/2109/30/21
Complete09/28/21Jack CorriganRichmondRORVC 043 River ChaseF929/PewterAFrame for RV Garage
Jack Corrigan:

Need
(3) 2x12x20 pt for back porch beams
(4) 2x8x14 pt for RV garage door bucks
(4) 2x8x10 pt for RV garage door bucks


--------------------------------------------------------------

2x12x20 Jack says is for the back porch of the house and thinks that it needs to be on the base.
>Confirmed with Sam that this model needs (3) 2x12x20 for the back porch on the base.

GDR1C Option Totals from RORVC #043:
(1) 2x6x16 PT
(2) 2x8x14 PT
(0) 2x8x16 PT

New GDR1C Option Totals:
(0) 2x6x16 PT
(2) 2x8x14 PT
(2) 2x8x14 PT

New Base Package: +(3) 2x12x20 PT

Notes: Completed Package Change on Option and Base model - All Cost-Groups (frame vendors).
(Adam)
09/28/2109/28/21
Complete09/28/21John BurkettMattamy HomesMOMER 016 Meridian4-UnitMAAC/PRFire-Rated CDX
John Burkett:

Need more cdx. (20) sheets 15/32 fire rated cdx for new total of 120sheets.

-----------------------------------------

Job & Template Totals:
15/32 Fire-Rated CDX: 100

New Total:
15/32 Fire-Rated CDX: 120
09/28/2109/28/21
Complete09/28/21John BurkettMattamy HomesMOMER 017 Meridian6-UnitMCAACM/PRMOMER17.HDSUPPLYORLANDOAdding 1x5 Dowels
John Burkett:

Not enough dowels. Please submit so I can get them delivered with prep pack tomorrow.

(37) dowels for new total 199.

----------------------------------------------

MOMER #017 Meridian Totals:
1x5 Dowels: 162

New Template Totals:
1x5 Dowels: 199

(Adam)
09/28/2109/28/21
Complete09/27/21Carlos GarciaRichmondRORVS 039-04 RiverstoneF924/AmmoliteBAmmolite-F924-B CGRemoving Slab Prep Materials
Carlos Garcia:

Extra materials after slab prep.

Please delete (15) pieces of 20 foot number five rebar and (25) pieces of 30 x 30 corner bars.
----------------------------------------------------------------

RORVS 039-04 Riverstone Totals:
#5 Rebar - 20': (48)
30x30 Corner Bars: (46)

New Totals:
#5 Rebar - 20': (33)
30x30 Corner Bars: (21)
09/27/2109/27/21
Complete09/27/21Steven GilbertRichmondROASQ 027 Arlington SquareF9C3/CoralDF9C3-D Metal Frame Materials CGRemoving Metal Frame
Steven Gilbert:

Remove metal studs from package. Remove some studs from metal Package.

Remove (40) 3 5/8”x10’ studs metal
Remove (10) 6”x10’ studs metal

--------------------------------------------------------------------
ROASQ #027 Totals:
3 5/8”x10’ studs metal: (251)
6”x10’ studs metal: (35)

New Totals:
3 5/8”x10’ studs metal: (211)
6”x10’ studs metal: (25)
09/27/2109/27/21
Complete09/24/21John BurkettMattamy HomesMOMER 016 Meridian4 UnitMAAC/PRMO-MER 4-Unit (MAAC) - PRShaftwall Materials: H-Track
John Burkett:

Fill-In & Package Change:
Need (50) PCs of H track to complete bldg.
PO is (70) PCs with fill in of (50) = new total of (120) PCs


----------------------------------------------------
John said he needs the 12' for the attic area.

Job has:
(70) H Track 10'
(70) H Track 12'

Template updated
(Adam)
09/24/2109/24/21
Complete09/23/21John RathbunSurrey HomesSOSVL A09 Savannah LandingF913/PearlAF913/Pearl (A&B Elevations)SPH4
John Rathbun:

Hardware Package change pearl model A&B elevations.

I need to add 50 SPH4 for a new total of 150 on the pearl model A&B elevations. Required on every stud top and bottom With 12” stud spacing on all bearing walls.

---------------------------------------

SOSVL A09 Savannah Landing:
SPH4: 100
Cost-Group: 145

Notes:
Job is short by 45.
New Cost-Group Total: 150
09/23/2109/23/21
Complete09/23/21Nick CazaresMintoNDLTS 1932 Latitudes40-177B40-177 (A&B Elevations)Precast Changes
Nick Cazares:

precast takeoff is incorrect.

6’2” sill +1 total of 2
3’1” sill +1 total of 7

-------------------------------------------------------

In the Job (#1932):
6'-2" HiDri Sill: 1
3'-1" HiDri Sill: 8

Notes:
Nick said not to worry about the 3'-1"s for now and just change the 6'-2" sills.

Updated Cost-Groups on All Elevations.
(Adam)
09/23/2109/23/21
Complete09/23/21John RathbunSurrey HomesSOSVL A09 Savannah LandingF913/PearlAF913/Pearl (A&B Elevations)2x8x10 SYP for Truss Engineering
John Rathbun:

Package change pearl model A&B elevations.

Need to add four pieces of 2x8x10 SYP to the pearl model A&B elevation for a new total of 4 . This is for a new truss engineering detail.

+(4) 2x8x10 SYP

--------------------------------------------------------

SOSVL A09 Savannah Landing:

2x8x10 SYP: 0
Cost-Group: 0

Notes:
Cost-Groups updated on A&B Elevations for all Frame Suppliers. New 2x8x10 SYP Total: 4
(Adam)
09/23/2109/23/21
Complete09/22/21Chris PlantzRichmondNAFC10/AzureOptionRA-Azure-FC10-A ***WDWLAUNDRY
Chris Plantz:

Options revised by Chris Plantz.

Updated on the RA-Azure-A *** Template and removed all other instances of the same options from the other Azure templates (Adam).
09/22/2109/22/21
Complete09/22/21Chris PlantzRichmondNAFC10/AzureOptionRA-Azure-FC10-A ***WDWGREAT
Chris Plantz:

Options revised by Chris Plantz.

Updated on the RA-Azure-A *** Template and removed all other instances of the same options from the other Azure templates (Adam).
09/22/2109/22/21
Complete09/22/21Chris PlantzRichmondNAFC10/AzureOptionRA-Azure-FC10-A ***WDWBA-2
Chris Plantz:

Options revised by Chris Plantz.

Updated on the RA-Azure-A *** Template and removed all other instances of the same options from the other Azure templates (Adam).
09/22/2109/22/21
Complete09/22/21Carlos GarciaRichmondRORVS 014-23 RiverstoneF9C1/AmethistARemoving Block
Carlos Garcia:

Extras.

Please remove 20 pieces of half block and 20 pieces of lintel block. See pics, splitting with the leftovers at 15-23

-----------------------------------------------------------------------

BT Cost-Groups updated for all Masonry Suppliers:

Half Block - Changed from 80 to 60.
Lintel Block - Changed from 152 to 132.

(Adam)
09/22/2109/22/21
Complete09/22/21Carlos GarciaRichmondRORVS 015-23 RiverstoneF927/SlateBRemoving Block
Carlos Garcia:

Please delete 20 pieces of lintel block and 20 pieces of half block, see pictures-splitting between leftovers at 14-23.

-----------------------------------------------------------------------

BT Cost-Groups updated for all Masonry Suppliers.

Lintel Block - Changed from 185 to 165
Half Block - Changed from 94 to 74

(Adam)
09/22/2109/22/21
Complete09/22/21Chris PlantzRichmondNAFC10/AzureOptionRA-Azure-FC10-A ***BDRM3-ILO-STUDY
Chris Plantz:

Options revised by Chris Plantz.

Updated on the RA-Azure-A *** Template and removed all other instances of the same options from the other Azure templates (Adam).
09/22/2109/22/21
Complete09/20/21Mike SchlosserCC HomesCCMA6 013 Maple Ridge55-H3Add 20 Wedge Anchors
Mike Schlosser:

Need wedge anchors.
(20) 3/4x10” wedge anchors.

Wedge anchors in the old is 35. New count total is now 55. (20) 3/4x10”.

Adam ------------------------------------------------
HW Cost-Group for the 55-H3 has been updated
Added (20) WA3410 for a new total of (55).
Changed WS22916 from (60) to (48) to match the number of same size wedge anchors since all the others match and this one was off.
09/20/2109/20/21
Complete09/17/21Steven GilbertRichmondROFLK 199 Forest LakeFC11/RubyMRemove Pre-Blend (10)
Steven Gilbert:

To much mortar left over.
Remove 10 bags of mortar from package.

----------------------------------------------

Package had 146 bags of Pre-Blend.
New Total: 136 (Adam)
09/17/2109/17/21
Complete09/16/21Steven GilbertRichmondROFLK 202 Forest LakeF927/SlateMRemoving (20) 1x2x10 PT & 2x4x108 5/8 Spruce
Steven Gilbert:

To much lumber left over
Remove 20 2x4x108 5/8” spruce pre cut studs
Remove 20 1x2x10’ PT Borate
--------------------------------------------------
Frame Totals from ROFLK #202:
1x2x10 PT: 180
2x4x108 5/8 Spruce: 352

New Template/Cost-Group Totals:
1x2x10 PT: 160
2x4x108 5/8 Spruce: 332

Cost-Groups Updated on F927-M (Adam)


09/16/2109/16/21
Complete09/16/21Steven GilbertRichmondROFLK 198 Forest Lake1927/SlateLRemoving (15) 7/16 OSB & 2x4x14 SYP
Steven Gilbert:

Lumber package heavy.
Remove 15 sheets of OSB 7/16”x4’x8’ OSB sheathing
Remove 15 2x4x14’ #2 Southern Yellow pine

----------------------------------------------

Package Change:
7/16 OSB: -15
2x4x14 SYP: -15

Totals on ROFLK 198 Forest Lake:
7/16 OSB: 137
2x4x14 SYP: 111

New Totals:
7/16 OSB: 122
2x4x14 SYP: 96

Package Change made to Cost-Groups in BT (Adam)
09/16/2109/16/21
Complete09/16/21Jack CorriganDream FindersDOFER 235 FernandaPoincianaAAdded .5 Yards to Lintel Concrete
Jack Corrigan:

Need to bump lentil PO for this model from 8 yards up to 9. This model runs short on mud often.

-----------------------------------

Went over this with Estimating and Sam said to add .5 yards to the Lintel Concrete.

Poinciana-A Updated.
09/16/2109/17/21
Complete09/14/21Chad BrewsterToll BrothersTBWIP 005 WhippoorwillCorbeilFHRemoving Slab Prep Materials
Chad Brewster:

First time we have done this model and elevation. Just a few tweaks. Please change the following materials for this model and elevation

OLD- 4 box of 100 Rod chairs 16”-3 bar
NEW -3 box of 100 Rod Chairs 16”-3 bar

OLD - 103 #5 Rebar-20’ Length Grade 60
NEW - 97 #5 Rebar-20’ Length Grade 60
09/14/2109/14/21
Complete09/13/21Steven GilbertRichmondROFLK 171 Forest LakeF914/MoonstoneMRemove Pre-Blend (20)
Steven Gilbert:

Too much Pre-Blend. Remove 20 bags from the base package.


120 Bags in package. Updated to 100 (Adam)
09/13/2109/13/21
Complete09/13/21Steven GilbertRichmondROFLK 188 Forest LakeFC10/AzureKRemove Pre-Blend (18)
Steven Gilbert:

Remove 18 bags of mortar from the base package.

Base Package has 140 Bags of Pre-Blend.
Removed 18 Bags for a new Total of 122 (Adam)
09/13/2109/13/21
Complete09/13/21Steven GilbertRichmondROASQ 007 Arlington SquareF9C1/AmethistBRemove Pre-Blend (15)
Steven Gilbert:

Remove 15 bags of mortar from base package.

120 Bags if Pre-Blend in Base.
Updated to 105 bags of Pre-Blend (Adam)
09/13/2109/13/21
Complete09/09/21Steven GilbertRichmondROASQ 017 Arlington SquareF914/MoonstoneDMETA20 & Anchor Bolts
Steven Gilbert:

The moonstone continues to get to many bolts and not enough straps please send me a box of 100 to replace box on my truck that I keep for this situation and please fix package.

META 20: Change to 110 (from 46)
Anchor Bolts: Change to 20 (from 55)
09/09/2109/09/21
Complete09/08/21Ronald CampbellRichmondROSPN 064 Southern PinesFC10/AzureLRemove All Corner Bars
Ronald Campbell:

Remove all Corner Bars from Southern Pines models. Not being used.
09/08/2109/08/21
Complete09/07/21Jason BridgesRichmondROSPC 023 Spring CreekFC11/RubyJRemoving some Frame
Jason Bridges:

Please remove the following lumber from all Ruby “J” elevations
(5) 2x4x14 spruce
(5) 2x4x14 syp
(6) 2x6x10 spruce
09/07/2109/07/21
Complete09/01/21JoeCC HomesCCMA6 038 Maple Ridge55-W2Frame Materials
Joe Baller:

Frame Short. Fill-In & Package Change:

(7) 2x4x14 PT Need 9 total for package
(0) 2x6x10 PT. Need 2
(0) 2x6x16 PT. Need 1
(0) 2x8x14 Spruce. Need 26
(6) 2x4x10 SYP. Need 15
(0) 2x4x14 SYP. Need 30
(5) 2x6x10 SYP. Need 15
(0) 2x6x14 SYP. Need 7

(2) 2x4x14 PT
(2) 2x6x10 PT
(1) 2x6x16 PT
(26) 2x8x14 Spruce
(14) 2x4x10 SYP
(30) 2x4x14 SYP
(15) 2x6x10 SYP
(7) 2x6x14 SYP
09/01/2109/02/21
Complete08/31/21Steven GilbertRichmondROASQ 028 Arlington SquareFC11/RubyARemoved 14 Bags of Preblend
Steven Gilbert:

28 bags leftover remove 14 bags of mortar from package.
Remove 14 bags of mortar from package.
08/31/2108/31/21
Waiting08/30/21Steven GilbertRichmondROFLK 170 Forest LakeF926/EmeraldKPrecast Changes
Steven Gilbert:

Precast order missing precast and sills

Add (1) 3’6” precast for total of 2
Add (2) 3’1” sills for total of 5
Remove (1) 2’2.5” sill for a total of 1
08/30/21
Complete08/30/21Jack CorriganRichmondRORVC 021 River ChaseF929/PewterADoor Bucks for RV Garage Option
Jack Corrigan:

Missing garage door bucks for RV garage.

Missing RV garage door bucks on the take off. I will pick up from BFS today if possible. Thank you.

(4) 2x8x16PT
(2) 2x8x14 pt
08/30/2108/30/21
Complete08/25/21John RathbunSurrey HomesSOSVL A04 Savannah LandingSeascapeA&BHardware (SPH6)
John Rathbun:

I need 50 more SPH6 sent out . Needed at top and bottom of all bearing wall studs.
Please add 50 SPH6 to the seascape model for a new total of 110. On A&B elevations

Needed at top and bottom of all bearing wall studs
08/25/2108/25/21
Complete08/25/21John RathbunSurrey HomesSOSVL A04 Savannah LandingSeascapeA&B(1) 2x12x12 SYP for Bearing Wall
John Rathbun:

I need one 2x12x12 syp for a bearing wall header sent out .
And one added to the seascape model A&B elevation. New total of one.

Bearing wall header needed . Zero in P.O.
08/25/2108/25/21
Complete08/17/21John RathbunSurrey HomesSOSVL B08 Savannah LandingHarborA&BMasonry Changes
John Rathbun:

Extra block and mud left over

Please remove 72 regular block for a new total of 2266 .
Please remove 42 bags of preblend for a new total of 146
08/17/2108/17/21
Complete08/16/21Carlos GarciaRichmondROMPT 009 Mattie PointeF913/PearlEF913-EMasonry Changes
Carlos Garcia:

Extra materials left over and building is complete.

Remove five bags of mortar, and
30 regular block from takeoff
08/16/2108/16/21
Complete08/16/21Kyle JollyMintoNDLTS 1724 Latitudes50-179-IIBAdded (1) LGT3
Kyle Jolly:

Frame hardware pack change.
I did this change on a house in phase 4 but I guess it did not go thru.

LGT3 added to plans for truss tie down.
+1 LGT3
08/16/2108/16/21
Complete08/10/21Kyle JollyMintoNDLTS 1724 Latitudes50-179-IIBPrecast Changes
Kyle Jolly:

Package is a little off causing all of my other surrounding houses precast to be raided

13’4” header +1 total of 1
8’8” header +1 total of 2
4’6” header -3 total of 7
3’1”sill -2 total of 8
08/10/2108/10/21
Complete08/10/21Steven GilbertRichmondROFLK 169 Forest LakeF924/AmmoliteKPrecast Changes
Steven Gilbert:

Precast package adjustments:

Remove (2) 10’6” precast
Add (1) 7’6” precast
Remove (2) 3’1” sills
Add (2) 2’2.5” sill
Add (1) 6’2” sill
Remove (4) 4’5” sills
08/10/2108/10/21
Complete08/10/21Steven GilbertRichmondROFLK 200 Forest LakeF924/AmmoliteLPrecast Changes
Steven Gilbert:

Precast package wrong:

Add (1) 6’2” sill total
Add (1) 7’6” precast
Remove (1) 5’4” precast
Add (2) 2’2.5” sills
Remove (2) 3’1” sills
08/10/2108/10/21
Complete08/10/21Steven GilbertRichmondROVD3 027 Vista Del Lago 3F927/SlateCPrecast Changes
Steven Gilbert:

To many precast and sills.
Remove (1) 4’6” precast
Remove (1) 3’1” sill
08/10/2108/10/21
Complete08/05/21Jason BridgesDream FindersDOTAL 045 TalichetAvalon-IBSlab Prep Material
Jason Bridges:

Add (5) #5 rebar 20’ length grade 60 to all elevations for the Avalon model
Add (30) rod chairs 12” 2 bar to all elevations for Avalon model

Crews are taking materials from jobs not passed plumbing and using them to finish preps.
08/05/2108/10/21
Complete08/02/21Brian DinkerMintoNDLTM 1908 LatitudesVilla 9BMasonry Steel Changes
Brian Dinker:

Down rods are not correct on take off.
Please remove 13’ down rods and 8’ down rods.
Need to bring 9’ down rods to a total of 105
Need to add (6) 10’1” for columns.
08/02/2108/02/21
Complete08/02/21Steven GilbertRichmondROFLK 187 Forest LakeF913/PearlLAdding 1 6'-" Header08/02/2108/02/21
Complete07/22/21Luis UmpierreMattamy HomesMOSL2 021 Solara6 Unit(QEFFEQ) MDMO-6-Unit (QEFFEQ) MD(35) 2x8x14 PT for Ledgers
Luis Umpierre:

Need these lumber for my ledgers. Not on the POs.
(35)2”x 8”x 14’ PT
07/22/2107/22/21
Complete07/22/21John RathbunSurrey HomesSOSVL A06 Savannah LandingF913/PearlARA-Pearl-F913-A & Cost Group(1) 9'-4" Header & (1) 4'-5" WRF Sill
John Rathbun:

The pearl A elevation is missing one 9-4 header that goes from entry column to the house on the front porch . Need to add one to the A elevation package for a new total of 1 . I have not built a B elevation and do not have access to the base plans to even see the B elevation.

Also need a fill in P.O. Sent over to Lott’s for one 9-4 header that was short on the takeoff . and one 4-5 sill that was broken . Could not tell if it was broken on delivery or if the mason broke it . It was on the very bottom of the pile . I am heading to pick this up now .
07/22/2107/22/21
Complete07/22/21John RathbunSurrey HomesSOSVL A06 Savannah LandingF913/PearlARA-Pearl-F913-A & Cost Group#5 20' in Slab Pack
John R:

Need to add 10 bars of #5 20’ to the pearl model A elevation
Precast/masonry steel for a new total of 40 bars. This might also apply to a B elevation . Not sure yet as we have not built one yet and I can not see the base plans to see for myself.
07/22/2107/22/21
Complete07/21/21John RathbunSurrey HomesSOSVL A02 Savannah LandingSanctuaryBSO-Sanctuary-B, & Cost GroupMasonry Changes
John Rathbun:

Sanctuary model B elevation only masonry materials package change.

Remove 288 regulars new total of 2399
Remove 50 half block new total of 174
Add 55 four high block new total of 71.
Add 30 six high block new total of 30.
Remove 50 bags of preblend new total of 163.
07/21/2107/23/21
Complete07/21/21Steven GilbertRichmondROFLK 060 Forest LakeF924/AmmoliteKRA-F924-K***Adding 80 H8s07/21/2107/21/21
Complete07/21/21HermesBella Vista Building GroupBVSER 007 Serenity ReserveHarmonyCHarmony-C SR (1 Story)5/8 CDX & 7/16 Zip for Crickets07/21/2107/21/21
Complete07/15/21John RathbunSurrey HomesSOSVL B08 Savannah LandingHarborA&BSO-Harbor-A***Slab Prep Changes, Visqueen
John Rathbun:

Slab prep package change Harbor model A&B elev.

Remove one roll of 10x100 visqueen. New total of zero.
Add one roll of 20x100 visqueen. New total of 2 rolls.
Please update and release slab prep materials.

Ran short on the last slab prep we did for this model.
07/15/2107/15/21
Complete07/15/21Kyle JollyMintoNDLTS 1723 Latitudes50-179-IIA50-179-II-A***Masonry Changes07/15/2107/19/21
Complete07/13/21John RathbunSurrey HomesSOSVL A13 Savannah LandingHarborASO-Harbor-A***Slab Prep Changes, Dowels
John Rathbun:

Slab prep material change Harbor model

I need 20 1x4 dowels removed
I need 20 1x5 dowels added

We need 1x5 dowels at the garage curbs and columns.
Not enough projection to achieve the correct lap. Please update and release P.O.
07/13/2107/13/21
Review07/06/21Mike BoyceDavid WeeklyVSPAV 088 Payne Park7758/7757BDW-7758-7757-B (Titan)Frame Package Change
Mike Boyce:
Package Change & Fill-In Request: Short Framing, Possible Takeoff Error, Possible Plan Change?

Fill-In ($13,600+):
250 2x8x10 SYP
128 2x6x14 SYP
88 2x8x12 SYP
16 2x8x14 SYP
10 2x6x12 PT
12 2x4x14 PT
25 1/2 x4x8 fire rated plywood

Package Change Request:
2x8x10 SYP old:0 new:250
2x6x14 SYP old:109 new:329
2x8x12 SYP old:32 new:120
2x8x14 SYP old:5 new:21
2x6x12 PT old:0 new:10
2x4x14 PT old :12 new:24
1/2x4x8 fire rated plywood old:35 new:60
07/06/21
Complete07/01/21John RathbunSurrey HomesSOSVL B11 Savannah LandingSeascapeBSpruce Changes
John Rathbun:

Ceiling height jumps up at the front entry.

They are using fascia materials to frame the entry walls .

As for the 92 5/8 precuts. The estimate needs to be checked. I bet Plantz estimated this and the estimating template has an error. If there is no 8’ walls segmented on the interior walls page and it is showing on the calc sheet. It is an error.

This will apply to A and B elevations

Remove all 2x4 & 2x6x 92 5/8 Spruce precuts.
Total of zero on each item

Add 25 pieces of 2x6x14 spruce. new total of 51
Add 15 pieces of 2x4x12 spruce. New total of 115
07/01/2107/07/21
Complete07/01/21Joe BallerCC HomesCCMA6 152 Maple Ridge55-G2CC-DEVCO-55-G2 (1 Story)H2.5T
Joe Baller:

0 H2.5 in hardware package
30 H2.5
07/01/2107/01/21
Complete07/01/21Joe BallerCC HomesCCMA6 020 Maple Ridge55-F3CC-DEVCO-55-F3 (1 Story)H2.5T
Joe Baller:

0 H2.5 in hardware package
30 H2.5
07/01/2107/01/21
Complete07/01/21Kyle JollyMintoNDLTS 1676 Latitudes40-176-IIAND-LTS-40-176 II-AAdding 45 Degree Block
Kyle Jolly:

Masons run short 45° block on this house.
Not enough 45° block.

112 total 45° block on this back
Old 40
New 112
07/01/2107/01/21
Review07/01/21Mike BoyceDavid WeeklyVSPAV 090 Payne Park7760/7760BDW-7760-7760-A&B Angie's Est (3 Story 2x6)3rd Floor Frame Materials
Mike Boyce:

Fill in/ Package change. 3rd floor framing material not on PO.

60. 2 x 8 x 12 SYP old 0 new 60
10. 2 x 8 x 14 SYP old 0 new 10.
80. 2 x 4 x 10 spruce. Old 0. New 80.
07/01/21
Complete06/30/21Luis UmpierreMattamy HomesMOWAT 021 Waterbrooke6 Unit, C-C-A-A-C-SCRMattamy - C,C,A,A,C,S - CRABU44Z
Luis Umpierre:

Need Tapcons for loggers & front door bucks
Need buckets for 4x4post.

(14) ABU44Z Simpson 4x4 post buckets
(400) 1/4x 31/4 hex nut Tapcons
(200) 1/4x 13/4 hex nut Tapcons

-----------------------------------------------------------
Notes:(Adam)
The Hardware PO on this job went to CM w/ Trekker Materials and Pricing and was accepted.

The ABU44Z are missing from the HW package for sure (there are 14 posts in the frame pack).

Not 100% sure about the tapcons.

06/30/2106/30/21
Review06/29/21Luis UmpierreMattamy HomesMOWAT 024 Waterbrooke6 Unit, C-C-A-A-C-CMO-WAT 6-Unit (CCAACC)Removing a lot of Frame
Luis Umpierre:

A lot of material left over after completion of building.

Please remove from frame drop 1 -
50 sheets of 4 x 8 x 15/32 OSB for 134 total,
200 PCs of 2 x 4 x 16 Southern yellow Pine for 450 total,
20 pieces of 1 x 2 x 12 PT for 776 total.
Then add 30 sheets of fire rated plywood for 104 total to frame drop 1.

Please remove from frame drop 2-
50 sheets of 15/32 OSB for 212 total,
200 pieces of 2 x 4 x 16 SYP for 450 total
50 pieces of 2 x 4 x 14 SYP for 286 total.
Then add 30 sheets of fire rated plywood for 104 total to drop on Frame 1
06/29/21
Complete06/28/21Scott BierdRichmondROLKS 139 Lake SmartF927/SlateARA-Slate-F927-A***Short Pre-Blend
Scott Bierd:

Four straight slate models I’ve needed 15 bags of preblended morter type S 80 lb bags.
06/28/2106/28/21
Review06/28/21Mike BoyceDavid WeeklyVSPAV 090 Payne Park7760/7760BDW-7760-7760-A&B Angie's Est (3 Story 2x6)Frame Package Change
Mike Boyce:

Fill in Package change. Short ordered material some items not on PO
Different print used for take off?

128. 2 x 6 x 10 SYP old 3 new 131
30. 2 x 4 x 14 SYP old 82 new 112
16. 2 x 12 x 14 SYP old 0 new 16

2. 2 x 6 x 16 PT borate old 0 new 2
4. 2 x 6 x 12 pt borate old 4 new 8
12. 2 x 8 x 14 pt old 2 new 14

35. 1/2” x 4 x 8 fire rated plywood old 0 new 28
06/28/21
Complete06/25/21John RathbunSurrey HomesSOSVL B14 Savannah LandingF913/PearlASO-Pearl-AChange Ply Clips
John Rathbun:

I need plyclips changed from 7/16 to 5/8 on all models out here.

Pearl, Harbor, cove, sanctuary, and the seascape model.
All elevations
06/25/2106/28/21
Complete06/24/21Scott BierdRichmondRORVS 019-07 RiverstoneF914/MoonstoneDRA-Moonstone-F914-D***Missing Ply Clips
Scott Bierd:

Fill in and package change: There is no plywood clips on the PO.
2 boxes 7/16 of plywood clips.
06/24/2106/24/21
Complete06/24/21Scott BierdRichmondRORVS 002-10 RiverstoneF924/AmmoliteCRA-Ammolite-F924-C ***Hardware
Scott Bierd:

Fill in and package change:
30 wedge anchors
40 2”x2”x1/2” washers, we already have 10 on the takeoff, need to add 30
10 HTS20 twist straps
8 MSTAM36” flat strap Wood to masonry
25 MTS12 twist strap
10 LSTA 36” Flat strap, we already have 58 on takeoff only need 10
50 H3 truss strap
40 sp1 wall strap
100 SP2 wall strap
Need 2 boxes of plywood clips ,these are already on takeoff, but they have been used on several other houses.
06/24/2106/24/21
Complete06/22/21Carlos GarciaRichmondROSPC 095 Spring CreekF927/SlateHRA-Slate-F927-A A3/O8Removing Misc. Frame
Carlos Garcia:

Need to remove approximately:
(-12) 1x2x? Furring Strips
(-2) 2x8x14' PT
(-1) 2x6x12' PT
(-2) 2x6x16' Spruce
(-40) 2x4x?' Yellow Pine
06/22/2106/22/21
Review06/22/21Carlos GarciaRichmondROSPC 078 Spring CreekFC11/RubyGRA-Ruby-FC11-G***Removing 7/16 OSB
Carlos Garcia:

Approximately 45 sheets left over and this house is completed. I believe it may just be this elevation G that I am not sure we have seen before or me at least.

Note: Currently, (124) Sheets of 7/16" OSB in the FC11/Ruby G Templates.
06/22/21
Complete06/22/21Carlos GarciaRichmondROSPC 098 Spring CreekFC11/RubyJRA-Ruby-FC11-J***(+25) 2x4x14 Spruce
Carlos Garcia:

Please add 25 pieces of 2 x 4 x 14‘ spruce to the takeoff. This is requested by the framer who confirmed the overages on the first two package changes today.

Verified by Framer working at home that he needs more 14 foot 2 x 4 for interior framing

Note: Currently (49) in the package.
06/22/2106/22/21
Complete06/18/21John RathbunSurrey HomesSOSVL A05 Savannah LandingsHarborASO-Harbor-A + Cost GroupsSlab Prep Package Change
John Rathbun:

This will apply to the A and B elevation.

remove 16” 3 bar chairs.
Change Bar ties from 6 “ to 8”
Remove all corner bars.
06/18/2106/18/21
Review06/17/21Steven GilbertRichmondRPASQ 048 Arlington SquareFC11/RubyCRA-Ruby-FC11-C (Metal Interior) ***Need studs for door jams
Steven Gilbert:

Need wood studs for door jams. And buck for garage doors.
(40) 2x4x108” - For Door Jams.
(2) 2x8x8’ PT - For Office Top of Block for Door
06/17/21
Complete06/17/21Steven GilbertRichmondRPASQ 048 Arlington SquareFC11/RubyCRA-Ruby-FC11-C (Metal Interior) ***16" Katz too short. Need 24"
Steven Gilbert:

Need 24” Katz not 16” Katz please create p.o. For 20 to be delivered to lot 48.

(20) Katz-24” 25 gauge) add
(20) Katz-16” (25 gauge) remove
06/17/2106/18/21
Review06/15/21Mike BoyceDavid WeeklyVSPAV 078 Payne Park7760/7759BDW-7759-7760-A (3 Story 2x4)2 x 6 x 10 SYP
Mike Boyce:

After framing partial 2 floor exterior walls realized short 2 x 6 x 10 SYP. Noticed on BT the schedule of events is only layed out for two story unit.

Package Change & Fill-In:
(148) 2 x 6 x 10 SYP.
(72) Sub floor adhesive 28 oz. old 0 new 72

No sub floor glue on PO.
Short 2 x 6 x 10 SYP for exterior structural framing.
06/15/21
Complete06/09/21Carlos GarciaRichmondRORVS 013-10 RiverstoneF927/SlateJRA-Slate-F927-JRemoving Materials
Carlos Garcia:

Extra materials. Adjust the following:

Hardware:
Delete all 1/4x3-3/4 Tapcons for 0 total
1/4x3-1/4 change from 26 to 100
2x2 washers change from 10 to 12
HGA10KT change from 2 to 1
HUC412 change from 2 to 0
add 10 pcs mts12 for valley blocking and remove meta12 from 2 to 0
this is all base takeoff

Lumber:
delete 34 pcs 1x2 from 178 to 144 total from base

Options:
2x2 square washers from 3car from 10 to 12
Delete all 4 meta12 from 3rd car to 0
delete 1 box of plywood clips from 3rd car to 0
06/09/2106/10/21
Complete06/08/21Joe BallerCC HomesCCMA6 140 Maple Ridge55-R1CC-DEVCO-55-R1 (1 Story) ***HUC210-2
Joe Baller:

Fill-In & Package Change:
Need 2 huc 210-2 added to hardware package.
06/08/2106/08/21
Complete06/08/21Joe BallerCC HomesCCMA6 009 Maple Ridge55-D2CC-DEVCO-55-D2 (2 Story) ***HUC210-2
Joe Baller:

Fill-In & Package Change:
Need 1 huc 210-2 for porch header. Design flaw CC homes.
06/08/2106/08/21
Complete06/07/21Brian DinkerMintoNDLTS 1681 Latitudes40-176-IIBNDLTS - 40-176-II-B ***No 45 Degree Block
Brian Dinker:

Best block fill in order/ package change. No 45 degree block.

Need (200) 45 degree block.
Old (0) new (112) for package change on this lot.
06/07/2106/08/21
Complete06/07/21Joe BallerCC HomesCCMA6 137 Maple Ridge55-F1CC-DEVCO-55-F1 (1 Story)Need H2.5T Clips
Joe Baller:

No h2.5 in hardware package. Need 25.
06/07/2106/07/21
Complete06/07/21Joe BallerCC HomesCCMA6 027 Maple Ridge55-G1CC-DEVCO-55-G1 (1 Story)Need H2.5T Clips
Joe Baller:

No h2.5 in hardware package. Need 25.
06/07/2106/07/21
Complete06/07/21Brian DinkerMintoNDLTS 1681 Latitudes40-176-IIBNDLTS - 40-176-II-A ***45 Degree Block
Adam Sowers:

45 Degree Block Total should be 80 on each 40-176 Elevation/Template/CostGroup
06/07/2106/08/21
Complete06/07/21Brian DinkerMintoNDLTS 1681 Latitudes40-176-IIBNDLTS - 40-176-A ***45 Degree Block
Adam Sowers:

45 Degree Block Total should be 80 on each 40-176 Elevation/Template/CostGroup
06/07/2106/08/21
Complete06/04/21Steven GilbertRichmondROFOR 040 Forest GateF937/PineBRA-F937-Pine-BMissing LVLs
Adam Sowers:

I had a request come in from Steven on this lot for (3) 9.25 x 10’ LVLs that he said are missing and sent me a detail photo where it is calling them out.
06/04/21OK
Complete05/27/21Angela A.Dream FindersDOFER 238 FernandaPoincianaADF-Poinciana (All)Option / Selection
Adam Sowers:
Angela found a PO on this job that has an option removing the wrong sized header (not in the base). The option was removing a 9'-4" header but there is no 9'-4" header in the base. It needs to be removing (1) 7'-6" instead.

The PO has already been accepted so I am waiting to hear back from the field if the materials have been delivered or not to determine how to adjust the PO to make the correction.

I will be updating the selection/option (DF-9080SGD) to replace thew 9'-4" with the 7'-6" and change the name to: DF-Poinciana-9080SGD.
05/27/21NA05/27/21
Complete05/27/21Joe BallerCC HomesCCMA6 137 Maple Ridge55-F1CC-DEVCO-55-F1 (1 Story)Hardware
Joe Baller:
Not enough borate lumber in package for garage door bucks.

1 16’ 2x6 borate (Materials sent but Change not made)
2 10’ 2x6 borate (Materials sent but Change not made)

2 Huc 210-2 (Change made +2)
1 box 1/4 x 3 1/4 tapcons (Change made +1)

Package Change made to all 55-F1 Templates


05/27/2105/27/21
N/A - Closed05/24/21Bill H.Walters ConstructionWCWAL 1702 CustomCustomCustomN/AFrame & Hardware
Bill H:
Materials that are short and needed to finish framing:

(30) 2X4X14 Spruce
(12) 2X6X12 Pt
(10) 2X8X10Pt

(100) 1/2”X7” Red Heads with Square Washers
(30) MTS12
(20) MTS16
05/24/21
N/A - Closed05/24/21Bill H.Walters ConstructionWCWAL 826 EdwardsCustomCustomN/AFrame & Hardware
Bill H:
Framing and Hardware needed to finish framing:

(12) 2X6X12 Pt
(10) 2X8X10Pt

(100) 1/2”X7” Red Heads with Square Washers
(30) MTS12
(20) MTS16
05/24/21
Review05/13/21Scott BierdRichmondRORVS 010-10 RiverstoneF924/AmmoliteCRA-Ammolite-F924-CHardware Changes
Scott Bierd:

Fill in package change:
25 2”x2”x1/2” square washer
25 1/2” x7”. Anchor bolts
27 MTS12. Straps
12-HTS20 straps
10-MSTAM36 flat strap
2 DTT2Z

Notes: Materials sent. I asked Scott if he knows if this is for the Base or Options releated and he said it's for the Base but there are 8 options on the job so Package Change needs review.
05/13/21
N/A - Closed05/13/21Bill H.Walters ConstructionWCWAL 1702 CustomCustomCustomN/A2x6 Post Bases
Bill H:

I have four 6X6 Pt posts on the front porch and no post bases. I need 4–ABU66’s
I need these sent over to CM ASAP. As I am swinging trusses now.

(materials sent)
05/13/21
Review05/12/21George PyleSurrey HomesSOSVL A11 Savannah LandingSanctuaryASO-Sanctuary-AFascia & Studs
Adam Sowers:
Materials requested / sent:
(25) 2x6x14
(30) 2x4x12
05/12/21
Review05/10/21Joe BallerCC HomesCCMA6 153 Maple Ridge55-G3CC-DEVCO-55-G3 (1 Story)No H2.5's in package
Adam Sowers:
Need 25 H2.5 for valley trusses added to package
05/10/21
Review05/10/21Kyle JollyMintoNDLTS 1666 Latitudes40-178-IIBNDLTS-40-178-II-BMissing (1) 17'-4" Header05/10/21
Review05/10/21Ryan CorriganRichmondRORVC 053 River ChaseDifferent RV Option
Jack Corrigan:
This model has an RV garage with openings on both ends. I need the 2x8 bucks for the other side of the garage.

(2) 2x8x16 pt
(2) 2x8x12 pt
05/10/21
Pending05/06/21Kyle JollyMintoNDLTS 1956 Latitudes40-176-IIANDLTS-40-176-II-ASlab Concrete Over
Adam Sowers:
This is a 176 A 2 model and this is the second time I’ve gone over on slab mud by this much.
Po called for 53 yards. We poured 60.

Gone over on slab mud twice on this model
Would like to correct.

Slab concrete
Old 53yards
New 59yards

05/06/21
Pending05/06/21John BurkettMattamy HomesMOMER 012 Meridian4 UnitMAAC/COFire Caulk for Inspection
Adam Sowers:
No fire caulk in Job/POs for firewalls. Needed for inspection. John Burkett says that he can't go vertical without it.

(25) tunes for caulk (Requested)
(25) 11oz tubes (Sent)
05/06/21OK
Pending05/06/21Joey RamosMattamy Homes????Anchors / J-Bolts
Adam Sowers:
Adam on these jobs the 10” anchors (j bolts) do not work we need only 8” anchors Also the 3 bar chairs need doubled order if you use 1 chair the weight of the rebar will crush them so we have to double them up thanks.

Joey said this applies to all Multi-Familys & Customs that he is on. He mentioned: Gramercy Farms(complete?), Tohoqua(complete?), and Meridian (only one left).
05/06/21OK for Meridian
Review05/05/21Joey RamosDavid WeeklyVOLAP 002 Laureate Park4 UnitN/AVOLAP-4-UnitWedge/Anchor Bolts Swap
Adam Sowers:
Guys need wedge anchors for the party walls. They sent. J bolts. But we are not wet setting them because of the difficulty when they are pouring the slab.

200 pcs of 1/2" red head wedge anchors.
05/05/21
Complete05/05/21Joe BallerCC HomesCCMA6 036 Maple Ridge55-H3CC-DEVCO-55-H3 (2 Story)Need more PT
Adam Sowers:
Not enough borate lumber in package

8 14’ 2x4 borate
1 16’ 2x6 borate
2 10’ 2x6 borate

No Old/New Total Counts included. We've had this same request for multiple models/elevations in this community for door bucks.
05/05/21OK - by conversation with John R.05/12/21
Review05/04/21John BurkettBella Vista Building GroupBVSOD 001 SODO House6 UnitA-B-C-C-B-AN/AMETA 20 Straps
Adam Sowers:
(149) Meta 20 straps on take off we need (200) more for new total of (349).
05/04/21….
Review05/03/21Joey RamosDavid WeeklyVOLAP 002 Laureate Park4 UnitN/AVOLAP-4-UnitFrame Materials Short
Adam Sowers:
(432) pcs of 2x6x10 southern yellow pine
(80) pcs of 2x6x14 southern yellow pine
(10)pcs. 2x6x10 PT

No Old/New Total Counts submitted however materials were sent. No other details.
05/03/21
Review04/27/21Brian DinkerMintoNDLTM 1910 LatitudesVilla 7AND-Villa-7-APrecast Changes
Adam Sowers:
Screen lanai and sliding glass door changes. Need to check options. Screen lanai porches have been extended and sliding glass doors have been changed. Check options.

Need 12’0 precast old (0) new (1)
Need 13’4” precast old (2) new (3)
Please remove 9’4” precast
04/27/21